12-1.0-Revised -Craig Park Phase 1 Bid Schedule Rev1.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
CRAIG PARK SEAWALL PHASE 1 - REBID
Solicitation number
260120-B-JL
Issued by
Pinellas County, Florida

About this file

This is a bid schedule for the City of Tarpon Springs, Florida, detailing the revised quantities for the Craig Park Phase 1 seawall project. The schedule itemizes 14 bid items across various construction categories, including mobilization, erosion control, clearing and grubbing, embankment work, concrete construction, and reinforcing steel. Key quantities include 1,972 linear feet of sediment barrier, 2,464 linear feet of tree protection barrier, 1,972 linear feet of existing bulkhead removal, 1,947 cubic yards of embankment, 166 cubic yards of concrete for bulkhead construction, and 20,806 pounds of reinforcing steel. The bid schedule reflects highlighted changes from the original bid with increased quantities and references FDOT item numbers for standardization. The schedule provides the framework for contractors to submit unit costs and total prices for each line item, though specific response dates, due dates, and award information are not included in this document excerpt.

The bid schedule does not contain detailed pricing information, as it is designed as a template for bidders to complete with their own unit and total costs. Funding for the $2 million project is supported by a Federal Government grant secured through former Representative Gus Bilirakis, which covers the waterfront adjacent to Craig Park from the boat ramp to the observation deck. The project is part of a phased approach, with Phase 1 representing the initial construction effort, and future phases planned for the remaining waterfront on the north side of Spring Bayou. No incumbent information, set-asides, or specific contract terms are detailed in this bid schedule document.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

CITY OF TARPON SPRINGS
CRAIG PARK PHASE 1
BID SCHEDULE
HIGHLIGHTED CHANGES FROM ORIGINAL BID (QUANTITIES INCREASED)
BID ITEM NUMBERFDOT ITEM NUMBERITEM DESCRIPTIONUNITSQTYUNIT COSTTOTAL
1101-1MOBILIZATIONLS1
2104-1EROSION CONTROLLS1
3104-10-3SEDIMENT BARRIERLF1972
4104-11FLOATING TURBIDITY BARRIERLS1972
5110-1-1CLEARING & GRUBBINGLS1
6110-21TREE PROTECTION BARRIERLF2464
7110-73REMOVE EXISTING BULKHEADLF1972
8120-6EMBANKMENTCY1947
9120-72GRAVEL FILLCY372
10334-1-12SUPERPAVE ASPHALTIC CONC, TRAFFIC BTN1
11400-0-11CONCRETE CLASS NS, GRAVITY WALL INDEX 400-011CY5
12400-4-8CONC CLASS IV, BULKHEADCY166
13415-1-6REINFORCING STEEL- MISCELLANEOUSLB20806
14425-1-33INLETS, CURB, TYPE P-3, <10'EA1
15425-1-52INLETS, DT BOT, TYPE C,<10'EA7
16425-1-91INLETS, CLOSED FLUMEEA1
17425-5MANHOLE, ADJUSTEA3
18425-82REPLACE GRATEEA1
19430-174-118PIPE CULVERT, RCP, 18" SDLF20
20430-886MANATEE GRATE, UNHINGEDEA15
21451-70SOIL ANCHORSEA188
22455-135POLYMERIC SHEET PILE, FIBERGLASS REINFORCED PLASTICSF26208
23515-1-2PIPE HANDRAIL - GUIDERAIL, ALUMINUMLF88
24520-2-1CONCRETE CURB, TYPE ALF1428
25522-1CONCRETE SIDEWALK AND DRIVEWAYS, 4" THICKSY1157
26522-2CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICKSY402
27548-52RETAINING WALL SYSTEM, CMU WALL WITH FOOTERSF133
28570-1-2PERFORMANCE TURF, SODSY3176
29700-25-18SIGNS- MONUMENT, REMOVE EXISTING AND REINSTALLEA3
301050-31-212UTILITY PIPE- POLY VINYL CHLORIDE, FURNISH & INSTALL, WATER/SEWER, 12"LF221
31999-1LAMP POSTS AND FOUNDATIONSEA15
32999-2HDPE CATCH BASINEA2
33999-3LANDSCAPE ROCKSY89
34999-4REMOVE AND RESET GANGWAYEA1
35999-5TIDAL CHECK VALVEEA9
36999-6LANDSCAPE PLANTINGLS1
37999-7ADJUST IRRIGATIONLS1
38999-8REMOVE AND RESET BENCHEA10
39999-9RESET SURVEY DISKEA1
40999-10MOORING CLEATEA6
SUBTOTAL
-CONTINGENCYLS1$100,000$100,000
TOTAL
BID SCHEDULE NOTES
1.The FDOT Item Number, where applicable, references the appropriate section of the FDOT Standard Specifications for Road and Bridge Construction.
2.The unspecified work allowance is provided by the City as a contingency for additional work and/or alterations to the proposed work not specified in the Contract Plans.