UT ERFO 70014(2) Santaquin Canyon Road

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
6982AF23B000001
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Santaquin, Utah 84655, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks construction services for repairs to the UT ERFO 70014(2) Santaquin Canyon Road project located in Utah County, UT. The Department of Transportation Federal Highway Administration requires repairs to embankment, retaining walls, concrete box culverts, aggregate placement and asphalt paving damaged in a 2019 flood event. Key work items include 500 cubic yards of special rock embankment, 7,000 square feet of mechanically stabilized earth wall, 1,000 tons of roadway aggregate, 500 tons of asphalt, and 250 linear feet of reinforced concrete box culvert. Questions are due by June 7th and bids will be accepted until June 16th, 2023.

The work is to be performed without a set-aside at an estimated cost between $5-10 million. Construction is anticipated to occur between early July 2023 through July 2024 at the project location in Santaquin, UT. Two bids were received for the work, ranging from $7,994,325 to $11,793,855. The engineer's estimate was $5,022,278. NAICS codes for this work include 237110 and 237310. No incumbent was named.

Notice text

THIS IS AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE AVAILABLE

The UT ERFO 70014(2) Santaquin Canyon project is located in Utah County, UT within the Uinta-Wasatch-Cache National Forest, approximately 4 miles south of Santaquin, UT. This project will provide repairs to numerous sites damaged in a 2019 flood event.

SCOPE OF THE WORK: The proposed repairs include embankment construction, retaining wall construction, concrete box culvert construction, aggregate placement, and asphalt paving. These repairs will be accomplished to restore safe passage to the travelling public. The roadway is currently closed and will remain closed until repairs are complete. Diversions of the creek will be required during box culvert and retaining wall construction.

PRINCIPAL WORK ITEMS:

  • Special Rock Embankment, CUYD, 500
  • Mechanically Stabilized Earth (MSE) Wall, SQFT, 7,000
  • Roadway Aggregate, TON, 1,000
  • Asphalt, TON, 500
  • Reinforced Concrete Box Culvert, LNFT, 250

ANTICIPATED SCHEDULE:

Construction anticipated between early July 2023 and July 2024.

ESTIMATED COST RANGE: The proposed project is estimated at a cost of between $5,000,000 and $10,000,000

Files

Show all 14

Notice history

Notice Type Posted
UT ERFO 70014(2) Santaquin Canyon Award Award Notice
This notice Latest solicitation Solicitation
UT ERFO 70014(2) Santaquin Canyon Road Pre-Solicitation
UT ERFO 70014(2) Santaquin Canyon Road Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
UT NP ARCH 100(2) Bridges on Delicate Arch Road Moab, Utah 84532, United States · NAICS 237310 Federal Highway Administration No set-aside
Custer Gallatin National Forest Ashland and Sioux Road Maintenance Billings, Montana, United States · NAICS 237310 Region 6 - Pacific Northwest Region Total Small Business
GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest Garden City, Utah, United States · NAICS 237990 Forest Service Total Small Business
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements Tishomingo, Oklahoma 73460, United States · NAICS 237310 Federal Highway Administration Total Small Business
CO OMAD 300(71) Minuteman Missile Access Cheyenne, Wyoming, United States · NAICS 237310 Federal Highway Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors