AT&T_LE(70)_A01QK1Y.pdf
PDF 4 MB Posted
- Solicitation number
- CIP Nos. 70257 and 70256
- Issued by
- Orange County, California
About this file
These are technical civil engineering design drawings for an AT&T underground conduit construction project located in the Santa Ana Exchange, Redhill C.O. Area in California. The documents, prepared by CHC Consulting, detail underground infrastructure installation across multiple streets including Airship Avenue, Veterans Way, Compass Avenue, Flight Way, Helber Way, Peebler Way, Swaim Way, and John Johnson Way. The drawings are comprehensive site plans showing precise underground utility duct routing, trench specifications, curve data, and construction notes for a telecommunications infrastructure project.
The drawings include detailed specifications for installing various sized conduit ducts (ranging from 2-4 inches), joint trenches with power connections, and underground infrastructure. Each drawing provides specific technical details including exact measurements, ground line specifications, curve calculations, and construction requirements. The project emphasizes adherence to traffic control guidelines, environmental management practices, and compliance with local regulations. Specific construction notes highlight requirements such as minimum cover for structures, excavation protocols, and the need to follow traffic control manuals during installation. The project appears to be part of a broader telecommunications network expansion or upgrade in the Santa Ana region of California.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
A R
M S
TR
O
N G
A V E
AIRSHIP AVE AIRSHIP AVE
CURVE DATA
MH #2801
12' X 6' X 7'
CFV = 504
SOUTH WALL
LOOKING SOUTH
PICK UP 4-4" DUCTS
@ STA 10+73.49
H E
LB
E R W
A Y
WARNER AVE
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
N
L-1
AIRSHIP AVE
JOHN JOHNSON WAY
VE
TE
R A N
S W
A Y
CURVE DATA
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-2
JOHN JOHNSON WAY
VE
TE
R A N
S W
A Y
CURVE DATA
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-3
CURVE DATA
AIRSHIP AVE
C O
M P A S
S A
VE
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-4
C O
M P A S S A
VE
CURVE DATA
PEEBLER WAY
C O
M P A S S A
VE
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-5
SWAIM WAY
C O
M P A S S A
VE C
O
M P A S
S A
VE
CURVE DATADATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-6
H E
LB
E R
W A Y
CURVE DATA
PEEBLER WAYPEEBLER WAY
V E
TE
R A N
S W
A Y
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-7
CURVE DATA
VE
TE
R A N
S W
A Y
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-8
C O
M P A S S A
VE
CURVE DATA
FLIGHT WAY
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-9
FLIGHT WAY
VE
TE
R A N
S W
A Y
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-10
A R M
S T R O
N G
A V E
FLIGHT WAY
H E
LB
E R
W A Y
CURVE DATA
CURVE DATA
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-11
| Sheets and Views |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (2) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (5) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (3) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (4) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (6) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (7) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (8) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (9) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (10) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (11) |
File details come from the government source that posted it. Updated .