WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 69056725B000004
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Washington, United States
- Points of contact
-
- Contracts G. Office wfl.contracts@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration (FHWA) is soliciting bids for the reconstruction and improvement of Hawk Creek Road in Lincoln County, Washington, approximately 30 miles northwest of Davenport. The project scope includes earthwork, grading, base preparation, paving, drainage improvements, soil nail retaining walls, and guardrail installation along a 0.68-mile stretch of road that serves as the sole access route to Lake Roosevelt National Recreation Area (LARO) Hawk Creek Facilities. Key project requirements include clearing 4.5 acres, excavating 8,000 cubic yards, installing 1,350 linear feet of guardrail, placing 1,700 tons of asphalt concrete, establishing turf on 3.8 acres, and implementing environmental mitigation measures such as root wad installations. The solicitation documents were made available on SAM.gov during fall 2025, with technical questions to be submitted via email to wfl.plansspec@dot.gov and general inquiries directed to wfl.contracts@dot.gov or 360-619-7520. Site visits are encouraged during the fall season, as project access may be limited after October 31st due to seasonal weather conditions, and all material sources must be certified free from noxious weeds and invasive plants through fall weed inspections.
This opportunity is designated as a Total Small Business set-aside, limiting competition to small business entities. The estimated contract value ranges between $5 and $10 million, with a tentative fixed completion date of Summer/Fall 2026. The project encompasses comprehensive construction requirements including construction survey and staking, contractor quality control and assurance, construction schedules, soil erosion and sediment control, slope reinforcement and retaining walls, aggregate and base courses, asphalt pavements, incidental construction items such as culverts, and environmental mitigation components. The project is identified as WA FLAP LINCOL 57860(1) and WA NPS LARO 208(1), indicating involvement of both Federal Lands Access Program (FLAP) and National Park Service (NPS) funding sources. Prospective offerors should monitor SAM.gov for the formal solicitation release and maintain contact with the FHWA Western Federal Lands Highway Division for any updates to the project schedule or requirements.
Notice text
3 versions
Update #3 · Latest ·
Update 11/13/2025: QA_11-13-25.pdf posted to attachments.
WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
This work consists of: Earthwork, grading, base, paving, drainage, soil nail retaining walls, and guardrail
Project Location: 30 Miles NW of Davenport, Washington
Project Length: 0.68 Miles
Estimated Price Range: Between $5 and 10 Million
Tentative Fixed Completion Date: Summer/Fall 2026
See Attachments for additional information.
Update #2 ·
WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
This work consists of: Earthwork, grading, base, paving, drainage, soil nail retaining walls, and guardrail
Project Location: 30 Miles NW of Davenport, Washington
Project Length: 0.68 Miles
Estimated Price Range: Between $5 and 10 Million
Tentative Fixed Completion Date: Summer/Fall 2026
See Attachments for additional information.
Update #1 ·
WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
This work consists of: Earthwork, grading, base, paving, drainage, soil nail retaining walls, and guardrail
Project Location: 30 Miles NW of Davenport, Washington
Project Length: 0.68 Miles
Estimated Price Range: Between $5 and 10 Million
Tentative Fixed Completion Date: Summer/Fall 2025
See Attachments for additional information.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization | Award Notice | |
| WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 | Federal Highway Administration | Total Small Business | |
| WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 | Federal Highway Administration | No set-aside | |
| OK FW TSM 10(1) NFH Entrance Road and Parking Improvements | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity