Repair Interiors 505 TRS and 705 TRS, Bldg 90021

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
FA441720R0015
Agency
Responses due
Set-aside
HUBZone

Opportunity facts

Place of performance
Hurlburt Field FL 32544 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals for repair and interior construction work at Building 90021 located at Hurlburt Field, Florida. The Department of the Air Force Special Operations Command requires partial demolition and new construction of first and second floor interior spaces. The selected contractor shall provide new bathrooms, mechanical rooms, classrooms, laboratories, break rooms, offices, and training conference rooms. Proposals will be evaluated based on technical qualifications, past performance, and price. The deadline for proposals is August 11, 2020.

The solicitation is set aside for HUBZone small businesses. The primary NAICS code is 236220 and PSC code S206. The place of performance is Hurlburt Field, Florida. The work includes partial demolition of approximately 5,000 square feet of existing floor slabs and construction of 7,500 square feet of new interior spaces. The period of performance is 380 calendar days from the notice to proceed. A pre-proposal site visit was held on July 14, 2020 and two amendments have extended the closing date and provided revised specifications and drawings.

Notice text

6 versions

Update #6 · Latest ·

* 06 Aug 2020 - Issue attached Amendment 0001 to incorporate Addendum 1, associated updated Specifications, Drawings and revise response to question #60 of site visit questions.

* 03 Aug 2020 - Remaining responses to Site Visit Questions (60-64)attached

* 29 Jul 2020 - Responses to Site Visit questions attached. 

* 28 Jul 2020 - Issue attached Amendment 0001 to extend proposal due date to 11 Aug 2020.

* 14 July 2020 - Pre-Bid Site Visit MFR and Sign-In Sheet attached.

The work includes the partial demolition and new construction for a 1st and 2nd floor interior build out of existing south end warehouse of building 90021. 1st floor will have partial demolition of the existing warehouse floor slab for both new plumbing and foundation support for the new 2nd floor deck above. 1st floor work includes new bathrooms, mechanical room, classroom, labs and support spaces. 2nd floor demolition includes partial demolition of the existing mezzanine area for tie in of the new 2nd floor slab. 2nd floor new work includes the partial renovation of existing areas within the existing building and new areas allowed by installation of a new floor slab above the existing warehouse area below. The new 2nd floor area will include Breakrooms, Bathrooms, Mechanical Room, Offices, Classrooms and Training Conference Rooms along with other supporting spaces. New work includes a prefabricated metal stairway with precast treads and landings on the south side of the existing building. Demolition for both floors include new penetrations through existing interior and exterior walls.

Update #5 ·

* 03 Aug 2020 - Remaining responses to Site Visit Questions (60-64)attached

* 29 Jul 2020 - Responses to Site Visit questions attached. 

* 28 Jul 2020 - Issue attached Amendment 0001 to extend proposal due date to 11 Aug 2020.

* 14 July 2020 - Pre-Bid Site Visit MFR and Sign-In Sheet attached.

The work includes the partial demolition and new construction for a 1st and 2nd floor interior build out of existing south end warehouse of building 90021. 1st floor will have partial demolition of the existing warehouse floor slab for both new plumbing and foundation support for the new 2nd floor deck above. 1st floor work includes new bathrooms, mechanical room, classroom, labs and support spaces. 2nd floor demolition includes partial demolition of the existing mezzanine area for tie in of the new 2nd floor slab. 2nd floor new work includes the partial renovation of existing areas within the existing building and new areas allowed by installation of a new floor slab above the existing warehouse area below. The new 2nd floor area will include Breakrooms, Bathrooms, Mechanical Room, Offices, Classrooms and Training Conference Rooms along with other supporting spaces. New work includes a prefabricated metal stairway with precast treads and landings on the south side of the existing building. Demolition for both floors include new penetrations through existing interior and exterior walls.

Update #4 ·

* 29 Jul 2020 - Responses to Site Visit questions attached. 

* 28 Jul 2020 - Issue attached Amendment 0001 to extend proposal due date to 11 Aug 2020.

* 14 July 2020 - Pre-Bid Site Visit MFR and Sign-In Sheet attached.

The work includes the partial demolition and new construction for a 1st and 2nd floor interior build out of existing south end warehouse of building 90021. 1st floor will have partial demolition of the existing warehouse floor slab for both new plumbing and foundation support for the new 2nd floor deck above. 1st floor work includes new bathrooms, mechanical room, classroom, labs and support spaces. 2nd floor demolition includes partial demolition of the existing mezzanine area for tie in of the new 2nd floor slab. 2nd floor new work includes the partial renovation of existing areas within the existing building and new areas allowed by installation of a new floor slab above the existing warehouse area below. The new 2nd floor area will include Breakrooms, Bathrooms, Mechanical Room, Offices, Classrooms and Training Conference Rooms along with other supporting spaces. New work includes a prefabricated metal stairway with precast treads and landings on the south side of the existing building. Demolition for both floors include new penetrations through existing interior and exterior walls.

Update #3 ·

* 28 Jul 2020 - Issue attached Amendment 0001 to extend proposal due date to 11 Aug 2020.

* 14 July 2020 - Pre-Bid Site Visit MFR and Sign-In Sheet attached.

The work includes the partial demolition and new construction for a 1st and 2nd floor interior build out of existing south end warehouse of building 90021. 1st floor will have partial demolition of the existing warehouse floor slab for both new plumbing and foundation support for the new 2nd floor deck above. 1st floor work includes new bathrooms, mechanical room, classroom, labs and support spaces. 2nd floor demolition includes partial demolition of the existing mezzanine area for tie in of the new 2nd floor slab. 2nd floor new work includes the partial renovation of existing areas within the existing building and new areas allowed by installation of a new floor slab above the existing warehouse area below. The new 2nd floor area will include Breakrooms, Bathrooms, Mechanical Room, Offices, Classrooms and Training Conference Rooms along with other supporting spaces. New work includes a prefabricated metal stairway with precast treads and landings on the south side of the existing building. Demolition for both floors include new penetrations through existing interior and exterior walls.

Update #2 ·

* 14 July 2020 - Pre-Bid Site Visit MFR and Sign-In Sheet attached.

The work includes the partial demolition and new construction for a 1st and 2nd floor interior build out of existing south end warehouse of building 90021. 1st floor will have partial demolition of the existing warehouse floor slab for both new plumbing and foundation support for the new 2nd floor deck above. 1st floor work includes new bathrooms, mechanical room, classroom, labs and support spaces. 2nd floor demolition includes partial demolition of the existing mezzanine area for tie in of the new 2nd floor slab. 2nd floor new work includes the partial renovation of existing areas within the existing building and new areas allowed by installation of a new floor slab above the existing warehouse area below. The new 2nd floor area will include Breakrooms, Bathrooms, Mechanical Room, Offices, Classrooms and Training Conference Rooms along with other supporting spaces. New work includes a prefabricated metal stairway with precast treads and landings on the south side of the existing building. Demolition for both floors include new penetrations through existing interior and exterior walls.

Update #1 ·

The work includes the partial demolition and new construction for a 1st and 2nd floor interior build out of existing south end warehouse of building 90021. 1st floor will have partial demolition of the existing warehouse floor slab for both new plumbing and foundation support for the new 2nd floor deck above. 1st floor work includes new bathrooms, mechanical room, classroom, labs and support spaces. 2nd floor demolition includes partial demolition of the existing mezzanine area for tie in of the new 2nd floor slab. 2nd floor new work includes the partial renovation of existing areas within the existing building and new areas allowed by installation of a new floor slab above the existing warehouse area below. The new 2nd floor area will include Breakrooms, Bathrooms, Mechanical Room, Offices, Classrooms and Training Conference Rooms along with other supporting spaces. New work includes a prefabricated metal stairway with precast treads and landings on the south side of the existing building. Demolition for both floors include new penetrations through existing interior and exterior walls.

Files

Show all 16

Notice history

Notice Type Posted
Repair Interiors 505 TRS and 705 TRS, Bldg 90021 Award Award Notice
This notice Latest solicitation Solicitation
Repair Interiors 505 TRS and 705 TRS, Bldg 90021 Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, Florida Homestead, Florida 33039, United States · NAICS 236220 Reserve Command No set-aside
WWYK260004 - repair structural integrity, B1134, post 34 & north wall Tinker AFB, Oklahoma 73145, United States · NAICS 238190 Air Force Sustainment Center Total Small Business
Armed Forces Recruiting Building 25 Tenant Improvement and Renovation Project- Sources Sought Notice Lakewood, Colorado 80226, United States · NAICS 236220 — No set-aside
WWYK250063 - install react VII facility, B9001, post V19 Tinker AFB, Oklahoma 73145, United States · NAICS 236220 Air Force Sustainment Center Woman-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors