UT FLAP 218(1) Sheep Creek Geological Loop Pavement Memo.pdf

PDF 235 KB Posted

Attached to
UT FLAP 218(1) Sheep Creek Loop Federal contract opportunity
Solicitation number
6982AF21B000015
Issued by
Department of Transportation Federal Highway Administration

About this file

This memorandum provides recommendations for the structural pavement section for the UT FLAP 218(1) Sheep Creek Geological Loop road project in Daggett County, Utah. The project will reconstruct 1.84 miles of roadway, installing two box culverts, performing some minor realignment requiring imported aggregate, and pulverizing the remaining portion of the existing pavement before placing a new 3-inch asphalt concrete surface. Based on the existing conditions and available space, the recommended structural sections include 6 inches of aggregate base for the realignment areas and pulverizing the existing pavement to a depth of 6 inches before placing 3 inches of new asphalt concrete. Pay items will include roadway aggregate, full depth reclamation to 6 inches, and asphalt concrete pavement. Both the asphalt and aggregate base should meet UDOT specifications without need for modification.

This federal contract opportunity is a request for bid to improve 1.85 miles of the Sheep Creek Loop road in Daggett County, Utah. Major work includes widening, minor profile adjustments, guardrail replacement, drainage improvements, clearing vegetation, shoulder stabilization, a concrete box culvert, cattleguard installation, pavement markings and signage updates. Select pullouts and access roads will be rehabilitated or reconstructed. The cost is estimated between $2.5-3.5 million. The contract will be awarded by the Federal Highway Administration through an open competition solicitation process.

View the file

Other files for this federal contract opportunity

Other files attached to UT FLAP 218(1) Sheep Creek Loop, newest first.
File Type Posted
Tabulation of Bids.pdf PDF
Bid Opening Summary .pdf PDF
QnA 11 10 2021.pdf PDF
Sheep_Creek_UT218(1)_Hydraulics_Report.pdf PDF
UT FLAP 218(1) Plans - 3 of 3.pdf PDF
FP-14_Eng.pdf PDF
Memo UT FLAP 218(1) Sheep Creek Road_FINAL.pdf PDF
6982AF21B000015.pdf PDF
Cross Sections - X Y Z Sheets.pdf PDF
UT FLAP 218(1) Plans - 2 of 3.pdf PDF
UT FLAP 218(1) Plans - 1 of 3.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Memorandum

Subject: UT FLAP 218(1) Sheep Creek Geological Loop Road Pavement Recommendations

Date: August 20, 2021

From: Ron Andresen Materials Engineer

To: Braden Peters, PM Steve Short, Lead Designer

Background:

This memorandum provides the pavement structural section recommendation for the UT FLAP 218(1) Sheep Creek Geological Loop road project. The project is located in Daggett County UT, on Forest Service Road 218, in the northeast corner of UT, near Flaming Gorge Reservoir. The project will reconstruct 1.84 miles of roadway.

Recommendations:

The scope of the project is to install two box culverts, do some minor realignment, import aggregate where the realignment is being done, and pulverize the remaining portion of the road, topping it off with new asphalt concrete pavement.

The roadway in narrow in some areas. There are cliffs on one side of the road and Sheep Creek on the other. The new roadway will fit on the existing bench where possible. The intent of the structural section design is the fit the available width and raise the road as little as possible.

The existing pavement is oxidized, fatigue cracked, with edge breaking and potholes. The pavement has exceeded its life and will be pulverized to use as base course. Five cores were taken along the 1.84 miles. The core thickness varied from 2¼ inches to 3¼ inches. The existing gravel was measured at the edge of the pavement and found to be 4 inches thick. Based on the available room, the existing typical section, and the desire to use as much of the existing material, the recommend structural section for the realignment section and reconstruction section is:

August 20, 2021

Reconstruction Section Depth of Layer Layer Description

6 inches Aggregate Base 3 inches Hot Asphalt Concrete Pavement

Rehabilitation Section Depth of Layer Layer Description

6 inches Pulverizing 3 inches Hot Asphalt Concrete Pavement

The new aggregate base is necessary to adjust the elevation of the new alignment, in addition to providing a uniform aggregate layer to pave on.

Recommended Paving Pay Items for this Project:

Item Number Item Description Unit

30202-2000 Roadway aggregate, method 2 Ton

30402-5300 Full Depth Reclamation, method 2, 6-inche depth Sq Yard

40301-0000 Asphalt Concrete Pavement, type 1 Ton

Both the Hot Asphalt Pavement and the Aggregate Base should meet a UDOT specification. There should be no need to modify Section 302 or 403 for this project.

If you have any questions, please let us know.

CC: CFLHD Pavements & Materials Project Files: \\cflcadd3.cflhd.local\projects\UT\218(1)\Pavements\3. Reports-