Tustin_Legacy_-_Gas_Plan_-_Phase_2.pdf

PDF 303 KB Posted

Attached to
Armstrong Avenue Pedestrian Bridge (CIP No. 70257) & Neighborhood D South Phase 2 Package #2 Improvements (CIP No. 70256)
Solicitation number
CIP Nos. 70257 and 70256
Issued by
Orange County, California

About this file

Summary of Tustin Legacy Gas Plan Phase 2 Document

This is a pre-planning engineering drawing for the City of Tustin's infrastructure project involving gas utility line placement in the Neighborhood D South Phase 2 area of Orange County, California. The drawing depicts a gas plan layout for the project bounded by Armstrong Avenue, Warner Avenue, Airship Avenue, and Compass Avenue, showing existing and proposed utility infrastructure including three separate gas lines (a 4-inch PP line, a 3-inch PD line, and a 2-inch PD line) with specific locations, measurements, and notification numbers. The drawing is scaled at 1 inch equals 40 feet and includes street dimensions, curb measurements, and reference points along John Johnson Way, Veterans Way, Warner Avenue, and Airship Avenue. This document is explicitly marked "Not for Construction" and is intended solely for pre-planning and project-level planning purposes, with notification number 31613057 referenced for tracking purposes. The associated bid package indicates a pre-bid meeting was held on August 28, 2025, with sealed bids due September 30, 2025, at 2:00 pm, and the project is scheduled for 300 working days of construction.

The project scope encompasses multiple infrastructure components including fine grading, roadway overlay, utility work, hardscape, landscaping, irrigation, pavement striping, traffic signals, and pedestrian bridge construction as part of the comprehensive Armstrong Avenue Pedestrian Bridge (CIP No. 70257) and Neighborhood D South Phase 2 Package #2 Improvements (CIP No. 70256) initiative. The Engineer's estimate ranges from $10.8 million to $12.3 million, with liquidated damages of $8,500 per calendar day. Contractors must possess a Class A license and submit bid bonds, subcontractor lists, references, and insurance certificates through the OpenGov procurement system, with hard copies mailed to the City Clerk. The apparent low bidder must submit additional documentation including performance bonds and guaranty bonds within 10 working days. Integration with Southern California Edison and AT&T utility networks is required, indicating coordination with existing municipal infrastructure systems.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C L

C L

C L

CL

C L

C L

C L

C L

C L

CL

3'

4'

4'

60'

4'

4'40

3'

AIRSHIP

AVE

WARNER

AVE

(1 0'

C U

R B)

(1 0'

C U

R B)

(1 6'

' C U

R B)

VE

TE

R

AN

S

W

AY

44244-071

07-14

4" PP

30163077

11-21

3" PD

-2

2" P

D

' 21

56'

56'

70'

JOHN JOHNSON

WAY

CL

CL

CL

CL

301630773" PD 11/21

2'

7'

(1 6'

' C U

R B)

4'

4'

4'

0'

0'

3'

EC

N

1" = 40'

N1" = 0'WL

This print should only be used for pre-planning and project-level planning. Do not send this print to construction.

NOTIFICATION # 31613057

Sheets and Views
Not for Construction

File details come from the government source that posted it. Updated .