About this file

Campus Wide HVAC and Electrical System Renewal - Construction Documents Addendum

This document is Addendum No. 2, dated July 14, 2025, to the construction documents prepared by NBP Engineers, Inc. for Gordon State College in Barnesville, Georgia, under Board of Regents Project No. J-432. The project encompasses a comprehensive campus-wide HVAC and electrical system renewal across three major buildings: the Instructional Complex, Russell Hall, and the Student Center. The scope includes demolition and replacement of heating, ventilation, and air conditioning systems, including new boilers, chillers, air handling units (AHUs), variable air volume (VAV) terminal units, cooling and heating coils, pumps, and associated control systems throughout all buildings. The construction documents consist of detailed floor plans, mechanical room details, schedules, and specifications for both demolition and new work across multiple floors and roof areas of each building. The project involves substantial equipment replacement, including three new condensing hot water boilers (Lochinvar Crest as base bid with deductive alternates), multiple chilled and hot water pumps with variable frequency drives, and comprehensive building automation controls with BACnet MSTP integration.

The construction documents establish detailed design specifications for all HVAC components, including fan schedules, coil specifications with precise CFM ratings and water temperatures, pump schedules with horsepower requirements, and control valve configurations. Key equipment specifications note that certain boiler alternatives and associated replacement work are priced as deductive alternate M2, while existing pumps sized at 40 percent redundancy in variable loop configurations and existing cooling tower components remain serviceable with modifications. The documents mandate complete demolition and replacement of existing building control systems throughout all buildings, with new direct digital control (DDC) panels, temperature sensors, pressure sensors, and damper actuators installed as part of the base scope. Construction documentation reflects existing conditions based on original design documents and field surveys, with contractors required to verify equipment sizes and quantities and notify the design professional of any discrepancies between plans and actual as-built conditions prior to commencing work.

View the file

Other files

File Type Posted
Sample Contract.pdf PDF
GSC J_432 Project Manual.pdf PDF
GSC J_432 DBB Award.docx DOCX document
J_432 GSC GC _ ADDENDUM 2.pdf PDF
Bid Tab.pdf PDF
J_432 GSC _ GC ADDENDUM 3.pdf PDF
J_432 GSC GC _ ADDENDUM 1.pdf PDF
J_432 GSC GC _ ADDENDUM 4.pdf PDF
GSC J_432 Drawings.pdf PDF
GSC J_432 Bid Package.pdf PDF
GSC J_432 DBB_Award.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NBP ENGINEERS, INC.

MACON, GEORGIA316 CORPORATE PARKWAY

NBP

ENGINEERS

CONSULTANTS

478-745-1691 www.nbpengineers.com

GORDON STATE COLLEGE

Barnesville, Georgia

INSTRUCTIONAL COMPLEX - ABBREVIATIONS, LEGENDS, & SCHEDULE - HVAC

INSTRUCTIONAL COMPLEX - FIRST FLOOR PLAN - DEMOLITION - HVAC

INSTRUCTIONAL COMPLEX - THIRD FLOOR PLAN - DEMOLITION - HVAC

INSTRUCTIONAL COMPLEX - SECOND FLOOR PLAN - DEMOLITION - HVAC

INSTRUCTIONAL COMPLEX - FOURTH FLOOR PLAN - DEMOLITION - HVAC

INSTRUCTIONAL COMPLEX - FIRST FLOOR PLAN - DEMOLITION/NEW WORK - ELECTRICAL

INSTRUCTIONAL COMPLEX - SECOND FLOOR PLAN - DEMOLITION/NEW WORK - ELECTRICAL

INSTRUCTIONAL COMPLEX - THIRD FLOOR PLAN - DEMOLITION/NEW WORK - ELECTRICAL

INSTRUCTIONAL COMPLEX - FOURTH FLOOR PLAN - DEMOLITION/NEW WORK - ELECTRICAL

INSTRUCTIONAL COMPLEX - ROOF PLAN - DEMOLITION/NEW WORK - ELECTRICAL

INSTRUCTIONAL COMPLEX BUILDING

RUSSELL HALL BUILDING

RUSSELL HALL - ABBREVIATIONS, LEGENDS, & SCHEDULES - HVAC

RUSSELL HALL - LOWER & UPPER LEVEL FLOOR PLANS - DEMOLITION - HVAC

RUSSELL HALL - LOWER & UPPER LEVEL FLOOR PLANS - NEW WORK - HVAC

RUSSELL HALL - LARGE SCALE - LOWER & UPPER LEVEL MECHANICAL ROOMS - DEMOLITION & NEW WORK - HVAC

RUSSELL HALL - LOWER & UPPER LEVEL FLOOR PLANS - DEMOLITION/NEW WORK - ELECTRICAL

RUSSELL HALL - LARGE SCALE - LOWER & UPPER LEVEL MECHANICAL ROOMS - DEMOLITION & NEW WORK - ELECTRICAL

STUDENT CENTER BUILDING

STUDENT CENTER - ABBREVIATIONS, LEGENDS, & SCHEDULES - HVAC

INSTRUCTIONAL COMPLEX - LEGEND, & POWER RISER - DEMOLITION/NEW WORK - ELECTRICAL STUDENT CENTER - LEGEND, & POWER RISER - DEMOLITION/NEW WORK - ELECTRICAL

ICM000

ICM100

ICM101

ICM102

ICM103

ICM104

ICE000

ICE100

ICE101

ICE102

ICE103

ICE104

ICE105

RHE000

RHE101

RHE301

RHM000

RHM101

RHM201

RHM301

SCM000

SCM301

SCE000

SCE301

STUDENT CENTER - LARGE SCALE - GROUND FLOOR MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC

BOR Project No.: J-432

ICM200

ICM201

ICM202

ICM203

ICM204

INSTRUCTIONAL COMPLEX - BASEMENT FLOOR PLAN - DEMOLITION - HVAC

INSTRUCTIONAL COMPLEX - BASEMENT FLOOR PLAN - NEW WORK - HVAC

INSTRUCTIONAL COMPLEX - FIRST FLOOR PLAN - NEW WORK - HVAC

INSTRUCTIONAL COMPLEX - SECOND FLOOR PLAN - NEW WORK - HVAC

INSTRUCTIONAL COMPLEX - THIRD FLOOR PLAN - NEW WORK - HVAC

INSTRUCTIONAL COMPLEX - FOURTH FLOOR PLAN - NEW WORK - HVAC

ICM105 INSTRUCTIONAL COMPLEX - ROOF PLAN - DEMOLITION - HVAC

RUSSELL HALL - LEGEND, & PARTIAL POWER RISER - DEMOLITION/NEW WORK - ELECTRICAL

STUDENT CENTER - PARTIAL SECOND FLOOR PLAN - DEMOLITION - HVAC

STUDENT CENTER - PARTIAL SECOND FLOOR PLAN - NEW WORK - HVAC

SCE101A

SCE101B

SCE102A

SCE102B

STUDENT CENTER - PARTIAL FIRST FLOOR PLAN - DEMOLITION/NEW WORK - LIGHTING

STUDENT CENTER - PARTIAL FIRST FLOOR PLAN - DEMOLITION/NEW WORK - LIGHTING

SCE103

SCE104

ICM001

SCE701 STUDENT CENTER - DETAILS - ELECTRICAL

STUDENT CENTER - LARGE SCALE - GROUND FLOOR MECHANICAL ROOM - DEMOLITION & NEW WORK - ELECTRICAL

INSTRUCTIONAL COMPLEX - BASEMENT FLOOR PLAN - DEMOLITION & NEW WORK - ELECTRICAL

ICM205 INSTRUCTIONAL COMPLEX - ROOF PLAN - NEW WORK - HVAC

STUDENT CENTER - PARTIAL FIRST FLOOR PLAN - DEMOLITION - HVAC

STUDENT CENTER - PARTIAL FIRST FLOOR PLAN - NEW WORK - HVAC

ICM401 INSTRUCTIONAL COMPLEX - AHU FLOW DIAGRAM - HVAC

ICM402

ICM403

RHM401

RHM402

RHM403

SCM402

SCM401

SCM400

SCM403

SCM404

SCM405

STUDENT CENTER - PARTIAL FIRST FLOOR PLAN - DEMOLITION/NEW WORK - POWER

STUDENT CENTER - PARTIAL SECOND FLOOR PLAN - DEMOLITION/NEW WORK - POWER

SCM101A

SCM101B STUDENT CENTER - PARTIAL FIRST FLOOR PLAN - DEMOLITION - HVAC

SCM102A

SCM102B STUDENT CENTER - PARTIAL SECOND FLOOR PLAN - DEMOLITION - HVAC

SCM201A

SCM201B STUDENT CENTER - PARTIAL FIRST FLOOR PLAN - NEW WORK - HVAC

STUDENT CENTER - PARTIAL SECOND FLOOR PLAN - NEW WORK - HVACSCM202A

SCM202B

INDEX OF DRAWINGS

SCA102A STUDENT CENTER - PARTIAL SECOND FLOOR PLAN - DEMOLITION/NEW WORK - CEILING

STUDENT CENTER - PARTIAL SECOND FLOOR PLAN - DEMOLITION/NEW WORK - LIGHTING

STUDENT CENTER - PARTIAL SECOND FLOOR PLAN - DEMOLITION/NEW WORK - LIGHTING

SCM001 STUDENT CENTER - SCHEDULES & DETAILS - HVAC

INSTRUCTIONAL COMPLEX - SCHEDULES & DETAILS - HVAC

ICM501 INSTRUCTIONAL COMPLEX - DETAILS - HVAC

ICP000

ICP100

INSTRUCTIONAL COMPLEX - LEGEND, SCHEDULE, NOTES, & DETAILS - PLUMBING

CONSTRUCTION DOCUMENTS - 06.12.2025

ICP200

INSTRUCTIONAL COMPLEX - PARTIAL BASEMENT FLOOR PLAN - DEMOLITION - PLUMBING

INSTRUCTIONAL COMPLEX - PARTIAL BASEMENT FLOOR PLAN - NEW WORK - PLUMBING

CAMPUS WIDE HVAC AND ELECTRICAL SYSTEM RENEWAL

1 ADDENDUM NO. 2 07.14.25

ICM502 INSTRUCTIONAL COMPLEX - DETAILS - HVAC

RHM501 RUSSELL HALL - DETAILS - HVAC

SCM501 STUDENT CENTER - DETAILS - HVAC

STUDENT CENTER - EXISTING AHU 1 & 2 FLOW DIAGRAM - HVAC

STUDENT CENTER - EXISTING AHU 1, 3, & 4 FLOW DIAGRAM - HVAC

STUDENT CENTER - NEW AHU-2 FLOW DIAGRAM - HVAC

STUDENT CENTER - EXISTING HOT WATER BOILER PLANT FLOW DIAGRAM - HVAC

STUDENT CENTER - EXISTING CHILLER PLANT FLOW DIAGRAM - HVAC

STUDENT CENTER - EXISTING CHILLED WATER FLOW DIAGRAM - HVAC

RUSSELL HALL - EXISTING CHILLER PLANT FLOW DIAGRAM - HVAC

RUSSELL HALL - EXISTING AHU FLOW DIAGRAM - HVAC

RUSSELL HALL - EXISTING HOT WATER BOILER PLANT FLOW DIAGRAM - HVAC

INSTRUCTIONAL COMPLEX - NEW HOT WATER BOILER PLANT FLOW DIAGRAM - HVAC

INSTRUCTIONAL COMPLEX - EXISTING CHILLER PLANT FLOW DIAGRAM - HVAC

P:\24075\24075_IC_m001.dgn

DATE PLOTTED

DGN FILE

15-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24075\24075_IC_m001.dgn

AS SHOWN

RRH

LTF

RRH

24075

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

06.12.2025

G O

R D

O N S

T A

T E C

O L L E

G E

B a rn e s v il le

G e o rg ia

B O

R P ro je c t

N o

J -4

C O

N S T

R U

C T

IO

N

D O

C U

M E

N T S

C A

M P

U S W

ID

E H

V A

C A

N D E

L E

C T

R

IC

A L S

Y S

T E

M R

E N

E W

A L

MARK

FILTER SCHEDULE

CFM

MAX

MERV REMARKS

TYPE CFM

S.P.

MARK

MAX.

RPM

MOTOR

HP REMARKS

FAN SCHEDULE

MIN.

FAN DIA.

(IN)

(EA)

NO.

OF FANS

TYPE

NOTES:

ENTERING AIR LEAVING AIR

REMARKS

MARK

NOTES:

CFM MAX. ROWS

NOTES:

MAX. FPI

DB WB DB WB

( F) ( F) ( F) ( F)

COOLING COIL SCHEDULE

GPM

(IN)

PD

INITIAL

(IN)

PD

FINAL

MAX. HEIGHT

FILTERS

NO.

MAX. WIDTH

FILTERS

NO.

LAYOUT BASIS:

REMARKSMARK MAX. ROWS

NOTES:

MAX. FPI

HEATING COIL SCHEDULE

GPM

CFM

HC-1

15667.7 52.8

CC-1

47000 560 2095.9 62.25

47000 560 350

SFW-1 ARRAY 94,000

FRAME

FF-1 FH-2 13

ICM001

PROVIDE FILTER HOUSING SIZED FOR 24" x 24". PROVIDE QUANTITY OF FILTERS TO FILL HOUSING.

VAV UNIT SCHEDULE

GROSS

OUTPUT-MBH

INPUT-MBH

OPERATING

PRESSURE-PSIG

FUEL

BURNER DATARATINGS HOT WATER DATA

EWT LWT

MINIMUM MAX.

DESIGN

MARK

PRESSURE - PSIG

(RELIEF VALVE SETTING)

F F

WATER FLOW

GPM REMARKS

MAX.

MARK SERVICE

TYPE

PUMP

GPM

EFF.%

REMARKS

MIN.

HP

PUMP SCHEDULE

B&G

P-1 ES

P-2 ES

HOT WATER

HOT WATER

180 140

180 140

P-3 ES

P-4 ES

305P-5 80ES

P-6 ES 305 80

CHILLED WATER

CHILLED WATER

CONDENSER WATER

CONDENSER WATER

MOTOR

12 22 3166 12

94,000 5 10

HEAD FT.

DUTY POINT

6 8

MIN. MIN.

2 12 0.17

N.GAS50241999

81.7

81.7

77.7

75.1

75.1

77.7

E-1510-3AD

E-1510-3AD

E-1510-4GC

E-1510-4GC

E-1510-2.5BB

E-1510-2.5BB

MODEL

MANUFACTURER

MARK

TITUS

LAYOUT BASIS:

SIZE

DUCT

INLET

MIN. CFM

MAX MIN

E.S.P (IN WG)

INLET DOWNSTREAM

HOT WATER HEATING COIL

CFM GPMMBH

WPd

ROWS FPI

EWT LWT

F DB F DB

REMARKS

EAT LAT

F DB F DB

APD

FBN2001

24 50 N.GAS FBN2001

BLR-3

BLR-2

BLR-1

1923 1999 24 50 N.GAS FBN2001 180 140

CONDENSING HOT WATER BOILER SCHEDULE

MANUFACTURER

LOCHINVAR

LAYOUT BASIS:

NOTES:

4 LOCHNIVAR CREST SHALL BE BASE BID BOILER. OTHERS SHALL BE DEDUCTIVE ALTERNATE.

BACNET MSTP.

CONDENSATE NEUTRALIZATION KIT.

RESET WITH EWT=90 F / LWT 120 F OFF-PEAK CONDITIONS.

2 3 4 51

2 3 4 51

2 3 4 51

CC-2

COOLING CAPACITY (MBH)

SENSIBLE TOTAL

1379.39 2036.98 81.7 53

(FT.)

WPD

MAX.

(IN. WG)

APD

MAX.

16.7 0.82

(IN.)

COIL HEIGHT

MAX.

(IN.)

COIL WIDTH

MAX.

15667.7 52.847000 560 3506 8 1379.39 2036.98 81.7 53 16.7 0.82 99

2 31

2 31

COIL CAPACITIES DESIGNED FOR 42 F ENTERING WATER AND 54 F LEAVING WATER.

COIL DIMENSIONS REFLECT HALF OF THE TOTAL COOLING COIL ASSEMBLY.

EACH CC-X MARK CONSISTS OF A MINIMUM OF 3 STACKED COILS, FOR A SYSTEM TOTAL MINIMUM OF 6 COILS. REFER TO PLANS FOR HEADER LOCATIONS.

COIL DIMENSIONS REFLECT HALF OF THE TOTAL HEATING COIL ASSEMBLY.

EACH HC-X MARK CONSISTS OF A MINIMUM OF 3 STACKED COILS, FOR A SYSTEM TOTAL MINIMUM OF 6 COILS. REFER TO PLANS FOR HEADER LOCATIONS.

COIL CAPACITIES DESIGNED FOR 180 F ENTERING WATER AND 112.6 F LEAVING WATER.

HC-2

2 31

2 31

VELOCITY

FACE

MAX.

VELOCITY

FACE

MAX.

HEATING CAPACITY (MBH)

MIN.

SENSIBLE

ENTERING AIR LEAVING AIR

DB DB

( F) ( F)

13.9 55

(FT.)

WPD

MAX.

(IN. WG)

APD

MAX.

(IN.)

COIL HEIGHT

MAX.

(IN.)

COIL WIDTH

MAX.

5.28 101.25

14447000 560 2095.9 62.252 12 0.1713.9 55 5.28 101.25

(IN W.G.)

PROVIDE BACNET INTERFACE.

PROVIDE ONE VFD FOR EACH ROW OF 4 FANS, 3 VFD'S TOTAL.

TOTAL FAN WALL DIMENSIONS TO BE MAXIMUM 160" X 120".

4" PLEATED MERV-13.

NOTES:

0.28 0.9 CAMFIL 1 2

2 31

COIL

UNION(TYP)

•" GATE VALVE

W/HOSE ADAPTER

TEST PLUG

3-WAY CONTROL VALVE

GAUGE COCK

PIPING IS A HIGH POINT)

(PROVIDE IF RUNOUT

MANUAL AIR VENT

CIRCUIT SETTER

PIPE SIZE > 2"

BUTTERFLY VALVE FOR

BALL VALVE; PROVIDE

HWR

HWS

TEST PLUGS

UNIONS (3)

SUPPLY

RETURN

CONTROL VALVE

COIL

(PROVIDE IF RUNOUT PIPING

IS A HIGH POINT)

MANUAL AIR VENT GAUGE COCK

6" MAXIMUM

TEST PLUG IN TEE

(REMOVE PLUG FOR

DRAIN).

CIRCUIT SETTER

NOT TO SCALE

TYPICAL PIPING AT TU HEATING COILS - 2 WAY

NOT TO SCALE

TYPICAL PIPING AT TU HEATING COILS - 3 WAY

DETAILS - HVAC

SCHEDULES &

INSTRUCTIONAL COMPLEX -

MANUFACTURERS LAYOUT BASIS

2 EXISTING PUMP TO REMAIN.

SIZED AT 40% REDUNDANCY IN VARIABLE LOOP CONFIGURATION.

VAV-115

VAV-114

VAV-113

VAV-112

VAV-111

VAV-110

VAV-109

VAV-108

VAV-107

VAV-106

VAV-105

VAV-104

VAV-103

VAV-102

VAV-101

VAV-100

VAV-99

VAV-98

VAV-97

VAV-96

VAV-95

VAV-94

VAV-93

VAV-92

VAV-91

VAV-90

VAV-89

VAV-88

VAV-87

VAV-86

VAV-85

VAV-84

VAV-83

VAV-82

VAV-81

VAV-80

VAV-79

VAV-78

VAV-76

VAV-72

VAV-66

VAV-65

VAV-64

VAV-63

VAV-62

VAV-61

VAV-60

VAV-59

VAV-58

VAV-57

VAV-56

VAV-55

VAV-54

VAV-53

VAV-52

VAV-51

VAV-50

VAV-49

VAV-48

VAV-47

VAV-46

VAV-36

VAV-35

VAV-34

VAV-33

VAV-32

VAV-31

VAV-30

VAV-29

VAV-28

VAV-27

VAV-26

VAV-25

VAV-24

VAV-23

VAV-22

VAV-21

VAV-20

VAV-19

VAV-18

VAV-17

VAV-16

VAV-09

VAV-08

VAV-07

VAV-06

VAV-05

VAV-04

VAV-03

VAV-02

VAV-01

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

60.4

60.4

60.4

60.4

24.4

31.8

24.6

55.8

97.4

14.6

30.6

9.2

8.5

10.4

8.4

25.6

55.8

25.8

24.4

31.9

24.7

23.3

23.3

60.4

60.4

60.4

60.4

10.2

30.3

30.3

30.3

30.7

13.9

13.9

8.7

13.8

24.3

24.2

25.4

24.2

31.3

62.8

62.8

62.8

62.8

10.7

30.3

30.3

30.3

30.7

25.4

25.4

8.7

13.9

6.5

24.3

25.4

25.4

31.3

81.1

81.1

81.1

81.1

10.7

29.6

30.8

30.8

31.1

8.4

13.2

8.2

24.3

101.3

101.3

101.3

30.2

30.2

31.3

31.3

31.3

31.6

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

1.77

1.77

1.77

1.77

0.12

0.13

0.12

0.13

0.22

0.13

0.58

0.04

0.13

0.06

0.06

0.06

0.06

0.12

0.22

0.12

0.12

0.13

0.12

0.12

0.12

1.77

1.77

1.77

1.77

0.14

0.17

0.17

0.17

0.17

0.2

0.2

0.14

0.2

0.13

0.13

0.13

0.13

0.17

0.17

0.17

0.17

1.77

1.77

1.77

1.77

0.15

0.17

0.17

0.17

0.17

0.13

0.13

0.14

0.2

0.14

0.13

0.13

0.13

0.17

0.17

0.17

0.17

1.02

1.02

1.02

1.02

0.15

0.17

0.17

0.17

0.17

0.13

0.13

0.14

0.2

0.14

0.13

0.58

0.58

0.58

0.17

0.17

0.17

0.17

0.17

0.17

155.2

155.2

155.2

155.2

129.8

114.6

129.4

118.3

122.6

118.3

146.6

119.9

142.1

145.1

137.4

145.4

127.3

122.6

129.8

114.3

129.1

155.2

155.2

155.2

155.2

136.4

136.4

136.4

135.8

138.1

138.1

152.7

138.7

145.7

145.7

145.7

135.3

135.3

135.3

134.9

155.2

155.2

155.2

155.2

136.4

136.4

136.4

135.8

152.7

138.3

159.5

145.7

135.3

135.3

135.3

134.9

135.7

135.7

135.7

135.2

143.1

143.1

152.7

140.7

156.9

148.4

146.6

146.6

146.6

136.6

136.6

134.3

1.77

1.77

1.77

1.77

0.12

0.13

0.12

0.13

0.22

0.13

0.58

0.04

0.13

0.06

0.06

0.06

0.06

0.12

0.22

0.12

0.12

0.13

0.12

0.12

0.12

1.77

1.77

1.77

1.77

0.07

0.13

0.13

0.13

0.14

0.13

0.13

0.03

0.12

0.13

0.13

0.18

0.13

0.15

0.15

0.15

0.17

0.41

0.41

0.41

0.41

0.11

0.13

0.13

0.13

0.14

0.18

0.18

0.03

0.13

0.01

0.13

0.18

0.18

0.15

0.15

0.15

0.17

0.32

0.32

0.32

0.32

0.11

0.14

0.14

0.14

0.16

0.22

0.22

0.03

0.09

0.02

0.11

0.44

0.44

0.44

0.12

0.12

0.13

0.13

0.13

0.18

92.9

92.9

92.9

92.9

82.9

77.1

82.2

81.9

84.8

81.9

88.9

78.6

80.2

93.3

99.1

84.8

99.7

79.2

84.8

78.8

82.9

76.8

81.9

86.2

86.2

92.9

92.9

92.9

92.9

83.2

77.5

77.5

77.5

76.8

74.7

74.7

91.4

75.3

78.6

78.7

76.3

78.7

76.3

76.3

76.3

75.7

92.9

92.9

92.9

92.9

80.1

77.5

77.5

77.5

76.8

76.3

76.3

91.4

74.8

78.6

76.3

76.3

76.3

76.3

76.3

75.7

93.5

93.5

93.5

93.5

80.1

76.7

76.7

76.7

76.1

75.1

75.1

91.4

77.5

91.4

77.2

88.9

88.9

88.9

77.7

77.7

74.5

74.5

74.5

75.1 2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

3 - WAY

3 - WAY

3 - WAY

3 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

3 - WAY

3 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

3 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

3 - WAY

3 - WAY

2 - Way

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

3 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

3 - WAY

3 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

3 - WAY

3 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

2 - WAY

3 - WAY

3 - WAY

2 - WAY

PROVIDE VFD FOR NEW PUMP.

ESHF

1 ADDENDUM NO. 2 07.14.25

ƒ ƒ

6.0

DIA. (IN.)

RUNOUT

(FT.)

N.O.

625| 14/12

625|

14/12

D

D P R

V

625|

D

EXPMU

CF

CF

M U

C R

C S

M U

L-3 L-2

96/96

L-1

96/96

HS

HR

H S

CHS

CHR

HR

HS

V V

20/20

20/20

14/1814/18

6" CHR

5" HWR

14/18

14/12

1"CHS UP

1"CHR UP

8"CS

8"CR

CF

CF

ƒ"

1"

6" CHR

1"

2"

6" CHR

1 •"

"C

S

3•"

1"

1"

625|

6" CHR

6" CHR

6" CHR

6" CHS

4" HWR

4" HWS2•" HWS

2•" HWR

5" HWS

5" HWR 6" HWR

6" HWS

4" HWR

4" HWS

1 ‚"

24"x54"

1"

1"

UH-1

UH-2

T-1

C-1

WH

EF-18

EXPANSION TANK

CHEMICAL TREATMENT TANK

CHEMICAL TREATMENT TANKS

NN

FCU-5

FF

SWBD

EMB

ATS

T

LAP

LB

MCC

FIRE PUMP CONTROLLER

PUMP

FIRE

T

XB

FH-1

PH-1

AM-2

AM-1

P:\24075\24075_IC_m100.dgn

DATE PLOTTED

DGN FILE

15-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24075\24075_IC_m100.dgn

AS SHOWN

RRH

LTF

RRH

24075

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

06.12.2025

G O

R D

O N S

T A

T E C

O L L E

G E

B a rn e s v il le

G e o rg ia

B O

R P ro je c t

N o

J -4

C O

N S T

R U

C T

C U

M E

N T S

C A

M P

U S W

ID

E H

V A

C A

N D E

L E

C T

R

IC

A L S

Y S

T E

M R

E N

E W

A L

2 3 4 5 6 7

BASEMENT FLOOR PLAN - DEMOLITION - HVAC

INSTRUCTIONAL COMPLEX -

N

ICM100

GENERAL NOTES:(THIS SHEET ONLY)

A

TO NEW EQUIPMENT IN NEW WORK.

WHICH IS REQUIRED TO REPLACE FOR PROPER CONNECTIONS

ALL EXISTING DUCTWORK TO REMAIN EXCEPT FOR THAT

5" HWS

DP

R

V

SCALE:

= 1'-0

4 0 2 4 8

CD-1 CD-2

SF-1

SF-2

HC-1 CC-1

FF-1

FH-2

VFD

LINE LEGEND

EXISTING TO REMAIN

DEMOLITION

DEMOLITION - HVAC

BASEMENT FLOOR PLAN -

INSTRUCTIONAL COMPLEX -

F U

E L

T R

A

IN

4" HWS

B-1

P-1

P-2

P-5

P-6

REFRIGERANT MONITOR

DDC CONTROL PANEL

T T

TS

B

REMOVED AND REPLACED IN NEW WORK.

ALL BUILDING CONTROLS AND CONTROL ACCESSORIES TO BE

C

EXISTING SOUND ATTENUATORS SA-1 TO BE REMOVED.

SA-1

NOTES:(THIS SHEET ONLY)

1 EXISTING ACTUATOR TO BE REMOVED AND REPLACED IN NEW WORK.

EXISTING VFD'S TO BE REMOVED. NEW VFD'S TO BE RELOCATED IN NEW WORK.

REPLACED IN NEW WORK.

EXISTING OUTSIDE AIR TEMPERATURE SENSOR TO BE REMOVED AND

REPLACED IN NEW WORK.

EXISTING BOILER SHUTDOWN SWITCH TO BE REMOVED AND

IN NEW WORK.

EXISTING HIGH PRESSURE LIMIT SENSOR TO BE REMOVED AND REPLACED

IN NEW WORK.

EXISTING REFRIGERANT MONITOR TO BE REMOVED AND REPLACED

EXISTING DDC CONTROL TO BE REMOVED AND REPLACED IN NEW WORK.

IN NEW WORK.

EXISTING EMERGENCY SHUTDOWN SWITCH TO BE REMOVED AND REPLACED

IN NEW WORK.

EXISTING TEMPERATURE SENSOR TO BE REMOVED AND REPLACED

1 1

S

S

S

ES

ES

ES

VFD

PHPL

T

S

T

2 2

1 1 1 1

1 1

1 1 1

REPLACED IN NEW WORK.

EXISTING EMERGENCY ACTIVATION SWITCH FOR EF-18 TO BE REMOVED AND

NEW EQUIPMENT IN NEW WORK.

EXISTING APPARATUS WALL TO BE REMOVED AS REQUIRED TO FIT

AND FANS TO BE REMOVED AND REPLACED IN NEW WORK.

WATER COIL, HOT WATER COIL, ASSOCIATED CONTROL VALVES,

EXISTING FH-2 AND FF-1 FILTER RACK/FILTERS, CHILLED

NEW COMPONENTS.

EXISTING BUILT UP APPARATUS CASING TO REMAIN FOR USE WITH

12 12

.SHALL BE PRICED AS PART OF DEDUCTIVE ALTERNATE M2

ALL WORK ASSOCIATED WITH REPLACING THE BOILER AND PUMPS

NOTE:

AS PART OF THIS WORK.

FLOW DIAGRAMS FOR CHANGES TO EXISTING SYSTEMS

COMPONENTS/SENSORS REPLACE WITH NEW. SEE NEW

INCLUDING HEAD END AND ALL ITS DOWNSTREAM

DEMOLISH THE EXISTING BUILDING CONTROLS ENTIRELY,

CONTROL SCOPE

NOTIFY DESIGN PROFESSIONAL AND OWNER OF ANY DISCREPANCIES PRIOR TO PERFORMING ANY WORK.

IS ANTICIPATED THERE ARE DISCREPANCIES VERSUS THE AS-BUILT CONDITIONS. CONTRACT TO IDENTIFY AND

SURVEYS. THESE DOCUMENTS REFLECT EXISTING CONDITIONS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, IT

THESE DRAWINGS HAVE BEEN PRODUCED UTILIZING A COMBINATION OF ORIGINAL DESIGN DOCUMENTS AND FIELD

OF DEDUCTIVE ALTERNATE M2 IN NEW WORK.

MECHANICAL ROOM TO REMAIN AS PART

ASSOCIATED BOILER FLUES, PIPING, AND ACCESSORIES IN

EXISTING BOILER, HOT WATER PUMPS P-5 AND P-6, AND ALL

1 ADDENDUM NO. 2 07.14.25

CONTRACTOR TO VERIFY SIZE AND QUANTITY.

REPLACED IN NEW WORK. EXISTING DAMPERS AND ACTUATORS TOTAL FIVE (5).

EXISTING SMOKE CONTROL DAMPERS AND ACTUATORS TO BE REMOVED AND

P:\24075\24075_IC_m102.dgn

DGN FILE

15-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24075\24075_IC_m102.dgn

AS SHOWN

RRH

LTF

RRH

24075

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

06.12.2025

G O

R D

O N S

T A

T E C

O L L E

G E

B a rn e s v il le

G e o rg ia

B O

R P ro je c t

N o

J -4

C O

N S T

R U

C T

C U

M E

N T S

C A

M P

U S W

ID

E H

V A

C A

N D E

L E

C T

R

IC

A L S

Y S

T E

M R

E N

E W

A L

AA

B

A

1 1.1 2 3

C

D

E

F

G

B.1

4 5 6 7 87.9

H

ELEV ELEV

MEN

WOMEN

STAIR STAIR

SCALE:

= 1'-0

8 0 4 8 16

VAV-76

VAV-64 VAV-92

VAV-91 VAV-82

VAV-61

VAV-77

VAV-72

VAV-79

VAV-86

VAV-87 VAV-88

VAV-65

VAV-62

VAV-63

VAV-66

VAV-81

VAV-85

VAV-7

VAV-84

VAV-83

VAV-80

VAV-90

VAV-89

SECOND FLOOR PLAN - DEMOLITION - HVAC

INSTRUCTIONAL COMPLEX -

VAV-78

T 4

K V

A

C2A L2A

H2A

X2NL ABOVE

X2 &

L2B H2B

C2B

DEMOLITION - HVAC

SECOND FLOOR PLAN -

INSTRUCTIONAL COMPLEX -

N

ICM102

2•"

4"-DN

3"-UP

HWS

HWR

H W

R H

W S

H W

R H

W S

1 ‚"

1"

1 •"

1 ‚"

1"

2"

1 •" ƒ"

H W

R H

W S

H W

R H

W S

1 ‚" 1"

HWS

HWR

FCU-1

FCU-2

1 •"

LINE LEGEND

EXISTING TO REMAIN

DEMOLITION

GENERAL NOTES:(THIS SHEET ONLY)

A ƒ"

1 ‚"

1"

2" 2" 2"

HWS

HWR

HWR

HWS

1 •"

1 ‚"

1"

1"

T

T

VAV-63

T

T

VAV-61

T VAV-72

T T T T

T T

T

VAV-79

VAV-88VAV-87 VAV-89

VAV-90

VAV-91

T

T

T

VAV-86

T

T

VAV-76

T

T

VAV-84

VAV-82

T

VAV-81

EF-3

T

T

VAV-7

T

(TYPICAL)

PIPE SLEEVE

TO NEW EQUIPMENT IN NEW WORK.

THAT WHICH IS REQUIRED TO REPLACE FOR PROPER CONNECTIONS

ALL EXISTING DUCTWORK AND PIPING TO REMAIN EXCEPT FOR

NOTES:(THIS SHEET ONLY)

REPLACED IN NEW WORK.

THERMOSTAT, AND 2 FEET OF ASSOCIATED HWR/HWS PIPING. ALL TO BE

REMOVE EXISTING VAV UNIT, ASSOCIATED CONTROL VALVE, ASSOCIATED

1 1

AS PART OF THIS WORK.

FLOW DIAGRAMS FOR CHANGES TO EXISTING SYSTEMS

COMPONENTS/SENSORS REPLACE WITH NEW. SEE NEW

INCLUDING HEAD END AND ALL ITS DOWNSTREAM

DEMOLISH THE EXISTING BUILDING CONTROLS ENTIRELY,

CONTROL SCOPE

NOTIFY DESIGN PROFESSIONAL AND OWNER OF ANY DISCREPANCIES PRIOR TO PERFORMING ANY WORK.

IS ANTICIPATED THERE ARE DISCREPANCIES VERSUS THE AS-BUILT CONDITIONS. CONTRACT TO IDENTIFY AND

SURVEYS. THESE DOCUMENTS REFLECT EXISTING CONDITIONS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, IT

THESE DRAWINGS HAVE BEEN PRODUCED UTILIZING A COMBINATION OF ORIGINAL DESIGN DOCUMENTS AND FIELD

2 EXISTING FAN COIL UNIT TO REMAIN.

1 ADDENDUM NO. 2 07.14.25

P:\24075\24075_IC_m104.dgn

DGN FILE

15-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24075\24075_IC_m104.dgn

AS SHOWN

RRH

LTF

RRH

24075

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

06.12.2025

G O

R D

O N S

T A

T E C

O L L E

G E

B a rn e s v il le

G e o rg ia

B O

R P ro je c t

N o

J -4

C O

N S T

R U

C T

C U

M E

N T S

C A

M P

U S W

ID

E H

V A

C A

N D E

L E

C T

R

IC

A L S

Y S

T E

M R

E N

E W

A L

AA

B

A

1 1.1 2 3

C

D

E

F

G

B.1

4 5 6 7 87.9

H

ELEV ELEV

MEN

WOMEN

STAIR STAIR

SCALE:

= 1'-0

8 0 4 8 16

VAV-16

VAV-22

VAV-17

VAV-19

VAV-26

VAV-27 VAV-28

VAV-21

VAV-25

VAV-9

VAV-24

VAV-23

VAV-20

VAV-30

VAV-29

VAV-18

T 4

K V

A

L4A C4A

H4A

X4NL ABOVE

X4 &

C4B

H4B

L4B

VAV-4

VAV-3

VAV-6

VAV-5

VAV-2

VAV-1

N

ICM104

H W

R H

W S

1 •"

1 ‚"

1 •"

1 •" 2" 2"

H W

S H

W R

1 •"

1 ‚"

HWS

HWR

HWS

HWR

2"

1 •"

H W

R H

W S

1 •"

H W

R H

W S

1 ‚"

1 ‚"

1"

2•"

FOURTH FLOOR PLAN - DEMOLITION - HVAC

INSTRUCTIONAL COMPLEX -

DEMOLITION - HVAC

FOURTH FLOOR PLAN -

INSTRUCTIONAL COMPLEX -

LINE LEGEND

EXISTING TO REMAIN

DEMOLITION

GENERAL NOTES:(THIS SHEET ONLY)

A

FCU-3 HWR

HWS

1 ‚"

1 ‚"

1"

FCU-4

HWR

HWS

ƒ"

1"

1" 1 ‚" ƒ"

1"

H W

S H

W R

H W

R H

W S

1"

1 ‚"

H W

S H

W R

HWS

HWR

CHASE TO BELOW

2•" DROPS IN

(TYPICAL)

PIPE SLEEVE

(TYPICAL)

PIPE SLEEVE

T

T

T T

T

T

TT

T

T T T T

T

T

T

T

T

T

VAV-24

VAV-9VAV-16

VAV-3

VAV-1

VAV-27 VAV-28 VAV-29

VAV-30

VAV-19

T VAV-22

T

T

TO NEW EQUIPMENT IN NEW WORK.

THAT WHICH IS REQUIRED TO REPLACE FOR PROPER CONNECTIONS

ALL EXISTING DUCTWORK AND PIPING TO REMAIN EXCEPT FOR

NOTES:(THIS SHEET ONLY)

1 EXISTING FUME HOOD FACE VELOCITY MONITOR TO BE REMOVED AND REPLACED IN NEW WORK.

2 EXISTING DUCT STATIC PRESSURE SENSOR TO BE REMOVED AND REPLACED IN NEW WORK.

REPLACED IN NEW WORK.

THERMOSTAT, AND 2 FEET OF ASSOCIATED HWR/HWS PIPING. ALL TO BE

REMOVE EXISTING VAV UNIT, ASSOCIATED CONTROL VALVE, ASSOCIATED

AS PART OF THIS WORK.

FLOW DIAGRAMS FOR CHANGES TO EXISTING SYSTEMS

COMPONENTS/SENSORS REPLACE WITH NEW. SEE NEW

INCLUDING HEAD END AND ALL ITS DOWNSTREAM

DEMOLISH THE EXISTING BUILDING CONTROLS ENTIRELY,

CONTROL SCOPE

NOTIFY DESIGN PROFESSIONAL AND OWNER OF ANY DISCREPANCIES PRIOR TO PERFORMING ANY WORK.

IS ANTICIPATED THERE ARE DISCREPANCIES VERSUS THE AS-BUILT CONDITIONS. CONTRACT TO IDENTIFY AND

SURVEYS. THESE DOCUMENTS REFLECT EXISTING CONDITIONS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, IT

THESE DRAWINGS HAVE BEEN PRODUCED UTILIZING A COMBINATION OF ORIGINAL DESIGN DOCUMENTS AND FIELD

4 EXISTING FAN COIL UNIT TO REMAIN.

114 4

P:\24075\24075_IC_m105.dgn

DGN FILE

15-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24075\24075_IC_m105.dgn

AS SHOWN

RRH

LTF

RRH

24075

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

06.12.2025

G O

R D

O N S

T A

T E C

O L L E

G E

B a rn e s v il le

G e o rg ia

B O

R P ro je c t

N o

J -4

C O

N S T

R U

C T

C U

M E

N T S

C A

M P

U S W

ID

E H

V A

C A

N D E

L E

C T

R

IC

A L S

Y S

T E

M R

E N

E W

A L

SCALE:

= 1'-0

8 0 4 8 16

ROOF PLAN - DEMOLITION - HVAC

INSTRUCTIONAL COMPLEX -

DEMOLITION - HVAC

ROOF PLAN -

INSTRUCTIONAL COMPLEX -

EF-4

EF-3

EF-14

EF-6

EF-9

EF-13

EF-2

EF-5

RV-1

EF-17

EF-7

EF-15

EF-16

EF-8

EF-12

EF-1 1

EF-10

EF-1

PH-1

N

ICM105

GENERAL NOTES:(THIS SHEET ONLY)

A

LINE LEGEND

EXISTING TO REMAIN

DEMOLITION

IS ANTICIPATED.

REPLACEMENT OF ALL CONTROLS IN THE BUILDING. NO NEW EQUIPMENT

THE ONLY MECHANICAL ITEMS ON THIS SHEET IS RELATED TO THE

NOTES:(THIS SHEET ONLY)

1 EXISTING RELIEF AIR ACTUATOR TO BE REMOVED AND REPLACED IN NEW WORK.

AS PART OF THIS WORK.

FLOW DIAGRAMS FOR CHANGES TO EXISTING SYSTEMS

COMPONENTS/SENSORS REPLACE WITH NEW. SEE NEW

INCLUDING HEAD END AND ALL ITS DOWNSTREAM

DEMOLISH THE EXISTING BUILDING CONTROLS ENTIRELY,

CONTROL SCOPE

NOTIFY DESIGN PROFESSIONAL AND OWNER OF ANY DISCREPANCIES PRIOR TO PERFORMING ANY WORK.

IS ANTICIPATED THERE ARE DISCREPANCIES VERSUS THE AS-BUILT CONDITIONS. CONTRACT TO IDENTIFY AND

SURVEYS. THESE DOCUMENTS REFLECT EXISTING CONDITIONS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, IT

THESE DRAWINGS HAVE BEEN PRODUCED UTILIZING A COMBINATION OF ORIGINAL DESIGN DOCUMENTS AND FIELD

2 1

1 ADDENDUM NO. 2 07.14.25

EXISTING PENETRATION TO BE UTILIZED IN NEW WORK. EXISTING 8" FLUE AND CAP TO REMAIN.

REMOVE EXISTING 16" DIAMETER FLUE FROM RISER. REMOVE EXISTING 16" ROOF CAP.

625| 14/12

625|

14/12

D

D P R

V

625|

D

EXPMU

CF

CF

M U

C R

C S

M U

L-3 L-2

96/96

L-1

96/96

HS

HR

H S

CHS

CHR

HR

HS

V V

20/20

20/20

14/1814/18

6" CHR

5" HWR

14/18

14/12

1"CHS UP

1"CHR UP

8"CS

8"CR

CF

CF

ƒ"

1"

6" CHR

1"

2"

6" CHR

1 •"

"C

S

3•"

1"

1"

625|

6" CHR

6" CHR

6" CHR

6" CHS

4" HWR

4" HWS2•" HWS

2•" HWR

5" HWS

5" HWR 6" HWR

6" HWS

4" HWR

4" HWS

1 ‚"

24"x54"

1"

1"

UH-1

UH-2

T-1

C-1

WH

EF-18

EXPANSION TANK

CHEMICAL TREATMENT TANK

CHEMICAL TREATMENT TANKS

NN

FCU-5

FF

SWBD

EMB

ATS

T

LAP

LB

MCC

FIRE PUMP CONTROLLER

PUMP

FIRE

T

XB

FH-1

PH-1

AM-2

AM-1

P:\24075\24075_IC_m200.dgn

DATE PLOTTED

DGN FILE

15-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24075\24075_IC_m200.dgn

AS SHOWN

RRH

LTF

RRH

24075

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

06.12.2025

G O

R D

O N S

T A

T E C

O L L E

G E

B a rn e s v il le

G e o rg ia

B O

R P ro je c t

N o

J -4

C O

N S T

R U

C T

C U

M E

N T S

C A

M P

U S W

ID

E H

V A

C A

N D E

L E

C T

R

IC

A L S

Y S

T E

M R

E N

E W

A L

2 3 4 5 6 7

P-1

P-2

1 N

GENERAL NOTES:(THIS SHEET ONLY)

A

SCALE:

= 1'-0

4 0 2 4 8

ICM200

NEW WORK - HVAC

BASEMENT FLOOR PLAN -

INSTRUCTIONAL COMPLEX -

BASEMENT FLOOR PLAN - NEW WORK - HVAC

INSTRUCTIONAL COMPLEX -

EXISTING TO REMAIN

NEW WORK

POINT OF CONNECTION

LINE LEGEND

FF-1

FF-2

HC-1

NEW

NEW

NEW

NEW

SFW-1

PROVIDE NEW CONTROLS AND CONTROL ACCESSORIES THROUGHOUT BUILDING.

P-5

P-6

BLR-1

NEW

NEW

NEW

BLR-2

NEW

6" HWS

WATER COIL, HOT WATER COIL AND ASSOCIATED CONTROL VAVLES.

PROVIDE NEW FAN ARRAY, FILTER HOUSING, FILTERS, CHILLED

NOTES:(THIS SHEET ONLY)

HPL P

TT

T

VFD-1

BLR-3

NEW

NEW REFRIGERANT MONITOR

NEW DDC CONTROL PANEL

PROVIDE NEW DAMPER ACTUATOR ON EXISTING DAMPER.

4 PROVIDE NEW REFRIGERANT MONITOR.

6 PROVIDE NEW TEMPERATURE SENSOR.

PROVIDE NEW DDC PANEL.

PROVIDE NEW HIGH PRESSURE LIMIT SENSOR.

PROVIDE NEW EMERGENCY BOILER SHUT OFF SWITCH.

PROVIDE NEW OUTSIDE AIR INTAKE FOR BOILER COMBUSTION AIR.

VFD-2 VFD-3

NEW NEW NEW

TS

PROVIDE NEW OUTSIDE AIR TEMPERATURE SENSOR.1 1

1 1

S 12

12 PROVIDE NEW EMERGENCY ACTIVATION SWITCH FOR EF-18.

ES 13

S

13 PROVIDE NEW EMERGENCY SHUTDOWN SWITCH.

ES

13 S

16 NEW CO MONITOR.

CO

HC-2

NEW

CC-1

NEW

CC-2

NEW

RETURN

ABOVE

SUPPLY

H W

S

HWS

HWS

HWR

HWR

HWR

H W

R H

W R

3"

3"

6"

3"

3"

3"

H W

R

6"

AS PART OF DEDUCTIVE ALTERNATE M2.

THE BOILER AND PUMPS SHALL BE PRICED

ALL WORK ASSOCIATED WITH REPLACING

NOTE:

CLEAN STRAINER FOR P-2.

CLEAN COOLING TOWER OF DEBRIS.

REPLACE TRIPLE DUTY VALVE FOR P-1.

PROVIDE ACCESS TO P-3 AND P-4 PRESSURE AND TEMPERATURE TEST PORTS.

AS PART OF THIS WORK.

FLOW DIAGRAMS FOR CHANGES TO EXISTING SYSTEMS

COMPONENTS/SENSORS REPLACE WITH NEW. SEE NEW

INCLUDING HEAD END AND ALL ITS DOWNSTREAM

DEMOLISH THE EXISTING BUILDING CONTROLS ENTIRELY,

CONTROL SCOPE

NOTIFY DESIGN PROFESSIONAL AND OWNER OF ANY DISCREPANCIES PRIOR TO PERFORMING ANY WORK.

IS ANTICIPATED THERE ARE DISCREPANCIES VERSUS THE AS-BUILT CONDITIONS. CONTRACT TO IDENTIFY AND

SURVEYS. THESE DOCUMENTS REFLECT EXISTING CONDITIONS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, IT

THESE DRAWINGS HAVE BEEN PRODUCED UTILIZING A COMBINATION OF ORIGINAL DESIGN DOCUMENTS AND FIELD

"{10

PROVIDE NEW SMOKE CONTROL DAMPERS (MATCH EXISTING SIZE AND QUANTITY).

1 ADDENDUM NO. 2 07.14.25

FLUE DIMENSIONS TO BE RE-VERIFIED BY CHOSEN BOILER MANUFACTURER.

PROVIDE NEW BOILER FLUES. ROUTE THROUGH EXISTING CHASE TO ROOF.1

CONTRACTOR TO VERIFY SIZE AND QUANTITY.

PROVIDE NEW SMOKE CONTROL DAMPER ACTUATORS. ACTUATORS TOTAL FIVE (5).

P:\24075\24075_IC_m202.dgn

DGN FILE

15-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24075\24075_IC_m202.dgn

AS SHOWN

RRH

LTF

RRH

24075

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

06.12.2025

G O

R D

O N S

T A

T E C

O L L E

G E

B a rn e s v il le

G e o rg ia

B O

R P ro je c t

N o

J -4

C O

N S T

R U

C T

C U

M E

N T S

C A

M P

U S W

ID

E H

V A

C A

N D E

L E

C T

R

IC

A L S

Y S

T E

M R

E N

E W

A L

AA

B

A

1 1.1 2 3

C

D

E

F

G

B.1

4 5 6 7 87.9

H

ELEV ELEV

MEN

WOMEN

STAIR STAIR

T 4

K V

A

C2A L2A

H2A

X2NL ABOVE

X2 &

L2B H2B

C2B

2•"

4"-DN

3"-UP

HWS

HWR

H W

R H

W S

H W

R H

W S

1 ‚"

1"

1 •"

1 ‚"

1"

2"

1 •" ƒ"

H W

R H

W S

H W

R H

W S

1 ‚" 1"

HWS

HWR

FCU-1

FCU-2

1 •" ƒ"

1 ‚"

1"

2" 2" 2"

HWS

HWR

HWR

HWS

1 •"

1 ‚"

1"

1"

EF-3

(TYPICAL)

PIPE SLEEVE

SCALE:

= 1'-0

8 0 4 8 16

N

GENERAL NOTES:(THIS SHEET ONLY)

A

TO NEW EQUIPMENT IN NEW WORK.

WHICH IS REQUIRED TO REPLACE FOR PROPER CONNECTIONS

ALL EXISTING DUCTWORK TO REMAIN EXCEPT FOR THAT

LINE LEGEND

POINT OF CONNECTION

EXISTING TO REMAIN

NEW WORK

SECOND FLOOR PLAN - NEW WORK - HVAC

INSTRUCTIONAL COMPLEX -

NEW WORK - HVAC

SECOND FLOOR PLAN -

INSTRUCTIONAL COMPLEX -

ICM202

VAV-64

VAV-76

VAV-63

VAV-66

VAV-77

VAV-86

VAV-92

VAV-78

VAV-65VAV-62

VAV-7

VAV-85

VAV-84

VAV-81

VAV-83

VAV-80

VAV-82VAV-91

VAV-89

VAV-90

VAV-88

VAV-87

VAV-72

VAV-79

VAV-61

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEWNEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEWNEW

T

VAV-7

T T

VAV-81

T

T

VAV-84

T

T VAV-82T

VAV-91

T TVAV-89

VAV-90

T

VAV-79

TVAV-88

T VAV-72T

VAV-61

T VAV-87

T T

T

T

VAV-86

T T

VAV-63

T

T

VAV-76

NOTES:(THIS SHEET ONLY)

THERMOSTAT IN SAME LOCATION AS EXISTING.

THERMOSTAT, AND RECONNECT TO EXISTING HWR/HWS PIPING WITH NEW. LOCATE

INSTALL NEW VAV UNIT, ASSOCIATED CONTROL VALVE & ACCESSORIES, ASSOCIATED

AS PART OF THIS WORK.

FLOW DIAGRAMS FOR CHANGES TO EXISTING SYSTEMS

COMPONENTS/SENSORS REPLACE WITH NEW. SEE NEW

INCLUDING HEAD END AND ALL ITS DOWNSTREAM

DEMOLISH THE EXISTING BUILDING CONTROLS ENTIRELY,

CONTROL SCOPE

NOTIFY DESIGN PROFESSIONAL AND OWNER OF ANY DISCREPANCIES PRIOR TO PERFORMING ANY WORK.

IS ANTICIPATED THERE ARE DISCREPANCIES VERSUS THE AS-BUILT CONDITIONS. CONTRACT TO IDENTIFY AND

SURVEYS. THESE DOCUMENTS REFLECT EXISTING CONDITIONS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, IT

THESE DRAWINGS HAVE BEEN PRODUCED UTILIZING A COMBINATION OF ORIGINAL DESIGN DOCUMENTS AND FIELD

2 EXISTING FAN COIL UNIT TO REMAIN.

2 1 1

P:\24075\24075_IC_m204.dgn

DGN FILE

15-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24075\24075_IC_m204.dgn

AS SHOWN

RRH

LTF

RRH

24075

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

06.12.2025

G O

R D

O N S

T A

T E C

O L L E

G E

B a rn e s v il le

G e o rg ia

B O

R P ro je c t

N o

J -4

C O

N S T

R U

C T

C U

M E

N T S

C A

M P

U S W

ID

E H

V A

C A

N D E

L E

C T

R

IC

A L S

Y S

T E

M R

E N

E W

A L

AA

B

A

1 1.1 2 3

C

D

E

F

G

B.1

4 5 6 7 87.9

H

ELEV ELEV

MEN

WOMEN

STAIR STAIR

T 4

K V

A

L4A C4A

H4A

X4NL ABOVE

X4 &

C4B

H4B

L4B

H W

R H

W S

1 •"

1 ‚"

1 •"

1 •" 2" 2"

H W

S H

W R

1 •"

1 ‚"

HWS

HWR

HWS

HWR

2"

1 •"

H W

R H

W S

1 •"

H W

R H

W S

1 ‚"

1 ‚"

1"

2•"

FCU-3 HWR

HWS

1 ‚"

1 ‚"

1"

FCU-4

HWR

HWS

ƒ"

1"

1" 1 ‚" ƒ"

1"

H W

S H

W R

H W

R H

W S

1"

1 ‚"

H W

S H

W R

HWS

HWR

CHASE TO BELOW

2•" DROPS IN

(TYPICAL)

PIPE SLEEVE

(TYPICAL)

PIPE SLEEVE

SCALE:

= 1'-0

8 0 4 8 16

VAV-16

VAV-22

VAV-17

VAV-19

VAV-26

VAV-27 VAV-28

VAV-21

VAV-25

VAV-9

VAV-24

VAV-23

VAV-20

VAV-30

VAV-29

VAV-18

VAV-4

VAV-3

VAV-6

VAV-5

VAV-2

VAV-1

N

T

T

T T

T

T

TT

T

T T T T

T

T

T

T

T

T

VAV-24

VAV-9VAV-16

VAV-3

VAV-1

VAV-27 VAV-28 VAV-29

VAV-30

VAV-19

T VAV-22

T

T

GENERAL NOTES:(THIS SHEET ONLY)

A

TO NEW EQUIPMENT IN NEW WORK.

WHICH IS REQUIRED TO REPLACE FOR PROPER CONNECTIONS

ALL EXISTING DUCTWORK TO REMAIN EXCEPT FOR THAT

LINE LEGEND

POINT OF CONNECTION

EXISTING TO REMAIN

NEW WORK

ICM204

NEW WORK - HVAC

FOURTH FLOOR PLAN -

INSTRUCTIONAL COMPLEX -

FOURTH FLOOR PLAN - NEW WORK - HVAC

INSTRUCTIONAL COMPLEX -

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW NEW NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

SPS

NEW

NOTES:(THIS SHEET ONLY)

PROVIDE NEW FUME HOOD FACE VELOCITY MONITOR.

PROVIDE NEW DUCT STATIC PRESSURE SENSOR.

THERMOSTAT IN SAME LOCATION AS EXISTING.

THERMOSTAT, AND RECONNECT TO EXISTING HWR/HWS PIPING WITH NEW. LOCATE

INSTALL NEW VAV UNIT, ASSOCIATED CONTROL VALVE & ACCESSORIES, ASSOCIATED3

AS PART OF THIS WORK.

FLOW DIAGRAMS FOR CHANGES TO EXISTING SYSTEMS

COMPONENTS/SENSORS REPLACE WITH NEW. SEE NEW

INCLUDING HEAD END AND ALL ITS DOWNSTREAM

DEMOLISH THE EXISTING BUILDING CONTROLS ENTIRELY,

CONTROL SCOPE

NOTIFY DESIGN PROFESSIONAL AND OWNER OF ANY DISCREPANCIES PRIOR TO PERFORMING ANY WORK.

IS ANTICIPATED THERE ARE DISCREPANCIES VERSUS THE AS-BUILT CONDITIONS. CONTRACT TO IDENTIFY AND

SURVEYS. THESE DOCUMENTS REFLECT EXISTING CONDITIONS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, IT

THESE DRAWINGS HAVE BEEN PRODUCED UTILIZING A COMBINATION OF ORIGINAL DESIGN DOCUMENTS AND FIELD

4 EXISTING FAN COIL UNIT TO REMAIN.

P:\24075\24075_IC_m205.dgn

DGN FILE

15-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24075\24075_IC_m205.dgn

AS SHOWN

RRH

LTF

RRH

24075

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

06.12.2025

G O

R D

O N S

T A

T E C

O L L E

G E

B a rn e s v il le

G e o rg ia

B O

R P ro je c t

N o

J -4

C O

N S T

R U

C T

C U

M E

N T S

C A

M P

U S W

ID

E H

V A

C A

N D E

L E

C T

R

IC

A L S

Y S

T E

M R

E N

E W

A L

EF-4

EF-3

EF-14

EF-6

EF-9

EF-13

EF-2

EF-5

RV-1

EF-17

EF-7

EF-15

EF-16

EF-8

EF-12

EF-1 1

EF-10

EF-1

PH-1

SCALE:

= 1'-0

8 0 4 8 16

N

GENERAL NOTES:(THIS SHEET ONLY)

A

ICM205

NEW WORK - HVAC

ROOF PLAN -

INSTRUCTIONAL COMPLEX -

ROOF PLAN - NEW WORK - HVAC

INSTRUCTIONAL COMPLEX -

LINE LEGEND

POINT OF CONNECTION

EXISTING TO REMAIN

NEW WORK

NO NEW EQUIPMENT IS ANTICIPATED.

TO THE REPLACEMENT OF ALL CONTROLS IN THE BUILDING.

THE ONLY MECHANICAL ITEMS ON THIS SHEET IS RELATED

NOTES:(THIS SHEET ONLY)

AS PART OF THIS WORK.

FLOW DIAGRAMS FOR CHANGES TO EXISTING SYSTEMS

COMPONENTS/SENSORS REPLACE WITH NEW. SEE NEW

INCLUDING HEAD END AND ALL ITS DOWNSTREAM

DEMOLISH THE EXISTING BUILDING CONTROLS ENTIRELY,

CONTROL SCOPE

NOTIFY DESIGN PROFESSIONAL AND OWNER OF ANY DISCREPANCIES PRIOR TO PERFORMING ANY WORK.

IS ANTICIPATED THERE ARE DISCREPANCIES VERSUS THE AS-BUILT CONDITIONS. CONTRACT TO IDENTIFY AND

SURVEYS. THESE DOCUMENTS REFLECT EXISTING CONDITIONS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, IT

THESE DRAWINGS HAVE BEEN PRODUCED UTILIZING A COMBINATION OF ORIGINAL DESIGN DOCUMENTS AND FIELD

1 ADDENDUM NO. 2 07.14.25

2 1

8" FLUE AND CAP TO REMAIN.

BY CHOSEN BOILER MANUFACTURER. EXISTING

REFER TO DETAIL. DIMENSIONS TO BE RE-VERIFIED

NEW 10" ROOF CAPS FROM BOILER FLUES BELOW.

PROVIDE NEW ACTUATOR FOR RELIEF HOOD DAMPER.

P:\24075\24075_IC_m501.dgn

DGN FILE

15-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24075\24075_IC_m501.dgn

AS SHOWN

RRH

LTF

RRH

24075

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

06.12.2025

G O

R D

O N S

T A

T E C

O L L E

G E

B a rn e s v il le

G e o rg ia

B O

R P ro je c t

N o

J -4

C O

N S T

R U

C T

C U

M E

N T S

C A

M P

U S W

ID

E H

V A

C A

N D E

L E

C T

R

IC

A L S

Y S

T E

M R

E N

E W

A L

ICM501

NOT TO SCALE

COOLING COIL PIPING ISOMETRIC

COIL

DRAIN VALVE WITH HOSE CONNECTION

TEST PLUG

S.S. DRAIN PAN

AIR FLOW

'B'

'C'

'A' 'B' 'C' 'D' VALUE CVMARK

3 34

3 3

MAV

NOTES:

REMARKS

NOT TO SCALE

CAULK

‚" Xƒ" GALV. CONTINUOUS

BAR TAPPED AND THREADED

‚" MIN. (BOTTOM ANGLE SIMILAR)

2 - 3"X2"X1‚" WELD TOGETHER

12" O.C. MAX. CORRESPONDING TO FLANGE HOLES.

Š"{ HEXHEAD GALV. MACHINE BOLTS

INSULATION

SAFING

3"X3"X‰" STEEL TUBE

1‚"X2"

CEILING OR CASING TOP

24 GUAGE SAFING

1" 22 GUAGE S.S. STRAP

2"

1‚"C.U.

1"X32OZ. C.U. STRAP

3" FLOOR DRAIN

4" FLOOR TOPPING

FORM SLOPE TO DRAIN WITH

WATERPROOF GROUT.

3"X2"X‚" SET IN MASTIC AND ANCHOR

24 GUAGE SAFING INSULATED

WELD TO 3"X3"X3/16"

COLUMN BOTH ENDS

3"X3"X3/16" STEEL TUBE

COIL

12" 1‚"

18 GA.S.S. DRAIN PAN 2"DEEP

COIL LENGTH +2"

WALL

INSULATION

TYPICAL

WITH ‚" 0 BOLTS 12"O.C.

SECTION

PLAN

ƒ" OVERFLOW

COOLING COIL SUPPORT DETAIL - ( HEATING COIL SIMILAR )

YY

Z

ZSTIFFENER BAR

FILTER FRAME

5 FRAMES

6 FRAMES

7 FRAMES

8 FRAMES

4 FRAMES 3•"

4"

4•"

5"

5•"

NO. OF

FRAMES HIGH

(WIDTH OF

FLAT BAR)A

SECTION SECTIONY-Y Z-Z

A

INSIDE OF CASING

SAFINGFLOOR

CAULK BETWEEN FLASHING

AND FILTER FRAMES

…" STIFFENER BARS SHALL BE PROVIDED

BETWEEN EVERY OTHER COLUMN OF

FRAMES ON BANKS 4 HIGH BY 3 WIDE

AND LARGER. BAR WIDTH TO BE AS

SHOWN BELOW. BARS SHALL EXTEND

FROM FLOOR TO TOP OF CASING. SECURE

BARS TO FLOOR AND TOP OF CASING.

#10 - 32 x ‚ LAG SCREW

CAULK BETWEEN FRAMES

AND STIFFENER BAR

STIFFENER

BAR

SECURE AT

TOP AND

BOTTOM

SECURE SAFING TO CASING;

APPLY SEALANT BETWEEN

SAFING AND CASING‰" THICK GALVANIZED

STIFFENER BAR

20 GAUGE GALVANIZED

AND NUT THROUGH MULTIBANK

HOLES AND STIFFENER BAR

3" x 3" x ‰" STEEL TUBE

SECURED TO FLOOR AND

TOP OF CASING

NOT TO SCALE

BUILT-UP APPARATUS FILTER FRAME ASSEMBLY

AND NUT IN MULTIBANK HOLES

SAFING; TYPICAL ALL SIDES

#10 - 32 x ‹ LAG SCREW

DETAILS - HVAC

INSTRUCTIONAL COMPLEX -

NOT TO SCALE

HEATING COIL PIPING ISOMETRIC

COIL

DRAIN VALVE WITH HOSE CONNECTION

TEST PLUG

S.S. DRAIN PAN

AIR FLOW

'B'

'C'

'A' 'B' 'C' 'D' VALUE CVMARK

HC-1,2,3

HC-4,5,6

352• 2

22• 2 2

MAV

2 WAY CONTROL VALVE

NOTES:

REMARKS

ƒ" OVERFLOW

CC-2

CC-1

'D' (TYPICAL)

3 WAY CONTROL VALVE

'A'

'D' (TYPICAL)

'A'

2•

2" " " "

SETTER (TYPICAL)

CIRCUIT

1 ADDENDUM NO. 2 07.14.25

SETTER (TYPICAL)

CIRCUIT1

1 1

P:\24075\24075_IC_m502.dgn

DGN FILE

15-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24075\24075_IC_m502.dgn

AS SHOWN

RRH

LTF

RRH

24075

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

06.12.2025

G O

R D

O N S

T A

T E C

O L L E

G E

B a rn e s v il le

G e o rg ia

B O

R P ro je c t

N o

J -4

C O

N S T

R U

C T

C U

M E

N T S

C A

M P

U S W

ID

E H

V A

C A

N D E

L E

C T

R

IC

A L S

Y S

T E

M R

E N

E W

A L

ICM502

DETAILS - HVAC

INSTRUCTIONAL COMPLEX -

1 ADDENDUM NO. 2 07.14.25

BRANCH CIRCUIT FROM

PANELBOARD,SWITCHGEAR,OR MCC

(2600)

SYSTEM SHOWN IN NORMAL (VFD NOT BYPASSED)

NUMBERS IN PARENTHESES INDICATE DIVISION

UNDER WHICH WORK OR EQUIPMENT IS SPECIFIED.

NOT TO SCALE

MODE, MOTOR RUNNING.

OVERLOAD

CIRCUIT

BREAKER

VFD SINGLE LINE DIAGRAM

VFD PACKAGE

RECTIFIER AND

INVERTER

NOTES:(THIS DETAIL ONLY)

TYPICAL END SUCTION PUMP

ELEVATION

FLEXIBLE CONNECTION

FLEXIBLE COUPLING AND

COUPLING GUARD

PIPE INSULATION

PRESSURE GAUGE

TEST PLUG

‚" BALL VALVE, TYPICAL

ADJUSTABLE FOOT

FULL SIZE BLOWDOWN ‚" DRAIN

TO FLOOR DRAIN

PAN (CHILLED WATER

PUMP(S) ONLY

18 GA. S.S. DRIP

2"

1"

SUCTION DIFFUSER

WITH STRAINER

CONCRETE BASE AS SPECIFIED

BALL OR BUTTERFLY

•" DRAIN TAPPING

PIPE TO FLOOR DRAIN

CIRCUIT SETTER

DP SENSOR DETAIL

DP SENSOR

GAUGE

MANIFOLD UNION (TYP)

TEST PORT (TYP)

BLOW DOWN (TYP)

TO RETURNTO SUPPLY

NOT TO SCALE

PREFABRICATED FLUE THRU ROOF DETAIL

NOT TO SCALE

NOT TO SCALE

22 GA. MIN. TYPE 304 S.S.

DOUBLE CONE VENT CAP

DRAW BAND

CONT. WELD

TO 18" I.D., 22 GA. FOR LARGER SIZES)

FLUE

3"

ROOF

STAINLESS STEEL COUNTER FLASHING (24 GA. UP

STAINLESS . STEEL ROOF FLASHING

(2600)

(2300)

MOTOR (2300)

P:\24075\24075_RH_m000.dgn

DGN FILE

15-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24075\24075_RH_m000.dgn

AS SHOWN

RRH

LTF

RRH

24075

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

06.12.2025

G O

R D

O N S

T A

T E C

O L L E

G E

B a rn e s v il le

G e o rg ia

B O

R P ro je c t

N o

J -4

C O

N S T

R U

C T

C U

M E

N T S

C A

M P

U S W

ID

E H

V A

C A

N D E

L E

C T

R

IC

A L S

Y S

T E

M R

E N

E W

A L

SINGLE LINE DUCT LEGEND

DUCT (SUPPLY, RETURN & EXHAUST)

SUPPLY DUCT UP

SUPPLY DUCT DOWN

RETURN OR EXHAUST DUCT UP

RETURN OR EXHAUST DUCT DOWN

DUCT RISE

DUCT DOWN

VOLUME DAMPER (MANUAL UNLESS INDICATED A.V.D.)

TRANSITION

DUCT TAKE-OFF (SEE SPEC. PERTAINING TO DEFLECTROLS)

TRANSITION (FLAT ON TOP)

TRANSITION (FLAT ON BOTTOM)

TRANSITION (TOP OR BOTTOM ONLY)

SUPPLY CEILING DIFFUSER

RETURN OR EXHAUST CEILING GRILLE

SIDEWALL SUPPLY

SIDEWALL RETURN

FLEXIBLE CONNECTION (DUCT)

RELIEF AIR SUPPLY TO TOILET

DUCT SPLIT WITH SPLITTER DAMPER

FLEX. DUCT WITH SCREW ON COLLAR, TAKE-OFF

DUCT WITH DUCT LINER

SQUARE ELBOW WITH TURNING VANES

RADIUS ELBOW (SEE SPECS. PERTAINING TO TURNING VANES)

AUTOMATIC VOLUME DAMPER

DN

R

12\10 SPLIT

OR

OR

SCD

FOB

T OR B

RAS

AVD

FD/SCD

FD

SMOKE CONTROL DAMPER

COMBINATION FIRE/SMOKE CONTROL DAMPER

FIRE DAMPER (FD)

FIRE DAMPER

SPS

SD

COMBINATION STARTER

STARTER

PIPE SLEEVE

CONCENTRIC REDUCER

PIPE ANCHOR

HVAC LEGEND

BALL VALVE WITH

3/4" HOSE END

BALANCE VALVE

THREADED & FLANGED

GLOBE VALVE

CHECK VALVE

3-WAY MIXING VALVE

BALL VALVE

BUTTERFLY VALVE

SOLENOID VALVE

CONTROL VALVE

PLAN VIEW

2-WAY MOTORIZED VALVE

RELIEF VALVE

FLANGED UNION

BRANCH OUT TOP

STRAINER

BRANCH OUT BOTTOM

ELBOW DOWN

ELBOW UP

TEE OUT TOP

BLIND FLANGE

PIPE CAP

AUTOMATIC AIR VENTAAV

FLEX. PIPE CONN.

BACKFLOW PREVENTER

THERMOMETER

TEE OUT BOTTOM

MANUAL AIR VENT

PIPE TEST PLUG

HEATING WATER FLOW

COLD WATER DOMESTIC

NATURAL GAS

CONDENSER WATER FLOW

DRAIN

HEATING WATER RETURN

HOT WATER DOMESTIC

G

D

DUCT SIZE FIRST DIMENSION

IS SIDE SHOWN

24\12

DOOR GRILLE

REFERS TO DETAIL OR

PLAN ON SHEET M-1.THERMOSTAT

INTERVAL TIMER

T

I.T.

1\M-4

DUCT/PLENUM w/LINER

FIRE DAMPER

ELBOW WITH

TURNING VANES

FLEX. DUCT CONN.

TURNING VANES

ELBOW WITHOUT

ADJUSTABLE AIR

EXTRACTOR

INSULATED FLEX. DUCT

INSULATED FLEX. DUCT

c

ECCENTRIC REDUCER

HWS

HWR

SCHS

SCHR

CONDENSER WATER RETURN

CS

CR

STATIC PRESSURE SENSOR

SMOKE DETECTOR

POINT OF CONNECTION

DUCT SPLIT

THREADED & FLANGED

THREADED & FLANGED

UNION

GAUGE TAPPING

GAUGE WITH TAPPING

THREADED & FLANGED

THREADED & FLANGED

PIPE SOCKET WELL

FLOW INDICATOR BALANCER

M

T G THERMOSTAT w/GROUND

ANNULAR ELEMENT FLOW STATION

M

DAMPER - BLADE VIEW DAMPER - END VIEW

xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)

DOUBLE WALL INSULATED

ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}

CHILLED WATER FLOW

CHILLED WATER RETURN

CHS

CHR

WATER SUPPLY

SECONDARY CHILLED

WATER RETURN

SECONDARY CHILLED

CV

CVA

CONSTANT VOLUME

ADJUSTABLE

CONSTANT VOLUME

CFM

PRESSURE SENSOR

A COMPRESSED AIR

AAV AUTOMATIC AIR VENT

AF AIR FOIL

-AFF ABOVE FINISHED FLOOR

AV ACID VENT

AVD AUTOMATIC VOLUME DAMPER

AW ACID WASTE

-AC ABOVE CEILING

AH- AIR HANDLING UNIT

BBD BOILER BLOW DOWN

BE BOTTOM ELEVATION

BOL BOTTOM OF LINE (UNINSULATED)

BOD BOTTOM OF DUCT

BP- BOOSTER PUMP

BTUH BRITISH THERMAL UNIT PER HOUR

-BF BELOW FLOOR

BFP BACK FLOW PREVENTOR

C CONDUIT

CC COOLING COIL

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CR CONDENSER WATER RETURN

CS CONDENSER WATER SUPPLY

CW DOMESTIC COLD WATER

CAB CABINET FAN

CF CENTRIFICAL FAN

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFT CHEMICAL FEED TANK

CH CABINET HEATER

CHR CHILLER

CL CENTER LINE

CO CLEANOUT

CP CHILLER PUMP

CPHB CHROME PLATED HOSE BIBB

CT COOLING TOWER

CU COPPER

CV- CONVECTOR

Cv VALVE COEFFICIENT

D DRAIN

DDC DIRECT DIGITAL CONTROL

DHW DOMESTIC HOT WATER

DN DOWN

DP DIFFERENTIAL PRESSURE

DS DOWN SPOUT

DSO DOWN SPOUT OVER FLOW

DX DIRECT EXCHANGE

EAD EXHAUST AIR DAMPER

EAT ENTERING AIR TEMPERATURE

EDB ENTERING DRY BULB

EWB ENTERING WET BULB

ESP END SUCTION PUMP

ESP EXTERNAL STATIC PRESSURE

ELL ELBOW

ET EXPANSION TANK

EQT EQUIPMENT TRAP SET

EWT ENTERING WATER TEMPERATURE

EX EXPANSION TANK LINE

EXT EXTERNAL

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

F&BP FACE & BYPASS

FC FAN COIL UNIT

BPD BYPASS DAMPER

EAL EXHAUST AIR LOUVER

ECH ELECTRIC CABINET HEATER

ABBREVIATIONS

FD FLOOR DRAIN

FF FOULING FACTOR

FF- FLY FAN

FF FINISHED FLOOR

FF FINAL FILTER

FFM FIRE FLOW METER

FLEX FLEXIBLE

FM FIRE MAIN

FMS FLOW METER STATION

FOF FUEL OIL FLOW

FOR FUEL OIL RETURN

FOV FUEL OIL VENT

FOP FUEL OIL PUMP

FP FIRE PUMP

FP- FAN POWERED

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRT FLOW RATE TRANSMITTER

FT FEET

G LOW PRESSURE GAS

GA GAUGE

GPM GALLONS PER MINUTE

GT GREASE TRAP

GTH GRAND TOTAL HEAT

H HEIGHT

HC HEATING COIL

HB HOSE BIBB

HBT HORIZONTAL BLOW THROUGH

HD HUB DRAIN

HDT HORIZONTAL DRAW THROUGH

HP HORSEPOWER/HIGH PRESSURE

HPA HIGH PRESSURE AIR

HPG HIGH PRESSURE GAS

HPS HIGH PRESSURE STEAM

HPWS HEAT PUMP WATER SUPPLY

HPWR HEAT PUMP WATER RETURN

HSC HORIZONTAL SPLIT CASE

HWG HOT WATER GENERATOR

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

ILC IN-LINE CENTRIFICAL

IT INTERVAL TIMER

IN INCHES

INV INVERT

JB JUNCTION BOX

L LENGTH

LR LONG RADIUS

LAT LEAVING AIR TEMPERATURE

LCP LOCAL CONTROL PANEL

LDB LEAVING DRY BULB

LN LIQUID NITROGEN

LWB LEAVING WET BULB

LWT LEAVING WATER TEMPERATURE

LPS LOW PRESSURE STEAM

MAV MANUAL AIR VENT

MVD MANUAL VOLUME DAMPER

MAX MAXIMUM

MBH ONE THOUSAND BTUH PER HOUR

MCC MOTOR CONTROL CENTER

MIN MINIMUM

MH MAN HOLE

MP SUMP (MUD) PUMP

MPS MEDIUM PRESSURE STEAM

MPR MEDIUM PRESSURE RETURN

MTS MEDIUM TEMPERATURE SUPPLY

MTR MEDIUM TEMPERATURE RETURN

MUA MAKE-UP AIR

MUW MAKE-UP WATER

MZ MULTIZONE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTSIDE AIR DAMPER

ODT OUTDOOR TEMPERATURE

PC PUMP CONDENSATE

PD PRESSURE DROP

PRV PRESSURE REDUCING VALVE

PWF PROPELLER WALL FAN

R REFRIGERANT

RA RETURN AIR

RAD RETURN AIR DAMPER

RAS RELIEF AIR SUPPLY

RP RECIRCULATING PUMP

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RS REFRIGERANT SUCTION

RD ROOF DRAIN

RV RELIEF VALVE

SR SHORT RADIUS

OAL OUTSIDE AIR LOUVER

SAN SANITARY SEWER

SC SILL COCK

SCD SMOKE DAMPER

SD STORM DRAIN

SD SMOKE DETECTOR

SF SQUARE FEET

SDO STORM DRAIN OVERFLOW

SHC SENSIBLE HEAT CAPACITY

SP STAND PIPE

SP SUMP PUMP

SPS STATIC PRESSURE SENSOR

STA STATION

TR TEMPERED WATER RETURN

UG UNDERGROUND

VAC VACUUM PIPING

VDT VERTICAL DRAW THROUGH

VTR VENT THROUGH ROOF

WB WET BULB

O2 OXYGEN

?F DEGREES FAHRENHEIT

?C DEGREES CENTIGRADE

WM WATER METER

WL WATER LINE

WH WATER HEATER

WG WATER GAUGE

W WIDTH

W WASTE

VT VERTICAL TURBINE

VFD VARIABLE FREQUENCY DRIVE

VB VACUUM BREAKER

VAV VARIABLE AIR VOLUME

V VENT

UC UNDERCUT (DOOR - 3/4")

V- VALVE

TOS TOP OF STRUCTURE

TB THRUST BLOCK

T TEMPERED WATER

STR STRAINER

SP STATIC PRESSURE

SP SPRINKLER PIPE

SG SPECIALTY GAS

EUH ELECTRIC UNIT HEATER

RECIRCULATING

DHR DOMESTIC HOT WATER

TRANSMITTER

DPT DIFFERENTIAL PRESSURE

PER MINUTE

SCIM STANDARD CUBIC INCHES

TEMPERATURE

SST SATURATED SUCTION

(UNINSULATED)

TE TOP ELEVATION

(TOWER) PUMP

TP CONDENSER WATER

FSD FIRE/SMOKE DAMPER

EA EXHAUST AIR

MA MIXED AIR

AE ADJUSTABLE AIR EXTRACTOR

RAO RETURN AIR OPENING

AD AREA DRAIN/ACCESS DOOR

RHM000

& SCHEDULES - HVAC

ABBREVIATIONS, LEGENDS,

RUSSELL HALL -

MARK SERVICE

TYPE

PUMP

GPM

EFF.%

REMARKS

MIN.

HP

PUMP SCHEDULE

B&G

MAX.

230P-5 AHU-2 40ES

FT.H O2

HEAD

CONTROL

HEAD FT.

DUTY POINT

5 70.9 E-1510-3EB12

VAV UNIT SCHEDULE

MODEL

MANUFACTURER

MARK

TITUS

LAYOUT BASIS:

SIZE

DUCT

INLET

MIN. CFM

MAX MIN

E.S.P (IN WG)

INLET DOWNSTREAM

HOT WATER HEATING COIL

CFM GPMMBH

WPd

ROWS FPI

EWT LWT

F DB F DB

REMARKS

EAT LAT

F DB F DB

APD

VAV-33

VAV-32

VAV-31

VAV-30

VAV-29

VAV-28

VAV-27

VAV-26

VAV-25

VAV-24

VAV-23

VAV-20

VAV-19

VAV-18

VAV-17

VAV-16

VAV-15

VAV-14

VAV-13

VAV-12

VAV-11

VAV-10

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

18.9

18.8

20.2

48.2

24.5

28.2

17.9

60.4

57.6

19.4

18.5

5.6

19.5

17.1

8.1

28.6

56.2

60.4

30.2

0.5

0.5

0.41

0.41

0.41

4.61

2.1

1.1

0.41

2.1

1.77

1.77

1.77

0.41

0.44

0.14

0.41

0.41

0.44

0.15

2.1

1.77

1.77

1.09

160.6

160.7

159.3

167.4

160.7

161.6

164.6

155.4

155.2

156.3

160.1

156.9

160.5

162.5

146.7

165.3

156.9

155.2

159.3

0.13

0.12

0.18

0.39

0.16

0.15

0.1

0.33

0.4

0.41

0.34

0.11

0.22

0.02

0.13

0.15

0.16

0.13

0.28

0.31

0.41

0.17

78.9

79.1

76.5

78.4

97.6

93.3

92.9

95.4

84.1

99.7

91.4

78.8

77.7

103.7

75.9

99.9

96.6

92.9

81.6

AS PART OF THIS WORK.

FLOW DIAGRAMS FOR CHANGES TO EXISTING SYSTEMS

COMPONENTS/SENSORS REPLACE WITH NEW. SEE NEW

INCLUDING HEAD END AND ALL ITS DOWNSTREAM

DEMOLISH THE EXISTING BUILDING CONTROLS ENTIRELY,

CONTROL SCOPE

NOTIFY DESIGN PROFESSIONAL AND OWNER OF ANY DISCREPANCIES PRIOR TO PERFORMING ANY WORK.

IS ANTICIPATED THERE ARE DISCREPANCIES VERSUS THE AS-BUILT CONDITIONS. CONTRACT TO IDENTIFY AND

SURVEYS. THESE DOCUMENTS REFLECT EXISTING CONDITIONS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, IT

THESE DRAWINGS HAVE BEEN PRODUCED UTILIZING A COMBINATION OF ORIGINAL DESIGN DOCUMENTS AND FIELD

TEST PLUGS

UNIONS (3)

SUPPLY

RETURN

CONTROL VALVE

COIL

(PROVIDE IF RUNOUT PIPING

IS A HIGH POINT)

MANUAL AIR VENT

GAUGE COCK

6" MAXIMUM

TEST PLUG IN TEE

(REMOVE PLUG FOR

DRAIN).

NOT TO SCALE

N.O.

NOT TO SCALE

NOTES:

1 PROVIDE VFD FOR PUMP.

MANUFACTURER LAYOUT BASIS:

TYPE

CV

2-WAY

2-WAY

2-WAY

3-WAY

2-WAY

2-WAY

2-WAY

2-WAY

2-WAY

3-WAY

2-WAY

2-WAY

2-WAY

2-WAY

2-WAY

3-WAY

2-WAY

2-WAY

2-WAY

2-WAY

3-WAY

2-WAY

18 GA. S.S. DRIP PAN

(CHILLED WATER PUMP(S)

ONLY)

TEST PLUGS

1/2" SCH. 40 TO DRAIN (CHILLED

WATER PUMP(S) ONLY

LIQUID TIGHT,NEOPRENE COATED

FLEXIBLE CONDUIT

RIGID CONDUIT…