YELL 338223 - Bridge Preservation

Closed Solicitation Posted

Solicitation number
140P2026R0073
Agency
Not on record
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The National Park Service, through its Denver Service Center contracting office, seeks rehabilitation of three Yellowstone National Park bridges under solicitation 140P2026R0073 (YELL 338223), with proposals due November 6, 2026 at 2:00 p.m. Mountain Time, extended from October 30 by Amendment 0003. The procurement is unrestricted, with no set-aside used.

The project covers Lava Creek Bridge (1570-022P), Thumb Creek Bridge (1570-029P), and Unnamed Creek Bridge (1570-030P) in Teton County, Wyoming. Lava Creek sits near the north entrance, while Thumb Creek and Unnamed Creek are in the southern park near Yellowstone Lake. Work includes concrete spall repair, modified concrete deck overlays after hydrodemolition to 1-1/2 inches, stone masonry repointing, railing repair and painting, expansion joint replacement, in-water scour mitigation, riprap placement, and temporary stream diversion. All three structures tested positive for lead-based paint, so paint must be removed and disposed of as hazardous waste. Hydrodemolition wastewater must be collected and disposed of outside the park, with no discharge to waterways. Per Amendment 0003's Q&A, the National Park Service holds the Section 404 and Section 401 (NWP 13 and NWP 14) authorizations. Contractors must submit stream diversion and dewatering designs at least two weeks before in-water work.

Offerors must provide documented bridge preservation, restoration, or rehabilitation project histories. Evaluation weighs technical approach, project experience, key personnel qualifications, and past performance, with price secondary, under a best value tradeoff. The offeror must perform at least 15 percent of the total work with its own organization. Davis-Bacon wage rates apply.

The estimated price range is $1 million to $5 million. The contract is firm fixed-price with a 155-day completion timeline after notice to proceed, liquidated damages of $2,132 per calendar day of delay, and performance and payment bonds at 100 percent of contract price. The NAICS code is 237310 and the PSC is Z2LB. Standard work hours are 7:00 a.m. to 7:00 p.m. Monday through Friday, or one hour before sunset if sooner, with weekend and early morning work requiring contracting officer approval. Full closures require 28 days' notice and must fall between 1:00 a.m. and 5:00 a.m. Cutthroat trout spawning protection bars in-water work at Thumb Creek from April 15 through July 15. No incumbent is named.

Notice text

YELL 338223 - Bridge Preservation

Files

File Type Posted
B09_Amend_0003_Att_338223_Lead_Paint_Testing_Results_0003.pdf PDF
B09_Amend_0003_Att_Q-and-A_as_of_10-23-26_0003.pdf PDF
Sol_140P2026R0073_Amd_0003.pdf PDF
B09_Amentd_0002_1570-022P_-_Lava_Creek_-_RG350_0002.pdf PDF
B09_Amend_0002_Att_100__Drawings_Stamped_YELL_338223_0002.pdf PDF
B09_Amend_0002_Unnamed_Ck_BIR_photos_88_fire_0002.png PNG image
B09_Amend_0002_YELL_338223_-_Pre-Proposal_Conference_Transcripts_0002.pdf PDF
B09_Amend_0002_Pre-Proposal_Conference_List_of_Attendees_10-08-26_YELL_338223_0002.pdf PDF
B09_Amend_0002_Pre-Proposal_Conference_Slides_10-08-26_YELL_338223_0002.pdf PDF
B09_Amend_0002_Thumb_Ck_Br_FAD_0269_Rev_0569_0002.pdf PDF
B09_Amend_0002_Thumb_Ck_Br_Plan_0569-0669_0002.pdf PDF
B09_Amend_0002_Unnamed_Ck_Plan_1969_0002.pdf PDF
Sol_140P2026R0073_Amd_0002.pdf PDF
B09_Amend_0002_Unnamed_Ck_FAD_0269_0002.pdf PDF
Sol_140P2026R0073_Amd_0001.pdf PDF
Sol_140P2026R0073.pdf PDF
B08_Attach_6_2026_FinalRegionalConditions_WY.pdf PDF
B08_Attach_1_Drawings_YELL_338223.pdf PDF
B08_Attach_2_Specifications_YELL_338223.pdf PDF
B08_Attach_3_WD_Park_and_Teton_WY20260044_07_30_2026.pdf PDF
B08_Attach_4_2026NWPs_WY_EPA-R8_401WQC.pdf PDF
B08_Attach_5_NWP-13_Factsheet_2026.pdf PDF
B08__Attach_8_Past_Performance_Questionnaire.docx DOCX document
B08_Attach_10_General_References.pdf PDF
B08_Attach_7_Project_Experience.docx DOCX document
B08_Attach_9_LmtOnSubconRpt.xlsx XLSX spreadsheet
Show all 26

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
YELL 338223 - Bridge Preservation Pre-Solicitation
YELL 338223 - Bridge Preservation Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Mora-ADM new camp muir guide bldgs NAICS 236220 — Total Small Business
GRTE 237343 - Rehab 4 Lazy F Ranch NAICS 237110 National Office Total Small Business
Request for Proposal EFMO 224159/318539, Rehabilit NAICS 236220 — No set-aside
Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY25(2) Pennsylvania, United States · NAICS 237310 Federal Highway Administration Total Small Business
GAOA Brainard Lake Recreation Area Deferred Maintenance Ward, Colorado 80481, United States · NAICS 237310 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors