About this opportunity

Bulloch County Board of Commissioners is requesting sealed bids from GDOT Prequalified Contractors for the G.W. Oliver Road Bridge Construction Project (FY27-ENGCP-002-2), with bids due July 24, 2026 at 11:00 AM EDT—revised from the original July 17 deadline to avoid conflict with Georgia Department of Transportation's July 2026 letting. Only contractors with current active GDOT Prequalification in Work Class 500 Concrete Structures are eligible to bid.

The project scope encompasses demolition and removal of seven existing 84-inch reinforced concrete pipe culverts and damaged roadway and drainage structures; construction of a new 135-foot, three-span prestressed concrete cored slab bridge over Little Lotts Creek; embankment and slope construction; subgrade and graded aggregate base work; 12.5 MM Superpave asphalt pavement construction spanning 0.142 miles from Station 103+00.00 to Station 110+50.00; approach slabs; guardrail installation; erosion and sediment control; water quality monitoring; and permanent grassing and stabilization. The bridge design includes 20-inch square prestressed concrete pilings, four test piles, 1,464 linear feet of PSC cored slab beams, and 9,654 pounds of bar reinforcement steel. The project is located on G.W. Oliver Road approximately 1.0 mile north of Sinkhole Road near Georgia Highway 46 in Bulloch County. Design speed is 45 mph with 12-foot travel lanes and 6-foot paved shoulders.

Substantial Completion is due August 31, 2027, with Final Acceptance by September 30, 2027. Liquidated damages are $150 per calendar day for missed deadlines. A bid bond of 5% of total bid and performance and payment bonds each at 100% of contract price are required from U.S. Treasury–approved sureties licensed in Georgia. Monthly progress payments are due within 15 days of invoice with 10% retainage. The contractor must obtain GDOT-prequalified construction materials testing and secure all necessary permits, including coordination with the U.S. Army Corps of Engineers (Nationwide Permit No. 14 authorization already obtained). General liability insurance must be maintained at $1 million per occurrence and $2 million aggregate. Estimated award is August 4, 2026. Questions are due July 10, 2026 at 5:00 PM EDT, with responses posted July 13 at 5:00 PM EDT.

Opportunity text

The Bulloch County Board of Commissioners is accepting sealed bids from GDOT Prequalified Contractors for this project: FY27-ENGCP-002-2 GW Oliver Bridge Construction Project. The project consists of demolition and removal of existing damaged roadway and drainage structures, construction of a new bridge structure, roadway construction items including embankment construction, slope repair, construction of new approach slabs, subgrade construction, graded aggregate base construction, asphalt pavement construction, signing and marking, new guardrail installation, erosion and sediment control, water quality monitoring, and permanent grassing and stabilization. The project is located along GW Oliver Road approximately 1.0 mile north of the intersection of Sinkhole Road at Georgia Highway 46 and approximately 700 feet east of the intersection of GW Oliver Road at Sinkhole Road near coordinates Latitude 32.348504, Longitude -81.806075. A bid package may be requested by emailing the Bulloch County Procurement Office, at Procurementeng@bullochcounty.net, going to the Bulloch County website: https://bullochcounty.net/bid-opportunities/ or by going to the Georgia Procurement Registry website: https://doas.ga.gov/state-purchasing/georgia-procurement-registry-local-governments/gpr-overview. All contractors seeking to provide construction delivery services to Bulloch County for this project shall submit evidence of current active approval as a GDOT Prequalified Contractor in Work Class 500 Concrete Structures as of the bid submission deadline July 17, 2026, 11:00 AM EDT, and as it appears in GDOT¿s Directory of Prequalified Contractors webpage. Bidders are responsible for the actual delivery of sealed bids during normal business hours to the Bulloch County Procurement Office. The original bid along with one (1) copy and supporting documents must be submitted in a sealed clearly marked envelope addressed to Peyton Fuller, Procurement Director, GW Oliver Bridge Construction Project