UT FLAP 218(1) Plans - 1 of 3.pdf

PDF 40 MB Posted

Attached to
UT FLAP 218(1) Sheep Creek Loop Federal contract opportunity
Solicitation number
6982AF21B000015
Issued by
Department of Transportation Federal Highway Administration

About this file

This document outlines a federal contract opportunity for road reconstruction and improvement work. The Utah Department of Transportation Federal Highway Administration is soliciting bids for the UT FLAP 218(1) Sheep Creek Loop project located approximately 7 miles south of Manila, Utah. The project involves reconstructing and widening 1.85 miles of roadway on the Sheep Creek Geologic Loop to correct geometry and improve safety. Major work elements include widening the roadway, vertical and horizontal alignment changes, cut slopes, embankment, aggregate base course, paving, clearing vegetation, shoulder stabilization, drainage improvements including a concrete box culvert, cattleguard installation, pavement markings, and signage updates. Select pullouts and access road intersections will also be rehabilitated or reconstructed. The estimated cost range for the proposed project is between $2,500,000 to $3,500,000.

View the file

Other files for this federal contract opportunity

Other files attached to UT FLAP 218(1) Sheep Creek Loop, newest first.
File Type Posted
Tabulation of Bids.pdf PDF
Bid Opening Summary .pdf PDF
QnA 11 10 2021.pdf PDF
Sheep_Creek_UT218(1)_Hydraulics_Report.pdf PDF
UT FLAP 218(1) Sheep Creek Geological Loop Pavement Memo.pdf PDF
UT FLAP 218(1) Plans - 3 of 3.pdf PDF
FP-14_Eng.pdf PDF
Memo UT FLAP 218(1) Sheep Creek Road_FINAL.pdf PDF
6982AF21B000015.pdf PDF
Cross Sections - X Y Z Sheets.pdf PDF
UT FLAP 218(1) Plans - 2 of 3.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet and Description

B4 B5 B6 B7 B8

Grading, Staking and

Clearing Summaries

Surfacing Summary

Drainage & Guardrail

Summaries

Miscellaneous Summaries

Miscellaneous Summaries

Allowance Bid

Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15206-0000 SLOPE, REFERENCE, AND

CLEARING AND GRUBBING STAKE MILE 1.870 0.130 2.000

A0060 15215-3000 SURVEY AND STAKING, DRAINAGE

STRUCTURE EACH 17 1 18

A0080 15215-5000 SURVEY AND STAKING, BOX

CULVERT EACH 1 1

A0100 15216-2000 SURVEY AND STAKING, GRADE

FINISHING STAKES MILE 3.740 0.260 4.000

A0120 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0140 15401-0000 CONTRACTOR TESTING LPSM ALL

A0160 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0180 15701-0000 SOIL EROSION CONTROL LPSM ALL

A0200 15702-1000 SOIL EROSION CONTROL,

TEMPORARY DIVERSION CHANNEL LPSM ALL

A0220 15720-0000 STORM WATER POLLUTION

PREVENTION PLAN LPSM ALL

A0240 15802-0000 WATERING FOR DUST CONTROL LPSM ALL

A0260 20101-0000 CLEARING AND GRUBBING ACRE 11.79 0.21 12.00

A0280 20304-1000 REMOVAL OF STRUCTURES AND See Summary Tables

OBSTRUCTIONS

LPSM

ALL

and Plan Sheets for removal locations

A0300 20401-0000 ROADWAY EXCAVATION CUYD 4,423 177 4,600

A0320 20402-0000 SUBEXCAVATION CUYD 148 52 200

Adjust limits as directed by the CO

A0340 20403-0000 UNCLASSIFIED BORROW CUYD 904 146

A0360 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 80 10 90

A0380 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 CUYD 15.6 2.4 18.0

A0400 25101-0400 PLACED RIPRAP, METHOD A,

CLASS 4 CUYD 101.5 8.5 110.0

A0420 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 5,567 233 5,800

A0440 30402-5300 FULL DEPTH RECLAMATION,

METHOD 2, 6-INCH DEPTH SQYD 14,162 338 14,500

A0460 40301-0100 ASPHALT CONCRETE PAVEMENT,

TYPE 1 TON 3,687 153 3,840

A0480 40602-0000 FOG SEAL SQYD 22,569 651 23,220

A0500 41102-1000 PRIME COAT, METHOD 1 SQYD 22,569 651 23,220

A0520 41105-0000 BLOTTER TON 32

A0540 41201-0000 TACK COAT TON 9.7 0.3 10.0

MileStone: New 100% (Unshelved) Date Completed: 08/17/21 Report Date: 08/17/21

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A -A u g -2

:3 P

M

Remarks and/or Determination of Estimated

Quantity Pay Item Description Unit

Estimated Quantities

N

U T \u t2 (1

R o a d w a y\

S u b m it ta ls \T o S h el f\ [1

U n sh el vi n g S O

Q

FI

N A L.

xl sm

]S h ee t

STATE PROJECT

B1

UT FLAP 218(1)

Sheep Creek Geologic LoopUT

SHEET

NUMBER

Grading, Staking and

Clearing Summaries

Surfacing Summary

Drainage & Guardrail

Summaries

Miscellaneous Summaries

Miscellaneous Summaries

Allowance Bid

Schedule

A0560 60103-0000 CONCRETE, HEADWALL (& Pay item includes

WINGWALLS, INLET, TYPE B, construction of

DOUBLE 4'X8' CONCRETE BOX Wingwalls

CULVERT) EACH 1 1

A0580 60103-0000 CONCRETE, HEADWALL (& Pay item includes

WINGWALLS, OUTLET, DOUBLE construction of

4'X8' CONCRETE BOX CULVERT) EACH 1 1 Wingwalls

A0600 60201-0600 18-INCH PIPE CULVERT LNFT 4 4

A0620 60201-0800 24-INCH PIPE CULVERT LNFT 122 13 135

A0640 60202-0200 18-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 54 6 60

A0660 60202-0400 24-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 456 24 480

A0680 60202-0800 48-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 44 6 50

A0700 60210-0600 END SECTION FOR 18-INCH PIPE

CULVERT EACH 1 1

A0720 60210-0800 END SECTION FOR 24-INCH PIPE

CULVERT EACH 6 2 8

A0740 60211-0600 END SECTION FOR 18-INCH

EQUIVALENT DIAMETER ARCH OR

ELLIPTICAL PIPE CULVERT EACH 4 4

A0760 60211-0800 END SECTION FOR 24-INCH

EQUIVALENT DIAMETER ARCH OR

ELLIPTICAL PIPE CULVERT EACH 24 2 26

A0780 60211-1200 END SECTION FOR 48-INCH

EQUIVALENT DIAMETER ARCH OR

ELLIPTICAL PIPE CULVERT EACH 2 2

A0800 60222-1800 8 FEET SPAN, 4 FEET RISE

REINFORCED CONCRETE BOX

CULVERT, DOUBLE BARREL LNFT 40 40

A0820 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2,

CLASS A STEEL POSTS LNFT 200.0 200.0

A0840 61702-1500 TERMINAL SECTION, TYPE MGS

TANGENT EACH 2 2

A0860 61901-0000 FENCE (4-STRAND, WILDLIFE

FRIENDLY) LNFT 1,890 225 2,115

-A u g -2

:3 P

M

MileStone: New 100% (Unshelved) Date Completed: 08/17/21 Report Date: 08/17/21

N

U T \u t2 (1

R o a d w a y\

S u b m it ta ls \T o S h el f\ [1

U n sh el vi n g S O

Q

FI

N A L.

xl sm

]S h ee t (2

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number

Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B2

UT FLAP 218(1)

Sheep Creek Geologic LoopUT

Grading, Staking and

Clearing Summaries

Surfacing Summary

Drainage & Guardrail

Summaries

Miscellaneous Summaries

Miscellaneous Summaries

Allowance Bid

Schedule

A0880 61901-0500 FENCE, WOVEN WIRE, 96-INCH

HEIGHT LNFT 495 40 535

A0900 61902-2000 GATE, METAL, 28 FEET WIDTH EACH 1 1

A0920 61903-0700 CATTLE GUARD, 24 FEET EACH 2 2

A0940 61920-2000 REMOVE AND RESET GATE EACH 2 2

A0960 62201-0250 DUMP TRUCK, 10 CUBIC YARD

MINIMUM CAPACITY HOUR 20

A0980 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 18-INCH WIDTH HOUR 20

A1000 62201-0850 WHEEL LOADER, 1 CUBIC YARD

MINIMUM RATED CAPACITY HOUR 20

A1020 62201-1200 BULLDOZER, 80HP MINIMUM

FLYWHEEL POWER HOUR 20

A1040 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM

BLADE HOUR 20

A1060 62201-3300 HYDRAULIC EXCAVATOR, 3/4

CUBIC YARD MINIMUM CAPACITY HOUR 20

A1080 62301-0000 GENERAL LABOR HOUR 40

A1100 62302-1000 SPECIAL LABOR, HIRED

TECHNICAL SERVICES HOUR 20

A1120 62302-1100 SPECIAL LABOR, HIRED SURVEY

SERVICES HOUR 20

A1140 62303-1000 SPECIAL LABOR, HIRED

TECHNICAL SERVICES

(BIOLOGICAL SURVEYS) LPSM ALL

A1160 62406-0300 PLACING CONSERVED TOPSOIL,

4-INCH DEPTH ACRE 5.90 0.60 6.50

A1180 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 5.90 0.60 6.50

A1200 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 5.90 0.60 6.50

A1220 63301-0000 SIGN SYSTEM EACH 13 1 14

A1240 63301-0000 SIGN SYSTEM (SPECIAL) EACH 9 1 10

A1260 63308-3000 OBJECT MARKER, TYPE 3 EACH 16 16

A1280 63309-0000 DELINEATOR EACH 53 7 60

A1300 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

-A u g -2

:3 P

M

MileStone: New 100% (Unshelved) Date Completed: 08/17/21 Report Date: 08/17/21

N

U T \u t2 (1

R o a d w a y\

S u b m it ta ls \T o S h el f\ [1

U n sh el vi n g S O

Q

FI

N A L.

xl sm

]S h ee t (3

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number

Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B3

UT FLAP 218(1)

Sheep Creek Geologic LoopUT

File details come from the government source that posted it. Updated .