WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
69056725B000004
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Washington, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is procuring construction services for the Hawk Creek Road Improvements and Stabilization project, a comprehensive 0.68-mile roadway improvement and stabilization initiative located in Lincoln County, Washington, near the Lake Roosevelt National Recreation Area. The project encompasses road widening from its current state to 22-24 feet, bank erosion repair, road realignment, soil nail wall construction, drainage improvements, and related infrastructure work. Key contract requirements include compliance with Davis-Bacon wage determinations, performance and payment bonds, the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), and implementation of comprehensive stormwater pollution prevention measures and environmental controls. The contractor must utilize the Masterworks web-based system for project documentation and demonstrate capability in soil nail wall construction, shotcrete application, and geotechnical engineering. The bid opening occurred on January 15, 2026, with nine contractors submitting bids ranging from $3,511,625 to $7,175,526 against an Engineer's Estimate of $5,750,000, and the low bidder is DW Excavating at $3,511,625.

This is a total small business set-aside contract with no incumbent contractor identified in the solicitation documents. The estimated project value falls between $5,000,000 and $10,000,000, with the actual low bid of $3,511,625 significantly undercutting the government estimate. The contract includes a fixed completion date of October 6, 2026, allowing approximately nine months for construction activities originally planned between March and July 2025. The project will be performed in Lincoln County, Washington, approximately 15 miles northwest of Davenport, serving as the primary access to the Hawk Creek Facilities and supporting over 30,000 annual visitors to the Hawk Creek Campground and boat launch. Construction activities will involve approximately 3.1 acres of disturbance, requiring careful coordination with cultural resource protocols under the Native American Graves Protection and Repatriation Act and archaeological considerations specific to the Lake Roosevelt National Recreation Area.

Notice text

10 versions

Update #10 · Latest ·

Solicitation for Project :  WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

See attachments for full requirements

Posted 12/19/2025: QA_12-19-25.pdf

Posted 01/05/2026: QA_01-05-2026.pdf

Posted 01/09/2026: QA_01-09-2026.pdf

Posted 01/09/2026: Amendment A001.pdf

Posted 01/12/2026: Amendment A002.pdf

Posted 01/12/2026: QA_01-12-2026.pdf; QA_01-12-2026_2.pdf

Posted 01/14/2026: QA_01-14-2026.pdf 

Posted 01/15/2026: Bid Summary

Posted 01/16/2026: Bid Tabulations

Update #9 ·

Solicitation for Project :  WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

See attachments for full requirements

Posted 12/19/2025: QA_12-19-25.pdf

Posted 01/05/2026: QA_01-05-2026.pdf

Posted 01/09/2026: QA_01-09-2026.pdf

Posted 01/09/2026: Amendment A001.pdf

Posted 01/12/2026: Amendment A002.pdf

Posted 01/12/2026: QA_01-12-2026.pdf; QA_01-12-2026_2.pdf

Posted 01/14/2026: QA_01-14-2026.pdf 

Posted 01/15/2026: Bid Summary

Update #8 ·

Solicitation for Project :  WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

See attachments for full requirements

Posted 12/19/2025: QA_12-19-25.pdf

Posted 01/05/2026: QA_01-05-2026.pdf

Posted 01/09/2026: QA_01-09-2026.pdf

Posted 01/09/2026: Amendment A001.pdf

Posted 01/12/2026: Amendment A002.pdf

Posted 01/12/2026: QA_01-12-2026.pdf; QA_01-12-2026_2.pdf

Posted 01/14/2026: QA_01-14-2026.pdf 

Update #7 ·

Solicitation for Project :  WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

See attachments for full requirements

Posted 12/19/2025: QA_12-19-25.pdf

Posted 01/05/2026: QA_01-05-2026.pdf

Posted 01/09/2026: QA_01-09-2026.pdf

Posted 01/09/2026: Amendment A001.pdf

Posted 01/12/2026: Amendment A002.pdf

Posted 01/12/2026: QA_01-12-2026.pdf; QA_01-12-2026_2.pdf

Update #6 ·

Solicitation for Project :  WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

See attachments for full requirements

Posted 12/19/2025: QA_12-19-25.pdf

Posted 01/05/2026: QA_01-05-2026.pdf

Posted 01/09/2026: QA_01-09-2026.pdf

Posted 01/09/2026: Amendment A001.pdf

Posted 01/12/2026: Amendment A002.pdf

Posted 01/12/2026: QA_01-12-2026.pdf

Update #5 ·

Solicitation for Project :  WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

See attachments for full requirements

Posted 12/19/2025: QA_12-19-25.pdf

Posted 01/05/2026: QA_01-05-2026.pdf

Posted 01/09/2026: QA_01-09-2026.pdf

Posted 01/09/2026: Amendment A001.pdf

Update #4 ·

Solicitation for Project :  WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

See attachments for full requirements

Posted 12/19/2025: QA_12-19-25.pdf

Posted 01/05/2026: QA_01-05-2026.pdf

Posted 01/09/2026: QA_01-09-2026.pdf

Update #3 ·

Solicitation for Project :  WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

See attachments for full requirements

Posted 12/19/2025: QA_12-19-25.pdf

Posted 01/05/2026: QA_01-05-2026.pdf

Update #2 ·

Solicitation for Project :  WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

See attachments for full requirements

Posted 12/19/2025: QA_12-19-25.pdf

Update #1 ·

Solicitation for Project :  WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

See attachments for full requirements

Files

File Type Posted
Bid Tabulations_Hawk Creek Road.pdf PDF
BidSum_WA FLAP LINCOL 57860(1).pdf PDF
QA_01-14-2026.pdf PDF
QA_01-12-2026_2.pdf PDF
QA_01-12-2026.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
QA_01-09-2026.pdf PDF
QA_01-05-2026.pdf PDF
QA_12-19-25.pdf PDF
waa-lincol57860-1_SWPPP.pdf PDF
19laro23_Plan of Action_v2.pdf PDF
GR 04-24_Hawk Creek.pdf PDF
lincol57860(1)_Drainage TM_FINAL.pdf PDF
Physical Data_Hawk Creek_1.zip ZIP file
waa-lincol57860-1_plans.pdf PDF
IFB 69056725B000004.pdf PDF
Hawk Creek Compiled SWPPP for contract.pdf PDF
WA_NPS_LARO 208-1_FinalHydraulicReport_REV02_071524_FINAL.pdf PDF
Show all 19

Notice history

Notice Type Posted
WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization Award Award Notice
This notice Latest solicitation Solicitation
WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 Port Angeles, Washington, United States · NAICS 237310 Federal Highway Administration Total Small Business
Acadia National Park Maine, United States · NAICS 237310 Federal Highway Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors