Armstrong Avenue Pedestrian Bridge (CIP No. 70257) & Neighborhood D South Phase 2 Package #2 Improvements (CIP No. 70256)
Closed State & local contract opportunity
- Solicitation number
- CIP Nos. 70257 and 70256
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91101 C.i.p., Advertising
- 91115 C.i.p., Construction/Rehabilitation, Other Than Buildings
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91313 Construction, Bridge And Drawbridge (Includes Reconstruction/Rehabilitation)
- 914 Construction Services, Trades, New Construction
- 91502 Advertising (Including Notice Of Bid Solicitation, Statutory Notices)
- 92513 Bridge Engineering
- 92517 Civil Engineering
- 968 Public Works And Related Services
- UNSPSC codes
- 72141205 Drainage system construction service
- 72141206 Dredging service
- 81101500 Civil engineering
- 95121627 Footbridge
- 95121625 Road bridge
- 70170000 Water resources development and oversight
- 95121601 Steel bridge
- 95121602 Dry dock
- 72140000 Heavy construction services
- 72141107 Bridge construction and repair service
- Point of contact
-
- Hy Dang-Libunao hdang-libunao@tustinca.org (714) 573-3148
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Tustin is seeking sealed bids for a comprehensive infrastructure project in Orange County, California, involving the Armstrong Avenue Pedestrian Bridge (CIP No. 70257) and Neighborhood D South Phase 2 Package #2 Improvements (CIP No. 70256). The procurement encompasses a wide range of construction services, including fine grading, ARHM roadway overlay, utility infrastructure work, hardscape, landscaping, irrigation, pavement striping, traffic signal installation, street and pathway lighting, and pedestrian bridge construction. The project area is bounded by Armstrong Avenue, Warner Avenue, Airship Avenue, and Compass Avenue, with a linear park located west of Armstrong Avenue. Contractors must provide all necessary labor, materials, tools, and equipment to complete the specified improvements. A pre-bid meeting was held on August 28, 2025, at 9:30 am, with bids due on September 30, 2025, at 2:00 pm. Bidders are required to possess a Class A contractor's license and must submit comprehensive documentation, including a bid bond, list of subcontractors, ready-mix concrete suppliers, references, and insurance certificates. The project is scheduled for 300 working days, with liquidated damages of $8,500 per calendar day.
The procurement does not explicitly mention specific set-aside designations or restrictions for disadvantaged enterprises. The Engineer's estimate for the project ranges from $10.8 million to $12.3 million, indicating a significant municipal investment in infrastructure improvement. Bidders must electronically submit their responses through the OpenGov procurement system and mail a hard copy of the bid bond to the City Clerk. The apparent low bidder will need to submit additional documentation within 10 working days, including payment, performance, and guaranty bonds, as well as insurance certificates. The project involves multiple utility infrastructure components, including electrical work by Southern California Edison and telecommunications infrastructure by AT&T, suggesting potential integration requirements with existing utility networks. The comprehensive nature of the project, including a technologically advanced pedestrian bridge with integrated lighting systems and sensors, indicates a sophisticated municipal infrastructure development initiative. Contractors will need to demonstrate advanced technical capabilities in civil engineering, electrical systems, and urban infrastructure construction to successfully execute the project.
Opportunity text
NOTICE IS HEREBY GIVEN that the CITY OF TUSTIN, as AGENCY, invites sealed bids for the above stated project and will receive bids for construction, materials, supplies, equipment, and/or services set forth herein, subject to all conditions outlined in the Bid Package.
Scope of Work: This work shall consist in part of furnishing all labor, materials, tools, equipment and incidentals as required by the plans, specifications and contract documents for the above stated project.
The work to be done hereunder consists of fine grading, ARHM roadway overlay, removals and adjustments, dry utilities, hardscape, landscaping and irrigation, pavement striping, signing and delineation, traffic signal installation and interconnect, street lighting, pathway lighting, and the construction of a pedestrian bridge:
- The Neighborhood D South area is generally bounded by Armstrong Ave, Warner Avenue, Airship Ave and Compass Avenue.
- The Linear Park area is generally west of Armstrong Ave and north of Airship Ave.
- Armstrong Pedestrian Bridge spans over Armstrong Avenue, southwest of Warner Avenue and north of Airship Avenue.
Files
Show all 24