AT&T_LE(70)_A01QK1Y.pdf
PDF 4 MB Posted
- Solicitation number
- CIP Nos. 70257 and 70256
- Issued by
- Orange County, California
About this file
This is a construction design document prepared by CHC Consulting for the City of Tustin's Armstrong Avenue and Neighborhood D South infrastructure project in Santa Ana, California. The document consists of 11 layout sheets (LE(70) A01QK1Y) detailing conduit construction specifications across multiple streets including Armstrong Avenue, Airship Avenue, Warner Avenue, Veterans Way, John Johnson Way, Compass Avenue, Peebler Way, Swaim Way, Helber Way, and Flight Way. Each layout sheet displays curve data, manhole specifications (including dimensions such as 12' X 6' X 7' with a capacity factor volume of 504), and duct pickup locations at specific stations. The design drawings indicate underground utility infrastructure installation, including 4-inch ducts at designated locations, with AT&T telecommunications infrastructure integration noted throughout the document. The project area encompasses the neighborhood bounded by Armstrong Avenue, Warner Avenue, Airship Avenue, and Compass Avenue.
The document serves as technical construction guidance for underground conduit installation as part of the broader Armstrong Avenue Pedestrian Bridge and Neighborhood D South Phase 2 Package #2 Improvements project. These design plans support the comprehensive municipal infrastructure development initiative with an Engineer's estimate ranging from $10.8 million to $12.3 million. The conduit construction detailed in these layouts integrates with multiple utility systems, including AT&T telecommunications infrastructure and other dry utility work specified in the project scope. The design documents were prepared by CHC Consulting and include coordination with design engineers, exchange engineers, and subway inspectors to ensure compliance with construction specifications and municipal standards.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
A R
M S
TR
O
N G
A V E
AIRSHIP AVE AIRSHIP AVE
CURVE DATA
MH #2801
12' X 6' X 7'
CFV = 504
SOUTH WALL
LOOKING SOUTH
PICK UP 4-4" DUCTS
@ STA 10+73.49
H E
LB
E R W
A Y
WARNER AVE
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
N
L-1
AIRSHIP AVE
JOHN JOHNSON WAY
VE
TE
R A N
S W
A Y
CURVE DATA
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-2
JOHN JOHNSON WAY
VE
TE
R A N
S W
A Y
CURVE DATA
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-3
CURVE DATA
AIRSHIP AVE
C O
M P A S
S A
VE
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-4
C O
M P A S S A
VE
CURVE DATA
PEEBLER WAY
C O
M P A S S A
VE
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-5
SWAIM WAY
C O
M P A S S A
VE C
O
M P A S
S A
VE
CURVE DATADATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-6
H E
LB
E R
W A Y
CURVE DATA
PEEBLER WAYPEEBLER WAY
V E
TE
R A N
S W
A Y
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-7
CURVE DATA
VE
TE
R A N
S W
A Y
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-8
C O
M P A S S A
VE
CURVE DATA
FLIGHT WAY
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-9
FLIGHT WAY
VE
TE
R A N
S W
A Y
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-10
A R M
S T R O
N G
A V E
FLIGHT WAY
H E
LB
E R
W A Y
CURVE DATA
CURVE DATA
DATE REVISIONS
DWG.
SCALE
MAP #
T.G.M.
U.G. DESIGN ENGINEER:
EXCHANGE ENGINEER:
SUBWAY INSPECTOR:
LE(70) A01QK1Y
CONTRACTOR :
DA# N/A
CHC CONSULTING
CONDUIT CONSTRUCTION
California OF 11
SANTA ANA EXCHANGE
REDHILL C.O. AREA
CONSTRUCTION NOTES
L-11
| Sheets and Views |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (2) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (5) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (3) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (4) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (6) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (7) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (8) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (9) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (10) |
| LE(70) A01QK1Y LAYOUT-LAYOUT1 (11) |
File details come from the government source that posted it. Updated .