About this file

These are technical civil engineering design drawings for an AT&T underground conduit construction project located in the Santa Ana Exchange, Redhill C.O. Area in California. The documents, prepared by CHC Consulting, detail underground infrastructure installation across multiple streets including Airship Avenue, Veterans Way, Compass Avenue, Flight Way, Helber Way, Peebler Way, Swaim Way, and John Johnson Way. The drawings are comprehensive site plans showing precise underground utility duct routing, trench specifications, curve data, and construction notes for a telecommunications infrastructure project.

The drawings include detailed specifications for installing various sized conduit ducts (ranging from 2-4 inches), joint trenches with power connections, and underground infrastructure. Each drawing provides specific technical details including exact measurements, ground line specifications, curve calculations, and construction requirements. The project emphasizes adherence to traffic control guidelines, environmental management practices, and compliance with local regulations. Specific construction notes highlight requirements such as minimum cover for structures, excavation protocols, and the need to follow traffic control manuals during installation. The project appears to be part of a broader telecommunications network expansion or upgrade in the Santa Ana region of California.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

A R

M S

TR

O

N G

A V E

AIRSHIP AVE AIRSHIP AVE

CURVE DATA

MH #2801

12' X 6' X 7'

CFV = 504

SOUTH WALL

LOOKING SOUTH

PICK UP 4-4" DUCTS

@ STA 10+73.49

H E

LB

E R W

A Y

WARNER AVE

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

N

L-1

AIRSHIP AVE

JOHN JOHNSON WAY

VE

TE

R A N

S W

A Y

CURVE DATA

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-2

JOHN JOHNSON WAY

VE

TE

R A N

S W

A Y

CURVE DATA

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-3

CURVE DATA

AIRSHIP AVE

C O

M P A S

S A

VE

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-4

C O

M P A S S A

VE

CURVE DATA

PEEBLER WAY

C O

M P A S S A

VE

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-5

SWAIM WAY

C O

M P A S S A

VE C

O

M P A S

S A

VE

CURVE DATADATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-6

H E

LB

E R

W A Y

CURVE DATA

PEEBLER WAYPEEBLER WAY

V E

TE

R A N

S W

A Y

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-7

CURVE DATA

VE

TE

R A N

S W

A Y

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-8

C O

M P A S S A

VE

CURVE DATA

FLIGHT WAY

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-9

FLIGHT WAY

VE

TE

R A N

S W

A Y

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-10

A R M

S T R O

N G

A V E

FLIGHT WAY

H E

LB

E R

W A Y

CURVE DATA

CURVE DATA

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-11

Sheets and Views
LE(70) A01QK1Y LAYOUT-LAYOUT1 (2)
LE(70) A01QK1Y LAYOUT-LAYOUT1
LE(70) A01QK1Y LAYOUT-LAYOUT1 (5)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (3)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (4)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (6)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (7)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (8)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (9)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (10)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (11)

File details come from the government source that posted it. Updated .