About this file
This is a Stage II Invitation to Bid document issued by the Utah Division of Facilities Construction and Management (DFCM) for construction services related to water infrastructure improvements at Great Salt Lake State Park and the Great Saltair in Magna, Utah. The project encompasses installation of a new water line to serve both facilities, construction of an above-ground water storage tank, and a booster pump station. Only seven contractors shortlisted during the Stage I Request for Proposals process are eligible to submit bids: Dry Creek Structure LLC, J. Lyne Roberts & Sons Inc., Morgan Asphalt dba Knife River, Red Pine Construction LLC, VanCon Inc., Whitaker Construction Company Inc., and W.W. Clyde & Co. The solicitation was posted on July 15, 2026, with a final questions deadline of July 22, 2026, and final addendum deadline of July 29, 2026. Bids and bid bonds must be submitted through the U3P website no later than August 26, 2026 at 3:00 PM, with subcontractor lists due by August 27, 2026. Substantial completion is required by May 31, 2027, with liquidated damages assessed at $4,000 per day for delays.
The construction cost estimate is $10,200,000, with bid bonds required at five percent of the bid amount submitted on AIA Document A310-2010 form or equivalent. The project is tax-exempt and the work is located in Utah. Contractors are responsible for obtaining all required permits, including fugitive dust plans from the Utah Division of Air Quality and Stormwater Pollution Prevention Plans from the Utah Department of Environmental Quality, with permit fees borne by the contractor. Contractors must commence work within ten calendar days of the Notice to Proceed and are required to submit a Health Insurance Statement of Compliance Form prior to issuance of the Notice to Proceed if the prime contract exceeds $2,000,000. All project documentation, including technical specifications, drawings, and DFCM standard general conditions and supplemental conditions, are available on the DFCM website and through the U3P procurement portal.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division of Facilities Construction and Management Taylorsville State Office Building 4315 South 2700 West, 3rd Floor
Taylorsville, Utah 84129 dfcm.utah.gov | 801.957.7270
Value Based Selection for Construction Services Stage II: Invitation to Bid
July 15, 2026
Great Salt Lake Marina Water Line Replacement Department of Natural Resources – State Parks
Magna, Utah
DFCM Project #22236510 U3P Reference # MP26045-Stage II
Project design provided by Ensign Engineering
DFCM VBS Construction Stage II: Invitation to Bid, 5.15.2026 2
Solicitation Summary This solicitation is Stage II: Invitation to Bid of a multistage selection process for construction services. Only Contractors short listed by the Selection Committee during the Stage I: Request for Proposals process for this project are invited to interview and submit cost proposals during this stage of the selection process.
The State of Utah Division of Facilities Construction and Management (DFCM) has short listed and invites the following Contractors:
- Dry Creek Structure, LLC
- J. Lyne Roberts & Sons, Inc.
- Morgan Asphalt dba Knife River
- Red Pine Construction, LLC
- VanCon, Inc.
- Whitaker Construction Company, Inc.
- W.W. Clyde & Co.
Stage II: Invitation to Bid Great Salt Lake Marina Water Line Replacement Department of Natural Resources – State Parks Magna, Utah DFCM Project #22236510 | U3P Reference # MP26045-Stage II
Brief Project Description: The installation of a new water line to feed the Great Salt Lake State Park and the Great Saltair.
This will include the construction of an above-ground water storage tank and a booster pump station.
Substantial Completion Prior To: May 31, 2027 Liquidated Damages: $4,000.00 per day Construction Cost Estimate: $10,200,000.00 Tax Exempt: Yes ☐ No ☒ Energy Incentives: Yes ☐ No ☒
Communication during the selection process shall be directed to the DFCM Representatives below only.
DFCM Project Manager: Guy Wayman gwayman@utah.gov 801-859-4759 DFCM VBS Coordinator: dfcm_vbs@utah.gov
Solicitation Schedule Event Date Time Location
Solicitation Posting Stage II: Invitation to Bid Wednesday, July 15, 2026 3:00 PM U3P
Final Questions Deadline Wednesday, July 22, 2026 3:00 PM U3P
Final Addendum Deadline Wednesday, July 29, 2026 3:00 PM U3P
Bid and Bid Bond Deadline Wednesday, August 26, 2026 3:00 PM U3P
Subcontractors List Deadline Thursday, August 27, 2026 3:00 PM Email to dfcmcontracts@utah.gov
A bid tabulation document, inclusive of all Contractor bids, will be posted in U3P by the end of the business day on the bid deadline date.
mailto:dfcm_vbs@utah.gov https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:dfcmcontracts@utah.gov https://utah.bonfirehub.com/portal/?tab=openOpportunities
DFCM VBS Construction Stage II: Invitation to Bid, 5.15.2026 3
Additive Alternates & Additional Stage II Information Additive Alternates:
Backup unit heater in the booster pump station mechanical room.
Additional Information:
NA
DFCM VBS Construction Stage II: Invitation to Bid, 5.15.2026 4
Solicitation Documents The solicitation documents consist of all documents listed below, referenced within this solicitation, and contained in the Stage I: Request for Proposals.
Solicitation Documents and Forms The following project specific documents and standard documents and forms can be accessed in the U3P procurement posting for this solicitation under ‘Supporting Documentation’:
Project specific documents:
- VBS Construction Stage II: Invitation to Bid
- All documents contained in the Stage I: Request for Proposals solicitation for this project
DFCM Construction Management Standard Reference Documents All DFCM standard documents referenced in this solicitation can be accessed by visiting the DFCM Construction Management – Standard Documents page of the DFCM website.
DFCM General Conditions The DFCM General Conditions (“General Conditions”) and all Supplemental General Conditions (“also referred to as General Conditions”) are available on the DFCM Construction Management – Standard Documents page of the DFCM website and made part of this solicitation by reference.
https://utah.bonfirehub.com/portal/?tab=openOpportunities https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/standard-documents/ http://www.dfcm.utah.gov/ https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/standard-documents/ http://www.dfcm.utah.gov/ http://www.dfcm.utah.gov/
DFCM VBS Construction Stage II: Invitation to Bid, 5.15.2026 5
Stage II: Invitation to Bid Procurement Process
1. Requests for Information, Questions and Addendum All project related requests for information, clarifications, and questions must be submitted to DFCM via the U3P website no later than the time and date specified on the Solicitation Schedule. An addendum in response will be posted on the U3P website no later than the time and date specified on the Solicitation Schedule. All addenda issued shall become part of the solicitation, and any changes or additional requirements shall be incorporated into the Contractor’s bid or cost proposal.
a) Interpretation of Drawings and Specifications If any person or entity contemplating submitting a proposal or bid is in doubt as to the meaning of any part of the drawings, specifications or other contract documents, such person shall submit a request for an interpretation to DFCM via the U3P website no later than the time and date specified on the Solicitation Schedule. Any interpretation of the proposed documents will be made only by addenda posted on the U3P website. Neither DFCM nor A/E will be responsible for any other explanations or interpretations of the proposed documents. The A/E is deemed to be the architect or engineer hired by DFCM as the A/E or Consultant for the project.
b) Product Approvals Where reference is made to one or more proprietary products in the contract documents, but restrictive descriptive materials of one or more manufacturer(s) is referred to in the contract documents, the products of other manufacturers will be accepted, provided they equal or exceed the standards set forth in the drawings and specifications and are compatible with the intent and purpose of the design, subject to the written approval of the A/E. Such written approval must occur prior to the time and date specified on the Solicitation Schedule for the final addendum. The A/E’s written approval will be issued in an addendum. If the descriptive material is not restrictive, the products of other manufacturers specified will be accepted without prior approval provided they are compatible with the intent and purpose of the design as determined by the A/E.
2. Bid and Bid Bond Deadline Contractors bid and bid bond must be submitted through the U3P website no later than the time and date specified on the Solicitation Schedule.
Contractors attempting to submit bids through U3P website after the deadline has passed will not be successful and therefore not consideration for award of this project. It is the sole responsibility of the Contractor to confirm successful submission of their bids into U3P prior to the deadline. After the deadline, the Contract will be awarded to the responsive and responsible Contractor submitting the lowest bid. Technical questions related to U3P should be directed to u3padmin@utah.gov .
A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 – 2010 Bid Bond form, or equivalent, in the amount of 5% of the bid, shall accompany the bid and uploaded to the U3P website by the deadline specified on the Solicitation Schedule. If the bid bond is not provided with the bid, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.
The bid bond must be submitted on the AIA document A310 – 2010 Bid Bond form, or equivalent, to be accepted unless only one bid is received by DFCM, or the failure to comply with the bid bond requirements is determined by the Director of DFCM to be immaterial based on the following:
a) the bid bond is submitted on a form other than the AIA Document A310 – 2010 Bid Bond form, or equivalent, and the bid bond meets all other requirements including being issued by a surety firm authorized to do business in the State of Utah and be listed in the U.S. Department of the Treasury Circular 570, Companies Holding Certificates of Authority as Acceptable Securities on Federal Bonds and as Acceptable Reinsuring Companies for an amount not less than the amount of the bond to be issued. A co-surety may be utilized to satisfy this requirement; and https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:u3padmin@utah.gov
DFCM VBS Construction Stage II: Invitation to Bid, 5.15.2026 6
b) the Contractor provides a bid bond properly signed by a qualified surety and on the AIA Document A310 – 2010 Bid Bond form, or equivalent, by the close of business of the next business day after DFCM notifies the Contractor of the defective bid bond.
Before submitting a bid, the Contractor shall carefully examine the solicitation; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in their bid the cost of all items required by the solicitation. If the Contractor observes that portions of the Contract Documents are at variance with applicable laws, building codes, rules, regulations or contain obvious erroneous or uncoordinated information, the Contractor shall promptly notify the DFCM Project Manager, and the necessary changes shall be accomplished by addendum.
By submitting a bid, in any format, the Bidder / Offeror / Vendor certifies that: (1) no product to be supplied by the Bidder / Offeror / Vendor in connection with this Solicitation is a “forced labor product” as that term is defined in Utah Code 63G-6a-121; and (2) to the extent, if any, that this Solicitation involves technology, or technology services, networks or systems, the Bidder / Offeror / Vendor is not a “restricted foreign entity” as that term is defined in Utah Code 63G-6a- 121.
3. Subcontractors List All Contractors are required to email their Subcontractors List Form to dfcmcontracts@utah.gov by the time and date specified on the Solicitation Schedule. The DFCM Subcontractors List Form & Instructions can be found on the DFCM website – Construction Management - Standard Documents page and is also posted in U3P.
DFCM retains the right to audit or take other steps necessary to confirm compliance with requirements for the listing and changing of subcontractors. Any Contractor who is found incompliant with these requirements is subject to a debarment hearing and may be debarred from consideration for award of DFCM contracts for a period not to exceed three years.
4. Withdrawal of Proposals or Bids Contractors may withdraw their proposals and/or bids by written request to dfcm_vbs@utah.gov up until the Award Notification is issued.
5. DFCM Reservation of Rights The Division of Facilities Construction and Management reserves the right to reject any or all bids, or to waive any formality or technicality in any bid in the best interest of the State.
6. Contract DFCM intends to enter into a Construction Contract with the awarded Contractor. A copy of the Construction Contract can be found on the DFCM website – Construction Management - Standard Documents page.
7. Health Insurance Statement of Compliance Form The Health Insurance Statement of Compliance Form applies to: (i) a prime Contractor (and design professional) if the prime contract (or design professional contract) is in the aggregate amount of $2,000,000 or greater; and (ii) applies to a subcontractor (and subconsultant of design professional) if the subcontract is in the aggregate amount of $1,000,000 or greater. For benchmark information, please visit Health Insurance Statement of Compliance Benchmark Information.
The awarded Contractor must submit the Health Insurance Statement of Compliance Form to DFCM via email at dfcmcontracts@utah.gov before the Construction Contract Notice to Proceed will be issued. The form can be found on the DFCM website – Construction Management - Standard Documents page and is also posted in U3P.
8. Permits In concurrence with the requirements for permitting in the General Conditions, it is the responsibility of the Contractor to obtain the fugitive dust plan requirements from the Utah Division of Air Quality and the SWPPP requirements from the Utah Department of Environmental Quality, submit the completed forms, and pay any permit fee that may be required for this specific project. Failure to obtain the required permit may result in Work stoppage and fines from the regulating authority that will be the sole responsibility of the Contractor. Any delay to the project because of failure to obtain the permit, or noncompliance with the permit, shall not be eligible for extension in the Contract Time.
mailto:dfcmcontracts@utah.gov https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/standard-documents/ https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:dfcm_vbs@utah.gov https://dfcm.utah.gov/construction-management/standard-documents/ http://www.health.utah.gov/chip/PDF/2016Benchmark.pdf mailto:dfcmcontracts@utah.gov https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/standard-documents/