Tabulation of Bids.pdf

PDF 660 KB Posted

Attached to
UT FLAP 218(1) Sheep Creek Loop Federal contract opportunity
Solicitation number
6982AF21B000015
Issued by
Department of Transportation Federal Highway Administration

About this file

This bid tabulation report summarizes the bids received for the UT FLAP 218(1) Sheep Creek Loop project solicitation. The project involves reconstructing, widening, and making drainage and safety improvements to 1.85 miles of roadway on the Sheep Creek Geologic Loop in Daggett County, Utah. Major work includes clearing, embankment, aggregate base course, paving, drainage including a concrete box culvert, cattleguards, signing, and pullout rehabilitation. The low bid was submitted by Staker and Parson Companies dba Burdick Materials at $4,778,254.00. The second low bid was from Guardian Construction Inc. at $5,743,280.07. The engineer's estimate was $2,972,000. The report provides unit pricing for over 100 individual line items to complete the project.

View the file

Other files for this federal contract opportunity

Other files attached to UT FLAP 218(1) Sheep Creek Loop, newest first.
File Type Posted
Bid Opening Summary .pdf PDF
QnA 11 10 2021.pdf PDF
6982AF21B000015.pdf PDF
Cross Sections - X Y Z Sheets.pdf PDF
UT FLAP 218(1) Plans - 2 of 3.pdf PDF
Sheep_Creek_UT218(1)_Hydraulics_Report.pdf PDF
UT FLAP 218(1) Sheep Creek Geological Loop Pavement Memo.pdf PDF
UT FLAP 218(1) Plans - 3 of 3.pdf PDF
FP-14_Eng.pdf PDF
Memo UT FLAP 218(1) Sheep Creek Road_FINAL.pdf PDF
UT FLAP 218(1) Plans - 1 of 3.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 12/08/21

1 out of 11

Project No: UT FLAP 218(1)

Project Name: Sheep Creek Loop

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF21B000015

Division: Central Federal Lands

State: UT County: Daggett

Federal Land: Ashley National Forest Opened at: Lakewood, CO

Opened by: Jorey Deml

Date: 12/02/21

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Staker and Parson Companies dba:Burdick Materials $4,778,254.00 1368 South 3000 West Roosevelt, UT 84066

Guardian Construction Inc. $5,743,280.07 360 South Fort Lane, Bldg 1, Ste D Layton, UT 84041

Engineer's Estimate $2,972,000.00

2 out of 11

Project No: UT FLAP 218(1)

Project Name: Sheep Creek Loop

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Staker and Parson Companies dba:Burdick Materials Lump Sum $1,000,000.00 Guardian Construction Inc. Lump Sum $299,035.00 Engineer's Estimate ALL LPSM Lump Sum $364,301.00

A0040 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

Staker and Parson Companies dba:Burdick Materials $8,600.00 $17,200.00 Guardian Construction Inc. $12,688.50 $25,377.00 Engineer's Estimate 2.000 MILE $12,500.00 $25,000.00

A0060 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

Staker and Parson Companies dba:Burdick Materials $1,220.00 $21,960.00 Guardian Construction Inc. $914.50 $16,461.00 Engineer's Estimate 18 EACH $900.00 $16,200.00

A0080 15215-5000 SURVEY AND STAKING, BOX CULVERT

Staker and Parson Companies dba:Burdick Materials $1,220.00 $1,220.00 Guardian Construction Inc. $3,429.00 $3,429.00 Engineer's Estimate 1 EACH $4,500.00 $4,500.00

A0100 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

Staker and Parson Companies dba:Burdick Materials $6,400.00 $25,600.00 Guardian Construction Inc. $8,401.75 $33,607.00 Engineer's Estimate 4.000 MILE $7,500.00 $30,000.00

A0120 15301-0000 CONTRACTOR QUALITY CONTROL

Staker and Parson Companies dba:Burdick Materials Lump Sum $198,000.00 Guardian Construction Inc. Lump Sum $89,162.00 Engineer's Estimate ALL LPSM Lump Sum $85,000.00

A0140 15401-0000 CONTRACTOR TESTING

Staker and Parson Companies dba:Burdick Materials Lump Sum $366,000.00 Guardian Construction Inc. Lump Sum $171,465.00 Engineer's Estimate ALL LPSM Lump Sum $85,000.00

3 out of 11

Project No: UT FLAP 218(1)

Project Name: Sheep Creek Loop

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0160 15501-0000 CONSTRUCTION SCHEDULE

Staker and Parson Companies dba:Burdick Materials Lump Sum $12,000.00 Guardian Construction Inc. Lump Sum $10,288.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

A0180 15701-0000 SOIL EROSION CONTROL

Staker and Parson Companies dba:Burdick Materials Lump Sum $42,200.00 Guardian Construction Inc. Lump Sum $68,586.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

A0200 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL

Staker and Parson Companies dba:Burdick Materials Lump Sum $45,000.00 Guardian Construction Inc. Lump Sum $65,843.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

A0220 15720-0000 STORM WATER POLLUTION PREVENTION PLAN

Staker and Parson Companies dba:Burdick Materials Lump Sum $2,100.00 Guardian Construction Inc. Lump Sum $100,136.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

A0240 15802-0000 WATERING FOR DUST CONTROL

Staker and Parson Companies dba:Burdick Materials Lump Sum $167,000.00 Guardian Construction Inc. Lump Sum $20,576.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

A0260 20101-0000 CLEARING AND GRUBBING

Staker and Parson Companies dba:Burdick Materials $5,450.00 $65,400.00 Guardian Construction Inc. $48,600.00 $583,200.00 Engineer's Estimate 12.00 ACRE $3,500.00 $42,000.00

A0280 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Staker and Parson Companies dba:Burdick Materials Lump Sum $97,500.00 Guardian Construction Inc. Lump Sum $65,843.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00

4 out of 11

Project No: UT FLAP 218(1)

Project Name: Sheep Creek Loop

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0300 20401-0000 ROADWAY EXCAVATION

Staker and Parson Companies dba:Burdick Materials $20.00 $92,000.00 Guardian Construction Inc. $54.18 $249,228.00 Engineer's Estimate 4,600 CUYD $21.00 $96,600.00

A0320 20402-0000 SUBEXCAVATION

Staker and Parson Companies dba:Burdick Materials $190.00 $38,000.00 Guardian Construction Inc. $54.19 $10,838.00 Engineer's Estimate 200 CUYD $130.00 $26,000.00

A0340 20403-0000 UNCLASSIFIED BORROW

Staker and Parson Companies dba:Burdick Materials $83.00 $87,150.00 Guardian Construction Inc. $8.47 $8,893.50 Engineer's Estimate 1,050 CUYD $120.00 $126,000.00

A0360 21101-1000 ROADWAY OBLITERATION, METHOD 1

Staker and Parson Companies dba:Burdick Materials $43.00 $3,870.00 Guardian Construction Inc. $34.29 $3,086.10 Engineer's Estimate 90 SQYD $15.00 $1,350.00

A0380 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

Staker and Parson Companies dba:Burdick Materials $672.00 $12,096.00 Guardian Construction Inc. $1,028.78 $18,518.04 Engineer's Estimate 18.0 CUYD $250.00 $4,500.00

A0400 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4

Staker and Parson Companies dba:Burdick Materials $370.00 $40,700.00 Guardian Construction Inc. $267.48 $29,422.80 Engineer's Estimate 110.0 CUYD $300.00 $33,000.00

A0420 30202-2000 ROADWAY AGGREGATE, METHOD 2

Staker and Parson Companies dba:Burdick Materials $62.30 $361,340.00 Guardian Construction Inc. $57.61 $334,138.00 Engineer's Estimate 5,800 TON $61.00 $353,800.00

5 out of 11

Project No: UT FLAP 218(1)

Project Name: Sheep Creek Loop

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0440 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH

Staker and Parson Companies dba:Burdick Materials $2.75 $39,875.00 Guardian Construction Inc. $24.69 $358,005.00 Engineer's Estimate 14,500 SQYD $3.50 $50,750.00

A0460 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Staker and Parson Companies dba:Burdick Materials $176.00 $675,840.00 Guardian Construction Inc. $246.91 $948,134.40 Engineer's Estimate 3,840 TON $155.00 $595,200.00

A0480 40602-0000 FOG SEAL

Staker and Parson Companies dba:Burdick Materials $0.75 $17,415.00 Guardian Construction Inc. $0.59 $13,699.80 Engineer's Estimate 23,220 SQYD $0.85 $19,737.00

A0500 41102-1000 PRIME COAT, METHOD 1

Staker and Parson Companies dba:Burdick Materials $1.25 $29,025.00 Guardian Construction Inc. $0.59 $13,699.80 Engineer's Estimate 23,220 SQYD $1.10 $25,542.00

A0520 41105-0000 BLOTTER

Staker and Parson Companies dba:Burdick Materials $75.00 $2,400.00 Guardian Construction Inc. $428.66 $13,717.12 Engineer's Estimate 32 TON $200.00 $6,400.00

A0540 41201-0000 TACK COAT

Staker and Parson Companies dba:Burdick Materials $791.00 $7,910.00 Guardian Construction Inc. $1,118.00 $11,180.00 Engineer's Estimate 10.0 TON $950.00 $9,500.00

A0560 60103-0000 CONCRETE, HEADWALL (& WINGWALLS, INLET, TYPE B, DOUBLE 4'X8' CONCRETE BOX CULVERT)

Staker and Parson Companies dba:Burdick Materials $94,900.00 $94,900.00 Guardian Construction Inc. $34,293.00 $34,293.00 Engineer's Estimate 1 EACH $18,000.00 $18,000.00

6 out of 11

Project No: UT FLAP 218(1)

Project Name: Sheep Creek Loop

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0580 60103-0000 CONCRETE, HEADWALL (& WINGWALLS, OUTLET, DOUBLE 4'X8' CONCRETE BOX CULVERT)

Staker and Parson Companies dba:Burdick Materials $72,700.00 $72,700.00 Guardian Construction Inc. $34,293.00 $34,293.00 Engineer's Estimate 1 EACH $25,000.00 $25,000.00

A0600 60201-0600 18-INCH PIPE CULVERT

Staker and Parson Companies dba:Burdick Materials $847.00 $3,388.00 Guardian Construction Inc. $274.25 $1,097.00 Engineer's Estimate 4 LNFT $120.00 $480.00

A0620 60201-0800 24-INCH PIPE CULVERT

Staker and Parson Companies dba:Burdick Materials $446.00 $60,210.00 Guardian Construction Inc. $274.34 $37,035.90 Engineer's Estimate 135 LNFT $150.00 $20,250.00

A0640 60202-0200 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Staker and Parson Companies dba:Burdick Materials $288.00 $17,280.00 Guardian Construction Inc. $274.35 $16,461.00 Engineer's Estimate 60 LNFT $120.00 $7,200.00

A0660 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Staker and Parson Companies dba:Burdick Materials $424.00 $203,520.00 Guardian Construction Inc. $301.78 $144,854.40 Engineer's Estimate 480 LNFT $150.00 $72,000.00

A0680 60202-0800 48-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Staker and Parson Companies dba:Burdick Materials $604.00 $30,200.00 Guardian Construction Inc. $438.96 $21,948.00 Engineer's Estimate 50 LNFT $420.00 $21,000.00

A0700 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

Staker and Parson Companies dba:Burdick Materials $1,450.00 $1,450.00 Guardian Construction Inc. $4,801.00 $4,801.00 Engineer's Estimate 1 EACH $400.00 $400.00

7 out of 11

Project No: UT FLAP 218(1)

Project Name: Sheep Creek Loop

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0720 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

Staker and Parson Companies dba:Burdick Materials $1,134.00 $9,072.00 Guardian Construction Inc. $5,349.75 $42,798.00 Engineer's Estimate 8 EACH $750.00 $6,000.00

A0740 60211-0600 END SECTION FOR 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Staker and Parson Companies dba:Burdick Materials $980.00 $3,920.00 Guardian Construction Inc. $4,801.00 $19,204.00 Engineer's Estimate 4 EACH $600.00 $2,400.00

A0760 60211-0800 END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Staker and Parson Companies dba:Burdick Materials $1,505.00 $39,130.00 Guardian Construction Inc. $5,349.69 $139,091.94 Engineer's Estimate 26 EACH $850.00 $22,100.00

A0780 60211-1200 END SECTION FOR 48-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Staker and Parson Companies dba:Burdick Materials $5,900.00 $11,800.00 Guardian Construction Inc. $7,544.50 $15,089.00 Engineer's Estimate 2 EACH $4,500.00 $9,000.00

A0800 60222-1800 8 FEET SPAN, 4 FEET RISE REINFORCED CONCRETE BOX CULVERT, DOUBLE BARREL

Staker and Parson Companies dba:Burdick Materials $4,400.00 $176,000.00 Guardian Construction Inc. $2,743.45 $109,738.00 Engineer's Estimate 40 LNFT $4,500.00 $180,000.00

A0820 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS

Staker and Parson Companies dba:Burdick Materials $46.50 $9,300.00 Guardian Construction Inc. $109.74 $21,948.00 Engineer's Estimate 200.0 LNFT $55.00 $11,000.00

A0840 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

Staker and Parson Companies dba:Burdick Materials $5,500.00 $11,000.00 Guardian Construction Inc. $4,801.00 $9,602.00 Engineer's Estimate 2 EACH $4,500.00 $9,000.00

8 out of 11

Project No: UT FLAP 218(1)

Project Name: Sheep Creek Loop

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0860 61901-0000 FENCE (4-STRAND, WILDLIFE FRIENDLY)

Staker and Parson Companies dba:Burdick Materials $19.00 $40,185.00 Guardian Construction Inc. $34.05 $72,015.75 Engineer's Estimate 2,115 LNFT $6.00 $12,690.00

A0880 61901-0500 FENCE, WOVEN WIRE, 96-INCH HEIGHT

Staker and Parson Companies dba:Burdick Materials $37.00 $19,795.00 Guardian Construction Inc. $20.58 $11,010.30 Engineer's Estimate 535 LNFT $55.00 $29,425.00

A0900 61902-2000 GATE, METAL, 28 FEET WIDTH

Staker and Parson Companies dba:Burdick Materials $30,500.00 $30,500.00 Guardian Construction Inc. $32,921.00 $32,921.00 Engineer's Estimate 1 EACH $20,000.00 $20,000.00

A0920 61903-0700 CATTLE GUARD, 24 FEET

Staker and Parson Companies dba:Burdick Materials $43,700.00 $87,400.00 Guardian Construction Inc. $17,146.50 $34,293.00 Engineer's Estimate 2 EACH $22,000.00 $44,000.00

A0940 61920-2000 REMOVE AND RESET GATE

Staker and Parson Companies dba:Burdick Materials $6,100.00 $12,200.00 Guardian Construction Inc. $3,429.50 $6,859.00 Engineer's Estimate 2 EACH $1,500.00 $3,000.00

A0960 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Staker and Parson Companies dba:Burdick Materials $244.00 $4,880.00 Guardian Construction Inc. $212.60 $4,252.00 Engineer's Estimate 20 HOUR $135.00 $2,700.00

A0980 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

Staker and Parson Companies dba:Burdick Materials $109.00 $2,180.00 Guardian Construction Inc. $226.35 $4,527.00 Engineer's Estimate 20 HOUR $150.00 $3,000.00

9 out of 11

Project No: UT FLAP 218(1)

Project Name: Sheep Creek Loop

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1000 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY

Staker and Parson Companies dba:Burdick Materials $153.00 $3,060.00 Guardian Construction Inc. $322.35 $6,447.00 Engineer's Estimate 20 HOUR $160.00 $3,200.00

A1020 62201-1200 BULLDOZER, 80HP MINIMUM FLYWHEEL POWER

Staker and Parson Companies dba:Burdick Materials $165.00 $3,300.00 Guardian Construction Inc. $322.35 $6,447.00 Engineer's Estimate 20 HOUR $180.00 $3,600.00

A1040 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Staker and Parson Companies dba:Burdick Materials $172.00 $3,440.00 Guardian Construction Inc. $390.95 $7,819.00 Engineer's Estimate 20 HOUR $225.00 $4,500.00

A1060 62201-3300 HYDRAULIC EXCAVATOR, 3/4 CUBIC YARD MINIMUM CAPACITY

Staker and Parson Companies dba:Burdick Materials $150.00 $3,000.00 Guardian Construction Inc. $363.50 $7,270.00 Engineer's Estimate 20 HOUR $180.00 $3,600.00

A1080 62301-0000 GENERAL LABOR

Staker and Parson Companies dba:Burdick Materials $47.00 $1,880.00 Guardian Construction Inc. $89.15 $3,566.00 Engineer's Estimate 40 HOUR $60.00 $2,400.00

A1100 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Staker and Parson Companies dba:Burdick Materials $179.00 $3,580.00 Guardian Construction Inc. $116.60 $2,332.00 Engineer's Estimate 20 HOUR $130.00 $2,600.00

A1120 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Staker and Parson Companies dba:Burdick Materials $244.00 $4,880.00 Guardian Construction Inc. $116.60 $2,332.00 Engineer's Estimate 20 HOUR $200.00 $4,000.00

10 out of 11

Project No: UT FLAP 218(1)

Project Name: Sheep Creek Loop

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1140 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGICAL SURVEYS)

Staker and Parson Companies dba:Burdick Materials Lump Sum $5,800.00 Guardian Construction Inc. Lump Sum $89,162.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

A1160 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

Staker and Parson Companies dba:Burdick Materials $14,300.00 $92,950.00 Guardian Construction Inc. $37,722.31 $245,195.02 Engineer's Estimate 6.50 ACRE $4,100.00 $26,650.00

A1180 62510-2000 SEEDING, HYDRAULIC METHOD

Staker and Parson Companies dba:Burdick Materials $1,350.00 $8,775.00 Guardian Construction Inc. $71,329.38 $463,640.97 Engineer's Estimate 6.50 ACRE $1,750.00 $11,375.00

A1200 62515-2000 MULCHING, HYDRAULIC METHOD

Staker and Parson Companies dba:Burdick Materials $2,090.00 $13,585.00 Guardian Construction Inc. $48,010.15 $312,065.98 Engineer's Estimate 6.50 ACRE $2,500.00 $16,250.00

A1220 63301-0000 SIGN SYSTEM

Staker and Parson Companies dba:Burdick Materials $976.00 $13,664.00 Guardian Construction Inc. $1,337.43 $18,724.02 Engineer's Estimate 14 EACH $700.00 $9,800.00

A1240 63301-0000 SIGN SYSTEM (SPECIAL)

Staker and Parson Companies dba:Burdick Materials $1,250.50 $12,505.00 Guardian Construction Inc. $1,337.40 $13,374.00 Engineer's Estimate 10 EACH $1,200.00 $12,000.00

A1260 63308-3000 OBJECT MARKER, TYPE 3

Staker and Parson Companies dba:Burdick Materials $549.00 $8,784.00 Guardian Construction Inc. $1,337.44 $21,399.04 Engineer's Estimate 16 EACH $125.00 $2,000.00

11 out of 11

Project No: UT FLAP 218(1)

Project Name: Sheep Creek Loop

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1280 63309-0000 DELINEATOR

Staker and Parson Companies dba:Burdick Materials $104.00 $6,240.00 Guardian Construction Inc. $377.22 $22,633.20 Engineer's Estimate 60 EACH $100.00 $6,000.00

A1300 63501-0000 TEMPORARY TRAFFIC CONTROL

Staker and Parson Companies dba:Burdick Materials Lump Sum $183,000.00 Guardian Construction Inc. Lump Sum $137,172.00 Engineer's Estimate ALL LPSM Lump Sum $160,000.00

Total Schedule - All Items

Staker and Parson Companies dba:Burdick Materials $4,778,254.00 Guardian Construction Inc. $5,743,280.07 Engineer's Estimate $2,972,000.00

2021-12-08T17:21:45-0700
JOREY MATTHEW DEML