8-4-MP26045-22236510 Approved Specs.pdf

PDF 147 MB Posted

Attached to
DFCM Construction - VBS Construction Stage II - Invitation to Bid - DNR/State Parks - Great Salt Lake Marina Water Line Replacement - Project #22236510
Solicitation number
MP26045-Stage II
Issued by
Utah

About this file

This is an Approved Specifications document for a Stage II Invitation to Bid issued by the Utah Division of Facilities and Construction Management (DFCM) for construction services at Great Salt Lake State Park and Great Saltair. The project scope encompasses installation of a new water line to serve both facilities, construction of an above-ground water storage tank, and a booster pump station. The work also includes traverse retaining wall repair in Draper City, involving selective demolition and reconstruction of deteriorated walls, removal and replacement of concrete block courses with geogrid reinforcement, chemical surface treatment application, and slope revegetation. Only contractors advanced through Stage I Request for Proposals evaluation are eligible to bid. Bids are due August 26, 2026, and contractors must commence work within ten calendar days of Notice to Proceed. Substantial completion with all punch list items must be achieved within thirty calendar days. The construction cost estimate is $10,200,000.

Contractors are responsible for furnishing all labor, materials, equipment, permits, and fees, and must coordinate with Blue Stakes of Utah for utility location. Work must comply with APWA standards, OSHA requirements, and a September 30, 2025 geotechnical report. Contractors must maintain comprehensive general liability insurance with the City as additional named insured, worker's compensation insurance, and performance and payment bonds as specified. All work is guaranteed for eighteen months from Project Acceptance for Maintenance, with contractors obligated to correct deficiencies at their sole expense or face cost recovery by the City. The contractor bears full responsibility for stormwater mitigation and traffic control throughout the project, which is located in Utah, primarily within Draper City limits.

View the file

Other files

File Type Posted
2-TraverseRetainingWall Plans West Wall 26.07.16.pdf PDF
1-MP26045-22236510 Stage II Solicitation.pdf PDF
1-A-DFCM General Conditions August 2020-Clean rev 07122023.pdf PDF
1-TraverseRetainingWall Contract Docs 26.07.16.pdf PDF
4-7-MP26045-22236510 - Permit Fees - Contractor Fees - 4.14.2026.pdf PDF
9-3-MP26045-22236510 Approved Plans.pdf PDF
B-Subcontractors List Form Instructions-7.1.2021.docx DOCX document
5-MP26045-22236510 Approved Structural-Calcs.pdf PDF
5-2-MP26045-22236510 - Pre-Posting Addendum.pdf PDF
4-MP26045-22236510 Approved Specs.pdf PDF
3-MP26045-22236510 Approved Plans.pdf PDF
2-B-Subcontractors List Form Instructions-7.1.2021.docx DOCX document
4-TraverseRetainingWall Plans East Wall 26.07.17.pdf PDF
7-6-MP26045-22236510 Geotechnical-Report.pdf PDF
3-C-DFCM Health Insurance Statement of Compliance Form, Revised 7.28.25.docx DOCX document
A-DFCM General Conditions August 2020-Clean rev 07122023.pdf PDF
C-DFCM Health Insurance Statement of Compliance Form, Revised 7.28.25.docx DOCX document
2-MP26045-22236510 - Pre-Posting Addendum.pdf PDF
6-MP26045-22236510 Geotechnical-Report.pdf PDF
6-5-MP26045-22236510 Approved Structural-Calcs.pdf PDF
10-1-MP26045-22236510 Stage II Solicitation.pdf PDF
7-MP26045-22236510 - Permit Fees - Contractor Fees - 4.14.2026.pdf PDF
3-TraverseRetainingWall Specs 26.07.16.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .