Craig park seawall phase 1 - rebid
Closed State & local contract opportunity Posted
- Solicitation number
- 260120-B-JL
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91315 Construction, Canal Or Aquaduct
- 91348 Construction, Special Foundation
- 95935 Construction Services, General (Marine)
- 95939 Dam And Levee Construction, Maintenance, Management And Repair
- 95990 Waterfront Construction Services Including Piers, Docks, Decking, Etc. (Includes Maintenance And Repair)
- UNSPSC codes
- 72141214 Sheet pile driving service
- 95121618 Marina
- 72141213 Waterway construction service
- 95121622 Ferry terminal building
- 95122505 Marine transfer station
- 95121619 Yacht harbor
- 72141202 Canal construction service
- 72141203 Dam construction service
- 72141207 Harbor construction service
- 72141210 Marina construction service
Show all 27
- 72141216 Offshore construction vessel service
- 72154009 Industrial dock and dock equipment installation service
- 95121623 Ro ro terminal
- 95121617 Dock
- 72141209 Levee construction service
- 72141204 Dock construction service
- 72141211 Pier construction service
- 72141215 Underwater construction service
- 72141217 Ice management technical services
- 72141119 Aqueduct construction service
- 95121616 Pier
- 95121624 Lighthouse
- 95121620 Breakwater
- 95121621 Seawall
- 95121615 Quay or wharf
- 70171702 Dam maintenance or management services
- 95121807 Dam
Opportunity details come from ctsfl.bonfirehub.com. Updated .
About this opportunity
The City of Tarpon Springs, Florida is soliciting competitive sealed bids for the Craig Park Seawall Phase 1 Rebid project (Bid No. 260120-B-JL), a heavy construction infrastructure initiative located in Pinellas County. Electronic bids must be submitted through the Bonfire procurement portal by 3:00 p.m. on March 6, 2026, with a Notice to Proceed anticipated for March 1, 2026. The project encompasses comprehensive seawall replacement and elevation work to protect Craig Park from tidal flooding by raising the perimeter elevation from approximately 2.0 feet to 5.0 feet or higher above mean sea level. Specific deliverables include replacement of approximately 3,300 linear feet of the existing seawall with new fiber reinforced polymer or vinyl sheet pile construction with concrete caps, replacement of failing sidewalks at the new elevation, reconstruction of the observation deck on the east side of Spring Bayou, addition of a grassy berm on the western side, installation of nine tidal check valves with manatee protection grates in various pipe sizes, installation of 535 cubic yards of backfill within water areas, protection and additional drainage improvements around the War Memorial, and comprehensive stormwater drainage infrastructure including inlets, pipes, and anti-tidal influx check valves. The contractor must achieve substantial completion within 270 calendar days from the Notice to Proceed, with liquidated damages of $471.00 per day assessed for delays beyond the contract period. All work must comply with federal prevailing wage requirements established under the Davis-Bacon Act, with hourly rates ranging from $7.25 to $39.01 depending on classification, as well as Build America Buy America Act domestic materials requirements, E-Verify employment verification, and federal nondiscrimination standards. Required qualifications include possession of appropriate contractor licensing, bonding capacity for a five percent bid guarantee and 100 percent performance and payment bonds from a surety rated A- or better, commercial general liability and workers' compensation insurance, builder's risk coverage, and demonstrated ability to manage complex waterfront construction involving seawall installation, sheet pile driving with nonvibratory methods, and stormwater systems installation.
This procurement includes no specific set-asides for disadvantaged businesses or minority-owned enterprises based on the available solicitation documents, though all contractors must comply with Section 3 Worker hiring requirements and targeted worker employment obligations when applicable under federal infrastructure funding guidelines. The project is funded substantially by a $2 million federal grant from the U.S. Department of Housing and Urban Development secured through former Representative Gus Bilirakis, which covers only the waterfront adjacent to Craig Park from the boat ramp to the observation deck, with future Phase 2 work planned for the remaining waterfront on the north side of Spring Bayou. The engineer's estimated construction cost ranges from $1,000,000 to $5,000,000, though this represents a rebid following a previous solicitation, and the actual contract sum will be determined through the competitive bidding process. No incumbent contractor information is identified in the available documents. All bidders must acknowledge receipt of and compliance with federal contract provisions including the FHWA Form 1273 requirements, Davis-Bacon wage determinations, labor standards documentation, and weekly certified payroll submission protocols. The project requires compliance with permits issued by the U.S. Army Corps of Engineers under Nationwide Permit 3 (valid until March 14, 2026), Pinellas County Water and Navigation Permit WND-23-00742, and adherence to detailed technical specifications and construction plans prepared by Stantec Consulting Services, with all work subject to design review and monthly progress payment certification by the Architect/Engineer.
Opportunity text
• Project purpose: To protect Craig Park from tidal flooding by raising the elevation all around the perimeter of the park. • Existing conditions: o The existing sidewalk and seawall are failing in parts around the permitter of Craig Park. Failing sidewalk sections have undergone "patch" repairs over the past few years, but they have intermittently and frequently been closed to pedestrians for safety reasons. o In most places the sidewalk sits at approximately +/- 2.0 feet above mean sea level. o The existing observation deck (the dock on the east side of Spring Bayou) sits at approximately 3.0 feet above mean sea level and is supported by a shallow sea wall. It is structurally failing and is at risk of eventual collapse. o A $2M grant from the Federal Government (secured through efforts of former Representative Gus Bilirakis) is being used to cover a significant portion of the cost of the project. The grant covers only the waterfront adjacent to Craig Park from the boat ramp to and including the observation deck. The remaining waterfront on the north side of Spring Bayou will be completed as a later second phase. • Implementation: The project goal will be accomplished by the following: o Replacement of most of the seawall with a new seawall at a higher target elevation (5.0 feet or more above sea level) o Replacement of the existing sidewalk at the new elevation. o Replacement of the existing observation deck at the new elevation. o Addition of a short grassy berm (less than 2-feet above grade) around the western side of the park at the new elevation. o Replacement of seawall cap along the western side of the park (no seawall replacement is necessary in that portion of the project). o Protection of the War Memorial including additional drainage o Addition of drainage inlets, pipes, and stormwater check valves to prevent tidal influx throughout the park. o Other various repairs as needed o No changes are proposed to the boat ramp or the boat ramp parking area at this time. • Special note about the schedule: The project is expected to be complete well before January 6, 2027. However, in the event that construction duration extends up to or beyond January 6, 2027, the contractor must make provisions to accommodate the annual Greek Epiphany Celebration on that date with unrestricted access to the eastern section of Spring Bayou (east of and including the War Memorial) and all of the surrounding platforms and sidewalks.
Files
Show all 12
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity