About this file
Brickyard Road 60% Draft Plans
This is a preliminary engineering document prepared by Sigma Consulting Group, Inc. for Escambia County, Florida's Board of County Commissioners, presenting 60% draft construction plans for drainage improvements to Brickyard Road damaged during Hurricane Sally. The project consists of replacing an existing 36-inch culvert pipe beneath Brickyard Road near Barth Road, extending the new culvert beneath CSX Railroad right-of-way, reconstructing the roadway surface, installing shoulder armoring, constructing a new headwall, and placing rip rap at the outfall. The plans include eight sheets detailing existing conditions, proposed conditions, plan/profile views, cross sections, and typical roadway sections, along with comprehensive stormwater pollution prevention plan specifications. The project encompasses approximately 0.8 acres of soil disturbance with total disturbed area of 0.8 acres. Proposed work includes 167 linear feet of 36-inch reinforced concrete pipe at 3.08% slope, 100 linear feet of proposed guardrail, removal of an existing 48-inch CMP standpipe, jack and bore installation of 66 linear feet of 50-inch steel casing, removal and replacement of 244 square yards of asphalt, and construction of an 18-inch rip-rap underdrain with filter fabric. The plans anticipate permanent wetlands impacts of 53 square yards (124 cubic yards) and temporary wetlands impacts of 242 square yards. Construction specifications reference Escambia County Technical Specifications and FDOT standards, with specific requirements for erosion and sediment control, utility notification, traffic maintenance, and protection of railroad rights-of-way.
The preliminary plans establish contractual obligations requiring contractors to notify the County Design Engineer 48 hours prior to construction, maintain at least one 10-foot open lane at all times, restore roads to two lanes of traffic daily, prevent erosion through silt fence and staked hay bales, and comply with all local, state, and federal requirements. Contractors are responsible for acquiring any necessary private right-of-way beyond the guaranteed county right-of-way access. The project is funded through FEMA Project PD 22-23.041 related to Hurricane Sally disaster recovery. Utility owners requiring 48-hour notification prior to construction include Emerald Coast Utility Authority (sewer/water), Florida Power & Light (electric), Pensacola Energy (natural gas), Cox Cable, AT&T Florida, and the Escambia County Transportation & Traffic Division. Archaeological protocols and unmarked human remains procedures are specified in accordance with Florida Statute 872.05 and Florida Department of State requirements. The plans note that this document is not to be used for construction, bidding, recordation, conveyance, or sales purposes and is designated as preliminary in status as of December 2023.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
GENERAL NOTES SHEET
SWPPP SHEET
EXISTING CONDITIONS PLAN/PROFILE SHEET
PROPOSED CONDITIONS PLAN/PROFILE SHEET
BRICKYARD ROAD PLAN/PROFILE SHEET
CROSS SECTION & TYPICAL ROADWAY SECTION SHEET
DETAIL SHEET
ESCAMBIA COUNTY, FLORIDA
IMPROVEMENT PLANS PROPOSED FOR
INDEX OF ROADWAY PLANS
ENGINEERING DEPARTMENT
SHEET NO. SHEET DESCRIPTION
BOARD OF COUNTY COMMISSIONERS
PROJECT MANAGER:
PROJECT ENGINEER:
MATTHEW SKIPPER
Jason L. Lashley, P.E.
SECTION / TOWNSHIP / RANGE:
SIGNATURE:
DISTRICT:
REG FLA ENG NO:
DATE:
3298 SUMMIT BOULEVARD, SUITE 32
PENSACOLA, FLORIDA 32503
PHONE: (850) 332-7912
CERTIFICATE OF AUTHORIZATION #26889
60% DRAFT PLANS
DECEMBER, 2023
BRICKYARD ROAD FEMA
PROJECT
PD 22-23.041
COMMISSIONERS
JEFF BERGOSH
MIKE KOHLER
LUMON MAY (CHAIRMAN)
ROBERT BENDER
STEVEN BARRY (VICE CHAIRMAN)
DISTRICT ONE
DISTRICT TWO
DISTRICT THREE
DISTRICT FOUR
DISTRICT FIVE
VICINITY MAP
57353
22-3N-31 2
PRELIMINARY
THESE PLANS HAVE BEEN PREPARED IN ACCORDANCE WITH THE LATEST ESCAMBIA
COUNTY TECHNICAL SPECIFICATIONS.
ANY REFERENCE TO FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION, LATEST EDITION, DIVISION 1, GENERAL REQUIREMENTS AND COVENANTS,
SHALL BE EXCLUDED AND NOT APPLICAPABLE TO ANY SPECIFICATION REFERED HEREIN
OR OTHERWISE LISTED IN THESE PLANS OR RELATED DOCUMENTS OR THE ESCAMBIA
COUNTY TECHNICAL SPECIFICATIONS.
PROJECT
LOCATION
C
EN
TU
R
Y B
LV
D
N
BA
R
TH
R D
N BARTH RD
BRICKYARD RD
AutoCAD SHX Text
TRANS.
AutoCAD SHX Text
CSX
AutoCAD SHX Text
CSX
AutoCAD SHX Text
SS
AutoCAD SHX Text
SYSTEM
AutoCAD SHX Text
SEABOARD
AutoCAD SHX Text
ST. L.S.F. RY.
AutoCAD SHX Text
RY.
AutoCAD SHX Text L
AutoCAD SHX Text
ST
AutoCAD SHX Text
SF
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
IL
AutoCAD SHX Text
RA
AutoCAD SHX Text
RY
AutoCAD SHX Text
AutoCAD SHX Text
SF
AutoCAD SHX Text L
AutoCAD SHX Text
ST.
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RAILWAY
AutoCAD SHX Text
FRANCISCO
AutoCAD SHX Text
SAN
AutoCAD SHX Text
AND
AutoCAD SHX Text
ST. LOUIS
AutoCAD SHX Text
CONSULTING
AutoCAD SHX Text
GROUP, INC.
AutoCAD SHX Text
SIGMA
AutoCAD SHX Text
NAME
AutoCAD SHX Text
DATE
AutoCAD SHX Text
LICENSE NO.
AutoCAD SHX Text THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION CONVEYANCE, SALES OR AS THE BASIS FOR THE ISSUANCE OF A PERMIT
AutoCAD SHX Text
JASON L. LASHLEY
AutoCAD SHX Text
SEE TITLE BLOCK
AutoCAD SHX Text 57353
1. THE CONTRACTORS SHALL NOTIFY THE COUNTY DESIGN ENGINEER OR DESIGNEE 48 HOURS PRIOR TO CONSTRUCTION.
2. ALL CONDITIONS AND STIPULATIONS OF THE CONSTRUCTION PERMITS AND THE APPROVALS ISSUED BY THE ESCAMBIA COUNTY ENGINEER SHALL BE
COMPLIED WITH IN EVERY DETAIL.
3. ALL ROADS DAMAGED BY CONSTRUCTION OPERATIONS ARE TO BE PATCHED OR RECONSTRUCTED AS DIRECTED BY THE COUNTY ENGINEER OR
DESIGNEE.
4. THE CONTRACTOR SHALL TAKE STEPS NECESSARY TO PREVENT EROSION AND ANY OFF SITE SEDIMENT TRANSPORT RESULTING FROM INCREASED RUNOFF DURING CONSTRUCTION BY PROVIDING SILT FENCE AND/OR STAKED HAY BALES AS REQUIRED BY THE FLORIDA STORMWATER EROSION AND SEDIMENT CONTROL INSPECTOR'S MANUAL, 2008 EDITION, OR AS INDICATED ON THE PLANS. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL ASSOCIATED DISTURBED AREAS ARE STABILIZED AS TO REDUCE SEDIMENT RUNOFF, UNLESS OTHERWISE DIRECTED BY THE ENGINEER OR
DESIGNEE.
5. ANY NECESSARY PERMITS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ESCAMBIA COUNTY OR ITS DESIGNEE WILL ASSIST CONTRACTOR WITH
REQUIRED PERMITS.
6. THE CONTRACTOR IS CAUTIONED TO VISIT THE SITE AND FAMILIARIZE HIMSELF WITH THE PROJECT PRIOR TO BIDDING AND/OR CONSTRUCTION.
7. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO PRESERVE OR RELOCATE ALL BENCHMARKS (VERTICAL CONTROL) AS NEEDED DURING CONSTRUCTION. ALL PUBLIC OR PRIVATE CORNER MONUMENTATION SHALL BE PROTECTED. IF A PUBLIC OR PRIVATE CORNER MONUMENTATION IS IN DANGER OF BEING DESTROYED AND HAS NOT BEEN PROPERLY REFERENCED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER OR DESIGNEE IMMEDIATELY. ANY ESCAMBIA COUNTY HARN/GPS NETWORK MONUMENTS OR BUREAU OF SURVEY AND MAPPING GPS NETWORK MONUMENTS WITHIN THE LIMITS OF CONSTRUCTION SHALL BE PROTECTED. IF A HARN/GPS NETWORK MONUMENTS OR BUREAU OF SURVEY AND MAPPING GPS NETWORK MONUMENTS ARE DISTURBED OR DESTROYED THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OF THE MONUMENTS AND HAVE THE MONUMENTS POSITION DETERMINED BY A FLORIDA LICENSED PROFESSIONAL SURVEYOR AND MAPPER USING GUIDELINES AS ESTABLISHED BY
NATIONAL GEODETIC SURVEY FOR BLUE BOOKING AND APPROVAL.
8. EXISTING DRAINAGE FEATURES WITHIN CONSTRUCTION LIMITS SHALL REMAIN UNLESS OTHERWISE NOTED.
9. THE CONTRACTOR SHALL MATCH EXISTING CONDITIONS AT THE BEGINNING AND END OF CONSTRUCTION AS DIRECTED BY THE COUNTY ENGINEER OR
DESIGNEE.
10. EXISTING STREETS AND DRIVES SHALL BE MAINTAINED TO LOCAL TRAFFIC AND PROPERTY OWNERS.
11. ALL ROADWAY CONSTRUCTION SHALL COMPLY WITH THE ESCAMBIA COUNTY TECHNICAL SPECIFICATIONS, LATEST EDITION.
12. ALL MATERIALS, TESTING AND CONSTRUCTION METHODS SHALL CONFORM TO THE ESCAMBIA COUNTY TECHNICAL SPECIFICATIONS, LATEST EDITION.
13. ANY REFERENCE TO FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION, DIVISION 1, GENERAL REQUIREMENTS AND COVENANTS, SHALL BE EXCLUDED AND NOT APPLICABLE TO ANY SPECIFICATION REFERRED HEREIN OR OTHERWISE LISTED IN THESE PLANS OR
RELATED DOCUMENTS OR THE ESCAMBIA COUNTY TECHNICAL SPECIFICATIONS.
14. EXISTING STREET AND ROAD NAME SIGNS ON THE PROJECT SHALL BE KEPT VISIBLE AT ALL TIMES FOR THE FACILITATION OF ACCESS BY EMERGENCY VEHICLES. ALL OTHER EXISTING SIGNS THAT CONFLICT WITH CONSTRUCTION OPERATIONS SHALL BE TAKEN DOWN AND STOCKPILED WITHIN THE R/W LIMITS BY THE CONTRACTOR AS DIRECTED BY THE COUNTY ENGINEER OR DESIGNEE. ANY EXISTING SIGNS THAT ARE TO BE RELOCATED AND ARE DAMAGED BEYOND USE BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
15. THE CONTRACTOR SHALL MAINTAIN AT LEAST ONE 10' OPEN LANE AT ALL TIMES. NO OPEN EXCAVATION SHALL REMAIN OVER NIGHT. CONTRACTOR
SHALL RESTORE ROAD TO TWO LANES OF TRAFFIC AT THE END OF EACH WORK DAY.
16. CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.
17. ONLY ACCESS TO THE ROAD R/W AS SHOWN IS GUARANTEED BY THE COUNTY. PRIVATE R/W REQUIRED BY THE CONTRACTOR TO FACILITATE CONSTRUCTION SHALL BE ACQUIRED BY THE CONTRACTOR WITH NO ADDITIONAL COMPENSATION OR ASSISTANCE FROM THE COUNTY.
18. IN THE EVENT THAT SURVEY MONUMENTATION OR REFERENCE POINTS ARE MISSING OR HAVE BEEN DESTROYED, PLEASE CONTACT:
MR. JOE BARRETT, PLS JACE RICARD, P.L.S.
ESCAMBIA COUNTY SURVEYOR SIGMA CONSULTING GROUP, INC
3363 WEST PARK PLACE 3298 SUMMIT BOULEVARD ; SUITE 32
PENSACOLA, FLORIDA 32505 PH (850) 595-3427 PENSACOLA, FLORIDA 32503 PH (850) 332-7912
19. VEGETATION ON R/W AND EASEMENTS SHALL BE RESTORED TO ORIGINAL CONDITION UNLESS OTHERWISE NOTED ON THE PLAN SHEETS. COST OF SAID
RESTORATION SHALL BE CONSIDERED INCIDENTAL TO OTHER PAY ITEMS.
20. GRADED AGGREGATE BASE SHALL BE REQUIRED WHERE THE SEASONAL HIGH GROUND WATER ENCROACHES WITHIN TWO (2) FEET OF THE BOTTOM OF
BASE.
21. ALL TREES WITHIN LIMITS OF CONSTRUCTION SHALL REMAIN UNLESS OTHERWISE NOTED IN PLANS.
22. ALL COMPACTED FILL SHALL BE PLACED IN 4" LIFTS FOR HAND POWERED TAMPERS AND 8" LIFTS FOR HEAVY EQUIPMENT OPERATED TAMPERS.
23. MAINTENANCE OF TRAFFIC AS PER FDOT INDEX 600.
24. ALL EXISTING MAILBOXES INTERFERING WITH NEW CONSTRUCTION SHALL BE RELOCATED OR REPLACED BY THE CONTRACTOR IN ACCORDANCE WITH POSTAL REQUIREMENTS AND IN ACCORDANCE WITH ESCAMBIA COUNTY TECHNICAL SPECIFICATION, FDOT DESIGN STANDARDS AND UNITED POSTAL REQUIREMENTS. ALL EXISTING BRICK MAILBOXES WITHIN LIMITS OF CONSTRUCTION OR COUNTY RIGHT OF WAY SHALL BE REMOVED AND PLACED ON THE PROPERTY LINE OF THE OWNER. CONTRACTOR SHALL REPLACE EXISTING BRICK MAILBOX WITH APPROVED PLASTIC BREAK AWAY MAILBOX.
25. THE CONTRACTOR SHALL, AT A MINIMUM, MATCH EXISTING SIGNING AND PAVEMENT MARKINGS. ALL SIGNING AND PAVEMENT MARKINGS SHALL BE
PLACED IN ACCORDANCE WITH THE LATEST FDOT SPECIFICATIONS AND STANDARD PLANS.
26. WHERE UNSUITABLE MATERIAL, AS DEFINED BY THE COUNTY SPECIFICATIONS SECTION 02300, 1.3(I), IS ENCOUNTERED IN THE AREAS PROPOSED FOR PAVING, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COUNTY ENGINEER OR DESIGNEE PRIOR TO ANY EXCAVATION.
27. PIPE LENGTHS SHOWN IN THE PLANS DO NOT INCLUDE THE LENGTH OF PIPE THAT MUST BE INSTALLED WITH THE MITERED END SECTION. THEREFORE, ALL PIPES LENGTHS ASSOCIATED WITH MITERED END SECTIONS SHALL BE PAID FOR IN THE UNIT COST OF THE MITERED END SECTION.
GENERAL NOTES:
UTILITY NOTES:
29. IF ARCHAEOLOGICAL MATERIAL/PREHISTORIC ARTIFACTS SUCH AS POTTERY OR CERAMICS, STONE TOOLS OR METAL IMPLEMENTS, OR ANY OTHER PHYSICAL REMAINS THAT COULD BE ASSOCIATED WITH NATIVE AMERICAN CULTURES, OR EARLY COLONIAL OR AMERICAN SETTLEMENT ARE ENCOUNTERED AT ANY TIME, THE PROJECT SHOULD CEASE ALL ACTIVITIES INVOLVING SUBSURFACE DISTURBANCE IN THE IMMEDIATE VICINITY OF SUCH DISCOVERIES. THE APPLICANT/RECIPIENT, OR OTHER DESIGNEE, SHOULD CONTACT THE FLORIDA DEPARTMENT OF STATE, DIVISION OF HISTORICAL RESOURCES, THE STATE HISTORIC PRESERVATION OFFICER (SHPO) AND THE DSH/FEMA REGION IV ENVIRONMENTAL OFFICER AND FDEM STATE ENVIRONMENTAL LIAISON OFFICER FOR FURTHER GUIDANCE. PROJECT ACTIVITIES SHOULD NOT RESUME WITHOUT
VERBAL AND/OR WRITTEN AUTHORIZATION FROM THE DIVISION OF HISTORICAL RESOURCES.
30. IN THE EVENT THAT UNMARKED HUMAN REMAINS ARE ENCOUNTERED DURING PERMITTED ACTIVITIES, ALL WORK MUST STOP IMMEDIATELY AND
THE PROPER AUTHORITIES NOTIFIED IN ACCORDANCE WITH F.S. 872.05.
1. THE LOCATION SHOWN FOR EXISTING UNDERGROUND UTILITIES IS APPROXIMATE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK IN EACH AREA. THE CONTRACTOR AGREES TO BE COMPLETELY RESPONSIBLE FOR ALL DAMAGES WHICH MIGHT OCCUR BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ALL UTILITIES.
2. UTILITY OWNERS SHALL BE NOTIFIED AT LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION SO THAT THE UTILITY OWNER CAN SPOT VERIFY AND/OR
EXPOSE THEIR UTILITIES. KNOWN UTILITIES OWNERS INCLUDE:
SEWER/WATER - EMERALD COAST UTILITY AUTHORITY ELECTRIC - FLORIDA POWER & LIGHT
MR. JACOB KEARLEY MR. STEPHEN HARRIS
P.O. BOX 15311 ONE ENERGY PLACE
PENSACOLA, FL. 32514 PH: (850) 969-5823 PENSACOLA, FL. 32520 PH: (850) 516-8499
JACOB.KEARLEY@ECUA.FL.GOV STEPHEN.HARRIS@FPL.COM
NATURAL GAS - PENSACOLA ENERGY CABLE - COX CABLE
MR. ANDREW BRISKE MR. TROY YOUNG
1625 ATWOOD DRIVE 3405 MCLEMORE DRIVE
PENSACOLA, FL. 32514 PH: (850) 474-5309 PENSACOLA, FL. 32514 PH: (850) 232-5044
ABRISKE@CITYOFPENSACOLA.COM TROY.YOUNG@COX.COM
TELEPHONE - AT&T FLORIDA SUNSHINE STATE ONE-CALL
MR. TOM MANNING 7200 LAKE ELLENOR DRIVE, SUITE 200
6689 E MAGNOLIA STREET ORLANDO, FL. 32809 PH: (800) 432-4770
MILTON, FL. 32570 PH: (850) 463-5176
TM2709@ATT.COM
ESCAMBIA COUNTY TRANSPORTATION & TRAFFIC DIVISION ESCAMBIA COUNTY SCHOOL BOARD
MR. ANDREA LUGAR MR. ROB DOSS
3363 WEST PARK PLACE 9255 STURDENVANT STREET
PENSACOLA, FL. 32505 PH:(850) 595-3639 PENSACOLA, FL 32514 PH: (850) 469-5488
ARLUGAR@MYESCAMBIA.COM
3. AT&T FLORIDA WILL COMPLETE ALL WORK DURING THE HOURS OF 7:30 AM - 4:30 PM, MONDAY THRU FRIDAY. NO NIGHT OR WEEKEND WORK.
4. ALL CABLE DAMAGE MUST BE REPORTED TO THE ATT FLORIDA REPAIR SERVICE DEPARTMENT AT 611 FROM A LAND LINE OR 877-737-2478 IF USING
A CELL PHONE.
5. ALL VEHICLE LOOP INSTALLATION SHALL BE DONE AS PER FDOT INDEX 660-001.
6. CONTRACTOR IS TO USE CAUTION WHEN WORKING IN OR AROUND AREAS OF OVERHEAD TRANSMISSION LINES AND UNDERGROUND UTILITIES.
7. UTILITIES TO REMAIN AND BE PROTECTED DURING CONSTRUCTION. NECESSARY REPAIRS SHALL BE CONSIDERED INCIDENTAL TO OTHER PAY
ITEMS AND SHALL BE TO THE SATISFACTION OF UTILITY OWNERS.
1. CONTRACTOR SHALL NOT WORK WITHIN OR ENTER THE CSX RAIILROAD R.O.W. WITHOUT A PERMIT.
PROJECT SPECIFIC NOTES:
GE
NE
RA
L N
OT
ES
S
HE
ET
PRELIMINARY
Project Number:
Date:
Drawn By:
Sheet:
R E
V
IS
IO
N
D A
TE
N
O
Designed By:
Checked By:
220904
DECEMBER 2023
M.G.M/ F.E.A
F.E.A.
J.L.L.
B R
IC
K
Y A
R D
R O
A D
D R
A
IN
A G
E
IM
PR
O
V
EM
EN
TS
B O
A R
D O
F C
O U
N
TY
C O
M M
IS
SI
O N
ER
S
ES
C
A M
B
IA
C O
U N
TY
, F
LO
R
ID
A
EN
G
IN
EE
R
IN
G D
EP
A
R
TM
EN
T
C O
N
SU
LT
IN
G G
R O
U P, I N
C
SI
G
M A
A W
A G
G O
N
ER
C O
M
PA
N Y32
S
U M
M
IT
B O
U
LE
VA
R
D
SU
IT
E
PE
N
SA
C
O
LA
, F
LO
R
ID
A
PH
O
N E:
(8
) 3
-7
C
ER
TI
FI
C
AT
E
O F
AU
TH
O R
IZ
AT
IO
N
AutoCAD SHX Text
NAME
AutoCAD SHX Text
DATE
AutoCAD SHX Text
LICENSE NO.
AutoCAD SHX Text THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION CONVEYANCE, SALES OR AS THE BASIS FOR THE ISSUANCE OF A PERMIT
AutoCAD SHX Text
JASON L. LASHLEY
AutoCAD SHX Text
SEE TITLE BLOCK
AutoCAD SHX Text 57353
Xref .\XREF\SPRING STREET - PLAN VIEW BORDER.dwg
SILT FENCE DETAIL
DETAIL OF PROPERLY
INSTALLED STRAW BALE
THE FOLLOWING NARRATIVE OF THE STORMWATER POLLUTION PREVENTION PLAN CONTAINS REFERENCES TO THE STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, THE DESIGN STANDARDS, OTHER SHEETS OF THESE CONSTRUCTION PLANS. THE FIRST SHEET OF THE CONSTRUCTION PLANS (CALLED THE KEY SHEET) CONTAINS AN INDEX TO THE OTHER SHEETS, THE COMPLETE STORMWATER POLLUTION PREVENTION PLAN INCLUDES SEVERAL ITEMS: THIS NARRATIVE DESCRIPTION, THE DOCUMENTS REFERENCES IN THIS NARRATIVE, THE CONTRACTOR'S APPROVED EROSION CONTROL PLAN REQUIRED BY FDOT
SPECIFICATION SECTION 104, AND REPORTS OF INSPECTIONS MADE DURING CONSTRUCTION.
1.0 SITE DESCRIPTION
1.A NATURE OF CONSTRUCTION ACTIVITY:
THE PROJECT CONSISTS OF CONSTRUCTING DRAINAGE SYSTEM IMPROVEMENTS TO REPAIR THE DAMAGED CROSSDRAIN INFRASTRUCTURE LOCATED ON BRICKYARD ROAD THAT WAS DAMAGED DURING HURRICANE SALLY.
1.B. SEQUENCE OF MAJOR SOIL DISTURBING ACTIVITIES:
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A DETAILED SEQUENCE OF CONSTRUCTION FOR ALL CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL FOLLOW THE SEQUENCE OF MAJOR ACTIVITIES DESCRIBED BELOW, UNLESS THE CONTRACTOR PROPOSES A DIFFERENT SEQUENCE THAT IS EQUAL OR BETTER AT
CONTROLLING EROSION AND TRAPPING SEDIMENT AND IS APPROVED BY THE ENGINEER.
FOR EACH CONSTRUCTION PHASE, INSTALL PERIMETER CONTROLS AFTER CLEARING AND GRUBBING NECESSARY FOR INSTALLATION OF CONTROLS BUT BEFORE BEGINNING OTHER WORK FOR THE CONSTRUCTION PHASE. REMOVE PERIMETER
CONTROLS ONLY AFTER ALL UPSTREAM AREAS ARE STABILIZED.
CLEARING AND GRUBBING, EARTHWORK, PIPE INSTALLATION AND ROADWAY REPAIR.
1.C. AREA ESTIMATES:
TOTAL SITE AREA: 0.8 ACRES
TOTAL AREA TO BE DISTURBED: 0.8 ACRES
1.D. RUNOFF DATA:
RUNOFF COEFFICIENTS:
BEFORE: 0.4
DURING: 0.4
AFTER: 0.4
SOILS DATA: SILT/ LOAM/ UNSUITABLE MATERIALS ANTICIPATED
FOR ADDITIONAL SOILS DATA SEE PROJECT GEOTECHNICAL REPORT PREPARED BY NOVA ENGINEERING
OUTFALL INFORMATION:
THE EXISTING STAND PIPE DISCHARGES TO A 72" OUTFALL PIPE UNDER CSX RIGHT OF WAY AND SHEETS FLOWS TO
ESCAMBIA RIVER, THAT DISCHARGES TO ESCAMBIA BAY.
1.E. SITE MAP:
THE CONSTRUCTION PLANS ARE BEING USED AS THE SITE MAPS. THE LOCATION OF THE REQUIRED INFORMATION IS DESCRIBED BELOW. THE SHEET NUMBERS FOR THE PLAN SHEETS REFERENCED ARE IDENTIFIED ON THE KEY SHEET OF THESE
CONSTRUCTION PLANS.
· APPROXIMATE SLOPES: THE SLOPES OF THE SITE CAN BE SEEN IN PLAN SHEETS
· AREAS OF SOIL DISTURBANCE: THE AREAS TO BE DISTURBED ARE INDICATED ON THE PLAN SHEETS. ANY AREAS WHERE
PERMANENT FEATURES ARE SHOWN TO BE CONSTRUCTED ABOVE OR BELOW GROUND WILL BE DISTURBED.
· AREAS NOT TO BE DISTURBED : SODDED / MAINTAINED AREAS BEYOND WEST ROW, EAST ROW.
· LOCATIONS OF TEMPORARY CONTROLS: TO BE SHOWN ON THE CONTRACTORS APPROVED EROSION CONTROL PLAN.
SEDIMENTATION BASIN AND FLOATING/ STAKED TURBIDITY BARRIER ARE SUGGESTED.
· LOCATIONS OF PERMANENT CONTROLS: SOD ALL DISTURBED NON-PAVED AREAS (EXCLUDING DITCH BOTTOM)
· AREAS TO BE STABILIZED: ROADSIDE SWALES/ DITCHES.
1.F RECEIVING WATERS:
SEE ITEM 1.D. FOR THE OUTFALL LOCATIONS AND RECEIVING WATER NAMES.
2.0 CONTROLS
2.A. EROSION AND SEDIMENT CONTROLS:
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED STABILIZATION AND STRUCTURAL PRACTICES. THE FOLLOWING RECOMMENDED GUIDELINES ARE BASED ON THE GRADING PLAN OUTLINED IN THE CONSTRUCTION PLANS. THE CONTRACTOR MAY CHOOSE TO ACCEPT THE FOLLOWING GUIDELINES OR MODIFY THEM IN THE SEDIMENT AND EROSION CONTROL PLAN, SUBJECT TO APPROVAL BY THE ENGINEER. AS WORK PROGRESSES, THE CONTRACTOR SHALL MODIFY THE PLAN TO ADAPT TO SEASONAL VARIATION, CHANGES IN CONSTRUCTION ACTIVITIES, AND THE NEED FOR BETTER PRACTICES.
FOR EACH CONSTRUCTION PHASE, INSTALL PERIMETER CONTROLS AFTER CLEARING AND GRUBBING
NECESSARY FOR INSTALLATION OF CONTROLS BUT BEFORE BEGINNING OTHER WORK FOR THE
CONSTRUCTION PHASE. REMOVE PERIMETER CONTROLS ONLY AFTER ALL UPSTREAM AREAS ARE STABILIZED.
2.A.1 STABILIZATION PRACTICES:
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE STABILIZATION PRACTICES PROPOSED TO CONTROL EROSION. THE CONTRACTOR SHALL INITIATE ALL STABILIZATION MEASURES AS SOON AS PRACTICAL, BUT IN NO CASE MORE THAN 7 DAYS, IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED. THE STABILIZATION PRACTICES SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE APPROVED BY THE ENGINEER.
THE PARAGRAPH ABOVE REFERS TO A 7 DAY LIMIT BEFORE INITIATING STABILIZATION. THE DEP GENERIC PERMIT SPECIFIES 7 DAYS, BUT STRICTER REQUIREMENTS FROM OTHER PERMITTING AGENCIES WILL OFTEN APPLY AND
SHOULD BE NOTED.
TEMPORARY:
* ARTIFICIAL COVERINGS IN ACCORDANCE WITH FDOT SPECIFICATION SECTION 104.
* TURF AND SOD IN ACCORDANCE WITH FDOT SPECIFICATION SECTION 104.
PERMANENT:
* SOD IN ACCORDANCE WITH SPECIFICATION SECTION 570 AND INDEX 105.
2.A.2 STRUCTURAL PRACTICES:
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED STRUCTURAL PRACTICES TO CONTROL OR TRAP SEDIMENT AND OTHERWISE PREVENT THE DISCHARGE OF POLLUTANTS FROM EXPOSED AREAS OF THE SITE. SEDIMENT CONTROLS SHALL BE IN PLACE BEFORE DISTURBING SOIL UPSTREAM OF THE CONTROL. THE STRUCTURAL PRACTICES SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE APPROVED BY THE ENGINEER:
TEMPORARY:
* SEDIMENT BARRIERS IN ACCORDANCE WITH FDOT SPECIFICATION SECTION 104.
* INLET PROTECTION IN ACCORDANCE WITH FDOT SPECIFICATION DETAIL 104 AND SPECIAL DETAILS SHOWN IN
THE TTC PLAN.
* SEDIMENT CONTAINMENT SYSTEM: SILT FENCE AND HAY BALES WILL BE UTILIZED AS THE TEMPORARY
SEDIMENT CONTAINMENT SYSTEM.
PERMANENT:
* SOD
2.B STORMWATER MANAGEMENT:
EXISTING ROADSIDE DITCHES COLLECT STORMWATER AND DIRECT IT TO SURROUNDING WETLAND AREAS.
2.C OTHER CONTROLS:
2.C.1 WASTE DISPOSAL:
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED METHODS TO PREVENT THE DISCHARGE OF SOLID MATERIALS, INCLUDING BUILDING MATERIALS, TO WATERS OF THE UNITED STATES. THE PROPOSED METHODS SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE APPROVED BY
THE ENGINEER:
· PROVIDING LITTLER CONTROL AND COLLECTION WITHIN THE PROJECT DURING CONSTRUCTION
ACTIVITIES.
· DISPOSING OF ALL FERTILIZER OR OTHER CHEMICAL CONTAINERS ACCORDING TO EPA'S STANDARD PRACTICES
AS DETAILED BY THE MANUFACTURER.
2.C.2 OFF-SITE VEHICLE TRACKING & DUST CONTROL:
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED METHODS FOR MINIMIZING OFFSITE VEHICLE TRACKING OF SEDIMENTS AND GENERATING DUST. THE PROPOSED METHODS SHALL
INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE APPROVED BY THE ENGINEER.
· COVERING LOADED HAUL TRUCKS WITH TARPAULINS.
· REMOVE EXCESS DIRT FROM ROADS DAILY.
· STABILIZING CONSTRUCTION ENTRANCES ACCORDING TO FDOT DESIGN STANDARDS.
· USING ROADWAY SWEEPERS DURING DUST GENERATING ACTIVITIES SUCH AS EXCAVATION AND
HANDLING OPERATIONS.
2.C.3 STATE AND LOCAL REGULATIONS FOR WASTE DISPOSAL, SANITARY SEWER, OR SEPTIC TANK REGULATIONS:
IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED PROCEDURES TO COMPLY WITH APPLICABLE STATE AND LOCAL REGULATIONS FOR WASTE DISPOSAL, AND SANITARY SEWER OR
SEPTIC SYSTEMS.
2.C.4 FERTILIZERS AND PESTICIDES:
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROCEDURES FOR APPLYING FERTILIZERS AND PESTICIDES. THE PROPOSED PROCEDURES SHALL COMPLY WITH APPLICABLE
SUBSECTION OF SECTION 570 OF THE FDOT SPECIFICATIONS.
2.C.5 TOXIC SUBSTANCES
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A LIST OF TOXIC SUBSTANCES THAT ARE LIKELY TO BE USED ON THE JOB AND PROVIDE A PLAN ADDRESSING THE GENERATION, APPLICATION, MIGRATION, STORAGE, AND DISPOSAL OF THESE SUBSTANCES.
2.D.4 APPROVED STATE AND LOCAL PLANS AND PERMITS:
· THIS PROJECT MEETS THE REQUIREMENTS FOR A PERMIT EXEMPTION PER THE NORTHWEST FLORIDA WATER
MANAGEMENT DISTRICT.
3.0 MAINTENANCE:
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A PLAN FOR MAINTAINING ALL EROSION AND SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. THE MAINTENANCE PLAN SHALL AT A MINIMUM
COMPLY WITH THE FOLLOWING:
· SILT FENCE: MAINTAIN PER FDOT SPECIFICATION SECTION 104. THE CONTRACTOR SHOULD ANTICIPATE
REPLACING SILT FENCE ON 12 MONTH INTERVALS.
· SEDIMENT BARRIERS: REMOVE SEDIMENT AS PER MANUFACTURER'S RECOMMENDATIONS OR WHEN
WATER PONDS IN UNACCEPTABLE AMOUNTS OR AREAS.
4.0 INSPECTIONS:
QUALIFIED PERSONNEL SHALL INSPECT THE FOLLOWING ITEMS AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A STORM THAT IS 0.50 INCHES OR GREATER. TO COMPLY. THE CONTRACTOR SHALL INSTALL AND MAINTAIN RAIN GAUGES AND RECORD THE DAILY RAINFALL. WHERE SITES HAVE BEEN PERMANENTLY STABILIZED, INSPECTIONS SHALL BE CONDUCTED AT LEAST ONCE EVERY MONTH. THE CONTRACTOR SHALL ALSO INSPECT THAT CONTROLS INSTALLED IN THE FIELD AGREE WITH THE LATEST STORMWATER POLLUTION PREVENTION
PLAN.
LIST OF INSPECTION ITEMS
· POINTS OF DISCHARGE TO MUNICIPAL SEPARATE STORM DRAIN SYSTEMS.
· DISTURBED AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED.
· AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION.
· STRUCTURAL CONTROLS.
· STORMWATER MANAGEMENT SYSTEMS.
· LOCATIONS WHERE VEHICLES ENTER THE SITE.
THE CONTRACTOR SHALL INITIATE REPAIRS WITHIN 24 HOURS OF INSPECTIONS THAT INDICATE ITEMS ARE NOT IN GOOD WORKING ORDER. IF INSPECTIONS INDICATE THE INSTALLED STABILIZATION AND STRUCTURAL PRACTICES ARE NOT SUFFICIENT TO MINIMIZE EROSION, RETAIN SEDIMENT, AND PREVENT DISCHARGE OF POLLUTANTS, THAT
CONTRACTOR SHALL PROVIDE ADDITIONAL MEASURES, AS APPROVED BY THE ENGINEER.
5.0 NON-STORMWATER DISCHARGES:
IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL IDENTIFY ALL ANTICIPATED NON-STORMWATER DISCHARGES (EXCEPT FLOWS FROM FIRE FIGHTING ACTIVITIES). THE CONTRACTOR SHALL DESCRIBE THE PROPOSED MEASURES TO PREVENT POLLUTION OF THESE NON-STORMWATER DISCHARGES. IF THE CONTRACTOR ENCOUNTERS CONTAMINATED SOIL OR GROUNDWATER , CONTACT ESCAMBIA COUNTY ENGINEERING.
Xref .\22X34-PLAN VIEW.dwg
SW
PP
P
SH
EE
T
PRELIMINARY
Project Number:
Date:
Drawn By:
Sheet:
R E
V
IS
IO
N
D A
TE
N
O
Designed By:
Checked By:
220904
DECEMBER 2023
M.G.M/ F.E.A
F.E.A.
J.L.L.
B R
IC
K
Y A
R D
R O
A D
D R
A
IN
A G
E
IM
PR
O
V
EM
EN
TS
B O
A R
D O
F C
O U
N
TY
C O
M M
IS
SI
O N
ER
S
ES
C
A M
B
IA
C O
U N
TY
, F
LO
R
ID
A
EN
G
IN
EE
R
IN
G D
EP
A
R
TM
EN
T
C O
N
SU
LT
IN
G G
R O
U P, I N
C
SI
G
M A
A W
A G
G O
N
ER
C O
M
PA
N Y32
S
U M
M
IT
B O
U
LE
VA
R
D
SU
IT
E
PE
N
SA
C
O
LA
, F
LO
R
ID
A
PH
O
N E:
(8
) 3
-7
C
ER
TI
FI
C
AT
E
O F
AU
TH
O R
IZ
AT
IO
N
AutoCAD SHX Text
FIBERTEX (OR APPROVED EQUAL)
AutoCAD SHX Text
MATERIAL ATTACHED TO WIRE FENCE
AutoCAD SHX Text
COMPACTED SOIL
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
TOE OF FABRIC
AutoCAD SHX Text
WIRE FENCE
AutoCAD SHX Text
NTS
AutoCAD SHX Text
FILTERED RUNOFF
AutoCAD SHX Text
BINDING WIRE OR TWINE
AutoCAD SHX Text
SEDIMENT LADEN RUNOFF
AutoCAD SHX Text
PREVENT PIPING
AutoCAD SHX Text
STAKED AND ENTRENCHED
AutoCAD SHX Text
COMPACTED SOIL TO
AutoCAD SHX Text
STRAW BALE
AutoCAD SHX Text
NTS
AutoCAD SHX Text
POST @ 6 FT. O.C. (TYP.)
AutoCAD SHX Text 2" x 4" OR 3" 0.D. TREATED TIMBER
AutoCAD SHX Text
NAME
AutoCAD SHX Text
DATE
AutoCAD SHX Text
LICENSE NO.
AutoCAD SHX Text THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION CONVEYANCE, SALES OR AS THE BASIS FOR THE ISSUANCE OF A PERMIT
AutoCAD SHX Text
JASON L. LASHLEY
AutoCAD SHX Text
SEE TITLE BLOCK
12+62
10+00 11+00 12+00
7+
DAM CROSSING PROFILE PROFILE
22.00
26.00
30.00
34.00
38.00
10+00 11+00 12+00 12+50
EX
: 2
3.
EX
: 2
6.
EX
: 2
8.
EX
: 3
9.
EX
: 3
7.
EX
: 2
5.
EX
: 3
7.
EX
: 3
4.
EX
: 1
9.
INV ELEV:22.34
INV ELEV:20.43
INV ELEV:19.91
-1:21:
INV ELEV:23.84
N
S
W E
PL
A
N
PR
O
FI
LE
S H
EE
T
HORIZONTAL SCALE = 1"-20'
VERTICAL SCALE = 1"-5'
PRELIMINARY
EXISTING 48" CMP
STANDPIPE
EXISTING BLOCK/BRICK
WALL
EXISTING 36" CMP
PIPE
EXISTING 48" CMP
STANDPIPE
59 LF OF EXISTING
36" CMP PIPE
61 LF OF EXISTING 72" RCP
PIPE (TO BE PROTECTED)
EXISTING CONDITIONS
EXISTING SCOURHOLE
Project Number:
Date:
Drawn By:
Sheet:
R E
V
IS
IO
N
D A
TE
N
O
Designed By:
Checked By:
220904
DECEMBER 2023
M.G.M/ F.E.A
F.E.A.
J.L.L.
B R
IC
K
Y A
R D
R O
A D
D R
A
IN
A G
E
IM
PR
O
V
EM
EN
TS
B O
A R
D O
F C
O U
N
TY
C O
M M
IS
SI
O N
ER
S
ES
C
A M
B
IA
C O
U N
TY
, F
LO
R
ID
A
EN
G
IN
EE
R
IN
G D
EP
A
R
TM
EN
T
C O
N
SU
LT
IN
G G
R O
U P, I N
C
SI
G
M A
A W
A G
G O
N
ER
C O
M
PA
N Y32
S
U M
M
IT
B O
U
LE
VA
R
D
SU
IT
E
PE
N
SA
C
O
LA
, F
LO
R
ID
A
PH
O
N E:
(8
) 3
-7
C
ER
TI
FI
C
AT
E
O F
AU
TH
O R
IZ
AT
IO
N
APPARENT CSX
RAILROAD R.O.W.
APPARENT ESCAMBIA
COUNTY R.O.W.
APPARENT CSX
RAILROAD R.O.W.
APPARENT ESCAMBIA
COUNTY R.O.W.
Feet
40200
APPARENT CSX
RAILROAD R.O.W.
EXISTING 72"
RCP PIPE
EXISTING WATERS EDGE
EXISTING
ROAD
EXISTING BRICK
RETAINING WALL
EXISTING POWERPOLE
(TO BE PROTECTED)
APPARENT CSX
RAILROAD R.O.W.
EXISTING GRADE
EXISTING
GRADE
EXISTING WETLANDS
EXISTING WETLANDS
AutoCAD SHX Text
NAME
AutoCAD SHX Text
DATE
AutoCAD SHX Text
LICENSE NO.
AutoCAD SHX Text THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION CONVEYANCE, SALES OR AS THE BASIS FOR THE ISSUANCE OF A PERMIT
AutoCAD SHX Text
JASON L. LASHLEY
AutoCAD SHX Text
SEE TITLE BLOCK
12+62
10+00 11+00
12+00
7+
167' of 36" RCP @ 3.08%
26 27
28 29 30
DAM CROSSING PROFILE PROFILE
22.00
26.00
30.00
34.00
38.00
10+00 11+00 12+00 12+50
EX
: 2
3.
PR
EX
: 2
6.
PR
: 2
5.
EX
: 2
8.
PR
: 3
2.
EX
: 3
9.
PR
EX
: 3
7.
PR
EX
: 2
5.
PR
EX
: 3
7.
PR
EX
: 3
4.
PR
EX
: 1
9.
PR
-2.0% 3:1 2:
1 -2:1
6.0%
3:1
167' of 36" RCP @ 3.08%
N
S
W E
PL
A
N
PR
O
FI
LE
S H
EE
T
HORIZONTAL SCALE = 1"-20'
VERTICAL SCALE = 1"-5'
PRELIMINARY
PROPOSED DRAINAGE
EASEMENT (48'X40')
PROPOSED EARTHFILL
PROPOSED GUARDRAIL
PROPOSED EARTHFILL
PROPOSED CONDITIONS
PROPOSED
ARMORING (81 SY)
PROPOSED
ARMORING (50 SY)
EXISTING E.O.P.
Project Number:
Date:
Drawn By:
Sheet:
R E
V
IS
IO
N
D A
TE
N
O
Designed By:
Checked By:
220904
DECEMBER 2023
M.G.M/ F.E.A
F.E.A.
J.L.L.
B R
IC
K
Y A
R D
R O
A D
D R
A
IN
A G
E
IM
PR
O
V
EM
EN
TS
B O
A R
D O
F C
O U
N
TY
C O
M M
IS
SI
O N
ER
S
ES
C
A M
B
IA
C O
U N
TY
, F
LO
R
ID
A
EN
G
IN
EE
R
IN
G D
EP
A
R
TM
EN
T
C O
N
SU
LT
IN
G G
R O
U P, I N
C
SI
G
M A
A W
A G
G O
N
ER
C O
M
PA
N Y32
S
U M
M
IT
B O
U
LE
VA
R
D
SU
IT
E
PE
N
SA
C
O
LA
, F
LO
R
ID
A
PH
O
N E:
(8
) 3
-7
C
ER
TI
FI
C
AT
E
O F
AU
TH
O R
IZ
AT
IO
N
APPARENT CSX
RAILROAD R.O.W.
APPARENT ESCAMBIA
COUNTY R.O.W.
Feet
40200
PROPOSED GUARDRAIL
(100 LF)
EXISTING 48" CMP STANDPIPE
(TO BE REMOVED)
EXISTING SHEET
PILE WALL
PROPOSED GUARDRAIL
(100 LF)
APPARENT CSX RAILROAD R.O.W.
REMOVE AND REPLACE
244 SY OF ASPHALT
APPARENT CSX
RAILROAD R.O.W.
PROJECT SPECIFIC NOTES:
1. CONTRACTOR SHALL NOT WORK WITHIN OR ENTER
THE CSX RAIILROAD R.O.W. WITHOUT AUTHORIZATION
APPARENT CSX
RAILROAD R.O.W.
APPARENT ESC.
CO. R.O.W.
10'
PROPOSED TYPE "H" (4 GRATE)
DITCH BOTTOM INLET WITH
SLOTS (N+S)
TOP: 30.00'
INV.: 20.43'
CONSTRUCT 36'' MES
PER FDOT INDEX
NO. 430-022
INV. EL. 24.66'
EXISTING GRADE
PROPOSED 36''
CONCRETE PIPE
PROPOSED 50'' STEEL
CASING
A A
JACK & BORE 66 LF OF 50''
STEEL CASING
PROPOSED GRADE
SEE CROSS SECTION
ON SHEET 7
CONSTRUCT 18'' RIP-RAP
UNDERDRAIN WITH
FILTER-FABRIC (25 SY)
CONSTRUCT 36''
HEADWALL PER FDOT
INDEX NO. 430-030
INV EL. 19.89'
CONSTRUCT 36''
HEADWALL
WETLANDS LINE
TEMPORARY WETLANDS
IMPACTS (242 SY)
PROPOSED PERMANENT
WETLANDS IMPACTS (53 SY, 124 CY)
LEGEND
-ARMORING
-FILL
- PERMANENT WETLANDS IMPACTS
- TEMPORARY WETLANDS IMPACTS
AutoCAD SHX Text
NAME
AutoCAD SHX Text
DATE
AutoCAD SHX Text
LICENSE NO.
AutoCAD SHX Text THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION CONVEYANCE, SALES OR AS THE BASIS FOR THE ISSUANCE OF A PERMIT
AutoCAD SHX Text
JASON L. LASHLEY
AutoCAD SHX Text
SEE TITLE BLOCK
+0
6+00 7+00 8+00
33 34
36 37 38 39
27 28 29
38 38
6+00 7+00 8+00
22.00
26.00
30.00
34.00
38.00
6+00 7+00 8+00
EX
: 2
8.
PR
: 3
1.
EX
: 2
8.
PR
: 3
0.
EX
: 2
7.
PR
: 3
0.
EX
: 2
5.
PR
: 3
0.
EX
: 2
5.
PR
: 2
9.
EX
: 2
6.
PR
: 3
0.
EX
: 2
7.
PR
: 3
1.
-1.2% 4.0%
PL
A
N
PR
O
FI
LE
S H
EE
T
HORIZONTAL SCALE = 1"-20'
VERTICAL SCALE = 1"-5'
PRELIMINARY
BRICKYARD ROAD
Project Number:
Date:
Drawn By:
Sheet:
R E
V
IS
IO
N
D A
TE
N
O
Designed By:
Checked By:
220904
DECEMBER 2023
M.G.M/ F.E.A
F.E.A.
J.L.L.
B R
IC
K
Y A
R D
R O
A D
D R
A
IN
A G
E
IM
PR
O
V
EM
EN
TS
B O
A R
D O
F C
O U
N
TY
C O
M M
IS
SI
O N
ER
S
ES
C
A M
B
IA
C O
U N
TY
, F
LO
R
ID
A
EN
G
IN
EE
R
IN
G D
EP
A
R
TM
EN
T
C O
N
SU
LT
IN
G G
R O
U P, I N
C
SI
G
M A
A W
A G
G O
N
ER
C O
M
PA
N Y32
S
U M
M
IT
B O
U
LE
VA
R
D
SU
IT
E
PE
N
SA
C
O
LA
, F
LO
R
ID
A
PH
O
N E:
(8
) 3
-7
C
ER
TI
FI
C
AT
E
O F
AU
TH
O R
IZ
AT
IO
N
EXISTING E.O.P.
APPARENT CSX
RAILROAD R.O.W.
APPARENT ESCAMBIA
COUNTY R.O.W.
N
S
W E
Feet
40200
PROPOSED 36" RCP
LEGEND
-ARMORING
-FILL
EXISTING 72'' PIPE
PROPOSED TYPE "H" DITCH
BOTTOM INLET
EXISTING DITCH GRADE
PROPOSED DITCH
GRADE
PROPOSED FILL
(1250 CY)
- PERMANENT WETLANDS IMPACTS
- TEMPORARY WETLANDS IMPACTS
AutoCAD SHX Text
NAME
AutoCAD SHX Text
DATE
AutoCAD SHX Text
LICENSE NO.
AutoCAD SHX Text THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION CONVEYANCE, SALES OR AS THE BASIS FOR THE ISSUANCE OF A PERMIT
AutoCAD SHX Text
JASON L. LASHLEY
AutoCAD SHX Text
SEE TITLE BLOCK
7+20.00
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100
3.7:1 -3:1
2:1 -2:1
X .S
S H
EE
T
PRELIMINARY
Project Number:
Date:
Drawn By:
Sheet:
R E
V
IS
IO
N
D A
TE
N
O
Designed By:
Checked By:
220904
DECEMBER 2023
M.G.M/ F.E.A
F.E.A.
J.L.L.
B R
IC
K
Y A
R D
R O
A D
D R
A
IN
A G
E
IM
PR
O
V
EM
EN
TS
B O
A R
D O
F C
O U
N
TY
C O
M M
IS
SI
O N
ER
S
ES
C
A M
B
IA
C O
U N
TY
, F
LO
R
ID
A
EN
G
IN
EE
R
IN
G D
EP
A
R
TM
EN
T
C O
N
SU
LT
IN
G G
R O
U P, I N
C
SI
G
M A
A W
A G
G O
N
ER
C O
M
PA
N Y32
S
U M
M
IT
B O
U
LE
VA
R
D
SU
IT
E
PE
N
SA
C
O
LA
, F
LO
R
ID
A
PH
O
N E:
(8
) 3
-7
C
ER
TI
FI
C
AT
E
O F
AU
TH
O R
IZ
AT
IO
N
EXISTING GRADE
PROPOSED GRADE EXISTING 72'' PIPE
PROPOSED TYPE "H" DITCH
BOTTOM INLET
CROSS SECTION A-A
HORIZONTAL SCALE = 1"-20'
VERTICAL SCALE = 1"-20'
CONNECT PROPOSED INLET
TO EXISTING 72'' PIPE
BRICKYARD - TYPICAL SECTION
STA 06+63 - STA 07+63
11'
LANE
11'
LANE
4' G
R
AS
S
SH
O U
LD
ER
4' G
R
AS
S
SH
O U
LD
ER
(WIDTH VARIES) (WIDTH VARIES)
SURVEYED R.O.W.SURVEYED R.O.W.
2" ASPHALT
3:1
12" STABILIZED SUBGRADE
2% 2% 3:1
6% 6%
6" GRADED AGGREGATE BASE
AutoCAD SHX Text
NAME
AutoCAD SHX Text
DATE
AutoCAD SHX Text
LICENSE NO.
AutoCAD SHX Text THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION CONVEYANCE, SALES OR AS THE BASIS FOR THE ISSUANCE OF A PERMIT
AutoCAD SHX Text
JASON L. LASHLEY
AutoCAD SHX Text
SEE TITLE BLOCK
File details come from the government source that posted it. Updated .