Apron pavement rehabilitation - phase 2
Awarded State & local contract opportunity Posted
- Solicitation number
- 82
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90567 Runway Services (Not Otherwise Classified)
- 90646 Highways; Streets; Airport Pay-Parking Lots - Architectural
- 90910 Airport Facility Construction
- 90911 Airport Facility Maintenance And Repair
- 91310 Construction: Airport Roadway, Runway And Taxiway
- 91364 Maintenance And Repair: Airport Roadway, Runway And Taxiway
- UNSPSC codes
- Point of contact
-
- Andrew Wiersma awiersma@daltonga.gov (706) 259-2200
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Dalton, Georgia received sealed bids for Apron Pavement Rehabilitation — Phase 2 at Dalton Municipal Airport under Croy Engineering Project 2106.005, with bids due December 7, 2022 at 2:00 p.m. local time. The contract has been awarded.
The scope consists of removal and replacement of existing asphalt pavement adjacent to the airport terminal building, replacement of existing underground storm sewer piping, and placement of airfield pavement markings. Work is located at Dalton Municipal Airport, 4483 Airport Road, Dalton, Georgia.
A non-mandatory pre-bid meeting was held November 21, 2022 at 2:00 p.m. local time at the airport site. Electronic copies of plans and bid documents were available in PDF format at no cost upon request from awiersma@daltonga.gov. Sealed bids were opened and publicly read aloud at City Hall, 300 W Waugh Street, Dalton, Georgia 30720.
Opportunity text
Sealed bids will be received by the City of Dalton, Georgia at City Hall 300 W Waugh Street, Dalton, Georgia 30720 on December 7, 2022 until 2:00 P.M. Local Time and at that time opened and publicly read aloud for the improvements to the Airport as listed herein. Envelopes containing bids must be sealed, addressed to the undersigned, and marked as follows: "Bid for Construction: Ramp Rehab at Dalton Municipal Airport - Croy Engineering Project 2106.005." A non-mandatory pre-bid meeting will be held Monday, November 21, 2022, 2:00 PM Local Time at the Dalton Municipal Airport 4483 Airport Road, Dalton, GA 30721. PROJECT DESCRIPTION APRON PAVEMENT REHABILITATION - PHASE 2 The work will consist of, but is not limited to, removal and replacement of existing asphalt pavement adjacent to the airport terminal building, replacement of existing underground storm sewer piping, and placement of airfield pavement markings. The location of the work is at the Dalton Municipal Airport, Dalton, Georgia. Please email awiersma@daltonga.gov for an electronic copy of the plans and bid documents in pdf format sent via email, free of charge.