UT FLAP 218(1) Sheep Creek Loop
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 6982AF21B000015
- Agency
- Federal Highway Administration Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Manila, Utah 84046, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks bids for the reconstruction and improvement of approximately 1.85 miles of roadway on the Sheep Creek Geologic Loop in Daggett County, Utah. The procuring agency is the United States Department of Transportation Federal Highway Administration. Major work includes widening the roadway, adjusting vertical and horizontal alignments, installing drainage structures including a concrete box culvert, clearing vegetation, stabilizing shoulders, and replacing signage. Bids will be evaluated based on technical qualifications and price. The deadline for submission of bids is December 2, 2021.
There is no set-aside designation for this procurement. The primary NAICS code is 237110 and PSC code is D301. The engineer's estimate for the project is between $2.5 million to $3.5 million. Key details include reconstructing 1.85 linear miles of roadway to a consistent 20-foot width located approximately 7 miles south of Manila, Utah. Performance will take place along Highway 218 in Daggett County, Utah.
Notice text
THIS PROJECT IS ADVERTISED AS FULL AND OPEN COMPETITION.
THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE AVAILABLE.
PROJECT NUMBER: UT FLAP 218(1)
PROJECT NAME : Sheep Creek Loop
PROJECT DESCRIPTION: The UT FLAP 218(1), Sheep Creek Geologic Loop Project is located on Highway 218 approximately 7 miles south of Manila, UT in Northeast Utah. The project crosses through private and Ashley National Forest (USFS) Lands, providing access to the Flaming Gorge-Uintas National Scenic Byway. The route is categorized as a rural recreational and scenic roadway in level terrain and is maintained by Dagget County. This project proposes reconstruction, widening, minor profile adjustments, guardrail replacement, and drainage improvements of 1.85 miles of roadway on the Sheep Creek Geologic Loop.
Major work elements include widening the roadway to a consistent width and vertical and horizontal alignment changes to correct roadway geometry and improve safety. Construction will generally include cut slopes, embankment, aggregate base course, and paving. Improvements include clearing roadside vegetation, stabilization of shoulders, drainage improvements (including a concrete box culvert), cattleguard installation, pavement markings, and updating signing. Select pullouts and access road intersections will also be rehabilitated or reconstructed.
COST RANGE: The proposed project is estimated at a cost between $2,500,000 and $3,500,000.
Attachments
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids.pdf | ||
| Bid Opening Summary .pdf | ||
| QnA 11 10 2021.pdf | ||
| FP-14_Eng.pdf | ||
| Memo UT FLAP 218(1) Sheep Creek Road_FINAL.pdf | ||
| Sheep_Creek_UT218(1)_Hydraulics_Report.pdf | ||
| UT FLAP 218(1) Sheep Creek Geological Loop Pavement Memo.pdf | ||
| UT FLAP 218(1) Plans - 3 of 3.pdf | ||
| UT FLAP 218(1) Plans - 1 of 3.pdf | ||
| 6982AF21B000015.pdf | ||
| Cross Sections - X Y Z Sheets.pdf | ||
| UT FLAP 218(1) Plans - 2 of 3.pdf |
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| UT FLAP 218(1) Sheep Creek Loop | Award Notice | |
| UT FLAP 218(1) Sheep Creek Loop | Solicitation | |
| UT FLAP 218(1) Sheep Creek Loop | Pre-Solicitation | |
| UT FLAP 218(1) Sheep Creek Loop | Pre-Solicitation | |
| UT FLAP 218(1) Sheep Creek Loop | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity