UT FLAP 218(1) Sheep Creek Loop

Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF21B000015
Agency
Federal Highway Administration Department of Transportation
Responses due
Not on record
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Manila, Utah 84046, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice is for a reconstruction and improvement project along 1.85 miles of the Sheep Creek Geologic Loop in Daggett County, Utah. The Department of Transportation Federal Highway Administration will rehabilitate the roadway to a consistent width and make vertical and horizontal alignment changes to correct geometry and improve safety. Major work elements include widening, embankment work, drainage improvements including a 40-foot concrete box culvert, and paving. Construction is estimated to cost between $2.5-3.5 million and will take place from March 2022 to September 2022.

There is no set-aside designation for this project. Significant work quantities include 4,600 cubic yards of excavation, 1,050 cubic yards of borrow, 5,700 tons of roadway aggregate, 3,800 tons of asphalt pavement. weekday road closures will be permitted for construction with access required for permit holders. The anticipated advertisement is late October 2021, bid opening is late November, and award is scheduled for mid-December.

Notice text

THIS PROJECT WILL BE ADVERTISED AS FULL AND OPEN

THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

PROJECT NUMBER:   UT FLAP 218(1)

PROJECT NAME :       Sheep Creek Loop

PROJECT DESCRIPTION:  The UT FLAP 218(1), Sheep Creek Geologic Loop Project is located on Highway 218 approximately 7 miles south of Manila, UT in Northeast Utah. The project crosses through private and Ashley National Forest (USFS) Lands, providing access to the Flaming Gorge-Uintas National Scenic Byway. The route is categorized as a rural recreational and scenic roadway in level terrain and is maintained by Dagget County. This project proposes reconstruction, widening, minor profile adjustments, guardrail replacement, and drainage improvements of 1.85 miles of roadway on the Sheep Creek Geologic Loop.

Major work elements include widening the roadway to a consistent width and vertical and horizontal alignment changes to correct roadway geometry and improve safety.  Construction will generally include cut slopes, embankment, aggregate base course, and paving. Improvements include clearing roadside vegetation, stabilization of shoulders, drainage improvements (including a concrete box culvert), cattleguard installation, pavement markings, and updating signing.  Select pullouts and access road intersections will also be rehabilitated or reconstructed.    

SIGNIFICANT QUANTITIES (Schedule A):

  • 20401-0000 Roadway Excavation: 4,600 CUYD
  • 20403-0000 Unclassified Borrow: 1,050 CUYD
  • 30202-2000 Roadway Aggregate, Method 2: 5,700 TON
  • 40301-0100 Asphalt Concrete Pavement, Type 1: 3,800 TON
  • 60222-1800 8 Feet Span, 4 Feet Rise Reinforced Concrete Box Culvert, Double Barrel: 40 LNFT

MISCELLANEOUS:

Weekday road closures to public traffic will be allowed during a large portion of the construction activities.  Access through the closure to USFS permit holders and local property owners will be required at all times.   For all other work, construction-caused delays to public traffic will be limited to a maximum of 30 minutes per passage through the project.

Perform pre-construction nesting bird survey within 7 days before vegetation removal performed prior to August 1.

Due to weather restrictions, on-site construction typically cannot occur until March.

Seeding must take place between the dates of September 15 and November 15.   

COST RANGE:  The proposed project is estimated at a cost between $2,500,000 and $3,500,000.

CONSTRUCTION DURATION:  Construction is anticipated from March 2022 to September 2022.

ADDITIONAL INFORMATION:

Anticipated Advertisement:  Late October 2021

Anticipated Bid Opening:  Late November 2021

Anticipated Award: Mid December 2021

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
UT FLAP 218(1) Sheep Creek Loop Award Award Notice
UT FLAP 218(1) Sheep Creek Loop Latest solicitation Solicitation
UT FLAP 218(1) Sheep Creek Loop This notice Pre-Solicitation
UT FLAP 218(1) Sheep Creek Loop Pre-Solicitation
UT FLAP 218(1) Sheep Creek Loop Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity