This document outlines a federal contract opportunity for repairs to Santaquin Canyon Road in Utah. The UT ERFO 70014(2) Santaquin Canyon project requires repairs to numerous sites damaged in a 2019 flood event, including embankment construction, retaining wall construction, concrete box culvert construction, aggregate placement, and asphalt paving. The work will restore safe passage on the currently closed roadway and include creek diversions during box culvert and retaining wall construction. Principal work items consist of special rock embankment, mechanically stabilized earth wall, roadway aggregate, asphalt, and a reinforced concrete box culvert. The construction period is anticipated between early July 2023 and July 2024. The estimated cost range for the proposed project is between $5,000,000 to $10,000,000. The solicitation was released by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO
NG
I i Project
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
STATE PROJECT SHEET
NUMBER
I UT ERFO 70014(2) PLANS FOR PROPOSED INDEX TO SHEETS
KEY MAP OF UTAH
TYPE OF CONSTRUCTION :
Emergency Relief for Federally Owned roads (ERFO)
U.S. CUSTOMARY DIMENSIONS :
Slopes are expressed as RISE :RUN
SPECIFICATIONS:
"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS
AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14"
lil Know what'• below.
Call before you dig.
~ 1-c,=.o~,=.cr=M-AN-A~G=•·~~,.-Ao=oe~s~,G~N=•·~
~ J. HENYJOOD R. GONZALEZ
N
To Vernon 39miles
UT ERFO 70014(2)
SANTAQUIN CANYON ROAD
UINTA-WASATCH-CACHE NATIONAL FOREST
UTAH COUNTY
SCHEDULE A - SITES 2, 3, 3A, 4, 4A, 5 & SA
OPTION X - 3, 3A, 4, 4A, 5, SA, 6, 6A, 7 & 7A
LENGTH 0.34 MILES
Genola
Santaquin Ill iii
Rocky Ridge iii rJm1
To Provo / 15 mile1/
Payson
Payson Utah Temple
Springlake
DryM
Elk Ridge
@11
Woodland Hills pi:~;g;i~~~ Q u~~rL;~i~q I Bald Mountain Q g TwinKnolls Q
! Go gle J r f
To Nephi 9miles
0 2 4 6
Scale in Miles
SHEET
Al A2-A3
A4
AS
B1-B2 B3-B4 B5-B8 Cl-C7 CS-Cll
Gl G2 G3 T l
T2- T5
T 6
T7
TS
T 9
Tl0-Tll
DESCRIPTION
TITLE SHEET
CONVENTIONAL PLAN SYMBOLS & ABBREVIATIONS
SITE MAP
SURVEY CONTROL SHEET
SUMMARY OF QUANTITIES - SCHEDULE A
SUMMARY OF QUANTITIES - OPTION X
MISCELLANEOUS QUANTITIES - SCHEDULE A & OPTION X
PLAN SHEETS SITE 2 - SIT E SA - SCHEDULE A
PLAN SHEETS SITE 6 - SIT E 7A - OPTION X
C251 - 50 PLACED RJPRAP AT CULVERT OUTLETS
252-A SPECIAL ROCK EMBANKM ENT
254-A CONCRETE BLOCK RETAINING WALL
601-A BOX CULVERT HEADWALLS AND WINGWALLS
602-1 2 3 4 METAL PIPE CULVERT STANDARDS
617- 20 MGS AND G4 W-BEAM GUARDRAIL TYPE TANGENT
TERMI NAL AND GRADING
617-32 MGS W- BEAM GUARDRAIL STEEL POST S
635-1 TEMPORARY TRAFFIC CONTROL ADVANCE SIGNING
635-A TEMPORARY TRAFFIC CONTROL SIGN INSTALLATION
647-A AOP DETAILS
PLANS PREPARED BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DENVER, COLORADO
APPROVED:
Cu RTI S R SCOTT Digitally signed by CURTIS R SCOTT Date: 2023.04.13 11 :36:46 -06'00'
----------------- DATE:
CHIEF OF ENGINEERING
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
See Letter Dated 4/13/2023
----------------- DATE:
FOREST SUPERVISOR
UINTA-WASATCH-CACHE NATIONAL FOREST (UWCNF)
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
:1
:2
P
M N
U
T \e r f o \R o a d w a y \C
A D
D S h e e ts
\A G e n s h t\
U T e r f o S y m
.d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
Plants (Revegetation)
36 31
36 31
6 1
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
:0
:5
P
M N
U
T \e rf o (2
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\ U
T e rf o (2
S y m
.d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r:
r
.g o n z a le z s o s a
SITE MAP
NO SCALE
S a n ta q u in
C a n y o n
R o a d Sites 6, 6A, 7 & 7A
Begin Project UT ERFO 70014(2)
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
Sites 2, 3, 3A, 4, 4A, 5 & 5A
Begin Project UT ERFO 70014(2)
A4
STATE PROJECT
:4
:3
P
M N
U
T \e r f o
\R o a d w a y
\C A
D D
S h e e ts
\A G e n s h t\ U
T e r f o
S it e M a p
.d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
0.34TOTALS (mi)
1798TOTALS (ft)
250+00 to 00+257A
1000+00 to 00+107
15070+50 to 72+007
256A
10060+50 to 61+506
450+00 to 00+455A
50050+00 to 55+005
3000+00 to 00+304A
22940+00 to 42+294
15037+50 to 39+003A
40030+00 to 34+003
13420+00 to 21+342
(ft)
Roadway Station to StationSite
LENGTH OF PROJECT
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
Created SJS
CONTROL SHEET
7/8/20
A5UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
STATE PROJECT
:5
:4
A M
N
U T
\e r f o \R o a d w a y \C
A D
D S h e e ts
\A G e n s h t\
U T
E
R F
O C o n tr o l_
S h e e t.
d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
Sheet and Description
B5-B8 B5-B8 B5-B8 B5-B8 B5-B8 B5-B8 B5-B8 B5-B8 B5-B8 B5-B8 B5-B8
Site 2 Site 3 Site 3A Site 4 Site 4A Site 5 Site 5A Site 6 Site 6A Site 7 Site 7A Allowance Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM All All All All All All All ALL
A0060 15214-2000 SURVEY AND STAKING, RETAINING
WALL LPSM All All All ALL
A0080 15215-5000 SURVEY AND STAKING, BOX
CULVERT EACH 1 1 2
A0100 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0120 15401-0000 CONTRACTOR TESTING LPSM ALL
A0140 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0160 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0180 15720-0000 STORM WATER POLLUTION
PREVENTION PLAN LPSM ALL
A0200 20301-0300 REMOVAL OF BOX CULVERT EACH 1 1
A0220 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 711 267 308 30 889 90 115 2,410
A0240 20402-0000 SUBEXCAVATION CUYD 100
A0260 20820-0000 DEWATERING LPSM ALL
A0280 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 122 8 130
A0300 25101-0500 PLACED RIPRAP, METHOD A,
CLASS 5 CUYD 156 163 31 350
A0320 25110-2500 GROUTED RIPRAP, METHOD B,
CLASS 5 CUYD 250
A0340 25201-1000 SPECIAL ROCK EMBANKMENT,
MECHANICALLY-PLACED CUYD 17 33 231 29 310
A0360 25403-0000 PRECAST CONCRETE BLOCK
RETAINING WALL SQFT 3,650 1,200 900 175 5,925
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 98 7 105
A0400 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 46 2 48
A0420 40601-0000 FOG SEAL TON 0.1 0.1 0.2
A0440 41102-1000 PRIME COAT, METHOD 1 SQYD 268 12 280
A0460 41201-0000 TACK COAT TON 0.1 0.1 0.2
A0480 60220-3965 12 FEET SPAN, 4 FEET RISE,
PRECAST REINFORCED CONCRETE
BOX CULVERT LNFT 40 4 44
A0500 60220-4780 17 FEET SPAN, 8 FEET RISE
PRECAST REINFORCED CONCRETE
BOX CULVERT LNFT 62 4 66
A0520 60230-0000 DEBRIS RACK EACH 1 1
MileStone: 100% PS&E Date Completed: 03/21/23 Report Date: 03/21/23
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-M ar
-2
5:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
N
U T\ er fo
4( 2)
\R oa dw ay
\C
AD
D _S he et s\ B -S um m
SO
Q _1
_U T_
ER
FO
_7
(2
_F
IN
A L.
xl sm
]S he et
PROJECT
B1UT ERFO 70014(2)
SANTAQUIN CANYON ROAD
Site 2 Site 3 Site 3A Site 4 Site 4A Site 5 Site 5A Site 6 Site 6A Site 7 Site 7A Allowance Bid Schedule
A0540 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2,
CLASS A STEEL POSTS LNFT 100 25 125
A0560 61702-1500 TERMINAL SECTION, TYPE MGS
TANGENT EACH 2 2
A0580 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 60
A0600 62201-0350 BACKHOE HOUR 60
A0620 62201-0850 WHEEL LOADER, 1 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 60
A0640 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 60
A0660 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 60
A0680 62301-0000 GENERAL LABOR HOUR 40
A0700 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 20
A0720 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 1.0
A0740 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 1.0
A0760 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A0780 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 81 9 90
A0800 64704-1600 MITIGATION, STREAMBED CHANNEL
RECONSTRUCTION CUYD 245 25 270
-M ar -2
5:
P M
MileStone: 100% PS&E Date Completed: 03/21/23 Report Date: 03/21/23
N
U T\ er fo
4( 2)
\R oa dw ay
\C A D
D _S he et s\ B -S um m
SO
Q _1
_U T_
ER
FO
_7
(2
_F
IN
A L.
xl sm
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
PROJECT
B2UT ERFO 70014(2)
SANTAQUIN CANYON ROAD
Site 2 Site 3 Site 3A Site 4 Site 4A Site 5 Site 5A Site 6 Site 6A Site 7 Site 7A Allowance Bid Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM All All All All ALL
X0060 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 1 1
X0080 15215-5000 SURVEY AND STAKING, BOX
CULVERT EACH 1 1 2
X0100 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0120 15401-0000 CONTRACTOR TESTING LPSM ALL
X0140 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0160 15701-0000 SOIL EROSION CONTROL LPSM ALL
X0180 15720-0000 STORM WATER POLLUTION
PREVENTION PLAN LPSM ALL
X0200 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1 2
X0220 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 200 150 50 30 430
X0240 20820-0000 DEWATERING LPSM ALL
X0260 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 119 3 79 19 220
X0280 25101-0500 PLACED RIPRAP, METHOD A,
CLASS 5 CUYD 128 207 35 370
X0300 25201-1000 SPECIAL ROCK EMBANKMENT,
MECHANICALLY-PLACED CUYD 14 156 20 190
X0320 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 236 97 157 23 292 42 77 81 30 55 1,090
X0340 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 118 46 77 7 147 17 35 32 10 16 505
X0360 40601-0000 FOG SEAL TON 0.3 0.1 0.2 0.1 0.4 0.1 0.1 0.1 0.1 0.2 1.7
X0380 41102-1000 PRIME COAT, METHOD 1 SQYD 711 267 458 30 889 90 200 170 50 145 3,010
X0400 41201-0000 TACK COAT TON 0.3 0.1 0.2 0.1 0.4 0.1 0.1 0.1 0.1 0.2 1.7
X0420 60202-0700 42-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 30 10 40
X0440 60211-1100 END SECTION FOR 42-INCH
EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT EACH 2 2
X0460 60220-4450 14 FEET SPAN, 8 FEET RISE
PRECAST REINFORCED CONCRETE
BOX CULVERT LNFT 44 4 48
X0480 60220-4755 15 FEET SPAN, 8 FEET RISE
PRECAST REINFORCED CONCRETE
BOX CULVERT LNFT 72 4 76
-M ar -2
5:
P M
MileStone: 100% PS&E Date Completed: 03/21/23 Report Date: 03/21/23
N
U T\ er fo
4( 2)
\R oa dw ay
\C A D
D _S he et s\ B -S um m
SO
Q _1
_U T_
ER
FO
_7
(2
_F
IN
A L.
xl sm
]S he et
3) SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
PROJECT
B3UT ERFO 70014(2)
SANTAQUIN CANYON ROAD
Site 2 Site 3 Site 3A Site 4 Site 4A Site 5 Site 5A Site 6 Site 6A Site 7 Site 7A Allowance Bid Schedule
X0500 60704-0000 CLEANING CULVERT IN PLACE EACH 1 1
X0520 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2,
CLASS A STEEL POSTS LNFT 325 125 75 25 550
X0540 61702-1500 TERMINAL SECTION, TYPE MGS
TANGENT EACH 2 2 2 6
X0560 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 20
X0580 62201-0350 BACKHOE HOUR 20
X0600 62201-0850 WHEEL LOADER, 1 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 20
X0620 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 20
X0640 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 20
X0660 62301-0000 GENERAL LABOR HOUR 20
X0680 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 20
X0700 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 1.0
X0720 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 1.0
X0740 62617-1300 QUERCUS GAMBELII, GAMBEL'S
OAK, 1 GALLON, CONTAINER GROWN EACH 25 25
X0760 62619-0500 SYMPHORICARPOS ALBUS, COMMON
SNOWBERRY, 1 GALLON EACH 100 100
X0780 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
X0800 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 79 53 13 145
X0820 64704-1600 MITIGATION, STREAMBED CHANNEL
RECONSTRUCTION CUYD 272 196 196 66 730
-M ar -2
5:
P M
MileStone: 100% PS&E Date Completed: 03/21/23 Report Date: 03/21/23
N
U T\ er fo
4( 2)
\R oa dw ay
\C A D
D _S he et s\ B -S um m
SO
Q _1
_U T_
ER
FO
_7
(2
_F
IN
A L.
xl sm
]S he et
4) SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
PROJECT
B4UT ERFO 70014(2)
SANTAQUIN CANYON ROAD
SCHEDULE A
MISCELLANEOUS SUMMARIES
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
Sheet 1 of 2
B5
STATE PROJECT
:5
:4
P
M N
U
T \e rf o
(2
R o a d w a y
\C A
D D
S h e e ts
\B -S u m m \S
U M
U
T E
R F
O
(2
M is c e ll a n e o u s q u a n ti ti e s .d
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
SCHEDULE A
MISCELLANEOUS SUMMARIES
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
Sheet 2 of 2
B6
STATE PROJECT
:5
:1
A
M N
U
T \e rf o
(2
R o a d w a y
\C A
D D
S h e e ts
\B -S u m m \S
U M
U
T E
R F
O
(2
M is c e ll a n e o u s q u a n ti ti e s .d
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
Tack coat........0.1 gal/sqyd, 233 gal/ton
Prime coat.......0.27 gal/sqyd, 233 gal/ton
Fog Seal.......0.1 gal/sqyd, 233 gal/ton
Asphalt concrete pavement.....145.2 lb/cuft
Roadway Aggregate, Method 2.....139 lb/cuft
Values used for estimating purposes:
OPTION X
MISCELLANEOUS SUMMARIES
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
Sheet 1 of 2
B7
STATE PROJECT
:0
:3
A
M N
U
T \e rf o
(2
R o a d w a y
\C A
D D
S h e e ts
\B -S u m m \S
U M
U
T E
R F
O
(2
M is c e ll a n e o u s q u a n ti ti e s .d
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
STATE PROJECT
:0
:3
A
M N
U
T \e rf o
(2
R o a d w a y
\C A
D D
S h e e ts
\B -S u m m \S
U M
U
T E
R F
O
(2
M is c e ll a n e o u s q u a n ti ti e s .d
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
OPTION X
MISCELLANEOUS SUMMARIES
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
Sheet 2 of 2
B8
:1
:2
P
M N
U
T \e rf o
(2
R o a d w a y
\C A
D D
S h e e ts
\C -M
L
P
P \p ln
S it e
.d
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
R O
C K S
LID
E
60D NAIL
RESC
60D NAIL
PLAN
A
A
SECTION A-A
100'50'0
Scale in Feet
15' (typ.)
Slope
Match Existing ground Existing
CL
16'
Tack Coat between lifts
Prime Coat (Method 1)
Fog Seal
Method 2
6" Roadway aggregate, DETAIL A
See C617-20 and C617-32
Tangent type end terminals, Install Guardrail and
30+00 - 33+75, Rt.
30+00 31+00 32+00 33+00 34+00
Profile
Existing Centerline
(15' offset)
Existing Ground waterline to be buried in place
Existing exposed abandoned
See G-Sheets for details
Retaining Wall
Construct Concrete Block
See G-Sheets for details
Retaining Wall
Construct Concrete Block
30+39 - 33+60, Rt.
WALL PROFILE
1:4
DETAIL B
sides of roadway)
(Detail applies to both right and left
Shoulder up with Roadway Aggregate, Method 2
Construct 30° pavement edge (safety edge)
Asphalt concrete pavement
1:1.5 Max.
C617-32 for details
See C617-20 and
Construct Guardrail
NOTE:
(For Information Only)
Bottom of Wall
E = 1570179.44
N = 7138709.02
E = 1570502.80
N = 7138442.90
Placed in two equal lifts
3" Asphalt concrete pavement structural section
See Section A-A, Details A & B
Construct new pavement pavement is placed - No Pay)
(Saw cut and crack seal after
Begin pavement removal
30+00 structural section
See Section A-A, Details A & B
Construct new pavement pavement is placed - No Pay)
(Saw cut and crack seal after
End pavement removal
34+00
Creek
Summit
Flow
Flow construction.
2. Do not undercut the slope above the roadway during wall
1. See Final Geotechnical Report No. UT-FE-70014-20-01.
SCHEDULE A & OPTION X
SITE 3
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
C2
2537 ft
To Site 2
290 ft
To Site 3A
1:2
PC
.0
P T
.1
P C
.7
P T
.3
P C
.8
P T
.6
P I
.9
Curve = SITE3-1
PI 30+67.18
D
R = 400.00'
T = 67.18'
L = 133.12'
Curve = SITE3-2
PI 32+10.04
D
R = 800.00'
T = 28.28'
L = 56.54'
Curve = SITE3-3
PI 33+05.29
D
R = 1,000.00'
T = 55.43'
L = 110.75'
30°30°
0.4'
Limits of Wall Excavation
:2
:3
P
M N
U
T \e rf o (2
R o a d w a y \C
A D
D S h e e ts
\C -M
L P
P
\p ln
S it e A
.d
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
320 325
0 335
IN
C
M P
D
IR
O
N
LY
MAG NAIL
PK NAIL
100'50'0
Scale in Feet
PLAN
A
A
Tack Coat between lifts
Prime Coat (Method 1)
Fog Seal
Method 2
6" Roadway aggregate, DETAIL A
SECTION A-A
15' (typ.)
Slope
Match Existing
CL
C617-32 for details
See C617-20 and
Construct Guardrail
See C617-20 and C617-32
Tangent type end terminals, Install Guardrail and
37+45 - 39+20, Rt.
(15' offset)
Existing Ground
Profile
Existing Centerline
37+00 38+00 39+00
16'
See G-Sheets for details
Retaining Wall
Construct Concrete Block
37+68 - 39+02, Rt.
See G-Sheets for details
Retaining Wall
Construct Concrete Block
WALL PROFILE
1:4
Asphalt concrete pavement
DETAIL B
sides of roadway)
(Detail applies to both right and left
Shoulder up with Roadway Aggregate, Method 2
Construct 30° pavement edge (safety edge)
(For Information Only)
Bottom of wall
1:1.5 Max
NOTE:
E = 1570741.27
N = 7138280.05
E = 1570951.97
N = 7138164.58
Placed in two equal lifts
3" Asphalt concrete pavement structural section
See Section A-A, Details A & B
Construct new pavement pavement is placed - No Pay)
(Saw cut and crack seal after
Begin pavement removal
37+50, Rt.
structural section
See Section A-A, Details A & B
Construct new pavement pavement is placed - No Pay)
(Saw cut and crack seal after
End pavement removal
39+00
See Special 252-A
30' L x 5' W x 3' D
Embankment
Place Special Rock
39+15, Rt.
construction.
2. Do not undercut the slope above the roadway during wall
1. See Final Geotechnical Report No. UT-FE-70014-20-01.
F lo w
Creek
Summit
Flow
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
SCHEDULE A & OPTION X
SITE 3A
C3
290 feet
To Site 3
310 feet
To Site 4
1:2
P I
.7
P
C
.1
P T
.3
P C
.7
PT 39+
29.28
PO
T
.8
Curve = SITE3-4
PI 37+65.79
D
R = 500.00'
T = 24.60'
L = 49.16'
PI 38+85.68
Curve = SITE3-5
D
R = 125.00'
T = 47.93'
L = 91.53'
30°
Limits of Wall Excavation
NOTE:
ROADWAY EROSION REPAIR
Tack Coat between lifts
Prime Coat (Method 1)
Fog Seal
Method 2
6" Roadway aggregate, DETAIL A
ROADWAY PAVEMENT REPAIR
roadway slope
Match existing
.5
1:4 sides of roadway)
(Detail applies to both right and left
Shoulder up with Roadway Aggregate, Method 2
Construct 30° pavement edge (safety edge)
Asphalt concrete pavement
DETAIL B
9' W x 30' L. See Details A & B
Construct new pavement
Remove pavement and
No. UT-FE-70014-20-01.
2. See Final Geotechnical Report
Location: 39.914055°, -111.746712°
1. This Site has not been surveyed.
See Special 252-A
10' H x 30' W x 3' D
Place Special Rock Embankment
Placed in two equal lifts
3" Asphalt concrete pavement
Embankment Item.
included in Special Rock
Unclassified borrow material is with unclassified borrow material.
Backfill underneath roadway
Material
Unclassified Borrow
SCHEDULE A & OPTION X
SITE 4A
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
C5
STATE PROJECT
:2
:3
P
M N
U
T \e rf o (2
R o a d w a y \C
A D
D S h e e ts
\C -M
L P
P
\p ln
S it e A
.d
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
18' Roadway Width
30'
H e ig h t
30' Le ngt h
30°
ROADWAY EROSION REPAIR
Tack Coat between lifts
Prime Coat (Method 1)
Fog Seal
Method 2
6" Roadway aggregate, DETAIL A
ROADWAY PAVEMENT REPAIR
roadway slope
Match existing
.5 depth of 2 feet. See G sheets for details extend below the streambed to a scour bottom of the channel. The wall should approximately 15' H x 45' L above the
Construct Concrete Block Retaining Wall, 1:4
DETAIL B
sides of roadway)
(Detail applies to both right and left
Shoulder up with Roadway Aggregate, Method 2
Construct 30° pavement edge (safety edge)
Asphalt concrete pavement
CL
15' (typ.)
C617-32 for details
See C617-20 and
Construct Guardrail
See G-Sheets for details
Retaining Wall
Construct Concrete Block
18'
Slope
Match Existing
1.1:5 Max.
TYPICAL SECTION
2. See Final Geotechnical Report No. UT-FE-70014-20-01.
Approximate Location: 39.911278°, -111.742678°
1. This Site has not been surveyed.
Details A & B structual section typical section. See
Construct new 18' W x 45' L
Remove pavement and cross section)
(lowest point in a given
Channel thalweg elevation channel thalweg
Found wall 8' below
Placed in two equal lifts
3" Asphalt concrete pavement
SCHEDULE A & OPTION X
SITE 5A
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
C7
STATE PROJECT
:3
:5
P
M N
U
T \e rf o (2
R o a d w a y \C
A D
D S h e e ts
\C -M
L P
P
\p ln
S it e A
.d
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
18' Roadway Width
45'
30°30°
INLET EXISTING STRUCTURE
.5
OUTLET EXISTING STRUCTURE
remain in place.
Pipe Culvert to
Existing 30" Dia.Ensure proper drainage to inlet.
Included in pay item 60704-0000.
sediment and debris from ditch.
surrounding area of
Clean existing structure and
No. UT-FE-70014-20-01.
2. See Final Hydraulics and Final Geotechnical Report
Approximate Location: 39.908726°, -111.739214°
1. This Site has not been surveyed.
See special 252-A to Channel Thalweg elevation (min.)
Extend Special Rock Embankment
Approximately 5' H x 25' L x 3' D
Place Special Rock Embankment
Do Not Disturb
Existing roadway
Creek
Summit
OPTION X
SITE 6A
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
C9
STATE PROJECT
:4
:2
P
M N
U
T \e rf o (2
R o a d w a y \C
A D
D S h e e ts
\C -M
L P
P
\p ln
S it e A
.d
U.S. DEPARTMENT OF TRANSPORTATION
/1
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
H e ig h t
25' Length
Le n th
:0
:2
P
M N
U
T \e rf o
(2
R o a d w a y
\C A
D D
S h e e ts
\C -M
L
P
P \p ln
S it e
.d
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
PK NAIL
PK NAIL
PK NAIL
A
A
100'50'0
Scale in Feet
PLAN
Tack Coat between lifts
Prime Coat (Method 1)
Fog Seal
Method 2
6" Roadway aggregate, DETAIL A
SECTION A-A
CHANNEL TYPICAL SECTION
C10 location, See photos this sheet
Flow Diversion Structure
Approximate existing
Section and photos this sheet location, See Channel Typical
Flow Diversion Structure
Approximate proposed
PIPE CULVERT INSTALLATION
DETAIL B
1:4 sides of roadway)
(Detail applies to both right and left
Shoulder up with Roadway Aggregate, Method 2
Construct 30° pavement edge (safety edge)
Asphalt concrete pavement
No. UT-FE-70014-20-01.
1. See Final Hydraulics and Final Geotechnical Report E = 1574249.18
N = 7134328.11
E = 1574338.57
N = 7134128.68
4' - 5' section is provided such that typical channel
Alleviate channel constriction by CO chute as directed at mouth of flood boulders and reset
Remove existing at mouth of flood chute
Place boulders and backfill as directed by CO
50' L
Grade V-shaped swale over pipe culvert
12" (min.) cover
CL
Slope
Existing
Match
1:
1.
Existing ground
See special 252-A
Embankment
Place Special Rock
Special Rock Embankment
Place thickened toe at the end of the
70+50 - 70+90, Lt.
See Section A-A and Details A & B structural section
Construct new typical section
(Saw cut and crack seal after pavement is placed - No Pay)
Begin pavement removal
70+50, Lt.
structural section
See Section A-A and Details A & B
Construct new typical section pavement is placed - No Pay)
(Saw cut and crack seal after
End pavement removal
72+00
Placed in two equal lifts
3" Asphalt concrete pavement
Primary channel Flood chute
Channel Thalweg Elevation
Existing channel
OPTION X
SITE 7
Embankment Item in Special Rock material is included
Unclassified borrow material
See Special 252-A
Place Special Rock Embankment
70+50 - 72+00, Lt.
See Photo this sheet
Riprap apron at outlet
2-Flared end sections
Install a 42" x 29' pipe arch culvert, Upstream of surveyed area, See Detail C251-50
Class 3 Riprap apron at outlet
2-Flared end sections
Install a 42" x 29' pipe arch culvert, Upstream of surveyed area, F lo w
Creek
Summit
Flow
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
100 snowberry @ 10 ft spacing
(25 oaks @ 20 ft spacing, 10,000 SQFT= 0.2 acres.
adjacent to Summit Creek, (Symphoricarpos oreophilus) and snowberry
(quercus gambilii)
Plant mix of gambel oak
P O T .0
P C .7
PT 70+90.84
71+
PC 7
1+67.
PT
+82 .51
+00
POT 7
2+
.92
Curve = SITE7-1
PI 70+58.93
D
R = 135.00'
T = 33.21'
L = 65.12'
Curve = SITE7-2
PI 71+74.94
D
R = 200.00'
T = 7.57'
L = 15.14' 0.4'
30°
15' - 17'
9'
:4
:2
P
M N
U
T \e rf o (2
R o a d w a y \C
A D
D S h e e ts
\C -M
L P
P
\p ln
S it e A
.d
U.S. DEPARTMENT OF TRANSPORTATION
/2
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
PLAN
Tack Coat between lifts
Prime Coat (Method 1)
Fog Seal
Method 2
6" Roadway aggregate, DETAIL A
1:3
3'
18'
C L
1:3
Existing
Match
Existing
Match
Headwalls and Wingwalls Lt. & Rt.
Single 14' Span x 8' Rise Concrete Box Culvert
Toe wall
Toe wall
ELEVATION
44' Concrete Box Culvert
8.0%
Headwalls and Wingwalls
Concrete Box Culvert
14' span x 8' rise x 44'
Install precast
EXISTING STRUCTURE INLET
pipe culvert
Remove existing
EXISTING STRUCTURE OUTLET
Channel Bottom
Proposed
See Channel Typical Section
Regrade channel approx. 100' upstream @ 8% concrete box culvert inlet of proposed
Regrade channel to of existing debris
Remove and dispose
15°
CHANNEL TYPICAL SECTION
40' L x 35' W x 3.5' D riprap apron, Rt.
Place Class 5
NO SCALE
C11
1:4 sides of roadway)
(Detail applies to both right and left
Shoulder up with Roadway Aggregate, Method 2
Construct 30° pavement edge (safety edge)
Asphalt concrete pavement
DETAIL B
S e e D e ta ils A B a n d r e p la c e m e n t
' P a v e m e n t r e m o v a l
NOTE:
8'
See Special 647-A for AOP details.
Pay Item.
Wingwalls and headwalls are included in the Box Culvert
See Final Hydraulics Report.
Approximate Location: 39.904242°, -111.734394°.
This Site has not been surveyed.
4.
3.
2.
1.
mitigate subsurface flow to seal the streambed and
Compact and apply water mitigate subsurface flow to seal the streambed and
Compact and apply water roadway prism
Grade to toe of canyon wall
Grade to toe of to the end of the wingwalls (typ.)
Extend low flow channel
Placed in two equal lifts
3" Asphalt concrete pavement
Channel Thalweg Elevation
Existing channel
OPTION X
SITE 7A
Angle = 15° (typ.)
Wingwall = 15' L (typ.)
Fl ow
Fl ow
Creek
Summit
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
UT
1:6 1:6
3.5' - 4.5'
0.4'
30°30°
40'
14' - 16'
C251-50
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITHOUT DITCH
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITH DITCH
AT CULVERT OUTLETS
PLACED RIPRAP
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
2'
49.8
38.7
18.5
13.3
5.2
3.2
1.7
44.5
34.1
15.6
10.9
3.9
2.2
2'
38.6
29.9
15.2
10.8
4.5
2.7
1.4
35.6
27.3
13.4
9.3
3.6
0.9
DETAIL APPROVED FOR USE
REVISED: 08/2014
NUMBER
SHEET
:4
:2
A
M N
U
T \e r f o \R o a d w a y \C
A D
D S h e e ts
\G \C
.d g n
/2
/2
U s e r r .g o n z a le z s o s a
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
G1
C
PLAN VIEW PLAN VIEW
Geotextile
END SECTION
CULVERT WITHOUT STANDARD
SECTION C-C
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r m in
S p a n
D ia o r
A A
B B
PLAN VIEW
Variable slope ground Original
Geotextile
END SECTION
CULVERT WITHOUT STANDARD
SECTION B-BSECTION A-A
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r
S p a n
D ia o r m in
Geotextile
Variable slope ground Original m in
WITHOUT DITCH
PROTECTIVE APRON AT CULVERT OUTLET
WITH DITCH
PROTECTIVE APRON AT CULVERT OUTLET
C C
C
NOTE:
H
D
Geotextile
SECTION E-ESECTION D-D
Geotextile ground Original m in ditch slope
Match existing
D
H m in ground Original m in
D m in
H ditch slope
Match existing
D D EE
ground
Original
W id th
D it c h
B o tt o m
W id th
D it c h
B o tt o m
PLAN VIEW
or flatter
Sloped 1V:2H will not be measured for payment.
3. Excavation for placement of riprap
Subsection 714.01(a).
2. Furnish geotextile conforming to slopes of less than 10%.
1. Use for aprons serving culverts with
Flowline
L
L
D D
D
H
H
D D
D
L
D
D
4D
D
D D
D
D D
(min.)
252-A
CL
Ground
Existing
Embankment
Place Special Rock
1:1.5
Geotextile
6' Riprap mound thickness
(lowest point in a given cross section)
Channel Thalwag Elevation
3'
EMBANKMENT
SPECIAL ROCK
G2UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
STATE PROJECT
:1
:0
A
M N
U
T \e r f o \R o a d w a y \C
A D
D S h e e ts
\G \s p A
.d
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL
U.S. CUSTOMARY SPECIAL
/2
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
Varies
3' Riprap mound height
Roadway Width Varies
254-A
LC
[2]
Original ground
[3] structure
Proposed pavement
BLOCK RETAINING WALL TYPICAL SECTION
FILL SIDE PRECAST CONCRETE
Edge of pavement block (typ.)
retaining wall precast concrete
Class A(AE)
1' overlap of geotextile Provide minimum of Geotextile filter, class 2, type A.
FOOTNOTE:
NOTE:
2% min.
[1] outlet pipe polyethylene drainage tubing 4" nonperforated corrugated polyethylene drainage tubing
4" perforated corrugated
[4] Guardrail
Geotextile Class 2, Type A
Wall underdrain system
Leveling Pad
Granular backfill with standard coupling bands or by other approved means.
according to Subsection 605.03. Hold the screen securely in place
5. Cover the end of the wall underdrain system outlet pipes with screen include this information in the final shop plans submitted to the CO.
current cross sections taken in the field by the Contractor and footing elevations, and all other necessary final details on
4. Base the exact retaining wall heights, footing step dimensions,
3. Step top of wall along roadway profile grade.
2. See plans for locations and quantities.
1. See Section 254.
G3
RETAINING WALL
CONCRETE BLOCK
Channel Thalweg
Tack Coat between lifts
Prime Coat (Method 1)
Fog Seal
Method 2
6" Roadway aggregate, DETAIL A
Placed in two equal lifts
3" Asphalt concrete pavement
1:4
Asphalt concrete pavement
DETAIL B
sides of roadway) and left
(Detail applies to both right
Aggregate, Method 2
Shoulder up with Roadway edge (safety edge)
Construct 30° pavement
See C617-20 and C617-32.
[4]
See Details A and B.
[3]
Wall batters steeper than 4V:1H are acceptable.
[2] at a maximum spacing of 100'
Place outlet pipes at all low spots along wall and [1]
0.4'
30°
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
Grouted Riprap Class 5
30" Wide (min.) curtainwall to approx. bot/leveling pad elev.
O r T o p /B e d r o c k
STATE PROJECT
:3
:1
P
M N
U
T \e r f o \R o a d w a y \C
A D
D S h e e ts
\G \s p A
.d
/2
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
H
D e s ig n w a ll h e ig h t v a r ia b le
12"
4' Setback
2' Embedment
12"
6" min.
30" min.
12"
601-A b.f. = both faces o.f. = other face f.f. = fill face
Abbreviations:
AND WINGWALLS
HEADWALLS
BOX CULVERT
1'-0"
#4 bars (6 tot.)
#4 @ 12" headwall reinforcement into
Extend longitudinal box H e a d w a ll L e n g th
1'-0"
(6 tot.)
#4 bars
#4 @ 18" toewall reinforcement into
Extend longitudinal box
2 (max.)
0-10
4'-6"
1-7
L
0-8
1'-0" 1'-6"
1'-0" to wall) perpendicular
(measured
#4 @ 12"
#5 @ 6"
#5 @ 12"
#4 bars (9 tot.)
#4 @ 12" b.f.
#4 @ 12"
#5 @ 6" recommendations install per manufacturer's
Geocomposite sheet drain
@ 8'-0" (max.) o.c.
slope 2% to drain sheet drain manufacturer.
recommended by
Provide drain grate as material
Limits of backfill
#4 @ 6"
NOTES:
footing) and headwall (above filler between wingwall
" expansion joint2
Finished slope
See Headwall Detail
See Toewall Detail culvert
Concrete box Toewall
Other face of wingwall footing bars splice to longitudinal
2-#4 bars b.f.
longitudinal footing bars
#4 bars splice to footing & toewall bars splice to longitudinal
4-#4 bars
Concrete box culvert
Face of headwall
See Box Culvert Plan and Profile Sheet filler (nail in place)
" expansion joint2
3" cl.
1'-10" min. splice
@ 8'-0" (max.) o.c.
R
TYPICAL HEADWALL / WINGWALL PLAN DETAIL
Foundation fill
WING ELEVATION
HEADWALL DETAIL
TOEWALL DETAIL
WINGWALL TYPICAL SECTION
wingwall typical section.
behind the wingwalls and headwalls. Limits are shown on the
10. Use Backfill material meeting the requirements of subsection 704.03 construction.
9. The contractor is responsible for the stability of the structure during
8. Include geocomposite sheet drains in the cost of 60220 Pay Items.
7. Clean all construction joints thoroughly before concrete is poured.
between concrete and soil = 0.65.
height of soil, heq = 2 feet. For sliding, nominal coefficient of friction fluid unit weight = 35 lbs. per cubic foot. Live load surcharge = equivalent bearing resistance, q =5.0 ksf. Lateral earth pressure equivalent to a
AASHTO LRFD Bridge Design Specifications 8th Edition, 2017 . Factored
6. Design Data:
28-day compressive strength f'c = 4000 psi.
5. Concrete will conform to Section 601 in the SCRs, with a minimum the face of any bar of 2", unless shown otherwise on the plans.
M322, Grade 60 deformed. Use a minimum concrete covering to
4. Use reinforcing steel meeting the requirements of AASHTO M31 or shown on the Box Culvert Plan and Profile Sheet.
3. Dimensions, elevations and angles for wingwalls and headwalls are included in the unit cost of 60220 Pay Items.
2. Expansion joint material shall conform to AASHTO M213. Payment
".4
31. Chamfer all exposed concrete corners
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
T1
STATE PROJECT
:4
:0
A
M N
U
T \e r f o \R o a d w a y \C
A D
D S h e e ts
\T \S
P A
.d
/2
/2
U s e r r .g o n z a le z s o s a
NUMBER
SHEET
c l.
8"
H m a x
W ingwall Length
1.
2.
3.
4.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
NOTE:
:1
P
M
J a n u a r y
S td
N
U T
\e r f o \R o a d w a y \C
A D
D S h e e ts
\T \S td .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
STANDARD APPROVED FOR USE 12/1993
6/2005 4/1994 REVISED:
602-1
STATE PROJECT
NUMBER
SHEET
UT
SANTAQUIN CANYON ROAD
UT ERFO 70014(2)
T2
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
BoltsBand
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
rerolled with 3" × 1" pipe corrugations.
COUPLING BAND
METAL PIPE CULVERT
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 corrugations on rerolled pipe ends.
diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
W
WWW
:2
J a n u a r y
S td
U T
\e r f o \R o a d w a y \C
A D
D S h e e ts
\T \S td .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
STANDARD APPROVED FOR USE 12/1993
6/2005 4/1994 REVISED:
602-2
STATE PROJECT
NUMBER
SHEET
UT
SANTAQUIN CANYON ROAD
T3
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
Half diameter or whichever is less section
Metal endMetal end section or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth; or lean concrete
> 54"
12" to 54"
6"
4"
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
12" (min.), 24" (max.)
"/foot of cover,2
NOTE:
H
Width
H H
H H
H H
H H
H
H
H
H
HH
H
(see table)
Minimum spacing or Span
Diameter or Span
Diameter
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
minimum
1'-0"
:2
J a n u a r y
S td
U T
\e r f o \R o a d w a y \C
A D
D S h e e ts
\T \S td .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STANDARD APPROVED FOR USE 12/1993
10/2017 DRAFT:
6/2005 4/1994 REVISED:
602-3
STATE PROJECT
NUMBER
SHEET
UT
SANTAQUIN CANYON ROAD
T4
2.
3.
4.
5.
6.
7.
8.
ROUND OR PIPE ARCH CULVERT
PIPE ARCH CULVERTROUND PIPE CULVERT
DESIGN C
CONNECTION TO METAL PIPE
OR OUTLET END OF CONCRETE PIPE
SECTION A-APLAN
ELEVATION ELEVATION
Slope
Toe plateToe plate riveted or welded connection
For all sizes of round pipe and pipe arch
END SECTIONS FOR ROUND PIPE CULVERT
END SECTIONS FOR PIPE ARCH CULVERT
A (min) B (max) H (min) W (max)
SLOPE
Approx.
A (min) B (max) H (min) W (max)
SLOPE
Approx.
A
A
DESIGN B
CONNECTION TO CONCRETE
PIPE INLET END
DESIGN A
CONNECTION TO ANNULAR
CORRUGATED METAL PIPE
Toe plate extension
(min. width A+W)
Toe plate extension
Corner plate
(min. width A+W)
Toe plate extension
Corner plate
Reinforced edge
Pipe coupling band shop bolted to
End section
Pipe culvert
Expander lug End section steel or aluminum pipe
Smooth galvanized
Bolted or welded
Threaded rod
Rod holder connector
Flat strap Pipe culvert Pipe culvert
End section End section
Strap bolt
Pivot bolt reinforcement bolted or riveted under the center panel seam.
Supplement the reinforced edges of end sections for
Variations in design and dimensions are permitted to allow for manufacturer's standards.
Fabricate the diameter of the end section of Design B to match the inside diameter of the concrete pipe culvert.
Design C may be used in lieu of design A for all metal pipe culvert sizes. Coupling bands may be any acceptable type for the pipe culvert specified.
Fabricate multiple piece bodies with lap seams tightly joined attached with bolts or rivets.
Fabricate connector section, corner plate and toe plate extensions from the same metal thickness as the panel body.
Use toe plate extension where shown on the plans.
Warp embankment slopes to match the slope of the flared end sections.
METAL END SECTIONS
60" and larger diameter pipe and 66" and larger
" bolts8 3spacing for
35" × 24" thru 66" × 51" pipe arch
For 30" thru 60" round pipe and
17" × 13" thru 28" × 20" pipe arch
For 12" thru 24" round pipe and
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.079
0.079
0.064
0.064
0.064
0.064
0.064
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.075
0.075
0.060
0.060
0.060
0.060
0.060
112 × 75
103 × 71
95 × 67
87 × 63
83 × 57
81 × 59
77 × 52
73 × 55
71 × 47
66 × 51
64 × 43
60 × 46
57 × 38
49 × 33
42 × 29
35 × 24
28 × 20
24 × 18
21 × 15
17 × 13
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.079
0.079
0.064
0.064
0.064
0.064
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.075
0.075
0.060
0.060
0.060
0.060
INCHES
SPAN × RISE
PIPE SIZE METAL THICKNESS
STEEL ALUMINUM
INCHES GAGE INCHES GAGE
INCHES
DIMENSIONS
L (±2")(INCHES)
DIAM.
VALENT
EQUI-
INCHES
DIAMETER
PIPE SIZE
STEEL
METAL THICKNESS
INCHES GAGE
ALUMINUM
INCHES GAGE
INCHES
DIMENSIONS
L (±2")
13" for 30" dia. and over.
culvert less than 30" dia.
7" for concrete pipe
" bolts8 3spacing for at 6" centers (max.) or equivalent
" angle4 1" × 2
1" × 22 1equivalent pipe arch provide 2
" bolts8 3flared end section with
" rivets or bolts. Fabricate end section center panels 8 3by
On end section center panels for 66" and larger from 0.138 inch steel or 0.135 inch aluminum.
for 60" and larger diameter pipe and equivalent pipe arch
" stiffener angles 4 1" × 2
1" × 22 1equivalent pipe arch with 2
NOTE:
edge
Reinforced
Pay Limit
Pipe Culvert diameter
Span or
B
L
AWA
End Section
SpanR is e
Di am et er
H H m in
12" (max.) hole lap after expansion
1" Minimum m in
12" (max.) hole
:2
J a n u a r y
S td
U T
\e r f o \R o a d w a y \C
A D
D S h e e ts
\T \S td .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STANDARD APPROVED FOR USE 12/1993
10/2007 DRAFT:
6/2005 4/1994 REVISED:
602-4
STATE PROJECT
NUMBER
SHEET
UT
SANTAQUIN CANYON ROAD
T5
6.
5.
4.
3.
2.
1.
embankment
Edge of widened post section. See Note 4 face of the rail in the standard
Tangent line projected from the embankment
Edge of widened post section. See Note 4 face of the rail in the standard
Tangent line projected from the
Varies by manufacturer end of terminal not shown.
Terminal posts and
Varies by manufacturer end of terminal not shown.
Terminal posts and
NOTE:
terminal grading extents where practical.
Construct a 1V:4H slope outside of the guardrail terminal.
Install a reflectorized object marker on the end of the according to the manufacturer's recommendations.
end farther from the edge of shoulder, or use a taper
Install terminal at a 1:25 taper or flatter to position the the manufacturer's recommendations.
necessary to install the tangent terminal according to manufacturer for a specific product. Adjust grading as begin at post 3. Verify the length of need with the
For design purposes, the length of need is assumed to of site limitations, use the alternative grading layout.
as practical within site constraints. If necessary because are provided, use the preferred grading layout as much staking notes or model.