WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 69056725B000004
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Washington, United States
- Points of contact
-
- Contracts G. Office wfl.contracts@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration is procuring construction services for the Hawk Creek Road Improvements and Stabilization project, a comprehensive 0.68-mile roadway improvement and stabilization initiative located in Lincoln County, Washington, near the Lake Roosevelt National Recreation Area. The project encompasses road widening from its current state to 22-24 feet, bank erosion repair, road realignment, soil nail wall construction, drainage improvements, and related infrastructure work. Key contract requirements include compliance with Davis-Bacon wage determinations, performance and payment bonds, the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), and implementation of comprehensive stormwater pollution prevention measures and environmental controls. The contractor must utilize the Masterworks web-based system for project documentation and demonstrate capability in soil nail wall construction, shotcrete application, and geotechnical engineering. The bid opening occurred on January 15, 2026, with nine contractors submitting bids ranging from $3,511,625 to $7,175,526 against an Engineer's Estimate of $5,750,000, and the low bidder is DW Excavating at $3,511,625.
This is a total small business set-aside contract with no incumbent contractor identified in the solicitation documents. The estimated project value falls between $5,000,000 and $10,000,000, with the actual low bid of $3,511,625 significantly undercutting the government estimate. The contract includes a fixed completion date of October 6, 2026, allowing approximately nine months for construction activities originally planned between March and July 2025. The project will be performed in Lincoln County, Washington, approximately 15 miles northwest of Davenport, serving as the primary access to the Hawk Creek Facilities and supporting over 30,000 annual visitors to the Hawk Creek Campground and boat launch. Construction activities will involve approximately 3.1 acres of disturbance, requiring careful coordination with cultural resource protocols under the Native American Graves Protection and Repatriation Act and archaeological considerations specific to the Lake Roosevelt National Recreation Area.
Notice text
10 versions
Update #10 · Latest ·
Solicitation for Project : WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
See attachments for full requirements
Posted 12/19/2025: QA_12-19-25.pdf
Posted 01/05/2026: QA_01-05-2026.pdf
Posted 01/09/2026: QA_01-09-2026.pdf
Posted 01/09/2026: Amendment A001.pdf
Posted 01/12/2026: Amendment A002.pdf
Posted 01/12/2026: QA_01-12-2026.pdf; QA_01-12-2026_2.pdf
Posted 01/14/2026: QA_01-14-2026.pdf
Posted 01/15/2026: Bid Summary
Posted 01/16/2026: Bid Tabulations
Update #9 ·
Solicitation for Project : WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
See attachments for full requirements
Posted 12/19/2025: QA_12-19-25.pdf
Posted 01/05/2026: QA_01-05-2026.pdf
Posted 01/09/2026: QA_01-09-2026.pdf
Posted 01/09/2026: Amendment A001.pdf
Posted 01/12/2026: Amendment A002.pdf
Posted 01/12/2026: QA_01-12-2026.pdf; QA_01-12-2026_2.pdf
Posted 01/14/2026: QA_01-14-2026.pdf
Posted 01/15/2026: Bid Summary
Update #8 ·
Solicitation for Project : WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
See attachments for full requirements
Posted 12/19/2025: QA_12-19-25.pdf
Posted 01/05/2026: QA_01-05-2026.pdf
Posted 01/09/2026: QA_01-09-2026.pdf
Posted 01/09/2026: Amendment A001.pdf
Posted 01/12/2026: Amendment A002.pdf
Posted 01/12/2026: QA_01-12-2026.pdf; QA_01-12-2026_2.pdf
Posted 01/14/2026: QA_01-14-2026.pdf
Update #7 ·
Solicitation for Project : WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
See attachments for full requirements
Posted 12/19/2025: QA_12-19-25.pdf
Posted 01/05/2026: QA_01-05-2026.pdf
Posted 01/09/2026: QA_01-09-2026.pdf
Posted 01/09/2026: Amendment A001.pdf
Posted 01/12/2026: Amendment A002.pdf
Posted 01/12/2026: QA_01-12-2026.pdf; QA_01-12-2026_2.pdf
Update #6 ·
Solicitation for Project : WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
See attachments for full requirements
Posted 12/19/2025: QA_12-19-25.pdf
Posted 01/05/2026: QA_01-05-2026.pdf
Posted 01/09/2026: QA_01-09-2026.pdf
Posted 01/09/2026: Amendment A001.pdf
Posted 01/12/2026: Amendment A002.pdf
Posted 01/12/2026: QA_01-12-2026.pdf
Update #5 ·
Solicitation for Project : WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
See attachments for full requirements
Posted 12/19/2025: QA_12-19-25.pdf
Posted 01/05/2026: QA_01-05-2026.pdf
Posted 01/09/2026: QA_01-09-2026.pdf
Posted 01/09/2026: Amendment A001.pdf
Update #4 ·
Solicitation for Project : WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
See attachments for full requirements
Posted 12/19/2025: QA_12-19-25.pdf
Posted 01/05/2026: QA_01-05-2026.pdf
Posted 01/09/2026: QA_01-09-2026.pdf
Update #3 ·
Solicitation for Project : WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
See attachments for full requirements
Posted 12/19/2025: QA_12-19-25.pdf
Posted 01/05/2026: QA_01-05-2026.pdf
Update #2 ·
Solicitation for Project : WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
See attachments for full requirements
Posted 12/19/2025: QA_12-19-25.pdf
Update #1 ·
Solicitation for Project : WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
See attachments for full requirements
Files
Show all 19
Notice history
| Notice | Type | Posted |
|---|---|---|
| WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization | Award Notice | |
| This notice | Solicitation | |
| WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 | Federal Highway Administration | Total Small Business | |
| Acadia National Park | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity