This document contains a request for bid for the UT FLAP 218(1) Sheep Creek Loop project. The project involves reconstruction, widening, drainage improvements, and other work along 1.85 miles of roadway on the Sheep Creek Geologic Loop located approximately 7 miles south of Manila, UT. Major work elements include widening the roadway to a consistent width, vertical and horizontal alignment changes, cut slopes, embankment, aggregate base course, paving, drainage improvements including a concrete box culvert, cattleguard installation, pavement markings, and updated signing. Select pullouts and access road intersections will also be rehabilitated or reconstructed. The estimated cost of the project is between $2,500,000 to $3,500,000. The solicitation is advertised as full and open competition with plans and specifications available.

The first document is questions and answers from the advertisement period and addresses issues like phasing work to maintain road access, temporary shoring responsibilities, and payment terms for related items.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for UT FLAP 218(1), Sheep Creek Geologic Loop

November 10, 2021

Questions Answers 1 Will culvert installation be phased in order to keep 1 lane of roadway open during construction? If so, has method of temporary shoring been determined for the first phase of culvert installation in each location?

The road may be closed during the day in accordance with SCR Section

156. Because the road is a loop, access for local residents during closures may be provided in either direction and emergency access plan developed, with coordination in accordance with Section 156. Phasing and any necessary temporary shoring for completing the work are the contractors responsibility. Payment will be full compensation for the work prescribed in the respective pay items listed in the bid schedule, temporary shoring will not be measured for payment.