Amendment 0001

View the file

Other files

File Type Posted
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_HH_-_Fuel_Pricing_and_DLA_Information.pdf PDF
Appendix_EE_-_HVAC_Design_Narrative_ _Analysis.pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_U_-_DBA_Waiver.pdf PDF
Appendix_T_-_FY14_-_FY17_Sealift_Rates.pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_BB_-_Seismic_Eval_of_Exisit_Building_97_Struct.pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
Appendix_B_-_NFS_Material_Borrow_Site.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_Q_-_Shipping_Rates_Gov_Furnished_Transport.pdf PDF
Appendix_AA_-_Prelim_Code_Analysis.pdf PDF
W912DS-14-R-0009_Amendment-0002.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Appendix_FF_-_DD_Form_1391_Redacted.pdf PDF
Appendix_N_-_Asbestos_Management_Plan.pdf PDF
Appendix_DD_-_Product_Data_Sheets.pdf PDF
Appendix_P_-_Dormitory_(Unaccopanied_Housing)_Design_Guide.pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
Appendix_X_-_Exist_Site_Utilities_Plans.pdf PDF
Appendix_W_-_Exist_Bldg_97_Photos.pdf PDF
Appendix_K_-_FGS-GL_(Environmental_Protection).pdf PDF
Appendix_M_-_PCB_Replacement_Plan.pdf PDF
Appendix_CC_-_Drawings.pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
Appendix_C_-_Conservation_Mgmt_Plan.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Appendix_S_-_Pacer_Goose_Shipping_Instructions.pdf PDF
Appendix_V_-_Facilities_Excellence_Plan_(Sept_2012).pdf PDF
Appendix_O_-_Lead_Paint_Management_Plan.pdf PDF
Technical_Provisions_Div._01 _General_Requirements__7-23-2014.pdf PDF
Appendix_R_-_FY13_Dormitory_Permafrost_ _Geotechnical_Investigation.pdf PDF
Appendix_GG_-_CID_24_July_14.pdf PDF
W912DS-14-R-0009_-_Phase-1_RFP.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Amend Section 00 22 20 - Phase-2 Instructions.

The due date and time for Phase-1 proposals is unchanged and remains 21 August 2014 at 2:00PM EST.

NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Aug-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-14-R-0009

X 9B. DATED (SEE ITEM 11)

22-Jul-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Aug-2014

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-14-R-0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

Amendment 0001

Section 00 22 20 is replaced in it’s entirety with the following:

SOLICITATION SECTION 00 22 20

PHASE TWO OF TWO PHASE DESIGN-BUILD SELECTION PROCEDURES

1.0 NOTICE TO OFFERORS

2.0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

3.0 PHASE TWO FACTOR(S) FOR EVALUATION

4.0 VOLUME II PRICE PROPOSAL

5.0 EVALUATION PROCEDURES

6.0 BASIS OF AWARD

PHASE TWO – SECTION 00 22 20 ATTACHMENTS

FORM A4 – DESIGN TEAM/FIRM PROJECT EXPERIENCE

SAMPLE CERTIFICATION OF DESIGN TEAM/FIRM’S PROFESSIONAL

QUALIFICATION AND TECHNICAL COMPETENCE:

SAMPLE BANK LETTER OF ASSURANCE

SAMPLE BANK LETTER OF GUARENTEE

1.0 NOTICE TO OFFERORS

1.1 Acquisition

This is the second phase of a two phase solicitation, in accordance with FAR 36.3, for all work described in this solicitation. Only Offerors who were determined to be among the (up to) five top qualified firms from phase one proposal evaluations are invited to submit phase two proposals. The Government will evaluate the proposals in accordance with the criteria described herein, and award a firm fixed price contract to the responsible Offeror, whose proposal conforms to all the terms and conditions of the solicitation and whose proposal is the lowest price technically acceptable, to the Government from the phase two proposal evaluations.

1.2 Who May Submit – Phase two is limited to those determined to be the (up to) five (5) best qualified firms from the phase one proposal evaluations.

1.3 Prospective Offerors should submit inquiries related to this solicitation only by e-mail to:

E-MAIL ADDRESS: Matthew.Lubiak@usace.army.mil Include the solicitation number, and project title with any questions/clarifications. Written questions must be received by this office not later than 7 calendar days prior to the date set for receipt of offers. TELEPHONE INQUIRIES WILL NOT BE ACCEPTED.

Oral explanations or instructions are not binding. Any information given to an Offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

As this is a competitive negotiation acquisition, there is no public proposal opening and no information will be given out as to the number of Offerors or the results of the competition until all awards are made.

1.4 Page Limit and Size of Printed Materials

In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information sufficiently detailed to clearly address submission requirements as outlined below.

The written portion of the phase two proposal (Volume I - Technical Proposal) shall not exceed 30 pages. A page printed on two sides will be counted as two pages. Any sheet with printed material (text or graphics), excluding dividers, cover sheets and letters of commitment, shall be considered a page. All sheets shall be submitted on 8-1/2 x 11 inch or international paper size A4 (210mm × 297mm) paper. Each page shall be minimally single spaced with a minimum 12-point font and one inch margins all around. Each page of Volume I shall be numbered sequentially.

1.5 Joint Ventures

a. When an Offeror is submitting a proposal as a joint venture, all members of the joint venture must sign the SF 1442 and any financial surety instrument that is required, unless a written agreement by all members of the joint venture is furnished with the proposal designating one firm with the legal authority to bind the other member(s) of the joint venture. Signatures on the written agreement designating one member of the joint venture as having legal authority to bind all other members of the joint venture must be executed by the duly authorized representatives of the respective joint venture members. All joint venture members will remain jointly and severally liable for all actions, representations, and other activities by the joint venture and by other joint venture members in connection with this solicitation and subsequent contract. A copy of the joint venture agreement and agreement providing evidence of the authority to legally bind all other members of the joint venture must be submitted with the Offeror’s proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.

2.0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

2.1 Proposal Requirements and Submission

Proposals should be submitted initially on the most favorable terms from a price and technical standpoint. Two (2) separate volumes shall be submitted as Volume I - Technical Proposal and Volume II - Price Proposal. Do not assume that Offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.

Do not submit any material not required by this solicitation (such as company or system brochures).

Offerors must meet all technical portions (construction criteria) of the RFP. The fact that the technical specifications and the drawings are not evaluated factors during solicitation does not relieve the Offerors from meeting all technical, or other, requirements of the RFP.

The Government will not make assumptions concerning the intent, capabilities, or experiences of the Offerors. Clear identification of proposal details shall rest as sole responsibility of the Offeror.

Therefore the proposal shall meet the following basic requirements:

a. Proposals shall be typed and easy to read. Margins (1-inch) shall be clean and clear.

b. Proposals shall be organized, concise, and submitted in the volumes and in the order indicated herein. Volumes shall be clearly identified and tabbed. Each factor shall be described in a separate tabbed section.

c. Proposals must be sent in two separate volumes. Each volume shall be contained within a separate 2 or 3 ring binder (no heat or spiral bound volumes). Each volume shall be identified by the solicitation number, volume number, and name, address, and telephone number of the prime Offeror on the cover. Each volume shall contain a Table of Contents and include at the bottom left side of each page the volume and page number.

d. Offerors shall submit the Price Schedule in Volume II, which shall be completed in full including all options. Offerors may be required to provide complete cost and pricing data and certification or information other than cost or pricing data at a later date if needed to adequately evaluate price proposals.

e. Offerors shall submit a signed Offer (Standard Form 1442) in Volume II for this solicitation including verification of all amendments received.

f. Offerors are reminded that elaborate corporate marketing information, formatting, special reproduction techniques, and the like are not necessary. However, proposals shall completely and adequately address the requirements of this solicitation.

g. Failing to submit attachments or failing to properly complete the proposal, may result in rejection of the Offer without further evaluation. Therefore, Offerors are urged to follow instructions and contact the Contract Specialist if instructions are not understood.

2.2 Where to Submit

Offerors shall submit their proposal packages to the Corps of Engineers (USACE) at the address shown in Block 7 of Standard Form 1442.

Offers may NOT be e-mailed or faxed. However, proposals may be withdrawn in writing by letter, fax or e-mail; Matthew.Lubiak. FAX: 212-264-3013; E-mail: Matthew.Lubiak@usace.army.mil.

Any written notice to withdraw an offer sent to this office must be received in the office designated in the Request for Proposal (RFP) for receipt of offers not later than the exact date and time set for receipt of proposals.

2.3 Submission Deadline

The USACE must receive proposals not later than the time and date specified in the Phase II request for Proposal.

Due to increased security your proposals may take longer than anticipated in arriving to New York District's Contracting Office in Room 1843. It is the sole responsibility of the Offeror to ensure that its proposal arrives by the designated date and time.

2.4 Incurring Costs

The Government is not liable for any costs incurred by the Offerors submitting an offer in response to this solicitation.

2.5 Format Requirements

Submit one (1) original plus five (5) copies and (1) CD containing a digital copy of the proposal. In the event that there is a discrepancy between the original or copies, the original will control. All proposals shall contain the volume number and the name, address and telephone number of the Prime and Major Subcontractors, Joint Venture, or other entity identified on the cover. The original proposal must be clearly marked as “ORIGINAL” and the original signatures must be in blue ink.

Copies of the proposals must also be clearly marked as “COPY x of y (i.e. COPY 1 of 5)”. Proposal clarity and material organization in each volume are mandatory. No material shall be incorporated by reference. Each volume will be submitted separately bound. The proposal shall address and contain the information listed below.

The information will be used by the Source Selection Board to evaluate each proposal. Offerors are advised that conciseness and relevance of the proposal is important and unrelated information will not be evaluated. Proposals that provide only superficial coverage of the information required below may not receive additional consideration and may be excluded from the competitive range.

Additionally, should the proposal include any terms and conditions that conflict with the terms and conditions of the solicitation, the proposal may be determined to be "unacceptable" and thus ineligible for award.

3.0 PHASE TWO FACTOR FOR EVALUATION

3.1. VOLUME I -TECHNICAL PROPOSAL (FACTOR 3)

Factor Location Description FACTOR 3 Vol. 1 TAB A Qualifications of the Offeror’s Team

3.2 FACTOR 3 - QUALIFICATIONS OF THE OFFEROR’S DESIGN TEAM

a) Submittal requirements/criteria:

The Offeror shall provide the following to show his capability, organization structure and qualifications of the team:

Letter of Commitment for the Design Firm of Record:

Letters of commitment (signed by both the subcontractor/Design Firm and Offeror) are required in order for the Government to consider subcontractor experience in the proposal.

Design Team Firm Experience:

To demonstrate recent, relevant experience, the Offeror must use the form A4, DESIGN TEAM/FIRM PROJECT EXPERIENCE. Submit projects that are currently well underway (designed and at least 75% construction progress completed) or completed and turned over no longer than ten (10) years preceding the date of this Solicitation. If any firm has multiple divisions, limit the project examples to those performed by the division submitting the offer. The Offeror shall submit at least three (3) but no more than five (5) projects.

The Offeror’s Design Team/Firm (Designer of Record) will be evaluated on the relevancy of their relevant design experience as demonstrated in their submittal for this step of evaluation. Factor 3 shall be rated in accordance with paragraph b, below. The projects submitted must include the following criteria.

Projects shall be considered similar in scope if: they are a new construction or major renovation to a commercial, institutional (including barracks and dorminitories) or industrial facility/building; provided with HV or HVAC systems; provided with fire protection or detection systems, and; preferably, located in an arctic region or permafrost zone (at least one project must be in an arctic/permafrost climate/zone.).

Projects shall be considered similar in complexity if they contain the management and coordination of a multiple construction trades/craftsmen to include a majority (five or more) of the following; structural steel work, carpentry, painting, plumbing, HV and/or HVAC system, building electrical, and communications.

Projects shall be considered similar in magnitude if they are over $5,000,000

Design Team/Firm Professional Qualification and Technical Competence:

i. Professional Qualifications: Offerors must submit a statement that their firm has staff members or consultant engineers or architects that will fill the following roles during the design phase of this project meet the criteria stated directly below and in paragraph ii:

1. Project Manager for Design (1, 2)

2. Senior Civil Engineer (1, 2)

3. Engineering Quality Assurance Manager (1, 2)

4. Architecture (1, 2)

5. Structural Engineering (1, 2)

6. Civil Engineering (1, 2)

7. Mechanical Engineering(1, 2)

8. Electrical Engineering (1, 2)

9. Fire Protection Engineering(1, 2 & 3)

10. Interior Designer

Notes:

1. Must be to be licensed/ registered to practice engineering or architecture. See paragraph ii below.

2. The individuals assigned to the design of this project have specific experience with both the International Building Code (IBC) and/or Unified Federal Criteria (UFC).

3. Requirements for Fire Protection Engineers are shown in the United Facilities Criteria UFC 3-600-01, http://62.204.17.188/report/doc_ufc.html. Use the latest publication of UFC 3-600-01 as of the posted date off this announcement.

ii. Degrees listed in resumes must be from institutions of higher education, such as United States universities or colleges, Danish universities, or international equivalents (see list below for international equivalents). Degrees offered with key personnel candidates must be either the United States or Danish or European bachelors degree (B.A./B.S.), masters degree (M.A./B.S.), doctorate (Ph.D.), or international equivalent (see list below for international equivalents).

Degrees typically considered equivalent to a U.S. bachelor's degree include the following:

Honours bachelor's degrees from Australia, Canada, New Zealand, South Africa, the United Kingdom, and British-Style schools and universities.

Bakalar, Diplom or Diploma, Inzenýr, Licenta, Magister, or Oklevél from East European states.

Diplôme, Maîtrise, or a professional title such as the Ingénieur from France or French-style schools and universities.

Diplom or Magister Artium from Germany.

b. Evaluation Criteria

The Offeror’s proposal for this factor will be evaluated against the minimum requirements stated above

Letter of Commitment for the Design Firm of Record

Offerors must submit a Letters of Commitment.

Design Team Firm Experience:

The Offeror must submit:

At least three (3) relevant projects (similar scope, complexity and magnitude;

Included in the three (3) relevant projects, at least one (1) building designed for use in an arctic climate.

Design Team/Firm Professional Qualification and Technical Competence:

Offerors must submit a statement in letter format that they have staff members or consultant engineers and architects with the requisite education and qualifications in the professional fields specified. See sample letter of Certification of Design Team/Firm’s Professional Qualification and Technical Competence, provided herein.

Rating Guidelines for Factor 3

The government will not award to an Offeror that receives an Unacceptable rating in this factor.

Acceptable: Proposal clearly meeting the minimum requirements of the solicitation.

Unacceptable: Proposal does not clearly meet the minimum requirements of the solicitation. Failure to provide any of the items and/or satisfy the minimum requirement in any of these items may be cause for an unacceptable rating for this factor.

4.0 VOLUME II - PRICE PROPOSAL

Factor/Sub Factor

Location Description Relative Importance

N/A Vol. 2 TAB A Price (Standard Form 1442 and Proposal Bid Schedules)

Not Rated

N/A Vol. 2 TAB B Bank Letter of Assurance Not Rated N/A Vol. 2 TAB C Self-Performed Work Not Rated N/A Vol. 2 TAB D Representations & Certifications Not Rated

*NOTE - The Government will evaluate price independently from the technical evaluation. Price will not be rated, but will be evaluated for fairness and reasonableness through the use of a price analysis. The price evaluators will also check for appearance of unbalancing of bids. Offerors are cautioned to include costs in the appropriate bid items, and to evenly distribute indirect costs, such as job overhead, home office overhead, bond, etc. to the appropriate bid items.

4.1 GENERAL

Submit the Pro Forma information in a separate envelope labeled: “Volume 2 - Pro Forma Requirements.”

4.2 TAB A - PRICE (STANDARD FORM 1442 AND CONTRACT LINE ITEM SCHEDULE)

Submission Requirements:

Submit the properly filled out and executed SF 1442, along with the CLIN Schedule, containing proposed line item and total pricing, as well as the Cost Breakdown Information.

Supplemental Cost Breakdown. The Government requests a cost breakdown of the Contract Line items in a sealed envelope marked “Cost Breakdown Information”, in Excel format. The Government will provide details for the preparation of the cost breakdown. This information is required for the initial proposal and, if requested, for any revised proposals. This information is not an opportunity for an Offeror to revise its non-price or price proposal.

Price will not be rated or scored, but will be evaluated for fairness and reasonableness through the use of a price analysis. Offerors are cautioned to distribute direct costs, such as material, labor, equipment, subcontracts, etc. and to evenly distribute indirect costs, such as job overhead, home office overhead, bond, etc., to the appropriate contract line items. Both parties shall presume that field overhead costs through the proposed contract duration are inclusive in the offered price for the contract.

If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluations described above.

4.3 TAB B - BANK LETTER OF ASSURANCE

Submission Requirements:

Submit a Bank Letter of Assurance followed by a Bank Letter of Guarantee (See samples appended to this document) Evaluation requirements:

This item is not rated. The Government will review the Bank Letter of Assurance for legal sufficiency.

TAB C - SELF-PERFORMED WORK

Submission Requirements:

The Offeror shall confirm that it understands and that it shall perform the amount of work required to be self-performed, in accordance with paragraph 5, section 00800.

Evaluation Requirements:

This item is not rated. In order to assure adequate interest in and supervision of all work, the Contractor shall be required to perform a significant part of the contract with its own forces. This public policy is expressed in various Statutes. The Offeror must confirm that it understands the amount of work performed, based on the status of the Offeror, and that it will self perform the required amount of work with its own forces. For purposes of these clauses, work that is performed off-site, such as factory fabrication or factory assembly of modules, or direct design work, may also be taken into account as self-performed work.

4.4 TAB D – REPRESENTATIONS & CERTIFICATIONS

SUBMISSION REQUIREMENTS: Confirm that the Offeror’s representations and certifications have been completed and also include hard copies under this Tab.

EVALUATION CRITERIA: The representations and certifications submitted under this tab and online will be reviewed to ensure the Offeror’s representations are consistent, accurate, and in accordance with regulation. It will not be rated.

In addition to the other proposal information, the Contracting Officer shall use this information in making an affirmative responsibility determination for award to the Successful Offeror, in accordance with FAR Part 9.

5.0 EVALUATION PROCEDURES

5.1. SOURCE SELECTION EVALUATION BOARD (SSEB)

5.1.1. The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal and any subsequent discussions required, as well as information obtained from other sources, e.g. past performance information. The SSEB will not consider any information incorporated by reference.

5.2. EVALUATION

5.2.1. The SSEB will evaluate the proposals and assign a consensus rating for each evaluation factor.

5.2.2. The Government intends to award without discussions. A “Competitive Range” is a subjective determination of the most highly rated proposals in the event that discussions with Offerors are required or considered to be in the Government’s best interests. In such an event, the Contracting Officer will establish a competitive range of all the most highly rated proposals.

5.2.3. If discussions are held, the Government may engage in a broad give and take with each Offeror in the competitive range, in accordance with FAR 15.306 (d). The Government will provide the Offeror an advance agenda for the discussions. During discussions, the Government may ask the Offeror to further explain its proposal and to answer questions about it. The Government may conduct written discussions.

5.2.4. Upon conclusion of discussions, those Offerors still considered the most highly rated, will be afforded an opportunity to submit their proposal revisions for final evaluation and selection.

5.3. DEFINITIONS

5.3.1. Deficiency

Deficiency is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

5.3.2. Uncertainty

Any aspect of the proposal for which the intent of the Offeror is unclear because there may be more than one way to interpret the offer or because inconsistencies in the offer indicate that there may be an error, omission, or mistake.

5.3.3. Deviation

Proposal implies or specifically offers a deviation below the specified criteria. The Offeror may or may not have called the deviation to the Government’s attention. A deviation is a deficiency. The proposal must conform to the solicitation requirements for award.

6.0 BASIS OF AWARD

6.1. The Government will award a firm fixed price contract to the responsible Offeror who was among the (up to) 5 best qualified firms as per the phase one evaluations and whose phase two proposal has the lowest priced of all the technically acceptable Offerors who were evaluated for Phase two. No award will be made to an Offeror receiving an Unacceptable rating in any Factor

6.2. The basis of award will be the Government’s assessment as to which proposal receives an acceptable rating and is the lowest price from the Offerors that were asked to submit phase two proposals.

Offerors that do not receive an acceptable rating in phase two, will not be selected, regardless of their price (lowest Offeror may not be selected). Price will be evaluated for fairness and reasonableness.

6.3. Offerors have been reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of an acceptable proposal without discussions, if deemed to be in the best interests of the Government.

FORM A4 DESIGN TEAM/FIRM PROJECT EXPERIENCE

(Note this form may be duplicated or re-created in a similar format, such as WORD)

EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED DESIGNTEAM'S

QUALIFICATIONS FOR THIS CONTRACT

(Present as many as 3 projects. Complete one of these forms for each project.)

A. EXAMPLE PROJECT KEY NUMBER (i.e., numbers 1, 2 or 3):

B. TITLE AND LOCATION (City and State and Country):

C. YEAR COMPLETED - PROFESSIONAL SERVICES:

D. YEAR COMPLETED - CONSTRUCTION (If applicable):

E. PROJECT OWNER'S INFORMATION - PROJECT OWNER:

F. PROJECT OWNER'S INFORMATION - POINT OF CONTACT NAME:

G. PROJECT OWNER'S INFORMATION - POINT OF CONTACT TELEPHONE NUMBER:

H. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, complexity and magnitude):

I. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT

(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE

SAMPLE

Certification of Design Team/Firm’s Professional Qualification and Technical Competence:

(Note this form may be combined and executed as one letter with the letter of commitment)

(DESIGN FIRM LETTERHEAD)

US Army Corps of Engineers, New York District Contracting Division, Room 1843 26 Federal Plaza, New York, NY 10278 U.S.A.

LETTER OF CERTIFICATION OF QUALIFICATLION AND TECHNICAL COMPETENCE

NUMBER____________________________

DATE: _________________

I/We, the undersigned, acting as the duly authorized representative of the Firm _______ [firm name here] _________ certify that we will provide a professional architectural and engineering staff for the design and other ancillary services necessary to fulfill the contract requirements and services from the start of design, through to the completion of design, and through to the completion of construction of the FY14 Renovate Dormitory, Building 97, at Thule Air Base, Greenland. I /We declare that the work will be performed by or under the direct supervision of design professionals as specified in paragraph 3.2, Factor 3 – Qualifications of the Offerors Design Team of Section 00 22 20 of the solicitation.

I/We further assert that the firm(s) of [firm name(s) here] have on staff or available consultant engineers and architects with the requisite education and qualifications in the professional fields as specified in paragraph 3.2, Factor 3 – Qualifications of the Offerors Design Team of Section 00 22 20 of the solicitation.

NAME & ADDRESS OF THE DESIGN FIRM OF RECORD

Signed By: ___________________________ Type Name underneath Signature)

Title: ___________________________________

(End of Summary of Changes)

File details come from the government source that posted it. Updated .