Renovate Dormitory, Building 97, Thule Air Base, Greenland

Award Notice Posted

Solicitation number
W912DS-14-R-0009
Agency
Awarded
to Adserballe & Knudsen Greenland A / S
Set-aside
No set-aside

Opportunity facts

Contract number
W912DS16C0006 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Thule Air Base Greenland

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

This solicitation and award is restricted in accordance with 10 U.S.C. 2304(c)(4) International Agreement, to Danish and Greenlandic firms ONLY. The U.S. Army Corps of Engineers, New York District intends to issue a Request for Proposal (RFP) seeking to award a firm-fixed price contract for the design and construction necessary for moderation and expansion of Building 97, an existing three-story dormitory building with an area of approximately 29,750 SF (2,761 SM), at Thule Air Base, Greenland. The work encompasses renovation of the roof, exterior walls and for the building to be remodeled into approximately fifteen (15) to eighteen (18) apartments on each floor. The building addition will provide added space to each of the three (3) floors to accommodate mechanical equipment rooms as well as a common kitchen and dining room. The addition has a NOT TO EXCEED area of 877 SF (81.4 SM) per floor. The work will also provide for utilities, communications, fire protection systems, site improvements, and pavements. The work under this contract also includes preparation of a Comprehensive Interior Design and other related services.

The construction season is short at Thule Air Base. General Conditions at Thule Air Base are as follows: the location of Thule Air Base limits exterior work to the months of June through September, although work is sometimes possible in May or October. Additionally, Thule's location demands that all supplies & personnel must be shipped and/or transported, in or out, via air and/or sealift. Thule Air Base is not a commercial air/sea port and there is no other access. Shipping schedules are dictated by Defense contracts, and materials and labor are not available locally. The region is glaciated and the existing soil is generally permafrost, which exists from 1 to 6 feet below the surface and to a measured depth of 1,600 feet. Average winter temperature is 20 -30 degrees F below zero while average summer temperature is 40-50 degrees F above zero. One annual military cargo sealift departs from Norfolk, Virginia to Thule AB, approximately 1 July. There are two sealifts that go from Copenhagen, Denmark to Thule AB, one in July & one in August. Airlifting any materials or equipment via military aircraft is very expensive and only on an emergency-need basis.

The North American Industry Classification System (NAICS) code is 236220 - Commercial and Institutional Building Construction. The project magnitude is between $10,000,000 and $25,000,000. The performance period for the contract will be approximately 540 calendar days from the issuance of the Notice to Proceed (NTP).

The solicitation will be a two-phase design-build source selection in accordance with FAR 36.3. The first phase will include technical factors for the Offerors to propose on from which the Government will determine the (up to) 5 most highly qualified firms and invite them to participate in the second phase. The (up to) top 5 Offerors from Phase One will then submit their price proposals and additional technical proposals for Phase Two.

Anticipate the Phase One requirements to be posted electronically on or about 22 July 2014 via the Federal Business Opportunities Website at www.fbo.gov, with a submission of phase one qualifications due on or about 21 August 2014. Only the (up to) 5 most highly qualified firms from Phase One will be invited participate in Phase Two. Award will be made not later than 30 September 2014. Hard copies will not be available. It is the contractor's responsibility to monitor the FedBizOps web-site for any amendments. Offerors are required to be registered in the System for Award Management (SAM) www.sam.gov to be eligible for award. Award will be made to the responsible Offeror, determined to represent the best value to the Government in accordance with the source selection procedures stated in the Request for Proposal (RFP). Offeror's submissions to Phase One and Two must conform with the requirements stated in the RFP. All questions must be submitted in writing via email, to the POC.

The media selected for issuance of synopsis, solicitation and amendments shall solely be at the discretion of the Government; accordingly, the media utilized for this project shall be the internet. Paper copies of this solicitation and amendments, if any, will not be available or issued. In accordance with FAR 52.204-7 and DFARS 252.204-7007, all vendors must be registered with the System for Award Management (SAM) to be eligible for award of a contract. Information on registration can be found at www.sam.gov. Interested parties may download the solicitation at no charge from the FedBizOpps website www.fbo.gov. Some contractor tools are as follows: 1. Register to receive Notification, and 2. Subscribe to the Mailing List for specific solicitations at Federal Business Opportunities (www.fbo.gov) or utilize the Vendor Notification Service in ASFI (https://www.acquisition.army.mil/asfi). FedBizOpps directs vendors to hyperlinks for Federal Business opportunities, such as solicitations, plans, specifications, and amendments. Check www.fbo.gov frequently for information and updates. Project specification files and drawings are portable document files (PDF). The Office of the Under Secretary of Defense (Acquisition Technology & Logistics (OUSD{AT&L}) A Guide to Collection & Use of Past Performance Information dated 2003 requires the collection and use of past performance information (PPI) in acquiring best-value goods and services. More definitive guidance and instructions will be incorporated in the solicitation and resultant contract.

Questions shall be submitted in writing via email to the Point of Contact: Matthew Lubiak, Contract Specialist, U.S. Army Corps of Engineers, New York District, 26 Federal Plaza, Room 1843, New York, NY 10278-0090
Phone: 917-790-8089
Email: matthew.lubiak@usace.army.mil

Update #1 ·

This solicitation and award is restricted in accordance with 10 U.S.C. 2304(c)(4) International Agreement, to Danish and Greenlandic firms ONLY. The U.S. Army Corps of Engineers, New York District intends to issue a Request for Proposal (RFP) seeking to award a firm-fixed price contract for the design and construction necessary for moderation and expansion of Building 97, an existing three-story dormitory building with an area of approximately 29,750 SF (2,761 SM), at Thule Air Base, Greenland. The work encompasses renovation of the roof, exterior walls and for the building to be remodeled into approximately fifteen (15) to eighteen (18) apartments on each floor. The building addition will provide added space to each of the three (3) floors to accommodate mechanical equipment rooms as well as a common kitchen and dining room. The addition has a NOT TO EXCEED area of 877 SF (81.4 SM) per floor. The work will also provide for utilities, communications, fire protection systems, site improvements, and pavements. The work under this contract also includes preparation of a Comprehensive Interior Design and other related services.

The construction season is short at Thule Air Base. General Conditions at Thule Air Base are as follows: the location of Thule Air Base limits exterior work to the months of June through September, although work is sometimes possible in May or October. Additionally, Thule's location demands that all supplies & personnel must be shipped and/or transported, in or out, via air and/or sealift. Thule Air Base is not a commercial air/sea port and there is no other access. Shipping schedules are dictated by Defense contracts, and materials and labor are not available locally. The region is glaciated and the existing soil is generally permafrost, which exists from 1 to 6 feet below the surface and to a measured depth of 1,600 feet. Average winter temperature is 20 -30 degrees F below zero while average summer temperature is 40-50 degrees F above zero. One annual military cargo sealift departs from Norfolk, Virginia to Thule AB, approximately 1 July. There are two sealifts that go from Copenhagen, Denmark to Thule AB, one in July & one in August. Airlifting any materials or equipment via military aircraft is very expensive and only on an emergency-need basis.

The North American Industry Classification System (NAICS) code is 236220 - Commercial and Institutional Building Construction. The project magnitude is between $10,000,000 and $25,000,000. The performance period for the contract will be approximately 540 calendar days from the issuance of the Notice to Proceed (NTP).

The solicitation will be a two-phase design-build source selection in accordance with FAR 36.3. The first phase will include technical factors for the Offerors to propose on from which the Government will determine the (up to) 5 most highly qualified firms and invite them to participate in the second phase. The (up to) top 5 Offerors from Phase One will then submit their price proposals and additional technical proposals for Phase Two.

Anticipate the Phase One requirements to be posted electronically on or about 23 June 2014 via the Federal Business Opportunities Website at www.fbo.gov, with a submission of phase one qualifications due on or about 23 July 2014. Only the (up to) 5 most highly qualified firms from Phase One will be invited participate in Phase Two. Award will be made not later than 30 September 2014. Hard copies will not be available. It is the contractor's responsibility to monitor the FedBizOps web-site for any amendments. Offerors are required to be registered in the System for Award Management (SAM) www.sam.gov to be eligible for award. Award will be made to the responsible Offeror, determined to represent the best value to the Government in accordance with the source selection procedures stated in the Request for Proposal (RFP). Offeror's submissions to Phase One and Two must conform with the requirements stated in the RFP. All questions must be submitted in writing via email, to the POC.

The media selected for issuance of synopsis, solicitation and amendments shall solely be at the discretion of the Government; accordingly, the media utilized for this project shall be the internet. Paper copies of this solicitation and amendments, if any, will not be available or issued. In accordance with FAR 52.204-7 and DFARS 252.204-7007, all vendors must be registered with the System for Award Management (SAM) to be eligible for award of a contract. Information on registration can be found at www.sam.gov. Interested parties may download the solicitation at no charge from the FedBizOpps website www.fbo.gov. Some contractor tools are as follows: 1. Register to receive Notification, and 2. Subscribe to the Mailing List for specific solicitations at Federal Business Opportunities (www.fbo.gov) or utilize the Vendor Notification Service in ASFI (https://www.acquisition.army.mil/asfi). FedBizOpps directs vendors to hyperlinks for Federal Business opportunities, such as solicitations, plans, specifications, and amendments. Check www.fbo.gov frequently for information and updates. Project specification files and drawings are portable document files (PDF). The Office of the Under Secretary of Defense (Acquisition Technology & Logistics (OUSD{AT&L}) A Guide to Collection & Use of Past Performance Information dated 2003 requires the collection and use of past performance information (PPI) in acquiring best-value goods and services. More definitive guidance and instructions will be incorporated in the solicitation and resultant contract.

Questions shall be submitted in writing via email to the Point of Contact: Matthew Lubiak, Contract Specialist, U.S. Army Corps of Engineers, New York District, 26 Federal Plaza, Room 1843, New York, NY 10278-0090
Phone: 917-790-8089
Email: matthew.lubiak@usace.army.mil

Files

File Type Posted
Appendix_B_-_NFS_Material_Borrow_Site.pdf PDF
Appendix_N_-_Asbestos_Management_Plan.pdf PDF
Appendix_FF_-_DD_Form_1391_Redacted.pdf PDF
Appendix_DD_-_Product_Data_Sheets.pdf PDF
Appendix_P_-_Dormitory_(Unaccopanied_Housing)_Design_Guide.pdf PDF
Appendix_CC_-_Drawings.pdf PDF
Appendix_C_-_Conservation_Mgmt_Plan.pdf PDF
Appendix_BB_-_Seismic_Eval_of_Exisit_Building_97_Struct.pdf PDF
W912DS-14-R-0009_Amendment-0002.pdf PDF
Appendix_AA_-_Prelim_Code_Analysis.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
Appendix_EE_-_HVAC_Design_Narrative_ _Analysis.pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_Q_-_Shipping_Rates_Gov_Furnished_Transport.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
Appendix_X_-_Exist_Site_Utilities_Plans.pdf PDF
Appendix_W_-_Exist_Bldg_97_Photos.pdf PDF
Appendix_M_-_PCB_Replacement_Plan.pdf PDF
Appendix_K_-_FGS-GL_(Environmental_Protection).pdf PDF
Appendix_U_-_DBA_Waiver.pdf PDF
Appendix_HH_-_Fuel_Pricing_and_DLA_Information.pdf PDF
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_O_-_Lead_Paint_Management_Plan.pdf PDF
Appendix_GG_-_CID_24_July_14.pdf PDF
Appendix_R_-_FY13_Dormitory_Permafrost_ _Geotechnical_Investigation.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Technical_Provisions_Div._01 _General_Requirements__7-23-2014.pdf PDF
Appendix_V_-_Facilities_Excellence_Plan_(Sept_2012).pdf PDF
Appendix_S_-_Pacer_Goose_Shipping_Instructions.pdf PDF
Appendix_T_-_FY14_-_FY17_Sealift_Rates.pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
W912DS-14-R-0009-0001.pdf PDF
W912DS-14-R-0009_-_Phase-1_RFP.pdf PDF
Show all 36

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors