Construction Engineering, & Inspection (CE&I) Services for the Brickyard Road, Monroe Avenue, and Oakfield/Palafox Area Drainage Improvement Projects CDBG-DR HS005

Closed State & local contract opportunity

Solicitation number
PD 25-26.053
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Escambia County, Florida is issuing a Request for Qualifications (RFQ) for Construction Engineering & Inspection (CE&I) Services for three Hurricane Sally-related regional drainage improvement projects funded through the Community Development Block Grant-Disaster Recovery (CDBG-DR HS005) program. The three projects comprise the Brickyard Road Drainage Improvements (estimated construction cost of $1.45 million), which involves replacing a damaged 36-inch culvert pipe beneath Brickyard Road near Barth Road, extending the new culvert beneath CSX Railroad right-of-way, and reconstructing the roadway with shoulder armoring, headwall installation, and rip rap placement; the Monroe Avenue Drainage Improvements (estimated construction cost of $705,000), consisting of repair and re-stabilization of 500 linear feet of damaged articulated block ditch with Concrete Canvas overlay installation, removal and replacement of a double 36-inch arch pipe culvert with a cast-in-place box culvert, and roadway reconstruction including milling, resurfacing, curb and gutter installation; and the Oakfield/Palafox Area Drainage Improvements (estimated construction cost of $14.9 million), addressing drainage infrastructure improvements along N Palafox Street, Majors Road, Hancock Lane, Pacific Street, W Oakfield Road, Kenmore Road, Travis Street, and W Pinestead Road. The selected consultant will provide comprehensive inspection, project administration, field surveys, quality assurance, testing, progress payment documentation, and citizen interface services, exercising the same responsibility and authority as Escambia County when administering the construction contracts. Qualified consultants must demonstrate experience with a minimum of three similar CE&I projects completed within the past seven years, provide detailed references and resumes of key personnel, and demonstrate current workload capacity. Required insurance includes General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Workers Compensation (statutory limits), Business Auto ($1,000,000), and Professional Errors and Omissions coverage ($1,000,000/$2,000,000 aggregate). The evaluation process consists of two phases: Phase 1 scoring based on experience and qualifications (30% weighting), similar project experience (40% weighting), and current workload capacity (30% weighting), with selected firms invited to Phase 2 interviews for final ranking and award recommendation to the Board of County Commissioners. The County prefers CE&I contract costs shall not exceed 7.5% of the estimated construction cost for each project, structured as a "Not to Exceed" agreement based on hourly rates for full-time onsite inspections. A mandatory pre-solicitation meeting is scheduled for March 11, 2026 at 3:00 PM via Microsoft Teams or in-person at the Escambia County Office of Purchasing; questions must be submitted by March 30, 2026 at 12:00 PM, and proposals are due April 6, 2026 at 10:00 AM via the electronic procurement portal.

Any firm previously awarded solicitations for this project related to environmental assessment, design services, or owner's representative services is ineligible to submit proposals for the CE&I contract. No set-aside designations for disadvantaged enterprises or small business classifications are identified in the procurement documents. An executed Construction Engineering and Inspection Services agreement with DocuSign evidence of signature dated October 23-24, 2025, and a Regional Stormwater Hurricane Sally Infrastructure Repair Agreement executed on May 6-7, 2024, indicate prior contract activity for these projects; however, the current RFQ represents a new procurement process for CE&I services specifically. The projects incorporate existing preliminary engineering plans prepared by Sigma Consulting Group, Inc., including 60% draft plans for both the Brickyard Road and Oakfield/Palafox projects and preliminary plans for the Monroe Avenue project, which bidders must review and reference in their proposals. Total estimated construction costs across all three projects approximate $16.6 million, with allowable CE&I service fees potentially ranging from $1.24 million to $1.28 million (calculated at 7.5% of total estimated construction costs), though individual project contracts will be structured as separate "Not to Exceed" agreements based on hourly rates for full-time onsite inspection services.

Opportunity text

Brickyard Road Drainage Improvements

The Brickyard Road Drainage Improvement Project consists of replacing an existing 36" culvert pipe beneath Brickyard Road near Barth Rd that was damaged during Hurricane Sally. The new culvert pipe will be extended from its original footprint and outfall beneath adjacent CSX Railroad right of way. Work includes, but is not limited to, reconstructing the roadway above the pipe, armoring the adjacent roadway shoulders, and installing a new headwall and rip rap at the outfall.

Monroe Avenue Drainage Improvements

The Monroe Avenue Drainage Improvement Project consists of the repair and re-stabilization of 500 LF of damaged articulated block ditch with additional roadside ditch re-grading and culvert replacement across Monroe Avenue between Woodland Street and Well Line Road.

Scope of work includes preparing the surface along the area of articulated block for installation of a Concrete Canvas overlay with sandbag ditch blocks. Additional existing damaged concrete ditch will be removed, re-graded and re-paved. The ditch front slopes will be re-graded to meet minimum clear zone requirements with appropriate permanent erosion control measures.

The existing double 36" arch pipe culvert will be open cut, removed and replaced with a cast-in-place box culvert and new straight end walls. Roadway reconstruction, milling and resurfacing of adjacent pavement with curb and gutter installation will be required.

Oakfield / Palafox Area Drainage Improvements

The Oakfield / Palafox Area Drainage Improvement project consists of improving the existing drainage infrastructure along N Palafox St, Majors Rd, Hancock Ln, Pacific St, W Oakfield Rd, Kenmore Rd, Travis St, and W Pinestead Rd.

Files

File Type Posted
Construction_Engineering,_&_Inspection_(CE&I)_Services_for_the_Brickyard_Road,_Monroe_Avenue,_and_Oakfield_Palafox_Area_Drainage_Improvement_Projects_CDBG-DR_HS005_(Addendum_#3_Revision).pdf PDF
Construction_Engineering,_&_Inspection_(CE&I)_Services_for_the_Brickyard_Road,_Monroe_Avenue,_and_Oakfield_Palafox_Area_Drainage_Improvement_Projects_CDBG-DR_HS005_(Addendum_#2_Revision).pdf PDF
Construction_Engineering,_&_Inspection_(CE&I)_Services_for_the_Brickyard_Road,_Monroe_Avenue,_and_Oakfield_Palafox_Area_Drainage_Improvement_Projects_CDBG-DR_HS005.pdf PDF
Brickyard_Road_60%_Draft_Plans_12-22-2023.pdf PDF
HS005-A1_Executed.pdf PDF
HS005_Escambia_County_Regional_Stormwater_Hurricane_Sally_Infrastructure_Repair_Agreement.pdf PDF
Monroe_Avenue_Cost_Estimate_February_2026.pdf PDF
Brickyard_Road_60%_Draft_Plans_12-22-2023.pdf PDF
HS005_Escambia_County_Regional_Stormwater_Hurricane_Sally_Infrastructure_Repair_Agreement.pdf PDF
Oakfield_Palafox_-_Working_Planset.pdf PDF
HS005_Escambia_County_Regional_Stormwater_Hurricane_Sally_Infrastructure_Repair_Agreement.pdf PDF
Oakfield_Palafox_-_Working_Planset.pdf PDF
Oakfield_Palafox_-_Working_Planset.pdf PDF
Brickyard_Road_FEMA_Drainage_Improvements_-_Cost_Estimate_-_02-11-2026.pdf PDF
Oakfield_-_Palafox_Cost_Estimate_2-12-26.pdf PDF
HS005-A1_Executed.pdf PDF
Brickyard_Road_60%_Draft_Plans_12-22-2023.pdf PDF
Brickyard_Road_FEMA_Drainage_Improvements_-_Cost_Estimate_-_02-11-2026.pdf PDF
Monroe_Avenue_Cost_Estimate_February_2026.pdf PDF
Brickyard_Road_FEMA_Drainage_Improvements_-_Cost_Estimate_-_02-11-2026.pdf PDF
HS005-A1_Executed.pdf PDF
Monroe_Avenue_Cost_Estimate_February_2026.pdf PDF
Monroe_Preliminary_Plans_2-23-26.pdf PDF
Monroe_Preliminary_Plans_2-23-26.pdf PDF
Monroe_Preliminary_Plans_2-23-26.pdf PDF
Show all 25