DFCM Construction - VBS Construction Stage II - Invitation to Bid - DNR/State Parks - Great Salt Lake Marina Water Line Replacement - Project #22236510

Closed State & local contract opportunity Posted

Solicitation number
MP26045-Stage II
State
Utah
Responses due

Opportunity facts

Opportunity details come from utah.bonfirehub.com. Updated .

About this opportunity

The Utah Division of Facilities and Construction Management (DFCM) is inviting bids from Stage I–shortlisted contractors on construction services for water infrastructure at Great Salt Lake State Park and Great Saltair under Stage II of a multistage selection process, with bids due August 26, 2026. Only contractors advanced through the Stage I Request for Proposals evaluation are eligible to bid.

The scope includes installation of a new water line to serve the two facilities, construction of an above-ground water storage tank, and a booster pump station. Attached technical documents reference traverse retaining wall repair work including selective demolition and reconstruction of a deteriorated wall in Draper City, removal and replacement of concrete block courses with geogrid reinforcement, application of chemical surface treatment, and revegetation of disturbed slopes. Work must comply with APWA standards, OSHA requirements, and a September 30, 2025 geotechnical report. The contractor bears responsibility for stormwater mitigation, utility coordination with Blue Stakes of Utah, traffic control, and protection of existing improvements.

The construction cost estimate is $10.2 million. Work is located in Utah, primarily within Draper City limits. Contractors must furnish all labor, materials, equipment, permits, and fees; commence work within ten calendar days of Notice to Proceed; achieve substantial completion with punch list items completed within thirty calendar days; and maintain comprehensive general liability insurance with the City as additional named insured, worker's compensation insurance, and performance and payment bonds as specified. All work is guaranteed for eighteen months from Project Acceptance for Maintenance, with contractors obligated to correct deficiencies at their sole expense or face cost recovery by the City. The City Engineer retains authority to reject defective work, suspend operations, and issue change orders.

Opportunity text

**INVITATION TO BID** This solicitation is Stage II: Invitation to Bid of a multistage selection process for construction services. Only Contractors short listed by the Selection Committee during the Stage I: Request for Proposals process for this project are invited to bid during this stage of the selection process. **Project Description:**The installation of a new water line to feed the Great Salt Lake State Park and the Great Saltair. This will include the construction of an above-ground water storage tank and a booster pump station. **Construction Cost Estimate:**$10,200,000.00

Files

File Type Posted
8-4-MP26045-22236510 Approved Specs.pdf PDF
A-DFCM General Conditions August 2020-Clean rev 07122023.pdf PDF
B-Subcontractors List Form Instructions-7.1.2021.docx DOCX document
C-DFCM Health Insurance Statement of Compliance Form, Revised 7.28.25.docx DOCX document
4-TraverseRetainingWall Plans East Wall 26.07.17.pdf PDF
7-6-MP26045-22236510 Geotechnical-Report.pdf PDF
4-7-MP26045-22236510 - Permit Fees - Contractor Fees - 4.14.2026.pdf PDF
1-A-DFCM General Conditions August 2020-Clean rev 07122023.pdf PDF
9-3-MP26045-22236510 Approved Plans.pdf PDF
1-TraverseRetainingWall Contract Docs 26.07.16.pdf PDF
2-TraverseRetainingWall Plans West Wall 26.07.16.pdf PDF
3-TraverseRetainingWall Specs 26.07.16.pdf PDF
7-MP26045-22236510 - Permit Fees - Contractor Fees - 4.14.2026.pdf PDF
6-5-MP26045-22236510 Approved Structural-Calcs.pdf PDF
10-1-MP26045-22236510 Stage II Solicitation.pdf PDF
6-MP26045-22236510 Geotechnical-Report.pdf PDF
2-MP26045-22236510 - Pre-Posting Addendum.pdf PDF
2-B-Subcontractors List Form Instructions-7.1.2021.docx DOCX document
1-MP26045-22236510 Stage II Solicitation.pdf PDF
3-C-DFCM Health Insurance Statement of Compliance Form, Revised 7.28.25.docx DOCX document
4-MP26045-22236510 Approved Specs.pdf PDF
3-MP26045-22236510 Approved Plans.pdf PDF
5-MP26045-22236510 Approved Structural-Calcs.pdf PDF
5-2-MP26045-22236510 - Pre-Posting Addendum.pdf PDF
Show all 24

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors