Bid Tabulations_Hawk Creek Road.pdf
PDF 624 KB Posted
- Attached to
- WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
- Solicitation number
- 69056725B000004
About this file
This is a Bid Tabulation Report for the Hawk Creek Road Improvements & Hawk Creek Road Stabilization project, located in Lincoln County, Washington, within the Lake Roosevelt National Recreation Area. The solicitation (No. 69056725B000004) was opened on 01/15/2026 in Vancouver, WA, with 10 construction contractors submitting bids. The base bid amounts ranged from $3,511,625 (DW Excavating Inc.) to $7,175,526 (North Fork Enterprises, LLC), with the Engineer's Estimate at $5,750,000.
The bid tabulation details itemized pricing for over 50 line items across various construction activities, including mobilization, soil erosion control, roadway excavation, asphalt concrete pavement, culvert installation, guardrail systems, traffic control, and landscape mitigation. Each line item shows individual contractor unit prices and total amounts, allowing for detailed comparative analysis. The project involves complex roadway improvements with specific requirements for environmental protection, traffic management, and infrastructure installation, typical of federal land construction projects managed by Western Federal Lands.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION REPORT
Project No. : WA FLAP LINCOL 57860(1) & WA NPS LARO 208(1) Project Name: Hawk Creek Road Improvements & Hawk Creek Road Stabilization
Contractor Responsive? Base Schedule A North Fork Enterprises, LLC $7,175,526.00 MJ Hughes Construction $5,948,450.00 YOY, Inc., DBA Verdis $5,603,324.70 Moreno and Nelson Construction Corp $5,495,475.00
James Dean Construction, Inc $5,372,585.00 Halme Construction Inc. $4,995,058.00 Pipkin Inc., dba Pipkin Construction $4,796,430.00 Black Flag Solutions LLC $3,844,698.50 Copenhaver Construction, Inc. $3,726,536.00 DW Excavating Inc. $3,511,625.00 Engineer's Estimate $5,750,000.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Marino Chea
Project No. : WA FLAP LINCOL
57860(1) & WA NPS
LARO 208(1)
Project Name: Hawk Creek Road Improvements & Hawk Creek Road Stabilization
Division: Western Federal Lands
Schedule: A Schedule Type: Base Lead Designer:
Solicitation No. : 69056725B000004 Opened at: Vancouver, WA Opened by: Marino Chea State: WA County: Lincoln Federal Land: Lake Roosevelt
National Recreation Area
Bid Open Date and Time: 01/15/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive North Fork Enterprises, LLC $7,175,526.00 MJ Hughes Construction, 11510 NE 87th Ave, Vancouver, WA, 98662
$5,948,450.00
YOY, Inc., DBA Verdis $5,603,324.70 Moreno and Nelson Construction Corp, PO Box 794, Walla Walla, WA, 99362
$5,495,475.00
James Dean Construction, Inc, 579 Hwy 141, White Salmon, WA, 98672
$5,372,585.00
Halme Construction Inc. $4,995,058.00 Pipkin Inc., dba Pipkin Construction, 4801 Contractors Drive, East Wenatchee, WA, 98802
$4,796,430.00
Black Flag Solutions LLC $3,844,698.50
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Copenhaver Construction, Inc. $3,726,536.00 DW Excavating Inc. $3,511,625.00 Engineer's Estimate $5,750,000.00
Project No. : WA FLAP LINCOL 57860(1) & WA
NPS LARO 208(1)
Project Name: Hawk Creek Road Improvements & Hawk Creek Road Stabilization
Schedule: A Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
A0010 15101-0000 MOBILIZATION Pipkin Inc., dba Pipkin Construction $800,000.00
North Fork Enterprises, LLC $715,000.00
James Dean Construction, Inc $700,000.00
MJ Hughes Construction $590,000.00
YOY, Inc., DBA Verdis $557,137.00 Halme Construction Inc. $490,000.00
Copenhaver Construction, Inc. $370,000.00
Black Flag Solutions
LLC $276,286.00
Moreno and Nelson Construction Corp $189,360.00
DW Excavating Inc. $127,600.00 Engineer's Estimate ALL LPSM LPSM $522,769.00
A0020 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
North Fork Enterprises, LLC $225,000.00
Halme Construction Inc. $150,000.00
YOY, Inc., DBA Verdis $112,100.00 MJ Hughes Construction $109,000.00
Copenhaver Construction, Inc. $100,000.00
James Dean Construction, Inc $100,000.00
Pipkin Inc., dba Pipkin Construction $100,000.00
Moreno and Nelson Construction Corp $72,430.00
Black Flag Solutions
LLC $57,878.00
DW Excavating Inc. $30,600.00 Engineer's Estimate ALL LPSM LPSM $57,500.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0030 15301-0010 CONTRACTOR
QUALITY CONTROL
AND ASSURANCE
YOY, Inc., DBA Verdis $560,500.00 North Fork Enterprises, LLC $300,000.00
Moreno and Nelson Construction Corp $256,050.00
MJ Hughes Construction $250,000.00
Halme Construction Inc. $200,000.00
James Dean Construction, Inc $200,000.00
Pipkin Inc., dba Pipkin Construction $200,000.00
Copenhaver Construction, Inc. $100,000.00
DW Excavating Inc. $61,100.00 Black Flag Solutions
LLC $52,090.00
Engineer's Estimate ALL LPSM LPSM $91,500.00
A0040 15401-0000 CONTRACTOR
TESTING
YOY, Inc., DBA Verdis $283,613.00 MJ Hughes Construction $250,000.00
North Fork Enterprises, LLC $250,000.00
Halme Construction Inc. $200,000.00
Pipkin Inc., dba Pipkin Construction $165,000.00
Black Flag Solutions
LLC $154,551.00
DW Excavating Inc. $132,100.00 Moreno and Nelson Construction Corp $125,490.00
Copenhaver Construction, Inc. $100,000.00
James Dean Construction, Inc $62,000.00
Engineer's Estimate ALL LPSM LPSM $61,500.00
A0050 15501-0000 CONSTRUCTION
SCHEDULE
YOY, Inc., DBA Verdis $336,300.00 North Fork Enterprises, LLC $75,000.00
MJ Hughes Construction $25,000.00
Pipkin Inc., dba Pipkin Construction $20,000.00
Halme Construction Inc. $10,000.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0050 15501-0000 CONSTRUCTION
SCHEDULE
James Dean Construction, Inc $10,000.00
Copenhaver Construction, Inc. $5,000.00
Black Flag Solutions
LLC $2,894.00
Moreno and Nelson Construction Corp $2,510.00
DW Excavating Inc. $1,400.00 Engineer's Estimate ALL LPSM LPSM $10,150.00
A0060 15702-6000 SOIL EROSION
CONTROL,
TEMPORARY
STREAM
DIVERSION
North Fork Enterprises, LLC $300,000.00
Copenhaver Construction, Inc. $250,000.00
YOY, Inc., DBA Verdis $224,200.00 Moreno and Nelson Construction Corp $154,620.00
MJ Hughes Construction $140,000.00
Black Flag Solutions
LLC $117,907.00
Halme Construction Inc. $100,000.00
Pipkin Inc., dba Pipkin Construction $100,000.00
DW Excavating Inc. $27,700.00 James Dean Construction, Inc $24,000.00
Engineer's Estimate ALL LPSM LPSM $88,500.00
A0070 15705-0100 SOIL EROSION
CONTROL, SILT
FENCE
Moreno and Nelson Construction Corp 270.000 $15.00 $4,050.00
Halme Construction Inc. 270.000 $13.00 $3,510.00
North Fork Enterprises, LLC 270.000 $12.00 $3,240.00
DW Excavating Inc. 270.000 $8.00 $2,160.00 Black Flag Solutions
LLC 270.000 $7.00 $1,890.00
MJ Hughes Construction 270.000 $7.00 $1,890.00
Pipkin Inc., dba Pipkin Construction 270.000 $6.00 $1,620.00
Copenhaver Construction, Inc. 270.000 $5.00 $1,350.00
James Dean Construction, Inc 270.000 $3.75 $1,012.50
YOY, Inc., DBA Verdis 270.000 $3.36 $907.20
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0070 15705-0100 SOIL EROSION
CONTROL, SILT
FENCE
Engineer's Estimate 270.000 LNFT $10.00 $2,700.00
A0080 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
North Fork Enterprises, LLC 12,000.000 $12.00 $144,000.00
Black Flag Solutions
LLC 12,000.000 $6.50 $78,000.00
MJ Hughes Construction 12,000.000 $6.00 $72,000.00
YOY, Inc., DBA Verdis 12,000.000 $4.48 $53,760.00 Moreno and Nelson Construction Corp 12,000.000 $4.25 $51,000.00
Copenhaver Construction, Inc. 12,000.000 $4.00 $48,000.00
Halme Construction Inc. 12,000.000 $4.00 $48,000.00
DW Excavating Inc. 12,000.000 $3.25 $39,000.00 Pipkin Inc., dba Pipkin Construction 12,000.000 $3.00 $36,000.00
James Dean Construction, Inc 12,000.000 $2.25 $27,000.00
Engineer's Estimate 12,000.000 LNFT $7.60 $91,200.00
A0090 15706-0200 SOIL EROSION
CONTROL, CHECK
DAM
North Fork Enterprises, LLC 35.000 $800.00 $28,000.00
Moreno and Nelson Construction Corp 35.000 $380.00 $13,300.00
Halme Construction Inc. 35.000 $250.00 $8,750.00
DW Excavating Inc. 35.000 $218.00 $7,630.00 Copenhaver Construction, Inc. 35.000 $170.00 $5,950.00
James Dean Construction, Inc 35.000 $150.00 $5,250.00
Black Flag Solutions
LLC 35.000 $116.00 $4,060.00
MJ Hughes Construction 35.000 $115.00 $4,025.00
YOY, Inc., DBA Verdis 35.000 $95.29 $3,335.15 Pipkin Inc., dba Pipkin Construction 35.000 $70.00 $2,450.00
Engineer's Estimate 35.000 EACH $690.00 $24,150.00
A0100 15706-1000 SOIL EROSION
CONTROL, INLET
PROTECTION
North Fork Enterprises, LLC 2.000 $500.00 $1,000.00
Halme Construction Inc. 2.000 $200.00 $400.00
Moreno and Nelson Construction Corp 2.000 $189.00 $378.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0100 15706-1000 SOIL EROSION
CONTROL, INLET
PROTECTION
DW Excavating Inc. 2.000 $115.00 $230.00 YOY, Inc., DBA Verdis 2.000 $112.10 $224.20 James Dean Construction, Inc 2.000 $100.00 $200.00
MJ Hughes Construction 2.000 $100.00 $200.00
Pipkin Inc., dba Pipkin Construction 2.000 $100.00 $200.00
Black Flag Solutions
LLC 2.000 $98.00 $196.00
Copenhaver Construction, Inc. 2.000 $50.00 $100.00
Engineer's Estimate 2.000 EACH $200.00 $400.00
A0110 15706-1600 SOIL EROSION
CONTROL,
STABILIZED
CONSTRUCTION
EXIT
Halme Construction Inc. 2.000 $10,000.00 $20,000.00
North Fork Enterprises, LLC 2.000 $10,000.00 $20,000.00
Moreno and Nelson Construction Corp 2.000 $5,670.00 $11,340.00
DW Excavating Inc. 2.000 $4,800.00 $9,600.00 YOY, Inc., DBA Verdis 2.000 $4,484.00 $8,968.00 Copenhaver Construction, Inc. 2.000 $4,000.00 $8,000.00
Black Flag Solutions
LLC 2.000 $2,894.00 $5,788.00
MJ Hughes Construction 2.000 $2,400.00 $4,800.00
James Dean Construction, Inc 2.000 $1,000.00 $2,000.00
Pipkin Inc., dba Pipkin Construction 2.000 $1,000.00 $2,000.00
Engineer's Estimate 2.000 EACH $3,260.00 $6,520.00
A0120 20101-0000 CLEARING AND
GRUBBING
North Fork Enterprises, LLC 4.000 $75,000.00 $300,000.00
Moreno and Nelson Construction Corp 4.000 $17,220.00 $68,880.00
YOY, Inc., DBA Verdis 4.000 $16,815.00 $67,260.00 Halme Construction Inc. 4.000 $15,000.00 $60,000.00
MJ Hughes Construction 4.000 $14,600.00 $58,400.00
Copenhaver Construction, Inc. 4.000 $9,000.00 $36,000.00
James Dean Construction, Inc 4.000 $8,900.00 $35,600.00
Pipkin Inc., dba Pipkin Construction 4.000 $8,500.00 $34,000.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0120 20101-0000 CLEARING AND
GRUBBING
DW Excavating Inc. 4.000 $6,100.00 $24,400.00 Black Flag Solutions
LLC 4.000 $5,209.00 $20,836.00
Engineer's Estimate 4.000 ACRE $25,000.00 $100,000.00 A0130 20301-1100 REMOVAL OF GATE Moreno and Nelson
Construction Corp 2.000 $910.00 $1,820.00
YOY, Inc., DBA Verdis 2.000 $560.50 $1,121.00 MJ Hughes Construction 2.000 $550.00 $1,100.00
Copenhaver Construction, Inc. 2.000 $500.00 $1,000.00
North Fork Enterprises, LLC 2.000 $500.00 $1,000.00
Pipkin Inc., dba Pipkin Construction 2.000 $400.00 $800.00
DW Excavating Inc. 2.000 $300.00 $600.00 Halme Construction Inc. 2.000 $300.00 $600.00
Black Flag Solutions
LLC 2.000 $289.00 $578.00
James Dean Construction, Inc 2.000 $250.00 $500.00
Engineer's Estimate 2.000 EACH $1,000.00 $2,000.00
A0140 20301-1200 REMOVAL OF
HEADWALL
Copenhaver Construction, Inc. 1.000 $10,000.00 $10,000.00
Pipkin Inc., dba Pipkin Construction 1.000 $10,000.00 $10,000.00
Moreno and Nelson Construction Corp 1.000 $7,440.00 $7,440.00
North Fork Enterprises, LLC 1.000 $5,000.00 $5,000.00
YOY, Inc., DBA Verdis 1.000 $3,363.00 $3,363.00 Halme Construction Inc. 1.000 $2,000.00 $2,000.00
MJ Hughes Construction 1.000 $1,400.00 $1,400.00
DW Excavating Inc. 1.000 $1,200.00 $1,200.00 James Dean Construction, Inc 1.000 $1,000.00 $1,000.00
Black Flag Solutions
LLC 1.000 $579.00 $579.00
Engineer's Estimate 1.000 EACH $5,100.00 $5,100.00 A0150 20301-2400 REMOVAL OF SIGN James Dean
Construction, Inc 14.000 $350.00 $4,900.00
Moreno and Nelson Construction Corp 14.000 $300.00 $4,200.00
YOY, Inc., DBA Verdis 14.000 $224.20 $3,138.80
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0150 20301-2400 REMOVAL OF SIGN Pipkin Inc., dba Pipkin Construction 14.000 $150.00 $2,100.00
North Fork Enterprises, LLC 14.000 $130.00 $1,820.00
Copenhaver Construction, Inc. 14.000 $100.00 $1,400.00
Halme Construction Inc. 14.000 $100.00 $1,400.00
MJ Hughes Construction 14.000 $100.00 $1,400.00
DW Excavating Inc. 14.000 $92.00 $1,288.00 Black Flag Solutions
LLC 14.000 $87.00 $1,218.00
Engineer's Estimate 14.000 EACH $135.00 $1,890.00
A0160 20302-0700 REMOVAL OF
FENCE
Copenhaver Construction, Inc. 450.000 $10.00 $4,500.00
DW Excavating Inc. 450.000 $10.00 $4,500.00 Halme Construction Inc. 450.000 $10.00 $4,500.00
Moreno and Nelson Construction Corp 450.000 $10.00 $4,500.00
North Fork Enterprises, LLC 450.000 $10.00 $4,500.00
Black Flag Solutions
LLC 450.000 $9.50 $4,275.00
YOY, Inc., DBA Verdis 450.000 $3.36 $1,512.00 James Dean Construction, Inc 450.000 $3.00 $1,350.00
MJ Hughes Construction 450.000 $3.00 $1,350.00
Pipkin Inc., dba Pipkin Construction 450.000 $2.50 $1,125.00
Engineer's Estimate 450.000 LNFT $12.00 $5,400.00
A0170 20302-1300 REMOVAL OF
GUARDRAIL,
CONCRETE
BARRIER
YOY, Inc., DBA Verdis 142.000 $56.05 $7,959.10 Moreno and Nelson Construction Corp 142.000 $42.00 $5,964.00
Copenhaver Construction, Inc. 142.000 $38.00 $5,396.00
Black Flag Solutions
LLC 142.000 $35.00 $4,970.00
DW Excavating Inc. 142.000 $30.00 $4,260.00 Halme Construction Inc. 142.000 $30.00 $4,260.00
North Fork Enterprises, LLC 142.000 $28.00 $3,976.00
MJ Hughes Construction 142.000 $25.00 $3,550.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0170 20302-1300 REMOVAL OF
GUARDRAIL,
CONCRETE
BARRIER
Pipkin Inc., dba Pipkin Construction 142.000 $25.00 $3,550.00
James Dean Construction, Inc 142.000 $20.00 $2,840.00
Engineer's Estimate 142.000 LNFT $37.50 $5,325.00
A0180 20401-0000 ROADWAY
EXCAVATION
North Fork Enterprises, LLC 9,500.000 $34.00 $323,000.00
MJ Hughes Construction 9,500.000 $26.50 $251,750.00
Moreno and Nelson Construction Corp 9,500.000 $22.00 $209,000.00
James Dean Construction, Inc 9,500.000 $17.00 $161,500.00
Pipkin Inc., dba Pipkin Construction 9,500.000 $14.50 $137,750.00
Black Flag Solutions
LLC 9,500.000 $14.00 $133,000.00
Copenhaver Construction, Inc. 9,500.000 $14.00 $133,000.00
DW Excavating Inc. 9,500.000 $11.20 $106,400.00 Halme Construction Inc. 9,500.000 $9.00 $85,500.00
YOY, Inc., DBA Verdis 9,500.000 $8.97 $85,215.00 Engineer's Estimate 9,500.000 CUYD $39.00 $370,500.00
A0190 20403-0000 UNCLASSIFIED
BORROW
Moreno and Nelson Construction Corp 16,000.000 $72.00 $1,152,000.00
MJ Hughes Construction 16,000.000 $70.50 $1,128,000.00
North Fork Enterprises, LLC 16,000.000 $64.00 $1,024,000.00
James Dean Construction, Inc 16,000.000 $55.00 $880,000.00
YOY, Inc., DBA Verdis 16,000.000 $47.08 $753,280.00 Halme Construction Inc. 16,000.000 $47.00 $752,000.00
Pipkin Inc., dba Pipkin Construction 16,000.000 $45.00 $720,000.00
Black Flag Solutions
LLC 16,000.000 $29.00 $464,000.00
DW Excavating Inc. 16,000.000 $16.50 $264,000.00 Copenhaver Construction, Inc. 16,000.000 $5.00 $80,000.00
Engineer's Estimate 16,000.000 CUYD $64.00 $1,024,000.00
A0200 25101-0000 PLACED RIPRAP,
METHOD A
(QUARRY SPALL)
MJ Hughes Construction 70.000 $300.00 $21,000.00
North Fork Enterprises, LLC 70.000 $250.00 $17,500.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0200 25101-0000 PLACED RIPRAP,
METHOD A
(QUARRY SPALL)
Moreno and Nelson Construction Corp 70.000 $230.00 $16,100.00
Halme Construction Inc. 70.000 $140.00 $9,800.00
James Dean Construction, Inc 70.000 $137.00 $9,590.00
DW Excavating Inc. 70.000 $132.00 $9,240.00 YOY, Inc., DBA Verdis 70.000 $123.31 $8,631.70 Pipkin Inc., dba Pipkin Construction 70.000 $110.00 $7,700.00
Black Flag Solutions
LLC 70.000 $106.00 $7,420.00
Copenhaver Construction, Inc. 70.000 $71.00 $4,970.00
Engineer's Estimate 70.000 CUYD $155.00 $10,850.00
A0210 25101-0100 PLACED RIPRAP,
METHOD A, CLASS
MJ Hughes Construction 420.000 $300.00 $126,000.00
Moreno and Nelson Construction Corp 420.000 $240.00 $100,800.00
North Fork Enterprises, LLC 420.000 $160.00 $67,200.00
DW Excavating Inc. 420.000 $140.00 $58,800.00 James Dean Construction, Inc 420.000 $137.00 $57,540.00
Halme Construction Inc. 420.000 $130.00 $54,600.00
YOY, Inc., DBA Verdis 420.000 $112.10 $47,082.00 Black Flag Solutions
LLC 420.000 $106.00 $44,520.00
Pipkin Inc., dba Pipkin Construction 420.000 $105.00 $44,100.00
Copenhaver Construction, Inc. 420.000 $85.00 $35,700.00
Engineer's Estimate 420.000 CUYD $170.00 $71,400.00
A0220 25101-0200 PLACED RIPRAP,
METHOD A, CLASS
MJ Hughes Construction 830.000 $235.00 $195,050.00
Moreno and Nelson Construction Corp 830.000 $210.00 $174,300.00
North Fork Enterprises, LLC 830.000 $165.00 $136,950.00
James Dean Construction, Inc 830.000 $137.00 $113,710.00
DW Excavating Inc. 830.000 $131.00 $108,730.00 Halme Construction Inc. 830.000 $125.00 $103,750.00
YOY, Inc., DBA Verdis 830.000 $123.31 $102,347.30
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0220 25101-0200 PLACED RIPRAP,
METHOD A, CLASS
Black Flag Solutions
LLC 830.000 $106.00 $87,980.00
Pipkin Inc., dba Pipkin Construction 830.000 $105.00 $87,150.00
Copenhaver Construction, Inc. 830.000 $72.00 $59,760.00
Engineer's Estimate 830.000 CUYD $215.00 $178,450.00
A0230 25101-0400 PLACED RIPRAP,
METHOD A, CLASS
Moreno and Nelson Construction Corp 45.000 $280.00 $12,600.00
MJ Hughes Construction 45.000 $235.00 $10,575.00
North Fork Enterprises, LLC 45.000 $145.00 $6,525.00
James Dean Construction, Inc 45.000 $137.00 $6,165.00
DW Excavating Inc. 45.000 $131.00 $5,895.00 Halme Construction Inc. 45.000 $130.00 $5,850.00
Pipkin Inc., dba Pipkin Construction 45.000 $110.00 $4,950.00
Black Flag Solutions
LLC 45.000 $102.00 $4,590.00
YOY, Inc., DBA Verdis 45.000 $84.08 $3,783.60 Copenhaver Construction, Inc. 45.000 $72.00 $3,240.00
Engineer's Estimate 45.000 CUYD $250.00 $11,250.00
A0240 25101-2700 PLACED RIPRAP,
METHOD B, CLASS
Moreno and Nelson Construction Corp 1,600.000 $310.00 $496,000.00
YOY, Inc., DBA Verdis 1,600.000 $179.36 $286,976.00 North Fork Enterprises, LLC 1,600.000 $175.00 $280,000.00
Halme Construction Inc. 1,600.000 $160.00 $256,000.00
James Dean Construction, Inc 1,600.000 $157.00 $251,200.00
DW Excavating Inc. 1,600.000 $152.00 $243,200.00 MJ Hughes Construction 1,600.000 $150.00 $240,000.00
Black Flag Solutions
LLC 1,600.000 $106.00 $169,600.00
Copenhaver Construction, Inc. 1,600.000 $106.00 $169,600.00
Pipkin Inc., dba Pipkin Construction 1,600.000 $100.00 $160,000.00
Engineer's Estimate 1,600.000 CUYD $270.00 $432,000.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0250 25120-0100 RIPRAP DITCH,
METHOD A, CLASS
Copenhaver Construction, Inc. 760.000 $180.00 $136,800.00
Black Flag Solutions
LLC 760.000 $108.00 $82,080.00
Moreno and Nelson Construction Corp 760.000 $75.00 $57,000.00
DW Excavating Inc. 760.000 $52.00 $39,520.00 North Fork Enterprises, LLC 760.000 $50.00 $38,000.00
MJ Hughes Construction 760.000 $45.00 $34,200.00
YOY, Inc., DBA Verdis 760.000 $28.03 $21,302.80 James Dean Construction, Inc 760.000 $24.00 $18,240.00
Pipkin Inc., dba Pipkin Construction 760.000 $23.00 $17,480.00
Halme Construction Inc. 760.000 $21.00 $15,960.00
Engineer's Estimate 760.000 LNFT $150.00 $114,000.00
A0260 25701-0500 CONTRACTOR
FURNISHED SOIL
NAIL RETAINING
WALL DESIGN
Pipkin Inc., dba Pipkin Construction $150,000.00
Halme Construction Inc. $50,000.00
Copenhaver Construction, Inc. $40,000.00
YOY, Inc., DBA Verdis $33,630.00 Moreno and Nelson Construction Corp $31,370.00
North Fork Enterprises, LLC $25,000.00
James Dean Construction, Inc $20,000.00
MJ Hughes Construction $20,000.00
DW Excavating Inc. $17,500.00 Black Flag Solutions
LLC $16,565.00
Engineer's Estimate ALL LPSM LPSM $20,000.00
A0270 25902-0000 SOIL NAIL
RETAINING WALL
James Dean Construction, Inc 6,000.000 $294.00 $1,764,000.00
North Fork Enterprises, LLC 6,000.000 $262.00 $1,572,000.00
Halme Construction Inc. 6,000.000 $223.33 $1,339,980.00
MJ Hughes Construction 6,000.000 $222.00 $1,332,000.00
DW Excavating Inc. 6,000.000 $202.00 $1,212,000.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0270 25902-0000 SOIL NAIL
RETAINING WALL
Moreno and Nelson Construction Corp 6,000.000 $189.00 $1,134,000.00
Black Flag Solutions
LLC 6,000.000 $183.00 $1,098,000.00
Copenhaver Construction, Inc. 6,000.000 $181.00 $1,086,000.00
YOY, Inc., DBA Verdis 6,000.000 $164.79 $988,740.00 Pipkin Inc., dba Pipkin Construction 6,000.000 $155.00 $930,000.00
Engineer's Estimate 6,000.000 SQFT $175.00 $1,050,000.00
A0280 25903-0000 VERIFICATION TEST
NAIL
Halme Construction Inc. 3.000 $20,000.00 $60,000.00
MJ Hughes Construction 3.000 $20,000.00 $60,000.00
DW Excavating Inc. 3.000 $18,700.00 $56,100.00 Black Flag Solutions
LLC 3.000 $17,655.00 $52,965.00
Copenhaver Construction, Inc. 3.000 $10,000.00 $30,000.00
James Dean Construction, Inc 3.000 $10,000.00 $30,000.00
North Fork Enterprises, LLC 3.000 $10,000.00 $30,000.00
YOY, Inc., DBA Verdis 3.000 $7,847.00 $23,541.00 Moreno and Nelson Construction Corp 3.000 $6,270.00 $18,810.00
Pipkin Inc., dba Pipkin Construction 3.000 $6,000.00 $18,000.00
Engineer's Estimate 3.000 EACH $3,575.00 $10,725.00
A0290 30201-2000 ROADWAY
AGGREGATE,
METHOD 2
North Fork Enterprises, LLC 2,070.000 $104.00 $215,280.00
Moreno and Nelson Construction Corp 2,070.000 $94.00 $194,580.00
MJ Hughes Construction 2,070.000 $88.00 $182,160.00
James Dean Construction, Inc 2,070.000 $70.00 $144,900.00
Pipkin Inc., dba Pipkin Construction 2,070.000 $70.00 $144,900.00
YOY, Inc., DBA Verdis 2,070.000 $67.26 $139,228.20 Copenhaver Construction, Inc. 2,070.000 $63.00 $130,410.00
DW Excavating Inc. 2,070.000 $62.00 $128,340.00 Halme Construction Inc. 2,070.000 $60.00 $124,200.00
Black Flag Solutions
LLC 2,070.000 $50.00 $103,500.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0290 30201-2000 ROADWAY
AGGREGATE,
METHOD 2
Engineer's Estimate 2,070.000 CUYD $112.50 $232,875.00
A0300 40301-0100 ASPHALT
CONCRETE
PAVEMENT, TYPE 1
YOY, Inc., DBA Verdis 1,700.000 $162.55 $276,335.00 Moreno and Nelson Construction Corp 1,700.000 $143.00 $243,100.00
DW Excavating Inc. 1,700.000 $140.00 $238,000.00 James Dean Construction, Inc 1,700.000 $140.00 $238,000.00
Halme Construction Inc. 1,700.000 $137.00 $232,900.00
Black Flag Solutions
LLC 1,700.000 $132.00 $224,400.00
MJ Hughes Construction 1,700.000 $130.00 $221,000.00
North Fork Enterprises, LLC 1,700.000 $127.00 $215,900.00
Copenhaver Construction, Inc. 1,700.000 $124.00 $210,800.00
Pipkin Inc., dba Pipkin Construction 1,700.000 $115.00 $195,500.00
Engineer's Estimate 1,700.000 TON $237.00 $402,900.00
A0310 60103-0240 CONCRETE,
HEADWALL FOR 54
-INCH PIPE
CULVERT
YOY, Inc., DBA Verdis 2.000 $44,840.00 $89,680.00 North Fork Enterprises, LLC 2.000 $28,000.00 $56,000.00
Pipkin Inc., dba Pipkin Construction 2.000 $20,000.00 $40,000.00
Moreno and Nelson Construction Corp 2.000 $12,790.00 $25,580.00
James Dean Construction, Inc 2.000 $12,000.00 $24,000.00
MJ Hughes Construction 2.000 $12,000.00 $24,000.00
Copenhaver Construction, Inc. 2.000 $10,000.00 $20,000.00
Halme Construction Inc. 2.000 $8,800.00 $17,600.00
DW Excavating Inc. 2.000 $8,500.00 $17,000.00 Black Flag Solutions
LLC 2.000 $6,812.00 $13,624.00
Engineer's Estimate 2.000 EACH $13,000.00 $26,000.00
A0320 60201-0800 24-INCH PIPE
CULVERT
North Fork Enterprises, LLC 120.000 $483.00 $57,960.00
Moreno and Nelson Construction Corp 120.000 $420.00 $50,400.00
MJ Hughes Construction 120.000 $250.00 $30,000.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0320 60201-0800 24-INCH PIPE
CULVERT
James Dean Construction, Inc 120.000 $215.00 $25,800.00
Black Flag Solutions
LLC 120.000 $178.00 $21,360.00
YOY, Inc., DBA Verdis 120.000 $145.73 $17,487.60 Copenhaver Construction, Inc. 120.000 $120.00 $14,400.00
DW Excavating Inc. 120.000 $107.00 $12,840.00 Pipkin Inc., dba Pipkin Construction 120.000 $105.00 $12,600.00
Halme Construction Inc. 120.000 $76.00 $9,120.00
Engineer's Estimate 120.000 LNFT $295.00 $35,400.00
A0330 60201-1300 54-INCH PIPE
CULVERT
Moreno and Nelson Construction Corp 65.000 $560.00 $36,400.00
MJ Hughes Construction 65.000 $550.00 $35,750.00
James Dean Construction, Inc 65.000 $500.00 $32,500.00
North Fork Enterprises, LLC 65.000 $500.00 $32,500.00
Black Flag Solutions
LLC 65.000 $310.00 $20,150.00
DW Excavating Inc. 65.000 $290.00 $18,850.00 Copenhaver Construction, Inc. 65.000 $270.00 $17,550.00
YOY, Inc., DBA Verdis 65.000 $246.62 $16,030.30 Pipkin Inc., dba Pipkin Construction 65.000 $215.00 $13,975.00
Halme Construction Inc. 65.000 $86.00 $5,590.00
Engineer's Estimate 65.000 LNFT $700.00 $45,500.00
A0340 60210-0800 END SECTION FOR
24-INCH PIPE
CULVERT
North Fork Enterprises, LLC 4.000 $2,500.00 $10,000.00
Halme Construction Inc. 4.000 $2,000.00 $8,000.00
Moreno and Nelson Construction Corp 4.000 $1,620.00 $6,480.00
Black Flag Solutions
LLC 4.000 $1,258.00 $5,032.00
Copenhaver Construction, Inc. 4.000 $1,000.00 $4,000.00
Pipkin Inc., dba Pipkin Construction 4.000 $1,000.00 $4,000.00
DW Excavating Inc. 4.000 $780.00 $3,120.00 James Dean Construction, Inc 4.000 $600.00 $2,400.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0340 60210-0800 END SECTION FOR
24-INCH PIPE
CULVERT
YOY, Inc., DBA Verdis 4.000 $560.50 $2,242.00 MJ Hughes Construction 4.000 $400.00 $1,600.00
Engineer's Estimate 4.000 EACH $765.00 $3,060.00 A0350 60230-0000 DEBRIS RACK North Fork
Enterprises, LLC 1.000 $35,000.00 $35,000.00
James Dean Construction, Inc 1.000 $20,000.00 $20,000.00
DW Excavating Inc. 1.000 $2,800.00 $2,800.00 Halme Construction Inc. 1.000 $2,500.00 $2,500.00
Moreno and Nelson Construction Corp 1.000 $2,320.00 $2,320.00
YOY, Inc., DBA Verdis 1.000 $2,242.00 $2,242.00 Copenhaver Construction, Inc. 1.000 $2,000.00 $2,000.00
MJ Hughes Construction 1.000 $1,800.00 $1,800.00
Pipkin Inc., dba Pipkin Construction 1.000 $1,000.00 $1,000.00
Black Flag Solutions
LLC 1.000 $145.00 $145.00
Engineer's Estimate 1.000 EACH $3,370.00 $3,370.00
A0360 60404-1000 CATCH BASIN, FLH
TYPE 1
YOY, Inc., DBA Verdis 2.000 $6,726.00 $13,452.00 DW Excavating Inc. 2.000 $6,200.00 $12,400.00 North Fork Enterprises, LLC 2.000 $6,000.00 $12,000.00
Halme Construction Inc. 2.000 $4,800.00 $9,600.00
Moreno and Nelson Construction Corp 2.000 $4,410.00 $8,820.00
Black Flag Solutions
LLC 2.000 $4,051.00 $8,102.00
James Dean Construction, Inc 2.000 $3,500.00 $7,000.00
Pipkin Inc., dba Pipkin Construction 2.000 $3,500.00 $7,000.00
MJ Hughes Construction 2.000 $3,000.00 $6,000.00
Copenhaver Construction, Inc. 2.000 $1,500.00 $3,000.00
Engineer's Estimate 2.000 EACH $7,710.00 $15,420.00
A0370 60409-0100 INLET TOP, METAL
FRAME AND
GRATE, FLH TYPE A
YOY, Inc., DBA Verdis 2.000 $22,420.00 $44,840.00 DW Excavating Inc. 2.000 $9,700.00 $19,400.00 Moreno and Nelson Construction Corp 2.000 $8,860.00 $17,720.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0370 60409-0100 INLET TOP, METAL
FRAME AND
GRATE, FLH TYPE A
North Fork Enterprises, LLC 2.000 $6,500.00 $13,000.00
Halme Construction Inc. 2.000 $2,500.00 $5,000.00
Black Flag Solutions
LLC 2.000 $1,736.00 $3,472.00
Copenhaver Construction, Inc. 2.000 $1,500.00 $3,000.00
Pipkin Inc., dba Pipkin Construction 2.000 $1,000.00 $2,000.00
MJ Hughes Construction 2.000 $750.00 $1,500.00
James Dean Construction, Inc 2.000 $200.00 $400.00
Engineer's Estimate 2.000 EACH $1,770.00 $3,540.00
A0380 60501-0000 STANDARD
UNDERDRAIN
SYSTEM (FRENCH
DRAIN)
Moreno and Nelson Construction Corp 105.000 $155.00 $16,275.00
DW Excavating Inc. 105.000 $95.00 $9,975.00 North Fork Enterprises, LLC 105.000 $75.00 $7,875.00
YOY, Inc., DBA Verdis 105.000 $72.87 $7,651.35 Copenhaver Construction, Inc. 105.000 $70.00 $7,350.00
Halme Construction Inc. 105.000 $65.00 $6,825.00
James Dean Construction, Inc 105.000 $60.00 $6,300.00
MJ Hughes Construction 105.000 $60.00 $6,300.00
Pipkin Inc., dba Pipkin Construction 105.000 $45.00 $4,725.00
Black Flag Solutions
LLC 105.000 $29.00 $3,045.00
Engineer's Estimate 105.000 LNFT $86.00 $9,030.00
A0390 60905-1000 GUTTER,
CONCRETE
Moreno and Nelson Construction Corp 600.000 $93.00 $55,800.00
North Fork Enterprises, LLC 600.000 $85.00 $51,000.00
Black Flag Solutions
LLC 600.000 $81.00 $48,600.00
Pipkin Inc., dba Pipkin Construction 600.000 $70.00 $42,000.00
Copenhaver Construction, Inc. 600.000 $50.00 $30,000.00
YOY, Inc., DBA Verdis 600.000 $28.03 $16,818.00 Halme Construction Inc. 600.000 $28.00 $16,800.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0390 60905-1000 GUTTER,
CONCRETE
James Dean Construction, Inc 600.000 $25.00 $15,000.00
MJ Hughes Construction 600.000 $15.00 $9,000.00
DW Excavating Inc. 600.000 $13.00 $7,800.00 Engineer's Estimate 600.000 LNFT $150.00 $90,000.00
A0400 61701-4500 GUARDRAIL
SYSTEM MGS, TYPE
2, CLASS A STEEL
POSTS
James Dean Construction, Inc 1,350.000 $90.00 $121,500.00
Pipkin Inc., dba Pipkin Construction 1,350.000 $85.00 $114,750.00
DW Excavating Inc. 1,350.000 $82.00 $110,700.00 North Fork Enterprises, LLC 1,350.000 $75.00 $101,250.00
YOY, Inc., DBA Verdis 1,350.000 $67.26 $90,801.00 Halme Construction Inc. 1,350.000 $65.00 $87,750.00
Black Flag Solutions
LLC 1,350.000 $63.00 $85,050.00
MJ Hughes Construction 1,350.000 $62.00 $83,700.00
Copenhaver Construction, Inc. 1,350.000 $40.00 $54,000.00
Moreno and Nelson Construction Corp 1,350.000 $37.00 $49,950.00
Engineer's Estimate 1,350.000 LNFT $50.00 $67,500.00
A0410 61702-1500 TERMINAL
SECTION, TYPE
MGS TANGENT
North Fork Enterprises, LLC 2.000 $10,000.00 $20,000.00
DW Excavating Inc. 2.000 $8,000.00 $16,000.00 James Dean Construction, Inc 2.000 $8,000.00 $16,000.00
Pipkin Inc., dba Pipkin Construction 2.000 $8,000.00 $16,000.00
YOY, Inc., DBA Verdis 2.000 $7,847.00 $15,694.00 Halme Construction Inc. 2.000 $7,500.00 $15,000.00
Black Flag Solutions
LLC 2.000 $7,293.00 $14,586.00
MJ Hughes Construction 2.000 $7,200.00 $14,400.00
Copenhaver Construction, Inc. 2.000 $7,000.00 $14,000.00
Moreno and Nelson Construction Corp 2.000 $4,460.00 $8,920.00
Engineer's Estimate 2.000 EACH $5,000.00 $10,000.00
A0420 61901-0800 FENCE, BARBED
WIRE, 3 STRAND
(TEMPORARY)
DW Excavating Inc. 420.000 $31.00 $13,020.00 MJ Hughes Construction 420.000 $31.00 $13,020.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0420 61901-0800 FENCE, BARBED
WIRE, 3 STRAND
(TEMPORARY)
Black Flag Solutions
LLC 420.000 $30.00 $12,600.00
Halme Construction Inc. 420.000 $30.00 $12,600.00
Copenhaver Construction, Inc. 420.000 $28.00 $11,760.00
YOY, Inc., DBA Verdis 420.000 $25.78 $10,827.60 Moreno and Nelson Construction Corp 420.000 $22.00 $9,240.00
James Dean Construction, Inc 420.000 $20.00 $8,400.00
North Fork Enterprises, LLC 420.000 $20.00 $8,400.00
Pipkin Inc., dba Pipkin Construction 420.000 $15.00 $6,300.00
Engineer's Estimate 420.000 LNFT $25.00 $10,500.00
A0430 62201-0200 DUMP TRUCK, 8
CUBIC YARD
MINIMUM
CAPACITY
DW Excavating Inc. 80.000 $245.00 $19,600.00 Copenhaver Construction, Inc. 80.000 $240.00 $19,200.00
Moreno and Nelson Construction Corp 80.000 $240.00 $19,200.00
North Fork Enterprises, LLC 80.000 $218.00 $17,440.00
Black Flag Solutions
LLC 80.000 $214.00 $17,120.00
Halme Construction Inc. 80.000 $200.00 $16,000.00
Pipkin Inc., dba Pipkin Construction 80.000 $200.00 $16,000.00
James Dean Construction, Inc 80.000 $190.00 $15,200.00
MJ Hughes Construction 80.000 $180.00 $14,400.00
YOY, Inc., DBA Verdis 80.000 $179.36 $14,348.80 Engineer's Estimate 80.000 HOUR $150.00 $12,000.00
A0440 62201-2050 ROLLER YOY, Inc., DBA Verdis 60.000 $212.99 $12,779.40 DW Excavating Inc. 60.000 $212.00 $12,720.00 Copenhaver Construction, Inc. 60.000 $207.00 $12,420.00
North Fork Enterprises, LLC 60.000 $189.00 $11,340.00
Halme Construction Inc. 60.000 $180.00 $10,800.00
Pipkin Inc., dba Pipkin Construction 60.000 $175.00 $10,500.00
Moreno and Nelson Construction Corp 60.000 $172.00 $10,320.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0440 62201-2050 ROLLER Black Flag Solutions
LLC 60.000 $168.00 $10,080.00
James Dean Construction, Inc 60.000 $160.00 $9,600.00
MJ Hughes Construction 60.000 $130.00 $7,800.00
Engineer's Estimate 60.000 HOUR $260.00 $15,600.00
A0450 62201-2850 MOTOR GRADER,
12 FOOT
MINIMUM BLADE
Moreno and Nelson Construction Corp 80.000 $340.00 $27,200.00
DW Excavating Inc. 80.000 $318.00 $25,440.00 Pipkin Inc., dba Pipkin Construction 80.000 $300.00 $24,000.00
Black Flag Solutions
LLC 80.000 $260.00 $20,800.00
Halme Construction Inc. 80.000 $250.00 $20,000.00
Copenhaver Construction, Inc. 80.000 $240.00 $19,200.00
MJ Hughes Construction 80.000 $220.00 $17,600.00
North Fork Enterprises, LLC 80.000 $210.00 $16,800.00
YOY, Inc., DBA Verdis 80.000 $201.78 $16,142.40 James Dean Construction, Inc 80.000 $160.00 $12,800.00
Engineer's Estimate 80.000 HOUR $218.00 $17,440.00
A0460 62201-3150 HYDRAULIC
EXCAVATOR,
CRAWLER
MOUNTED, 1.0
CUBIC YARD
MINIMUM
CAPACITY WITH
THUMB
ATTACHMENT
Black Flag Solutions
LLC 100.000 $347.00 $34,700.00
Moreno and Nelson Construction Corp 100.000 $300.00 $30,000.00
Copenhaver Construction, Inc. 100.000 $290.00 $29,000.00
Halme Construction Inc. 100.000 $265.00 $26,500.00
DW Excavating Inc. 100.000 $253.00 $25,300.00 Pipkin Inc., dba Pipkin Construction 100.000 $250.00 $25,000.00
MJ Hughes Construction 100.000 $230.00 $23,000.00
North Fork Enterprises, LLC 100.000 $219.00 $21,900.00
James Dean Construction, Inc 100.000 $200.00 $20,000.00
YOY, Inc., DBA Verdis 100.000 $168.15 $16,815.00 Engineer's Estimate 100.000 HOUR $230.00 $23,000.00
A0470 62301-0000 GENERAL LABOR MJ Hughes Construction 100.000 $180.00 $18,000.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0470 62301-0000 GENERAL LABOR Moreno and Nelson Construction Corp 100.000 $132.00 $13,200.00
Pipkin Inc., dba Pipkin Construction 100.000 $125.00 $12,500.00
Black Flag Solutions
LLC 100.000 $114.00 $11,400.00
DW Excavating Inc. 100.000 $100.00 $10,000.00 Halme Construction Inc. 100.000 $100.00 $10,000.00
North Fork Enterprises, LLC 100.000 $100.00 $10,000.00
Copenhaver Construction, Inc. 100.000 $90.00 $9,000.00
James Dean Construction, Inc 100.000 $80.00 $8,000.00
YOY, Inc., DBA Verdis 100.000 $78.47 $7,847.00 Engineer's Estimate 100.000 HOUR $85.00 $8,500.00
A0480 62406-0200 PLACING
CONSERVED
TOPSOIL, 3-INCH
DEPTH
North Fork Enterprises, LLC 4.000 $18,500.00 $74,000.00
Copenhaver Construction, Inc. 4.000 $18,000.00 $72,000.00
Moreno and Nelson Construction Corp 4.000 $17,520.00 $70,080.00
MJ Hughes Construction 4.000 $14,900.00 $59,600.00
Black Flag Solutions
LLC 4.000 $11,799.00 $47,196.00
Pipkin Inc., dba Pipkin Construction 4.000 $7,500.00 $30,000.00
YOY, Inc., DBA Verdis 4.000 $6,726.00 $26,904.00 Halme Construction Inc. 4.000 $6,500.00 $26,000.00
DW Excavating Inc. 4.000 $5,300.00 $21,200.00 James Dean Construction, Inc 4.000 $1,800.00 $7,200.00
Engineer's Estimate 4.000 ACRE $6,890.00 $27,560.00
A0490 62501-0000 TURF
ESTABLISHMENT
MJ Hughes Construction 4.000 $22,800.00 $91,200.00
Pipkin Inc., dba Pipkin Construction 4.000 $18,000.00 $72,000.00
Halme Construction Inc. 4.000 $17,000.00 $68,000.00
DW Excavating Inc. 4.000 $16,800.00 $67,200.00 Copenhaver Construction, Inc. 4.000 $16,500.00 $66,000.00
Moreno and Nelson Construction Corp 4.000 $16,040.00 $64,160.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0490 62501-0000 TURF
ESTABLISHMENT
North Fork Enterprises, LLC 4.000 $15,320.00 $61,280.00
Black Flag Solutions
LLC 4.000 $14,798.00 $59,192.00
James Dean Construction, Inc 4.000 $7,500.00 $30,000.00
YOY, Inc., DBA Verdis 4.000 $2,802.50 $11,210.00 Engineer's Estimate 4.000 ACRE $17,000.00 $68,000.00
A0500 62635-3000 CUTTINGS,
WILLOW POLE
Copenhaver Construction, Inc. 360.000 $90.00 $32,400.00
North Fork Enterprises, LLC 360.000 $72.00 $25,920.00
Halme Construction Inc. 360.000 $53.00 $19,080.00
Black Flag Solutions
LLC 360.000 $34.00 $12,240.00
MJ Hughes Construction 360.000 $33.00 $11,880.00
DW Excavating Inc. 360.000 $27.00 $9,720.00 YOY, Inc., DBA Verdis 360.000 $22.42 $8,071.20 Pipkin Inc., dba Pipkin Construction 360.000 $15.00 $5,400.00
Moreno and Nelson Construction Corp 360.000 $13.00 $4,680.00
James Dean Construction, Inc 360.000 $8.00 $2,880.00
Engineer's Estimate 360.000 EACH $28.60 $10,296.00
A0510 62901-1000 ROLLED EROSION
CONTROL
PRODUCT, TYPE 3.B
North Fork Enterprises, LLC 630.000 $20.00 $12,600.00
Black Flag Solutions
LLC 630.000 $18.00 $11,340.00
Halme Construction Inc. 630.000 $18.00 $11,340.00
MJ Hughes Construction 630.000 $17.00 $10,710.00
YOY, Inc., DBA Verdis 630.000 $8.97 $5,651.10 Moreno and Nelson Construction Corp 630.000 $7.00 $4,410.00
Pipkin Inc., dba Pipkin Construction 630.000 $7.00 $4,410.00
DW Excavating Inc. 630.000 $5.30 $3,339.00 James Dean Construction, Inc 630.000 $5.00 $3,150.00
Copenhaver Construction, Inc. 630.000 $2.90 $1,827.00
Engineer's Estimate 630.000 SQYD $13.00 $8,190.00 A0520 63302-0000 SIGN SYSTEM YOY, Inc., DBA Verdis 71.000 $224.20 $15,918.20
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0520 63302-0000 SIGN SYSTEM Moreno and Nelson Construction Corp 71.000 $158.00 $11,218.00
Pipkin Inc., dba Pipkin Construction 71.000 $155.00 $11,005.00
DW Excavating Inc. 71.000 $153.00 $10,863.00 Copenhaver Construction, Inc. 71.000 $150.00 $10,650.00
Halme Construction Inc. 71.000 $150.00 $10,650.00
MJ Hughes Construction 71.000 $150.00 $10,650.00
Black Flag Solutions
LLC 71.000 $145.00 $10,295.00
North Fork Enterprises, LLC 71.000 $139.00 $9,869.00
James Dean Construction, Inc 71.000 $70.00 $4,970.00
Engineer's Estimate 71.000 SQFT $240.00 $17,040.00
A0530 63309-0900 DELINEATOR, TYPE
FLEXIBLE (BROWN)
MJ Hughes Construction 20.000 $160.00 $3,200.00
Pipkin Inc., dba Pipkin Construction 20.000 $160.00 $3,200.00
Moreno and Nelson Construction Corp 20.000 $114.00 $2,280.00
YOY, Inc., DBA Verdis 20.000 $84.08 $1,681.60 Copenhaver Construction, Inc. 20.000 $80.00 $1,600.00
DW Excavating Inc. 20.000 $80.00 $1,600.00 Halme Construction Inc. 20.000 $77.00 $1,540.00
Black Flag Solutions
LLC 20.000 $75.00 $1,500.00
North Fork Enterprises, LLC 20.000 $75.00 $1,500.00
James Dean Construction, Inc 20.000 $70.00 $1,400.00
Engineer's Estimate 20.000 EACH $120.00 $2,400.00
A0540 63316-1000 REMOVE AND
RESET SIGN
MJ Hughes Construction 2.000 $1,800.00 $3,600.00
Pipkin Inc., dba Pipkin Construction 2.000 $1,750.00 $3,500.00
Moreno and Nelson Construction Corp 2.000 $1,380.00 $2,760.00
YOY, Inc., DBA Verdis 2.000 $1,121.00 $2,242.00 Copenhaver Construction, Inc. 2.000 $500.00 $1,000.00
DW Excavating Inc. 2.000 $421.00 $842.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0540 63316-1000 REMOVE AND
RESET SIGN
Halme Construction Inc. 2.000 $400.00 $800.00
Black Flag Solutions
LLC 2.000 $399.00 $798.00
North Fork Enterprises, LLC 2.000 $383.00 $766.00
James Dean Construction, Inc 2.000 $100.00 $200.00
Engineer's Estimate 2.000 EACH $650.00 $1,300.00
A0550 63401-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID (WHITE)
James Dean Construction, Inc 14,100.000 $1.50 $21,150.00
MJ Hughes Construction 14,100.000 $0.35 $4,935.00
Pipkin Inc., dba Pipkin Construction 14,100.000 $0.35 $4,935.00
Moreno and Nelson Construction Corp 14,100.000 $0.25 $3,525.00
YOY, Inc., DBA Verdis 14,100.000 $0.22 $3,102.00 Copenhaver Construction, Inc. 14,100.000 $0.17 $2,397.00
DW Excavating Inc. 14,100.000 $0.17 $2,397.00 Halme Construction Inc. 14,100.000 $0.17 $2,397.00
Black Flag Solutions
LLC 14,100.000 $0.15 $2,115.00
North Fork Enterprises, LLC 14,100.000 $0.15 $2,115.00
Engineer's Estimate 14,100.000 LNFT $4.00 $56,400.00
A0560 63401-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID (YELLOW)
James Dean Construction, Inc 14,300.000 $1.50 $21,450.00
MJ Hughes Construction 14,300.000 $0.35 $5,005.00
Pipkin Inc., dba Pipkin Construction 14,300.000 $0.35 $5,005.00
Moreno and Nelson Construction Corp 14,300.000 $0.25 $3,575.00
YOY, Inc., DBA Verdis 14,300.000 $0.22 $3,146.00 Copenhaver Construction, Inc. 14,300.000 $0.17 $2,431.00
DW Excavating Inc. 14,300.000 $0.17 $2,431.00 Halme Construction Inc. 14,300.000 $0.17 $2,431.00
Black Flag Solutions
LLC 14,300.000 $0.15 $2,145.00
North Fork Enterprises, LLC 14,300.000 $0.15 $2,145.00
Engineer's Estimate 14,300.000 LNFT $3.00 $42,900.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0570 63501-0000 TEMPORARY
TRAFFIC CONTROL
Pipkin Inc., dba Pipkin Construction $150,000.00
Halme Construction Inc. $130,000.00
North Fork Enterprises, LLC $120,000.00
YOY, Inc., DBA Verdis $72,865.00 Black Flag Solutions
LLC $61,223.00
DW Excavating Inc. $52,300.00 MJ Hughes Construction $52,000.00
James Dean Construction, Inc $50,000.00
Copenhaver Construction, Inc. $20,000.00
Moreno and Nelson Construction Corp $15,910.00
Engineer's Estimate ALL LPSM LPSM $74,200.00
A0580 63503-1000 TEMPORARY
TRAFFIC CONTROL,
PLASTIC FENCE
North Fork Enterprises, LLC 875.000 $15.00 $13,125.00
Moreno and Nelson Construction Corp 875.000 $10.00 $8,750.00
Halme Construction Inc. 875.000 $9.00 $7,875.00
Black Flag Solutions
LLC 875.000 $8.50 $7,437.50
MJ Hughes Construction 875.000 $6.00 $5,250.00
Copenhaver Construction, Inc. 875.000 $5.00 $4,375.00
DW Excavating Inc. 875.000 $5.00 $4,375.00 YOY, Inc., DBA Verdis 875.000 $3.36 $2,940.00 James Dean Construction, Inc 875.000 $2.50 $2,187.50
Pipkin Inc., dba Pipkin Construction 875.000 $2.00 $1,750.00
Engineer's Estimate 875.000 LNFT $6.00 $5,250.00
A0590 64703-5000 MITIGATION, ROOT
WAD
Moreno and Nelson Construction Corp 19.000 $3,750.00 $71,250.00
North Fork Enterprises, LLC 19.000 $1,520.00 $28,880.00
MJ Hughes Construction 19.000 $1,500.00 $28,500.00
Pipkin Inc., dba Pipkin Construction 19.000 $1,500.00 $28,500.00
YOY, Inc., DBA Verdis 19.000 $1,008.90 $19,169.10
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0590 64703-5000 MITIGATION, ROOT
WAD
Copenhaver Construction, Inc. 19.000 $1,000.00 $19,000.00
DW Excavating Inc. 19.000 $900.00 $17,100.00 Halme Construction Inc. 19.000 $700.00 $13,300.00
Black Flag Solutions
LLC 19.000 $587.00 $11,153.00
James Dean Construction, Inc 19.000 $300.00 $5,700.00
Engineer's Estimate 19.000 EACH $1,200.00 $22,800.00
A0600 64703-5000 MITIGATION, ROOT
WAD (ANCHORED)
Copenhaver Construction, Inc. 7.000 $8,000.00 $56,000.00
YOY, Inc., DBA Verdis 7.000 $5,605.00 $39,235.00 Moreno and Nelson Construction Corp 7.000 $4,580.00 $32,060.00
Halme Construction Inc. 7.000 $4,000.00 $28,000.00
Pipkin Inc., dba Pipkin Construction 7.000 $4,000.00 $28,000.00
DW Excavating Inc. 7.000 $2,600.00 $18,200.00 MJ Hughes Construction 7.000 $2,600.00 $18,200.00
Black Flag Solutions
LLC 7.000 $2,226.00 $15,582.00
North Fork Enterprises, LLC 7.000 $1,710.00 $11,970.00
James Dean Construction, Inc 7.000 $700.00 $4,900.00
Engineer's Estimate 7.000 EACH $1,750.00 $12,250.00
Report Generated on 01/16/2026 1:42 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
| 2026-01-16T13:01:02-0800 | |
| MARINO CHEA |
File details come from the government source that posted it. Updated .