This is a federal Amendment of Solicitation document (Standard Form 30) for the WA FLAP LINCOL 57860(1) and WA NPS LARO 208(1) Hawk Creek Road Improvements project. The amendment, designated as A001 and dated 01/09/2025, updates the original solicitation number 69056725B000004 originally issued on 12/11/2025. The amendment includes revisions to the Minimum Wage Schedule, updating the Davis-Bacon General Wage Decision Number WA20250001 to WA20260001 with a current effective date of 01/02/2026. Additionally, it deletes a document under part (d)(1) in the Special Contract Requirements section and revises notes on plan sheet K-1.

The document is issued by the Department of Transportation's Federal Highway Administration, located in Vancouver, WA. The amendment affects wage rates for various construction worker classifications across multiple Washington counties, including updates to rates for carpenters, power equipment operators, laborers, ironworkers, painters, cement masons, and truck drivers. The project involves road improvements and road stabilization work, with specific wage determinations that vary by county and worker classification group. The amendment ensures contractors are using the most current wage rates and references the appropriate geographic wage schedules for the project's location.

View the file

Other files

File Type Posted
Bid Tabulations_Hawk Creek Road.pdf PDF
BidSum_WA FLAP LINCOL 57860(1).pdf PDF
QA_01-14-2026.pdf PDF
QA_01-12-2026_2.pdf PDF
QA_01-12-2026.pdf PDF
Amendment A002.pdf PDF
QA_01-09-2026.pdf PDF
QA_01-05-2026.pdf PDF
QA_12-19-25.pdf PDF
lincol57860(1)_Drainage TM_FINAL.pdf PDF
19laro23_Plan of Action_v2.pdf PDF
waa-lincol57860-1_plans.pdf PDF
waa-lincol57860-1_SWPPP.pdf PDF
WA_NPS_LARO 208-1_FinalHydraulicReport_REV02_071524_FINAL.pdf PDF
Hawk Creek Compiled SWPPP for contract.pdf PDF
Physical Data_Hawk Creek_1.zip ZIP file
GR 04-24_Hawk Creek.pdf PDF
IFB 69056725B000004.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 01/09/2025 N/A See Blk 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056725B000004

9B. DATED (SEE ITEM 11)

12/11/2025

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 01-09-2026 WA FLAP LINCOL 57860(1) & WA NS LARO 208(1)

Solicitation No.69056725B000004 Hawk Creek Road Improvements & Hawk Creek Road Stabilization

REVISIONS ARE AS FOLLOWS:

MINIMUM WAGE SCHEDULE

Page D-1 through D-57. Updates Davis-Bacon General Wage Decision Number

WA20250001 to current effective date of 01/02/2026.

SPECIAL CONTRACT REQUIREMENTS

Page E-4, Subsection 102.02A, Physical Data. Deletes document under part (d) (1).

PLANS

Plan sheet # K-1 Revises notes.

ENCLOSURES

Pages:

D-1 through D-57

E-4

Plan Sheets:

K.1

D - 1

General Wage Decision

Project: WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk

Creek Road Stabilization

Revised by Amendment A001

"General Decision Number: WA20260001 01/02/2026

Superseded General Decision Number: WA20250001

State: Washington

Construction Type: Highway

Counties: Washington Statewide.

HIGHWAY (Excludes D.O.E. Hanford Site in Benton and Franklin

Counties)

Modification Number Publication Date

0 01/02/2026

* CARP0059-021 06/01/2025

ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY,

FRANKLIN, GARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND

OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN, AND YAKIMA

COUNTIES

Rates Fringes

CARPENTER

Assistant Diver Tender, ROV Tender/Technician.......$ 50.76 17.28

Bridge, Dock, and Wharf

Carpenter...................$ 48.21 17.28

Carpenter...................$ 44.21 17.28

Diver Standby...............$ 55.24 17.28

Diver Tender, Manifold

Operator, ROV Operator......$ 54.24 17.28

Diver Wet...................$ 110.48 17.28

Manifold Operator-Mixed Gas.$ 58.24 17.28

Piledriver: Includes driving, pulling, cutting, placing collars, setting, welding, or creosote treated material, on all piling......................$ 49.76 17.28

Employees may be required to perform any combination of work within the Diving team/crew, (except for Dive Supervisor) provided they are paid at the highest rate of pay that they

D - 2 received during their shift.

CARP0096-002 06/01/2025

CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS,

MASON, PACIFIC (North of a straight line made by extending the north boundary line of Wahkiakum County west to the Pacific

Ocean), PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND

WHATCOM Counties

MILLWRIGHT.......................$ 55.39 22.38

CARP0096-007 06/01/2025

SOUTHWEST WASHINGTON: CLARK, COWLITZ, LEWIS (Piledriver only), PACIFIC (South of a straight line made by extending the north boundary line of Wahkiakum County west to Willapa Bay to the

Pacific Ocean), SKAMANIA, and WAHKIAKUM Counties.

MILLWRIGHT.......................$ 59.35 22.38

* CARP0196-004 06/01/2025

CLARK, COWLITZ, *PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES

*PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY

EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO

WILLAPA BAY TO THE PACIFIC OCEAN, AND THENCE NORTH THROUGH THE

NATURAL WATERWAY TO THE PACIFIC OCEAN (THIS INCLUDES THE ENTIRE

PENINSULA WEST OF WILLAPA BAY)

Piledriver.......................$ 56.06 16.81

* CARP0196-006 06/01/2025

MASON, *PACIFIC, PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON

AND WHATCOM COUNTIES

* PORTION OF PACIFIC COUNTY NORTH OF A STRAIGHT LINE MADE BY

EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO

THE PACIFIC OCEAN COUNTIES OR PARTS OF COUNTIES EAST OF THE

120TH MERIDIAN

D - 3

Piledriver.......................$ 65.53 19.13

CARP0206-009 06/01/2025

KING AND KITSAP COUNTIES

BRIDGE CARPENTER............$ 65.58 19.13

CARPENTER...................$ 63.98 19.13

DIVER TENDER................$ 71.77 19.13

DIVER.......................$ 125.44 19.13

* CARP0360-006 09/15/2025

PACIFIC COUNTY

PORTION OF PACIFIC COUNTY NORTH OF A STRAIGHT LINE MADE BY

EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO

THE PACIFIC OCEAN COUNTIES OR PARTS OF COUNTIES EAST OF THE

120TH MERIDIAN

Carpenters:

Bridge Carpenter............$ 65.58 19.13

Carpenter/Drywall Hanger....$ 63.98 19.13

Diver Tender................$ 71.77 19.13

Diver.......................$ 125.44 19.13

* CARP0360-007 06/01/2025

PACIFIC COUNTY

PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY

EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO

WILLAPA BAY TO THE PACIFIC OCEAN, AND THENCE NORTH THROUGH THE

NATURAL WATERWAY TO THE PACIFIC OCEAN (THIS INCLUDES THE ENTIRE

PENINSULA WEST OF WILLAPA BAY)

D - 4

Creek Road Stabilization

Carpenters:

CARPENTERS..................$ 54.69 16.81

DIVERS TENDERS..............$ 64.32 16.81

DIVERS......................$ 108.33 16.81

DRYWALL.....................$ 54.59 16.81

* CARP0360-013 06/01/2025

GRAYS HARBOR, LEWIS, MASON, PIERCE, AND THURSTON COUNTIES

CARPENTER...................$ 63.98 19.13

DIVER TENDER................$ 71.77 19.13

DIVER.......................$ 125.44 19.13

* CARP0425-006 09/15/2025

CLALLAM, ISLAND, JEFFERSON, SAN JUAN, SKAGIT, SNOHOMISH, AND

WHATCOM COUNTIES

CARPENTER...................$ 63.98 19.13

DIVER TENDER................$ 71.77 19.13

DIVER.......................$ 125.44 19.13

* CARP0503-021 06/01/2025

D - 5

CLARK, COWLITZ, SKAMANIA, AND WAHKIAKUM COUNTIES

Carpenters:

CARPENTERS..................$ 54.69 16.81

DIVERS TENDERS..............$ 64.32 16.81

DIVERS......................$ 108.33 16.81

DRYWALL.....................$ 54.59 16.81

CARP1607-010 06/01/2025

ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY,

FRANKLIN, GARFIELD, GRANT, KLICKITAT, KITTITAS, LINCOLN,

OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN,

AND YAKIMA COUNTIES

MILLWRIGHT.......................$ 61.62 20.43

ELEC0046-001 08/04/2025

CALLAM, JEFFERSON, KING AND KITSAP COUNTIES

CABLE SPLICER....................$ 83.56 33.71

ELECTRICIAN......................$ 75.96 33.48

* ELEC0048-003 01/01/2025

CLARK, KLICKITAT AND SKAMANIA COUNTIES

CABLE SPLICER....................$ 44.22 21.50

ELECTRICIAN......................$ 63.50 29.73

HOURLY ZONE PAY:

Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:

D - 6

Creek Road Stabilization

Portland, The Dalles, Hood River, Tillamook, Seaside and

Astoria

Zone Pay:

Zone 1: 31-50 miles $1.50/hour

Zone 2: 51-70 miles $3.50/hour

Zone 3: 71-90 miles $5.50/hour

Zone 4: Beyond 90 miles $9.00/hour

*These are not miles driven. Zones are based on Delorrne

Street Atlas USA 2006 plus.

ELEC0048-029 01/01/2025

COWLITZ AND WAHKIAKUM COUNTY

CABLE SPLICER....................$ 44.22 21.50

ELECTRICIAN......................$ 63.50 29.73

ELEC0073-001 07/01/2025

ADAMS, FERRY, LINCOLN, PEND OREILLE, SPOKANE, STEVENS, WHITMAN

CABLE SPLICER....................$ 34.10 16.68

ELECTRICIAN......................$ 49.55 19.09

ELEC0076-002 08/31/2025

GRAYS HARBOR, LEWIS, MASON, PACIFIC, PIERCE, AND THURSTON

CABLE SPLICER....................$ 71.65 26.76

ELECTRICIAN......................$ 65.14 26.56

ELEC0112-005 06/01/2025

ASOTIN, BENTON, COLUMBIA, FRANKLIN, GARFIELD, KITTITAS, WALLA

WALLA, YAKIMA COUNTIES

D - 7

Creek Road Stabilization

CABLE SPLICER....................$ 63.00 27.87

ELECTRICIAN......................$ 60.00 27.78

ELEC0191-003 06/01/2022

ISLAND, SAN JUAN, SNOHOMISH, SKAGIT AND WHATCOM COUNTIES

CABLE SPLICER....................$ 44.23 17.73

ELECTRICIAN......................$ 53.20 27.51

ELEC0191-004 06/01/2018

CHELAN, DOUGLAS, GRANT AND OKANOGAN COUNTIES

CABLE SPLICER....................$ 40.82 17.63

ELECTRICIAN......................$ 42.45 21.34

ENGI0302-092 06/01/2025

KING AND SNOHOMISH COUNTIES

POWER EQUIPMENT OPERATOR

Group 1.....................$ 61.93 27.57

Group 1A....................$ 62.85 27.57

Group 1AA...................$ 63.75 27.57

Group 1AAA..................$ 64.66 27.57

Group 2.....................$ 61.14 27.57

Group 3.....................$ 60.46 27.57

Group 4.....................$ 56.63 27.57

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

Group 1AAA

Cranes: 300 tons and over or 300? of boom including jib with attachments; Cranes Friction: 200 tons and over; Tower

Cranes: over 250? in height from base to boom.

Group 1AA

Cranes: 200 tons- 299 tons, or 250? of boom including jib with attachments; Cranes: Friction cranes through 199 tons;

Leverman; Shovel, Excavator, Backhoes: over 90 metric tons;

Tower Crane: over 175? through 250? in height, base to boom.

Group 1A

Cranes: 100 tons through 199 tons, or 150? of boom (including jib with attachments); Drilling Machine; Overhead, bridge

D - 8

Creek Road Stabilization type: 100 tons and over; Tower Crane: up to 175? in height base to boom; Loader: Overhead 8 yards & over; Shovel, Excavator, Backhoes: over 50 metric tons and up to 90 metric tons; Mechanics.

Group 1

Asphalt plant Operators; Cableways; Concrete Pump: Truck mount with boom attachment over 42M; Cranes: 45 tons through 99 tons, under 150? of boom (including jib with attachments); Overhead, bridge type: 45 tons through 99 tons; Derricks: on building work; Hard Tail End Dump:

articulating off-road equipment 45 yards & over; Loader:

Overhead 6 yards but not including 8 yards; Motor Patrol

Graders; Mucking Machine, Mole, Tunnel Drill, Boring, Road

Header and/or Shield; Quad 9, HD 41, D10 and over; Remote

Control Operator on rubber tired earth moving equipment;

Rollagon; Scrapers, self-propelled: 45 yards and over;

Spreader: Topsider & Screedman; Shovel, Excavator, Backhoe:

over 30 metric tons and up to 50 metric tons; Slipform

Pavers; Transporters: all track or truck type; Welder.

Group 2

Batch Plant Operator: concrete; Barrier Machine: (Zipper);

Bump Cutter; Cranes: 20 tons through 44 tons with attachments; Overhead, bridge type Crane: 20 tons through

44 tons; Chipper; Concrete Pump: truck mount with boom attachment up to 42M; Crusher; Deck Engineer/Deck Winches

(Power); Grade Engineer: using blue prints, cut sheets, etc.; -Finishing Machine: Bidwell and Gamaco & Similar

Equipment; Guardrail Punch; Hard Tail End Dump:

articulating off-road equipment under 45 yards;

Horizontal/Directional Drill Operator; Loaders: Overhead under 6 yards; Loaders: Plant Feed; Locomotives: all;

Material Transfer Device; Piledriver: (other than crane mount); Quick Tower: no cab, under 100 feet in height base to boom; Roto-Mill, Roto-Grinder; Shovel, Excavator, Backhoe, Tractor: 15 to 30 metric tons; Subgrader Trimmer;

Scraper: self propelled under 45 yards; Truck Crane

Oiler/Driver: 100 tons and over; Truck Mount Portable

Conveyor; -Vac Truck (Vactor Guzzler, Hydro Excavator); Yo

Yo Pay Dozer.

Group 3

Cranes: through 19 tons with attachments, A-frame over 10 tons; Concrete Pump: Mounted or trailer high pressure line pump, pump high pressure; Conveyors; Dozers: D-9 & under;

Drill Oilers: auger type, truck or crane mount; Forklift:

3000 lbs and over with attachments; Horizontal/Directional

Drill Locator; Outside Hoists (Elevators and Manlifts), Air

Tuggers, Strato; Tower Bucket Elevators; Hydralifts/Boom trucks: over 10 tons; Loaders: elevating type belt; Plant

Oiler: asphalt, crusher; Rigger/Signal Person, Bellman

D - 9

Creek Road Stabilization

(Certified); Roller: plant mix or multi-lift materials;

Saws: Concrete; Scrapers: concrete & carry all Service

Engineers: equipment; Trenching Machines; Truck Crane

Oiler/Driver: under 100 tons; Shovel, Excavator, Backhoe, Tractors: under 15 metric tons.

Group 4

Assistant Engineer; Bobcat; Brooms; Compressor; Concrete

Finish Machine: Laser Screed; Cranes, A-frame: 10 tons and under; Elevator and man-lift: permanent and shaft type;

Forklifts: under 3000 lbs. with attachments;

Gradechecker/Stakeman; Hydralifts/Boom Trucks: 10 tons and under; Oil distributors, Blower Distribution & Mulch

Seeding Operator; Pavement Breaker; Posthole Digger:

mechanical; Power Plant; Pumps: water; -Rigger and Bellman;

Roller: other than plant mix; Wheel Tractors: Farm all type; Shotcrete/Gunite Equipment; Brokk: Remote demolition equipment

ENGI0302-093 06/01/2025

SKAGIT AND WHATCOM COUNTIES

Group 1.....................$ 61.47 27.57

Group 1A....................$ 62.39 27.57

Group 1AA...................$ 63.29 27.57

Group 1AAA..................$ 64.19 27.57

Group 2.....................$ 60.69 27.57

Group 3.....................$ 60.02 27.57

Group 4.....................$ 56.19 27.57 with attachments; Cranes: Friction cranes through 199 tons;

jib with attachments); Drilling Machine; Overhead, bridge type: 100 tons and over; Tower Crane: up to 175? in height

D - 10

Creek Road Stabilization base to boom; Loader: Overhead 8 yards & over; Shovel, mount with boom attachment over 42M; Cranes: 45 tons through 99 tons, under 150? of boom (including jib with attachments); Overhead, bridge type: 45 tons through 99 tons; Derricks: on building work; Hard Tail End Dump:

articulating off-road equipment 45 yards & over; Loader:

Overhead 6 yards but not including 8 yards; Motor Patrol

Graders; Mucking Machine, Mole, Tunnel Drill, Boring, Road

Header and/or Shield; Quad 9, HD 41, D10 and over; Remote

Control Operator on rubber tired earth moving equipment;

Rollagon; Scrapers, self-propelled: 45 yards and over;

Spreader: Topsider & Screedman; Shovel, Excavator, Backhoe:

Bump Cutter; Cranes: 20 tons through 44 tons with attachments; Overhead, bridge type Crane: 20 tons through

44 tons; Chipper; Concrete Pump: truck mount with boom attachment up to 42M; Crusher; Deck Engineer/Deck Winches

(Power); Grade Engineer: using blue prints, cut sheets, etc.; -Finishing Machine: Bidwell and Gamaco & Similar

Equipment; Guardrail Punch; Hard Tail End Dump:

articulating off-road equipment under 45 yards;

Horizontal/Directional Drill Operator; Loaders: Overhead under 6 yards; Loaders: Plant Feed; Locomotives: all;

Material Transfer Device; Piledriver: (other than crane mount); Quick Tower: no cab, under 100 feet in height base to boom; Roto-Mill, Roto-Grinder; Shovel, Excavator, Backhoe, Tractor: 15 to 30 metric tons; Subgrader Trimmer;

Scraper: self propelled under 45 yards; Truck Crane

Oiler/Driver: 100 tons and over; Truck Mount Portable tons; Concrete Pump: Mounted or trailer high pressure line pump, pump high pressure; Conveyors; Dozers: D-9 & under;

Drill Oilers: auger type, truck or crane mount; Forklift:

3000 lbs and over with attachments; Horizontal/Directional

Drill Locator; Outside Hoists (Elevators and Manlifts), Air

Tuggers, Strato; Tower Bucket Elevators; Hydralifts/Boom trucks: over 10 tons; Loaders: elevating type belt; Plant

Oiler: asphalt, crusher; Rigger/Signal Person, Bellman

(Certified); Roller: plant mix or multi-lift materials;

D - 11

Creek Road Stabilization

Saws: Concrete; Scrapers: concrete & carry all Service

Engineers: equipment; Trenching Machines; Truck Crane

Finish Machine: Laser Screed; Cranes, A-frame: 10 tons and under; Elevator and man-lift: permanent and shaft type;

Forklifts: under 3000 lbs. with attachments;

Gradechecker/Stakeman; Hydralifts/Boom Trucks: 10 tons and under; Oil distributors, Blower Distribution & Mulch

Seeding Operator; Pavement Breaker; Posthole Digger:

mechanical; Power Plant; Pumps: water; -Rigger and Bellman;

Roller: other than plant mix; Wheel Tractors: Farm all

ENGI0302-094 06/01/2025

KITSAP COUNTY

Group 1.....................$ 60.93 27.57

Group 1A....................$ 61.83 27.57

Group 1AA...................$ 62.73 27.57

Group 1AAA..................$ 63.62 27.57

Group 2.....................$ 60.14 27.57

Group 3.....................$ 59.49 27.57

Group 4.....................$ 55.68 27.57 with attachments; Cranes: Friction cranes through 199 tons;

jib with attachments); Drilling Machine; Overhead, bridge type: 100 tons and over; Tower Crane: up to 175? in height base to boom; Loader: Overhead 8 yards & over; Shovel, D - 12

Creek Road Stabilization mount with boom attachment over 42M; Cranes: 45 tons through 99 tons, under 150? of boom (including jib with attachments); Overhead, bridge type: 45 tons through 99 tons; Derricks: on building work; Hard Tail End Dump:

articulating off-road equipment 45 yards & over; Loader:

Overhead 6 yards but not including 8 yards; Motor Patrol

Graders; Mucking Machine, Mole, Tunnel Drill, Boring, Road

Header and/or Shield; Quad 9, HD 41, D10 and over; Remote

Control Operator on rubber tired earth moving equipment;

Rollagon; Scrapers, self-propelled: 45 yards and over;

Spreader: Topsider & Screedman; Shovel, Excavator, Backhoe:

Bump Cutter; Cranes: 20 tons through 44 tons with attachments; Overhead, bridge type Crane: 20 tons through

44 tons; Chipper; Concrete Pump: truck mount with boom attachment up to 42M; Crusher; Deck Engineer/Deck Winches

(Power); Grade Engineer: using blue prints, cut sheets, etc.; -Finishing Machine: Bidwell and Gamaco & Similar

Equipment; Guardrail Punch; Hard Tail End Dump:

articulating off-road equipment under 45 yards;

Horizontal/Directional Drill Operator; Loaders: Overhead under 6 yards; Loaders: Plant Feed; Locomotives: all;

Material Transfer Device; Piledriver: (other than crane mount); Quick Tower: no cab, under 100 feet in height base to boom; Roto-Mill, Roto-Grinder; Shovel, Excavator, Backhoe, Tractor: 15 to 30 metric tons; Subgrader Trimmer;

Scraper: self propelled under 45 yards; Truck Crane

Oiler/Driver: 100 tons and over; Truck Mount Portable tons; Concrete Pump: Mounted or trailer high pressure line pump, pump high pressure; Conveyors; Dozers: D-9 & under;

Drill Oilers: auger type, truck or crane mount; Forklift:

3000 lbs and over with attachments; Horizontal/Directional

Drill Locator; Outside Hoists (Elevators and Manlifts), Air

Tuggers, Strato; Tower Bucket Elevators; Hydralifts/Boom trucks: over 10 tons; Loaders: elevating type belt; Plant

Oiler: asphalt, crusher; Rigger/Signal Person, Bellman

(Certified); Roller: plant mix or multi-lift materials;

Saws: Concrete; Scrapers: concrete & carry all Service

D - 13

Creek Road Stabilization

Engineers: equipment; Trenching Machines; Truck Crane

Finish Machine: Laser Screed; Cranes, A-frame: 10 tons and under; Elevator and man-lift: permanent and shaft type;

Forklifts: under 3000 lbs. with attachments;

Gradechecker/Stakeman; Hydralifts/Boom Trucks: 10 tons and under; Oil distributors, Blower Distribution & Mulch

Seeding Operator; Pavement Breaker; Posthole Digger:

mechanical; Power Plant; Pumps: water; -Rigger and Bellman;

Roller: other than plant mix; Wheel Tractors: Farm all

ENGI0302-095 06/01/2025

CHELAN(WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS(WEST OF

THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON,

KITTITAS(WEST OF THE 120TH MERIDIAN), MASON, OKANOGAN(WEST OF

THE 120TH MERIDIAN), SAN JUNA, AND YAKIMA(WEST OF THE 120TH

MERIDIAN) COUNTIES

Group 1.....................$ 60.67 27.57

Group 1A....................$ 61.56 27.57

Group 1AA...................$ 62.47 27.57

Group 1AAA..................$ 63.35 27.57

Group 2.....................$ 59.88 27.57

Group 3.....................$ 59.23 27.57

Group 4.....................$ 55.43 27.57 with attachments; Cranes: Friction cranes through 199 tons;

D - 14

Creek Road Stabilization

Cranes: 100 tons through 199 tons, or 150? of boom (including jib with attachments); Drilling Machine; Overhead, bridge type: 100 tons and over; Tower Crane: up to 175? in height base to boom; Loader: Overhead 8 yards & over; Shovel, mount with boom attachment over 42M; Cranes: 45 tons through 99 tons, under 150? of boom (including jib with attachments); Overhead, bridge type: 45 tons through 99 tons; Derricks: on building work; Hard Tail End Dump:

articulating off-road equipment 45 yards & over; Loader:

Overhead 6 yards but not including 8 yards; Motor Patrol

Graders; Mucking Machine, Mole, Tunnel Drill, Boring, Road

Header and/or Shield; Quad 9, HD 41, D10 and over; Remote

Control Operator on rubber tired earth moving equipment;

Rollagon; Scrapers, self-propelled: 45 yards and over;

Spreader: Topsider & Screedman; Shovel, Excavator, Backhoe:

Bump Cutter; Cranes: 20 tons through 44 tons with attachments; Overhead, bridge type Crane: 20 tons through

44 tons; Chipper; Concrete Pump: truck mount with boom attachment up to 42M; Crusher; Deck Engineer/Deck Winches

(Power); Grade Engineer: using blue prints, cut sheets, etc.; -Finishing Machine: Bidwell and Gamaco & Similar

Equipment; Guardrail Punch; Hard Tail End Dump:

articulating off-road equipment under 45 yards;

Horizontal/Directional Drill Operator; Loaders: Overhead under 6 yards; Loaders: Plant Feed; Locomotives: all;

Material Transfer Device; Piledriver: (other than crane mount); Quick Tower: no cab, under 100 feet in height base to boom; Roto-Mill, Roto-Grinder; Shovel, Excavator, Backhoe, Tractor: 15 to 30 metric tons; Subgrader Trimmer;

Scraper: self propelled under 45 yards; Truck Crane

Oiler/Driver: 100 tons and over; Truck Mount Portable tons; Concrete Pump: Mounted or trailer high pressure line pump, pump high pressure; Conveyors; Dozers: D-9 & under;

Drill Oilers: auger type, truck or crane mount; Forklift:

3000 lbs and over with attachments; Horizontal/Directional

Drill Locator; Outside Hoists (Elevators and Manlifts), Air

Tuggers, Strato; Tower Bucket Elevators; Hydralifts/Boom

D - 15

Creek Road Stabilization trucks: over 10 tons; Loaders: elevating type belt; Plant

Oiler: asphalt, crusher; Rigger/Signal Person, Bellman

(Certified); Roller: plant mix or multi-lift materials;

Saws: Concrete; Scrapers: concrete & carry all Service

Engineers: equipment; Trenching Machines; Truck Crane

Finish Machine: Laser Screed; Cranes, A-frame: 10 tons and under; Elevator and man-lift: permanent and shaft type;

Forklifts: under 3000 lbs. with attachments;

Gradechecker/Stakeman; Hydralifts/Boom Trucks: 10 tons and under; Oil distributors, Blower Distribution & Mulch

Seeding Operator; Pavement Breaker; Posthole Digger:

mechanical; Power Plant; Pumps: water; -Rigger and Bellman;

Roller: other than plant mix; Wheel Tractors: Farm all

ENGI0302-124 06/01/2024

ASOTIN, BENTON, FRANKLIN, GARFIELD, LINCOLN, SPOKANE, STEVENS,

WALLA WALLA, AND WHITMAN

GROUP 1.....................$ 35.91 22.45

GROUP 2.....................$ 36.28 22.45

GROUP 3.....................$ 36.99 22.45

GROUP 4.....................$ 37.18 22.45

GROUP 5.....................$ 37.37 22.45

GROUP 6.....................$ 37.69 22.45

GROUP 7.....................$ 38.01 22.45

GROUP 8.....................$ 39.88 22.45

GROUP 1: Bit Grinders; Bolt Threading Machine; Compressors

(under 2000 CFM, gas, diesel, or electric power); Deck

Hand; Fireman & Heater Tender; Hydro-seeder, Mulcher, Nozzleman; Oiler Driver, & Cable Tender, Mucking Machine;

Pumpman; Rollers, all types on subgrade, including seal and chip coatings (farm type, Case, John Deere & similar, or

Compacting Vibrator), except when pulled by Dozer with operable blade; Welding Machine; Crane Oiler-Driver (CLD required) & Cable Tender, Mucking Machine

D - 16

Creek Road Stabilization

GROUP 2: A-frame Truck (single drum); Assistant Refrigeration

Plant (under 1000 ton); Assistant Plant Operator, Fireman or Pugmixer (asphalt); Bagley or Stationary Scraper; Belt

Finishing Machine; Blower Operator (cement); Cement Hog;

Compressor (2000 CFM or over, 2 or more, gas diesel or electric power); Concrete Saw (multiple cut); Distributor

Leverman; Ditch Witch or similar; Elevator Hoisting

Materials; Dope Pots (power agitated); Fork Lift or Lumber

Stacker, hydra-lift & similar; Gin Trucks (pipeline);

Hoist, single drum; Loaders (bucket elevators and conveyors); Longitudinal Float; Mixer (portable-concrete);

Pavement Breaker, Hydra-Hammer & similar; Power Broom;

Railroad Ballast Regulation Operator (self-propelled);

Railroad Power Tamper Operator (self-propelled); Railroad

Tamper Jack Operator (self-propelled; Spray Curing Machine

(concrete); Spreader Box (self-propelled); Straddle Buggy

(Ross & similar on construction job only); Tractor (Farm type R/T with attachment, except Backhoe); Tugger Operator

GROUP 3: A-frame Truck (2 or more drums); Assistant

Refrigeration Plant & Chiller Operator (over 1000 ton);

Backfillers (Cleveland & similar); Batch Plant & Wet Mix

Operator, single unit (concrete); Belt-Crete Conveyors with power pack or similar; Belt Loader (Kocal or similar);

Bending Machine; Bob Cat (Skid Steer); Boring Machine

(earth); Boring Machine (rock under 8 inch bit) (Quarry

Master, Joy or similar); Bump Cutter (Wayne, Saginau or similar); Canal Lining Machine (concrete); Chipper (without crane); Cleaning & Doping Machine (pipeline); Deck

Engineer; Elevating Belt-type Loader (Euclid, Barber Green

& similar); Elevating Grader-type Loader (Dumor, Adams or similar); Generator Plant Engineers (diesel or electric);

Gunnite Combination Mixer & Compressor; Locomotive

Engineer; Mixermobile; Mucking Machine; Posthole Auger or

Punch; Pump (grout or jet); Soil Stabilizer (P & H or similar); Spreader Machine; Dozer/Tractor (up to D-6 or equivalent) and Traxcavator; Traverse Finish Machine;

Turnhead Operator

GROUP 4: Concrete Pumps (squeeze-crete, flow-crete, pump-crete, Whitman & similar); Curb Extruder (asphalt or concrete); Drills (churn, core, calyx or diamond);

Equipment Serviceman; Greaser & Oiler; Hoist (2 or more drums or Tower Hoist); Loaders (overhead & front-end, under

4 yds. R/T); Refrigeration Plant Engineer (under 1000 ton);

Rubber-tired Skidders (R/T with or without attachments);

Surface Heater & Plant Machine; Trenching Machines (under 7

ft. depth capacity); Turnhead (with re-screening); Vacuum

Drill (reverse circulation drill under 8 inch bit)

GROUP 5: Backhoe (under 45,000 gw); Backhoe & Hoe Ram (under

3/4 yd.); Carrydeck & Boom Truck (under 25 tons); Cranes

D - 17

Creek Road Stabilization

(25 tons & under), all attachments including clamshell, dragline; Derricks & Stifflegs (under 65 tons); Drilling

Equipment(8 inch bit & over) (Robbins, reverse circulation

& similar); Hoe Ram; Piledriving Engineers; Paving (dual drum); Railroad Track Liner Operaotr (self-propelled);

Refrigeration Plant Engineer (1000 tons & over); Signalman

(Whirleys, Highline Hammerheads or similar); Grade Checker

GROUP 6: Asphalt Plant Operator; Automatic Subgrader (Ditches

& Trimmers)(Autograde, ABC, R.A. Hansen & similar on grade wire); Backhoe (45,000 gw and over to 110,000 gw); Backhoes

& Hoe Ram (3/4 yd. to 3 yd.); Batch Plant (over 4 units);

Batch & Wet Mix Operator (multiple units, 2 & incl. 4);

Blade Operator (motor patrol & attachments); Cable

Controller (dispatcher); Compactor (self-propelled with blade); Concrete Pump Boom Truck; Concrete Slip Form Paver;

Cranes (over 25 tons, to and including 45 tons), all attachments including clamshell, dragline; Crusher, Grizzle

& Screening Plant Operator; Dozer, 834 R/T & similar; Drill

Doctor; Loader Operator (front-end & overhead, 4 yds. incl.

8 yds.); Multiple Dozer Units with single blade; Paving

Machine (asphalt and concrete); Quad-Track or similar equipment; Rollerman (finishing asphalt pavement); Roto

Mill (pavement grinder); Scrapers, all, rubber-tired;

Screed Operator; Shovel(under 3 yds.); Trenching Machines

(7 ft. depth & over); Tug Boat Operator Vactor guzzler, super sucker; Lime Batch Tank Operator (REcycle Train);

Lime Brain Operator (Recycle Train); Mobile Crusher

Operator (Recycle Train)

GROUP 7: Backhoe (over 110,000 gw); Backhoes & Hoe Ram (3 yds

& over); Blade (finish & bluetop) Automatic, CMI, ABC, Finish Athey & Huber & similar when used as automatic;

Cableway Operators; Concrete Cleaning/Decontamination machine operator; Cranes (over 45 tons to but not including

85 tons), all attachments including clamshell and dragine;

Derricks & Stiffleys (65 tons & over); Elevating Belt

(Holland type); Heavy equipment robotics operator; Loader

(360 degrees revolving Koehring Scooper or similar);

Loaders (overhead & front-end, over 8 yds. to 10 yds.);

Rubber-tired Scrapers (multiple engine with three or more scrapers); Shovels (3 yds. & over); Whirleys & Hammerheads, ALL; H.D. Mechanic; H.D. Welder; Hydraulic Platform

Trailers (Goldhofer, Shaurerly andSimilar); Ultra High

Pressure Wateriet Cutting Tool System Operator (30,000 psi); Vacuum Blasting Machine Operator

GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower), all attachments including clamshell, dragline; Loaders (overhead and front-end, 10 yards and over); Helicopter Pilot

D - 18

Creek Road Stabilization

ENGI0302-125 06/01/2024

ADAMS, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS

(EAST OF THE 120TH MERIDIAN), FERRY, GRANT, OKANOGAN (EAST OF

THE 120TH MERIDIAN), PEND OREILLE, STEVENS, AND YAKIMA (EAST OF

THE 120TH MERIDIAN) COUNTIES

GROUP 1.....................$ 38.91 22.45

GROUP 2.....................$ 39.28 22.45

GROUP 3.....................$ 39.99 22.45

GROUP 4.....................$ 40.18 22.45

GROUP 5.....................$ 40.37 22.45

GROUP 6.....................$ 40.69 22.45

GROUP 7.....................$ 40.01 22.45

GROUP 8.....................$ 42.88 22.45

GROUP 1: Bit Grinders; Bolt Threading Machine; Compressors

(under 2000 CFM, gas, diesel, or electric power); Deck

Hand; Fireman & Heater Tender; Hydro-seeder, Mulcher, Nozzleman; Oiler Driver, & Cable Tender, Mucking Machine;

Pumpman; Rollers, all types on subgrade, including seal and chip coatings (farm type, Case, John Deere & similar, or

Compacting Vibrator), except when pulled by Dozer with operable blade; Welding Machine; Crane Oiler-Driver (CLD required) & Cable Tender, Mucking Machine

GROUP 2: A-frame Truck (single drum); Assistant Refrigeration

Plant (under 1000 ton); Assistant Plant Operator, Fireman or Pugmixer (asphalt); Bagley or Stationary Scraper; Belt

Finishing Machine; Blower Operator (cement); Cement Hog;

Compressor (2000 CFM or over, 2 or more, gas diesel or electric power); Concrete Saw (multiple cut); Distributor

Leverman; Ditch Witch or similar; Elevator Hoisting

Materials; Dope Pots (power agitated); Fork Lift or Lumber

Stacker, hydra-lift & similar; Gin Trucks (pipeline);

Hoist, single drum; Loaders (bucket elevators and conveyors); Longitudinal Float; Mixer (portable-concrete);

Pavement Breaker, Hydra-Hammer & similar; Power Broom;

Railroad Ballast Regulation Operator (self-propelled);

Railroad Power Tamper Operator (self-propelled); Railroad

Tamper Jack Operator (self-propelled; Spray Curing Machine

(concrete); Spreader Box (self-propelled); Straddle Buggy

(Ross & similar on construction job only); Tractor (Farm type R/T with attachment, except Backhoe); Tugger Operator

D - 19

Creek Road Stabilization

GROUP 3: A-frame Truck (2 or more drums); Assistant

Refrigeration Plant & Chiller Operator (over 1000 ton);

Backfillers (Cleveland & similar); Batch Plant & Wet Mix

Operator, single unit (concrete); Belt-Crete Conveyors with power pack or similar; Belt Loader (Kocal or similar);

Bending Machine; Bob Cat (Skid Steer); Boring Machine

(earth); Boring Machine (rock under 8 inch bit) (Quarry

Master, Joy or similar); Bump Cutter (Wayne, Saginau or similar); Canal Lining Machine (concrete); Chipper (without crane); Cleaning & Doping Machine (pipeline); Deck

Engineer; Elevating Belt-type Loader (Euclid, Barber Green

& similar); Elevating Grader-type Loader (Dumor, Adams or similar); Generator Plant Engineers (diesel or electric);

Gunnite Combination Mixer & Compressor; Locomotive

Engineer; Mixermobile; Mucking Machine; Posthole Auger or

Punch; Pump (grout or jet); Soil Stabilizer (P & H or similar); Spreader Machine; Dozer/Tractor (up to D-6 or equivalent) and Traxcavator; Traverse Finish Machine;

Turnhead Operator

GROUP 4: Concrete Pumps (squeeze-crete, flow-crete, pump-crete, Whitman & similar); Curb Extruder (asphalt or concrete); Drills (churn, core, calyx or diamond);

Equipment Serviceman; Greaser & Oiler; Hoist (2 or more drums or Tower Hoist); Loaders (overhead & front-end, under

4 yds. R/T); Refrigeration Plant Engineer (under 1000 ton);

Rubber-tired Skidders (R/T with or without attachments);

Surface Heater & Plant Machine; Trenching Machines (under 7

ft. depth capacity); Turnhead (with re-screening); Vacuum

Drill (reverse circulation drill under 8 inch bit)

GROUP 5: Backhoe (under 45,000 gw); Backhoe & Hoe Ram (under

3/4 yd.); Carrydeck & Boom Truck (under 25 tons); Cranes

(25 tons & under), all attachments including clamshell, dragline; Derricks & Stifflegs (under 65 tons); Drilling

Equipment(8 inch bit & over) (Robbins, reverse circulation

& similar); Hoe Ram; Piledriving Engineers; Paving (dual drum); Railroad Track Liner Operaotr (self-propelled);

Refrigeration Plant Engineer (1000 tons & over); Signalman

(Whirleys, Highline Hammerheads or similar); Grade Checker

GROUP 6: Asphalt Plant Operator; Automatic Subgrader (Ditches

& Trimmers)(Autograde, ABC, R.A. Hansen & similar on grade wire); Backhoe (45,000 gw and over to 110,000 gw); Backhoes

& Hoe Ram (3/4 yd. to 3 yd.); Batch Plant (over 4 units);

Batch & Wet Mix Operator (multiple units, 2 & incl. 4);

Blade Operator (motor patrol & attachments); Cable

Controller (dispatcher); Compactor (self-propelled with blade); Concrete Pump Boom Truck; Concrete Slip Form Paver;

Cranes (over 25 tons, to and including 45 tons), all attachments including clamshell, dragline; Crusher, Grizzle

& Screening Plant Operator; Dozer, 834 R/T & similar; Drill

D - 20

Creek Road Stabilization

Doctor; Loader Operator (front-end & overhead, 4 yds. incl.

8 yds.); Multiple Dozer Units with single blade; Paving

Machine (asphalt and concrete); Quad-Track or similar equipment; Rollerman (finishing asphalt pavement); Roto

Mill (pavement grinder); Scrapers, all, rubber-tired;

Screed Operator; Shovel(under 3 yds.); Trenching Machines

(7 ft. depth & over); Tug Boat Operator Vactor guzzler, super sucker; Lime Batch Tank Operator (REcycle Train);

Lime Brain Operator (Recycle Train); Mobile Crusher

Operator (Recycle Train)

GROUP 7: Backhoe (over 110,000 gw); Backhoes & Hoe Ram (3 yds

& over); Blade (finish & bluetop) Automatic, CMI, ABC, Finish Athey & Huber & similar when used as automatic;

Cableway Operators; Concrete Cleaning/Decontamination machine operator; Cranes (over 45 tons to but not including

85 tons), all attachments including clamshell and dragine;

Derricks & Stiffleys (65 tons & over); Elevating Belt

(Holland type); Heavy equipment robotics operator; Loader

(360 degrees revolving Koehring Scooper or similar);

Loaders (overhead & front-end, over 8 yds. to 10 yds.);

Rubber-tired Scrapers (multiple engine with three or more scrapers); Shovels (3 yds. & over); Whirleys & Hammerheads, ALL; H.D. Mechanic; H.D. Welder; Hydraulic Platform

Trailers (Goldhofer, Shaurerly andSimilar); Ultra High

Pressure Wateriet Cutting Tool System Operator (30,000 psi); Vacuum Blasting Machine Operator

GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower), all attachments including clamshell, dragline; Loaders (overhead and front-end, 10 yards and over); Helicopter Pilot

ENGI0612-001 06/01/2025

PIERCE County

ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH

GROUP SHALL BE 90% OF THE BASE RATE PLUS FULL FRINGE BENEFITS.

ON ALL OTHER WORK, THE FOLLOWING RATES APPLY.

Zone 1 (0-25 radius miles):

GROUP 1A...................$ 62.32 27.32

GROUP 1AA..................$ 63.22 27.32

GROUP 1AAA.................$ 64.11 27.32

GROUP 1.....................$ 61.41 27.32

D - 21

Creek Road Stabilization

GROUP 2.....................$ 60.63 27.32

GROUP 3.....................$ 59.96 27.32

GROUP 4.....................$ 56.15 27.32

Zone Differential (Add to Zone 1 rates):

Zone 2 (26-45 radius miles) = $1.00

Zone 3 (Over 45 radius miles) - $1.30

BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA

GROUP 1 AAA - Cranes-over 300 tons or 300 ft of boom

(including jib with attachments)

GROUP 1AA - Cranes- 200 tonsto 300 tons, or 250 ft of boom

(including jib with attachments; Tower crane over 175 ft in height, bas to boom

GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom

(including jib with attachments); Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders-overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments

GROUP 1 - Cableway; Cranes 45 tons thru 99 tons under 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment

45 yards and over; Loader- overhead, 6 yards to, but not including, 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9 HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon;

Scrapers-self-propelled 45 yards and over; Slipform pavers;

Transporters, all track or truck type

GROUP 2 - Barrier machine (zipper); Batch Plant Operator-concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane-Overhead, bridge type, 20 tons through

44 tons; Chipper; Concrete pump-truck mount with boom attachment; Crusher; Deck engineer/deck winches (power);

Drilling machine; Excavator, shovel, backhoe-3 yards and under; Finishing machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Loaders, overhead under 6 yards; Loaders-plant feed; Locomotives-all; Mechanics- all;

Mixers, asphalt plant; Motor patrol graders, finishing;

Piledriver (other than crane mount); Roto-mill, roto-grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green;

Scraper-self- propelled, hard tail end dump, articulating off-road equipment- under 45 yards; Subgrader trimmer;

D - 22

Creek Road Stabilization

Tractors, backhoe over 75 hp; Transfer material service machine-shuttle buggy, Blaw Knox- Roadtec; Truck Crane oiler/driver-100 tons and over; Truck Mount Portable

Conveyor; Yo Yo pay

GROUP 3 - Conveyors; Cranes through 19 tons with attachments;

Crane-A-frame over 10 tons; Drill oilers-auger type, truck or crane mount; Dozer-D-9 and under; Forklift-3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside Hoists-(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loaders-elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher;

Pump-Concrete; Roller, plant mix or multi-lfit materials;

Saws-concrete; Scrapers, concrete and carry all; Service engineers-equipment; Trenching machines; Truck crane oiler/driver under 100 tons; Tractors, backhoe under 75 hp

GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor;

Concrete Finish Machine-laser screed; Cranes A-frame 10 tons and under; Elevator and manlift (permanent and shaft type); Forklifts-under 3000 lbs. with attachments;

Gradechecker, stakehop; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger-mechanical; Power plant; Pumps-water; Rigger and

Bellman; Roller-other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator

FOOTNOTE A- Reduced rates may be paid on the following:

1. Projects involving work on structures such as buildings and bridges whose total value is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract.

2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utilities excluded.

3. Marine projects (docks, wharfs, etc.) less than $150,000.

HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designated hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan.

H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing, Class ""D"" Suit - Base

D - 23

Creek Road Stabilization wage rate plus $ .50 per hour.

H-2 Class ""C"" Suit - Base wage rate plus $1.00 per hour.

H-3 Class ""B"" Suit - Base wage rate plus $1.50 per hour.

H-4 Class ""A"" Suit - Base wage rate plus $2.00 per hour.

ENGI0612-008 06/01/2025

LEWIS AND PACIFIC (PORTION LYING NORTH OF A PARALLEL LINE

EXTENDING WEST FROM THE NORTHERN BOUNDARY OF WAHKAIKUM COUNTY

TO THE SEA) COUNTIES

GROUP 1A...................$ 61.22 27.32

GROUP 1AA..................$ 62.12 27.32

GROUP 1AAA.................$ 62.99 27.32

GROUP 1.....................$ 60.32 27.32

GROUP 2.....................$ 59.56 27.32

GROUP 3.....................$ 58.89 27.32

GROUP 4.....................$ 55.13 27.32

type, 100 tons and over; Tower crane up to 175 ft in height

D - 24

Creek Road Stabilization of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment

45 yards and over; Loader- overhead, 6 yards to, but not including, 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9 HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers-self-propelled 45 yards and over; Slipform pavers;

attachments; Crane-Overhead, bridge type, 20 tons through

44 tons; Chipper; Concrete pump-truck mount with boom attachment; Crusher; Deck engineer/deck winches (power);

Drilling machine; Excavator, shovel, backhoe-3 yards and under; Finishing machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Loaders, overhead under 6 yards; Loaders-plant feed; Locomotives-all; Mechanics- all;

Mixers, asphalt plant; Motor patrol graders, finishing;

Piledriver (other than crane mount); Roto-mill, roto-grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green;

Scraper-self- propelled, hard tail end dump, articulating off-road equipment- under 45 yards; Subgrader trimmer;

Tractors, backhoe over 75 hp; Transfer material service machine-shuttle buggy, Blaw Knox- Roadtec; Truck Crane or crane mount; Dozer-D-9 and under; Forklift-3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside Hoists-(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loaders-elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher;

Pump-Concrete; Roller, plant mix or multi-lfit materials;

Saws-concrete; Scrapers, concrete and carry all; Service tons and under; Elevator and manlift (permanent and shaft type); Forklifts-under 3000 lbs. with attachments;

Gradechecker, stakehop; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger-mechanical; Power plant; Pumps-water; Rigger and

D - 25

Creek Road Stabilization and bridges whose total value is less than $1.5 million designated hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as wage rate plus $ .50 per hour.

H-2 Class ""C"" Suit - Base wage rate plus $1.00 per hour.

ENGI0612-012 06/01/2025

THURSTON COUNTY

GROUP 1A...................$ 61.81 27.32

GROUP 1AA..................$ 62.71 27.32

GROUP 1AAA.................$ 63.59 27.32

GROUP 1.....................$ 60.91 27.32

GROUP 2.....................$ 60.14 27.32

GROUP 3.....................$ 59.46 27.32

D - 26

GROUP 4.....................$ 55.68 27.32

type, 100 tons and over; Tower crane up to 175 ft in height of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment

45 yards and over; Loader- overhead, 6 yards to, but not including, 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9 HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers-self-propelled 45 yards and over; Slipform pavers;

attachments; Crane-Overhead, bridge type, 20 tons through

44 tons; Chipper; Concrete pump-truck mount with boom attachment; Crusher; Deck engineer/deck winches (power);

Drilling machine; Excavator, shovel, backhoe-3 yards and under; Finishing machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Loaders, overhead under 6 yards; Loaders-plant feed; Locomotives-all; Mechanics- all;

Mixers, asphalt plant; Motor patrol graders, finishing;

Piledriver (other than crane mount); Roto-mill, roto-grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green;

Scraper-self- propelled, hard tail end dump, articulating off-road equipment- under 45 yards; Subgrader trimmer;

Tractors, backhoe over 75 hp; Transfer material service machine-shuttle buggy, Blaw Knox- Roadtec; Truck Crane

D - 27

Creek Road Stabilization or crane mount; Dozer-D-9 and under; Forklift-3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside Hoists-(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loaders-elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher;

Pump-Concrete; Roller, plant mix or multi-lfit materials;

Saws-concrete; Scrapers, concrete and carry all; Service tons and under; Elevator and manlift (permanent and shaft type); Forklifts-under 3000 lbs. with attachments;

Gradechecker, stakehop; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger-mechanical; Power plant; Pumps-water; Rigger and and bridges whose total value is less than $1.5 million designated hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as wage rate plus $ .50 per hour.

H-2 Class ""C"" Suit - Base wage rate plus $1.00 per hour.

D - 28

Creek Road Stabilization

ENGI0701-002 01/01/2025

CLARK, COWLITZ, KLICKKITAT, PACIFIC (SOUTH), SKAMANIA, AND

WAHKIAKUM COUNTIES

POWER RQUIPMENT OPERATORS: ZONE 1

GROUP 1.....................$ 58.94 17.15

GROUP 1A....................$ 61.10 17.15

GROUP 1B....................$ 63.26 17.15

GROUP 2.....................$ 57.03 17.15

GROUP 3.....................$ 55.88 17.15

GROUP 4.....................$ 52.55 17.15

GROUP 5.....................$ 51.31 17.15

GROUP 6.....................$ 48.09 17.15

Zone Differential (add to Zone 1 rates):

Zone 2 - $3.00

Zone 3 - $6.00

For the following metropolitan counties: MULTNOMAH;

CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA;

CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS

INDICATED:

All jobs or projects located in Multnomah, Clackamas and

Marion Counties, West of the western boundary of Mt. Hood

National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of

Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt.

St. Helens ""Blast Zone"" shall receive Zone I pay for all classifications.

All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the

Portland City Hall shall receive Zone II pay for all

All jobs or projects located more than 50 miles from the

Portland City Hall, but outside the identified…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .