This document is a Questions and Answers file for the WA FLAP LINCOL 57860 (1) & WA NPS LARO 208(1) project involving Hawk Creek Road Improvements and Road Stabilization. The file contains two technical questions and their corresponding answers. The first question inquires about the project's anticipated advertisement timeline, with the response confirming it is still expected to be advertised during the winter. The second question addresses discrepancies between two Stormwater Pollution Prevention Plan (SWPPP) documents, with the response instructing to disregard the "Hawk Creek Compiled SWPPP for contract" file and use the "waa-lincol57860-1_SWPPP" file, which will be corrected through an amendment.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA FLAP LINCOL 57860 (1), & WA NPS LARO
208(1), Hawk Creek Road Improvements & Hawk Creek Road Stabilization
# General Technical Question Answer Date
1 X
I wanted to reach out and see if this was still going to drop during this winter or based on the shutdown if it is going to slide to the right a bit. I wanted to check and see if there was a new estimated drop date or time frame.
We are still anticipating that this project will be advertised this winter.
11/13/25
2 X
I am looking over the documents and I noticed there are two SWPPPs listed. I am wondering if they are both needed, as I believe they are identical except for a few pages. The "Hawk Creek Compiled SWPPP for contract" file has an extra blank page and a Tab 3 divider page on pages 64-65 (also has a higher page count by 2), while the "waa-lincol57860-1_SWPPP" file is missing the blank page and has the Tab 3 divider page in the correct order, but has signatures the previous report is missing on the NPDES on page
64. There are a few blank pages that may be put in a slightly different order from each other, but otherwise everything looks the same. There are a couple of divider pages that say there should be photos included also.
Please disregard "Hawk Creek Compiled SWPPP for contract" and use file name “waa-lincol57860-1_SWPPP”. This will corrected through an amendment.
12/18/25
Check General or Technical