Z2DA--Endo Suite Finish (436-23-132)

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C25924Q0099
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The solicitation seeks a general contractor to replace approximately 1,200 square feet of existing sheet vinyl flooring and ceramic wall tile with epoxy flooring, wall coatings, and a flushing faucet at the Montana VA Health Care System. The Department of Veterans Affairs is seeking quotes from qualified contractors to complete the work within 30 days of notice to proceed, in accordance with submittal requirements, safety plans, infection controls and other construction protocols. Proposals are due by January 16, 2024.

The solicitation does not designate any set-asides. The work will be performed at the Montana VA Health Care System facility in Fort Harrison, Montana, for an estimated value between $100,000 to $250,000. The selected contractor must obtain photo identification badges for all employees and implement infection control and interim life safety measures throughout the 30-day performance period.

Notice text

3 versions

Update #3 · Latest ·

Attachments

Update #2 ·

Refer to SF-30

Update #1 ·

2

Rocky Mountain Network 19 | Montana VA Health Care System (436)

3687 Veterans Drive | P.O. Box 1500

Fort Harrison, MT 59636-1500

1.877.468.8387 | 406.442.6410

www.montana.va.gov

Statement of Work

Endo Suite Finish

Project Scope

The VA Montana Healthcare System requires the services of a qualified General Contracting firm to provide construction services for the replacement of approximately 1200 square feet of existing sheet vinyl flooring with VA approved high build glazed epoxy coating on walls and epoxy/resinous anti-skid flooring with 6-inch integral base. The VA also requires the installation of a flushing faucet to be installed in one of the procedure rooms.

The Contractor shall also be responsible for all damages to persons or property that occurs as a result of the Contractor s fault or negligence.

The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

Existing Site Conditions. The project will take place in an occupied healthcare facility and the build activities will require construction to be phased in such a way as to minimize impact to staff and patients. Infection Control measures will be always required as defined in ICRA assessment, Level IV, Category 4, Type C. Construction activity will require constant coordination with VA personnel.

Site Investigation is required for this project to ensure accuracy of design. The Contractor shall be responsible for field verifying all conditions and quantities that may affect the project work prior to bid of this project. Site investigation is to be included in the cost proposal. This work can be performed directly by the General Contracting firm, or indirectly via contract to a third party (Sub-Contractors). The person(s) conducting the site investigation are to check in with the VA Facilities Management Services department and will be escorted to review the project for not less than 4 hours by the VA Contracting Officer Representative (COR). This work can be done in advance and is intended to limit unforeseen site conditions not indicated on the drawings.

The final construction shall conform to all VA requirements outlined in the FGI Guidelines for Design and Construction of Hospitals, Facilities Guideline Institute (FGI), ADA, Joint Commission Accreditation Standards, ANSI, SMACNA, IBC, NEC, NFPA as well all requirements of the VA design manuals posted by discipline in the VA Technical Information Library at the following web address: http://www.cfm.va.gov/til/dManual.asp

Work shall be completed in conformance with the period of performance and the approved project schedule. The Contractor is solely responsible for preparing all necessary regulatory notifications to meet the time schedule.

Due to requirements in NFPA 101 Life Safety Code, a minimum of two egress routes for each occupied space must be maintained. To ensure the safety of VA patients, staff, and tenants, work is to be structured to allow for egress routes to be maintained throughout the course of construction. Work requiring relocation of tenants, is subject to notification requirements. If Contractor provides a schedule resulting in any violations of NFPA 101 Life Safety Code during any work, they must also submit proposed interim life safety measures for VA review. Any action necessitated by NFPA 101 Life Safety Code will be the responsibility of the Contractor.

Tasks and Requirements

General Contractor Requirements

Submittals must be reviewed and approved by the VA prior to the start of work.

Project schedule with sequencing, durations, phasing, etc.

All material submittals submit to COR for approval.

Health and safety plan will be submitted to the COR for review and will require approval by the VA Montana Healthcare System s Safety department prior to the commencement of work.

All demolition shall be required to remove abandoned utilities back to active main.

Installation shall minimize any penetrations in finished walls to the extent possible and with any such penetrations repaired to match existing construction or meet and/or exceed required sound transmission coefficient (STC), smoke/fire partition rating requirements after completion of work.

Any new construction shall match surrounding finishes unless indicated otherwise.

Contractor and their Sub-contractors are to provide necessary submittals and plans for approval prior to commencing with any new work not shown/provided in the construction documents.

All damage to floors, walls, ceilings, or any other VA property to be repaired/replaced by the contractor.

Contractor shall be responsible for all construction debris removal. The contractor shall provide their own dumpster as needed.

For interior construction the contractor shall provide dump carts and HEPA carts as needed. Dump carts are to be sealed with a tight-fitting lid during travel to and from the jobsite to the designated dumpster location. Dumpster location and debris removal pathway to be approved by the VA COR.

Temporary egress and life safety signage to be provided by contractor and any ILSMs required shall be coordinated with VA COR and VA safety personnel.

Description of Work:

Infection control measures as stated in the ICRA in the solicitation.

Remove in its entirety the existing welded seam sheet vinyl.

Remove all existing wall and floor ceramic tile in room 363C. Repair the walls to match the current finish level and provide a smooth and uniform wall finish.

Install VA approved high build glazed epoxy coating on walls and epoxy/resinous anti-skid flooring with 6-inch integral base. Final look shall be a smooth and uniform surface. Any seams to be at door thresholds per manufacture s recommendation. There shall be no seams in the interior of the rooms.

Room 362D 55 sqft

Room 362F 75 sqft

Room 362J 10 sqft

Room 362K 50 sqft

Room 363 275 sqft

Room 363A 275 sqft

Room 363B 40 sqft

Room 363C 50 sqft

Room 363E -350 sqft

The floor must meet the existing elevation so the door seals will still be able to create a controlled pressure room.

Walls are to be patched, repaired, and painted to match the current finish level and provide a smooth and uniform wall finish.

Replacement of foot pedal faucet with an Armstrong RADA MX1-40 flushing faucet or approved equal. Faucet shall be networked to existing Snider Electric building automation system.

Period of Performance

This contract is expected to start upon the issuance of the Performance Notice to Proceed (NTP) and be completed within 30 calendar days of issuance.

Work Schedule

Normal working hours are from 8:00 AM to 4:00 PM, Mountain Time. The Contractor shall discuss work hours with the COR prior to the commencement of work. To maintain schedule, work performed over the weekend may be allowed. Contractor shall coordinate these efforts with VA COR with a minimum 48-hour notice.

Privacy Statement

Information Security & Privacy Requirements:

The C and A requirements do not apply, and a Security Accreditation Package is not required. Incidental exposure may exist from accessing the facility. Staff will follow all privacy and security practices.

Project Management

Based on the above list of work items the general contractor selected must complete, maintain, and submit the following documentation and managerial requirements:

Construction schedule including sequencing and durations.

The schedule will be provided to the Contracting Officer s Representative (COR) ten (10) working days prior to the start of work.

Site-Specific Safety Plan (SSSP) with an emphasis on tasks to be performed during the work. The SSSP must:

Include a detailed description of how the work will be performed and be submitted with sketches, supporting documents, submittals etc.

Include a Job-Safety-Analysis (JSA) for all tasks associated with Statement of Work (SOW)

Be reviewed and commented by VA-Safety and COR prior to commencement of work.

Maintain site supervision by a competent individual(s) with OSHA-30 certificates. OSHA-30 certified technician shall be onsite anytime work is being performed.

Obtain VA identification PIV badges for all employees. Contractor to consider lead-time for badge procurement.

Manage job-site access and security.

Implement and maintain required ICRA and ILSM measures.

Appendix

P01 DWG.1 Endo Suite Finish (436-23-132)

P01 SPECS Endo Suite Finish (436-23-132)

Files

Show all 16

Notice history

Notice Type Posted
Z2DA--Endo Suite Finish Enhancement 436-23-132 Award Award Notice
This notice Latest solicitation Solicitation
Z2DA--Endo Suite Finish (436-23-132) Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
36C25726Q0431 504-26-006 RE finish B4 n and f ADM Amarillo, Texas, United States · NAICS 238330 Veterans Integrated Service Network 17 Service-Disabled Veteran-Owned Small Business
Z2DA--Repair & Replace Flooring in BLDG 10A Department of Veterans Affairs Carl Vison VA Medical Center Dublin, Georgia 31021, United States · NAICS 238330 Veterans Integrated Service Network 7 Total Small Business
Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring Mather, California, United States · NAICS 236220 Veterans Integrated Service Network 21 Service-Disabled Veteran-Owned Small Business
Z2DA--Renovate Space for Patient Care Improvements Asheville, North Carolina 28805, United States · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
Y1DZ--PCAC EHRM Infrastructure Upgrades Construction - Togus VAMC (VA-27-00009716) Industry Day: 810 Eastern Avenue Augusta ME 04330 · NAICS 236220 VA Technology Acquisition Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity