Technical_Provisions_Div._01 _General_Requirements__7-23-2014.pdf

PDF 768 KB Posted

Attached to
Renovate Dormitory, Building 97, Thule Air Base, Greenland
Solicitation number
W912DS-14-R-0009
Issued by

About this file

Div 01

View the file

Other files

File Type Posted
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_HH_-_Fuel_Pricing_and_DLA_Information.pdf PDF
Appendix_EE_-_HVAC_Design_Narrative_ _Analysis.pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_U_-_DBA_Waiver.pdf PDF
Appendix_T_-_FY14_-_FY17_Sealift_Rates.pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_BB_-_Seismic_Eval_of_Exisit_Building_97_Struct.pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
Appendix_B_-_NFS_Material_Borrow_Site.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_Q_-_Shipping_Rates_Gov_Furnished_Transport.pdf PDF
Appendix_AA_-_Prelim_Code_Analysis.pdf PDF
W912DS-14-R-0009_Amendment-0002.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Appendix_FF_-_DD_Form_1391_Redacted.pdf PDF
Appendix_N_-_Asbestos_Management_Plan.pdf PDF
Appendix_DD_-_Product_Data_Sheets.pdf PDF
Appendix_P_-_Dormitory_(Unaccopanied_Housing)_Design_Guide.pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
Appendix_X_-_Exist_Site_Utilities_Plans.pdf PDF
Appendix_W_-_Exist_Bldg_97_Photos.pdf PDF
Appendix_K_-_FGS-GL_(Environmental_Protection).pdf PDF
Appendix_M_-_PCB_Replacement_Plan.pdf PDF
Appendix_CC_-_Drawings.pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
Appendix_C_-_Conservation_Mgmt_Plan.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Appendix_S_-_Pacer_Goose_Shipping_Instructions.pdf PDF
Appendix_V_-_Facilities_Excellence_Plan_(Sept_2012).pdf PDF
Appendix_O_-_Lead_Paint_Management_Plan.pdf PDF
Appendix_R_-_FY13_Dormitory_Permafrost_ _Geotechnical_Investigation.pdf PDF
Appendix_GG_-_CID_24_July_14.pdf PDF
W912DS-14-R-0009-0001.pdf PDF
W912DS-14-R-0009_-_Phase-1_RFP.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL, DESIGN BUILD

RENOVATE DORMITORY BUILDING 97 - THULE AIR BASE, GREENLAND 24 JULY 2014

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 10 PROJECT DESCRIPTION AND DESIGN REQUIREMENTS

01 12 00.00 18 DESIGN AND RECORD DRAWING REQUIREMENTS

01 12 00.01 DESIGN SUBMISSION REQUIREMENTS AFTER AWARD

01 32 01.00 18 PROJECT SCHEDULE

01 33 00.00 18 SUBMITTAL PROCEDURES DESIGN-BUILD CONSTRUCTION

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02.00 18 QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 18 CONTRACTOR QUALITY CONTROL DESIGN-BUILD CONSTRUCTION

01 45 20.00 18 TESTING FOR MECHANICAL AND ELECTRICAL SYSTEMS

01 52 60.00 18 CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 62 35 RECYCLED/RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00.00 18 CLOSEOUT SUBMITTALS

01 78 23.00 18 OPERATION AND MAINTENANCE DATA

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 01 10 10

PROJECT DESCRIPTION AND DESIGN REQUIREMENTS

08/11

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The work includes renovation of Dormitory Building 97 at Thule Air Base, Greenland and incidental related work. Refer to PART 3 EXECUTION for more information.

1.1.2 Location

The work is located at and within Building 97 and its immediate proximity.

The exact limits of work shall be determined by the Design/Builder and submitted to the Contracting Officer or his/her representative for approval.

1.2 OCCUPANCY OF PREMISES

Building will not be occupied during performance of work under this Contract.

Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.3 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.4 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits from the Contracting Officer prior to start of excavation. Scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated to be specified or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

SECTION 01 10 10 Page 1

1.4.1 Notification

Notify the Contracting Officer in writing at least 15 days prior to starting excavation work.

1.5 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

Pursuant to Contract Clause and as indicated in Appendix AA, the Government will furnish materials and equipment for installation by the Contractor.

It is the intention of the Government to furnish all quantities of the items required to complete the work as specified.

1.5.1 Delivery Schedule

Deliveries to Thule are limited to a short period each year during the summer. Arrange all deliveries with the COR far enough in advance that materials and equipment can be transported efficiently and without damage to the materials or delay to the Work.

1.5.2 Delivery Location

The materials and equipment are to be delivered to a location approved by the COR.

1.6 GOVERNMENT-INSTALLED WORK

Not applicable.

1.7 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged shall remain the property of the Government. Refer to Contract Special Provisions for particulars.

The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area.

Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Technical requirements follow.

SECTION 01 10 10 Page 2

RENOVATE DORMITORY, BLDG 97 – THULE AIR BASE, GREENLAND 24 JULY 2014

SECTION 01 10 10 Page 3

SECTION 1 – DESIGN OBJECTIVES

1.1 SCOPE OF WORK

Prepare design/build construction documents and provide construction for the renovation of approximately 29,750 square foot (existing), three (3) story dormitory facility with an addition of approximately

1,970 square feet (657 sq. ft. per floor) to accommodate mechanical rooms, multi-purpose area and the two (2) new egress stairwells, and

240 square feet for the canopy entrance areas. Refer to Appendix CC for Base Bid concept floor layout.

The building was originally constructed in 1959. With the exception of the existing building structural frame which is to remain, the requirements for this project work include demolition of all non-structural interior elements, MEP equipment and associate piping and conduits, and exterior envelope. Provide new building roof assembly, exterior walls and windows with a thermally efficient envelope. The

Air Force goal is to provide sixteen (16) remodeled apartment units on each of the three (3) floors for a total of forty-eight (48) apartment modules for E5/E6 NCO’s (see Appendix CC for Base Bid concept floor layout). In case the Base Bid cannot be accomplished due to limited project funding, an Optional Bid of fourteen (14) remodeled apartment units on each of the three (3) floors for a total of forty-two (42) apartment modules for E5/E6 NCO’s shall be considered (see Appendix CC for Optional Bid concept floor layout).

Each apartment unit configuration shall consist of a living room/kitchen, bedrooms, bathrooms, and entry area. The facility shall be provided with all necessary utilities upgrades, communications, and site improvements to accommodate vehicles (number of heaters and vehicles to be maximized per available space on south face of building

97). The work under this contract also includes preparation of a

Comprehensive Interior Design (CID) per requirements indicated in the

CID documents.

As part of the Base Bid, the Design-Build Contractor shall construct one complete and fully functional living module for inspection and approval by the Contracting Officer prior to proceeding with any work associated with the remaining units; i.e. rough-in framing of interior walls or doors, installation of ductwork, plumbing, electrical lighting/power and heating.

A major Air Force objective is to provide unaccompanied contractor personnel with housing conducive to their proper rest, relaxation, and

SECTION 01 10 10 Page 4 personal well-being. Properly designed and furnished quarters providing individual privacy are essential to the successful accomplishment of the increasingly complicated and essential jobs these people perform at this remote arctic location; e.g. compliant with current UFC/Air Force criteria for dormitory buildings and

Federal/DOD energy standards as specified in this RFP. This project is in accordance with Air Staff guidance for quality of life improvement and meets the Air Force Unaccompanied Housing Design Guide criteria unless specified otherwise in this RFP. ATFP, UFAS, ADA-ABA/ADAAG do not apply nor are there any LEED objectives or certification requirements. Federal/DOD Energy standards and goals that are lifecycle justifiable apply.

1.2 BID OPTIONS

Please see Bid Schedule (Section 00 00 10) for complete details.

1.3 DESIGN CRITERIA

The conceptual building design shown in this RFP is based on:

DD Form 1391 (DD) - Appendix FF

UFC 1-200-01 General Building Requirement

Thule Air Base Standards and Design Guidelines – Refer to

Appendices for details.

Design development, construction drawings, technical specifications and construction shall at minimum comply with the requirements and quality standards outlined herein and in the Unified Facilities Guide

Specifications (UFGS). Specifically, the UFGS dictates Department of

Defense (DoD) antiterrorism/force protection requirements.

The Architect-Engineer (AE) shall employ safety and health standards promulgated under the Occupational Safety and Health Act (OSHA) of

1970 as published in the Federal Register, October 18, 1972, Volume

37, Number 202, Part II (Title 29, Chapter 17, Part 1910) and subsequently issued OSHA standards or standards consistent therewith in the design of this facility. In addition, the AE shall follow the

National Institute of Occupational Safety and Health (NIOSH)

Standards.

Air Force Criteria is available from the National Institute of

Building Sciences Whole Building Design Guide Construction Criteria

Base (CCB) 2 in CD-ROM, from their website for CCB subscribers

(http://www.wbdg.org/ccb), or via the USACE website

SECTION 01 10 10 Page 5

(http://www.usace.army.mil). The resources found on the CCB include US

Army Corps of Engineers requirements and Air Force Base Design Gui des

(AFDG), Engineering Technical Letters (AFETL), Pamphlets (AFP), and

Regulations (AFR).

Applicable design and construction criteria is specifically indicated, but not limited to that mentioned in the following sections of this document. Criteria shall be taken from the most current references as of the date of issue of the RFP, unless noted otherwise. Referenced codes and standards are minimum acceptable criteria. Administrative, contractual, and procedural features of the contract shall be as described in other sections of this RFP.

1.4 SPECIFICATIONS

The technical specifications shall be developed from those provided with this RFP and the Unified Facilities Guide Specifications (UFGS) by the Designers of Record. If not available in UFGS, the Designer of

Record shall develop specific sections using a SpecIntact template.

The Design-Build Contractor is also directed to section 01 12 00.01, paragraph 1.16.1 Technical Specification for additional requirements.

The Design-Build Contractor may use specifications other than from

UFGS as long as the specifications meet Master Format 2010 and meet the technical requirements for the RFP.

1.5 DESIGN QUALITY

The main objectives of this solicitation are to obtain a design for the Building 97 renovation, including associated site development within funds and gross square footage available while maximizing design and material quality. Utility systems should be integrated within the building and on the site. Building systems should be selected for low-cost maintenance and operation. Therefore, there should be an overall balance of aesthetics and functionality within the parameters provided in this RFP.

1.6 DESIGN FREEDOM

Requirements stated and illustrated in this RFP are minimums.

Innovative, creative, or cost saving proposals which meet or exceed these requirements are encouraged and shall be considered during design submittal reviews. The drawings provided establish project floor area requirements and spatial relationships that have been reviewed for user function and preliminary code compliance. Floor plans may change with government approval to enhance design, comply

SECTION 01 10 10 Page 6 with codes, incorporate options, include betterments, or support constructability.

1.7 ENERGY STANDARD COMPLIANCE

Per UFC 1-200-02 (High Performance and Sustainable Building

Requirements), the building shall exceed the provisions of ASHRAE

Standard 90.1 – Energy Standard for Buildings by the percentage as required in other parts of this RFP. As a separate part or section of the Design Analysis demonstrate exceeding ASHRAE 90.1 with calculations, vendor literature, equipment catalog sheets, compliance forms, worksheets, and narrative descriptions of the building envelope, HVAC systems, service water heating, electrical power, lighting, and other equipment and systems.

1.8 PERMITS

Not applicable.

SECTION 01 10 10 Page 7

SECTION 2 – FUNCTION DESIGN REQUIREMENTS

2.1 GENERAL DEFINITIONS AND REQUIREMENTS

2.1.1 GROSS AREA DEFINITION

Gross building area is measured to the outside face of exterior enclosure walls. The Design-Build Contractor's proposal shall meet all requirements including Minimum or Maximum net areas indicated in this

RFP.

2.1.2 NET AREA DEFINITION

Net area is measured to the inside face of the room or partition walls.

2.1.3 NET AREA REQUIREMENTS

A programmed space is included on the floor plans under the room names. Net areas indicated for building circulation and utility rooms are for guidance only. These spaces shall be sized to accommodate the required function and equipment, comply with code requirements, enhance constructability, and comply with other requirements of the

RFP.

2.1.4 FINISH REQUIREMENTS

Room finishes stated in the following sections are the minimum requirements and must be coordinated with the furniture specified in the Comprehensive Interior Design (CID). The approved selection of interior finishes shall be coordinated as a Structural Interior Design

(SID) package, which is awarded separately from this RFP.

2.1.5 FUNCTIONAL AREA REQUIREMENTS

During work sessions conducted with the user’s discussions resulted in some variations from the original functional requirements matrix. The total square footage of 29,750 SF in the original 1391 may be exceeded. The following columns are included to capture the specific breakdown:

A breakdown of types of rooms as defined in the Project

Definition.

Area. Original Square footage in the requirements document.

No. of Rooms.

Total Net Area. SF without wall space or other multipliers.

No. of Occupants per building.

Approved Area.

SECTION 01 10 10 Page 8

Notes are included to capture client comments or requirements for each space that impacted the total size or adjacencies. Compete adjacencies can be found in the attached drawings.

SECTION 3 – DESIGN NARRATIVES

A10 FOUNDATIONS

As the geotechnical report for the dormitory building addition was not available at the time of preparing the RFP, for footing design, assumptions have been made based on available geotechnical information in as-built drawings. According to the foundation notes of the existing drawings, isolated column footings for the additions can be sized based on an allowable bearing capacity of 4000 psf. Based on

2013 Dorm Design, footing bearing elevation must be at a minimum of

8’-0” below from top of the grade.

A geotechnical report is recommended in order to provide an efficient design for new footings of the addition, and for retrofit and rehabilitation of the existing building (Building 97). In the case if a geotechnical report is not available, a conservative approach shall be used based on governing building code.

A1010 STANDARD FOUNDATIONS

A1010.1 COLUMN FOUNDATIONS

To avoid difficulties in pouring concrete for new foundations on the permafrost building site, it is recommended to use precast concrete footing elements to support the new steel columns proposed to support the proposed building addition. Steel column bases shall be attached to supporting footings using steel anchor bolts.

A1020 SPECIAL FOUNDATIONS

A1020.1 GRADE BEAMS

Precast concrete grade beams shall be sized and constructed to support exterior walls providing enclosure to the new stair towers.

SECTION 01 10 10 Page 9

B10 SUPERSTRUCTURE

B1010 FLOOR CONSTRUCTION

B1010.1 FLOOR SYSTEM

The new floor structural system shall be sized to ensure that the new and existing finish floor heights are aligned. Refer to C1010 for additional requirements.

B1010.2 EXTERIOR STAIRS

Exterior stair treads and landings shall be fabricated and constructed of structural steel rolled sections and plates supporting metal grating. The grating material shall be specified to provide the required slip resistance and prevent deterioration in the Thule environment. Handrails and guardrails shall be fabricated from tubular steel sections.

Treads and risers shall be sized to meet applicable code requirements.

The stairs framing shall be supported by an independent foundation system.

B1020 ROOF CONSTRUCTION

B1020.1 ROOF ASSEMBLY

The existing roofing assembly shall be removed, including the existing purlins. The existing primary steel structure at the roof shall remain and shall be used to support a new system of purlins supporting a new roofing assembly

The new roof areas shall be steel framed with a purlin system supporting a new roofing assembly.

B1020.2 ROOF DECKS, SLABS AND SHEATHING

The existing roof deck shall be removed and replaced with a new 9” insulated metal panel. The panel system shall have an interlocking edge with indexed slots to allow adjacent panels to be locked together. The panels shall be constructed with galvanized/galvanneal steel sheet with a polyisocyanurate core. The specifications shall provide all required performance and material approvals.

The panels shall support pre-fabricated metal roofing on metal furring/clips.

The new roof areas shall be constructed in the same fashion.

SECTION 01 10 10 Page 10

B1020.3 CANOPIES

Canopies shall be provided at the three exterior stairs. Canopies shall be steel framed supporting a steel deck with metal roofing to match the main roof.

B1020.4 ROOF CONSTRUCTION VAPOR RETARDERS, AIR BARRIERS AND INSULATION

Roof insulation is provided by the insulated metal panel system which supports the finish roofing. The finished roof assembly shall have a U value of 0.016, which translates to an R value of 62.5.

Membrane underlayment shall be provided that is compatible with the specified metal roofing.

B1020.5 OTHER ROOF CONSTRUCTION

Flashings and other miscellaneous sheet metal components shall be fabricated from metal or other compatible sheet material. Lead, lead-coated metal and galvanized steel shall not be used. Fasteners shall conform to the requirements of the same specification and be compatible with the sheet metal selected.

B20 EXTERIOR ENCLOSURE

B2010 EXTERIOR WALLS

B2010.1 EXTERIOR WALL SKIN

The existing building and new additions shall receive the same exterior skin. The exterior building face shall be comprised of an 8” insulated metal panel system supported on sub girts/sub framing. The overall U value for the entire exterior wall assembly, inclusive of the batt insulated interior skin shall be 0.15, which translates to an

R value of 64.5. The exterior insulated metal panel is shop finished in compliance with NAAMM AMP 500. Coating shall be baked-on type at both exterior and interior faces.

B2010.2 EXTERIOR WALL VAPOR RETARDERS AIR BARRIERS AND INSULATION

Insulation of the exterior wall assembly is primarily achieved by the interlocking 8” insulated wall panels. In combination with the batt-filled interior skin, the envelope is to provide an R value of 64.5.

An insulated plenum shall be provided below the first floor slab to provide a freeze-protected area for new sanitary plumbing to be installed. The insulation shall be provided by a 9” insulated metal panels system supported by a new steel framework that is attached to the existing steel floor beams. The new panel shall have an R value of approximately 64.5.

SECTION 01 10 10 Page 11

The building shall be provided with a continuous air barrier system that shall be tested by an approved testing agency. A certified testing report shall be issued.

B2010.3 EXTERIOR WALL INTERIOR SKIN

The interior assembly for exterior walls shall comprise of 2-1/2” 22GA metal studs with 5/8” gypsum board applied to the exterior face and two layers of 5/8” gypsum board at the interior. The assembly shall be packed with batt insulation.

B2010.4 EXTERIOR LOUVERS, GRILLES AND SCREENS

Pre-finished storm resistant with bird screens AMCA 500-D and AMCAS

511 rated for air performance and water penetration; three coat fluorocarbon coating not less than 1.4 mil thick full strength 70% resin 3 coat Fluoropolymar finish. Color to match adjoining exterior wall color.

B2010.5 EXTERIOR SOFFITS

Exterior soffits shall be fabricated from sheet metal and pre-finished with baked on fluorocarbon coating, color to match surrounding wall/roof.

B2020 EXTERIOR WINDOWS

B2020.1 EXTERIOR STANDARD WINDOWS

Windows shall be triple glazed high performance units. Frames shall be fabricated from vinyl. The single sash is operable with a tilt/ turn ventilator style operation. Provide PVC, reinforcing members, fasteners, hardware, weather-stripping, and anchors conforming to

AAMA/WDMA/CSA 101/I.S.2/A440. Windows shall have a typical assembly U value of 0.2 (Imperial). Windows shall be Energy Star qualified products as appropriate to Northern climate zone. Window fr ames shall be white.

B2030 EXTERIOR DOORS

B2030.1 EXTERIOR ENTRANCE DOORS

Insulated steel doors and frames shall be provided in lieu of Grade I standard steel doors and frames at all exterior applications. Door size(s), design, and material shall be as specified for standard steel doors as minimum as Dan-Doors. Insulated steel doors shall have a core of polyurethane foam and an R factor of 10.0 or more (based on a k value of 0.16); face sheets, edges, and frames of galvanized steel to be not lighter than 0.7 mm thick, 1.5 mm thick, and 1.5 mm

SECTION 01 10 10 Page 12 respectively; magnetic weather-stripping; non-removable pin hinges;

thermal-break aluminum threshold; and vinyl door bottom. Doors and frames shall receive phosphate treatment, rust-inhibitive primer, and baked acrylic enamel finish. Doors shall have been tested in accordance with SDI/DOOR A250.4 and shall have met the requirements for Level C. Prepare doors to receive specified hardware.

B30 ROOFING

B3010 ROOF COVERINGS

B3010.1 DECK VAPOR RETARDER AND INSULATION

Refer to B1020 Roof Construction.

B3010.2 MANUFACTURED ROOFING

Provide factory finished structural standing seam metal roofing

(SSSMR) typical, with 2-1/2 in. raised seams and 18in. o.c. raised panels. Soffits shall match the roofing color. Roof flashing shall match the roofing color. Roof flashing shall match the roof material and color.

B3010.3 SHEET METAL ROOFING

See B3010.2 above.

B3010.4 FLASHING AND SHEET METAL

Flashings and other miscellaneous sheet metal components shall be fabricated from metal or other compatible sheet material. Lead, lead-coated metal and galvanized steel shall not be used. Fasteners shall conform to the requirements of the same specification and be compatible with the sheet metal selected.

B3010.5 MANUFACTURED EXTERIOR SPECIALTIES

Provide snow guards near eaves of all roofs. Provide ridge vents to match roofing.

SECTION 01 10 10 Page 13

C10 SUPERSTRUCTURE

All building structural systems and components shall comply with the requirements of the applicable codes, standards and criteria as well as industry standards and commonly accepted method of practice. The proposed building addition shall be limited to the middle (housing) and end parts (stair towers and covered entry) of the existing dormitory building and shall extend for the full height as shown on the RFP plans and sections. The superstructure of the middle part of the new addition shall match, as practically possible, the structural system of the existing building (i.e. steel moment frames and gabled roof). East and West stairs shall be constructed of steel framing

(i.e. columns and beams) and steel plates for the steps and shall be connected to the building at each floor level. The stair towers shall be enclosed using non-load bearing exterior walls to provide necessary fire rating of the egress. Covered entries shall consist of exterior steel stairs connecting the building’s 1 st floor level to the grade and covered by a framed steel canopy.

Refer to Appendix BB for report and structural calculation of seismic and wind evaluation for the rehabilitation of the existing building.

Any structural calculations and/or reports that involve with a structural design during design/build phases for both addition and existing building must be submitted as part of design documents.

C1001 SEISMIC EVALUATION AND REHABILITATION OF EXISTING BUILDING

C1001.1 EVALUATION/ REHABILITATION REQUIREMENTS

As per applicable UFC and building code provisions, and in order to allow for a building addition to the existing dormitory building, it is necessary to perform a seismic evaluation of the building structure to determine the feasibility of making such an addition and to evaluate the potential seismic upgrades necessary to achieve acceptable performance objectives. The Design Build Contractor shall be responsible for performing necessary technical analyses to complete the structural evaluation and for preparing and executing necessary seismic upgrades to meet UFC and building code performance requirements.

C1001.2 SEISMIC DATA AND RESPONSE PARAMETERS

UFC 3-301-01 provides guidance on applicable seismic data for the dormitory building site at Thule Airbase. Table F-3 provides applicable spectral accelerations as follows:

SECTION 01 10 10 Page 14

Short-period (0.2-sec) spectral response acceleration (2% probability of being exceeded in 50 years) (Site Class B)

Ss = 0.39 g

Long-period (1.0-sec) spectral response acceleration (2% probability of being exceeded in 50 years) (Site Class B)

S1 = 0.18 g

Short-period (0.2-sec) spectral response acceleration (10% probability of being exceeded in 50 years) (Site Class B)

Ss-10/50 = 0.20 g

Short-period (0.2-sec) spectral response acceleration (10% probability of being exceeded in 50 years) (Site Class B)

S1-10/50 = 0.09 g

UFC 3-310-04 provides applicable seismic response parameters for the lateral resisting system of the dormitory building as follows:

Response Modification Coefficient R = 3-1/2

System Overstrength Factor o = 3

Deflection Amplification Factor Cd = 3

C1001.3 SITE CLASS

In lieu of available site-specific seismic/ geotechnical information, the Design Build Contractor shall be responsible for identifying the site classification to be used to modify the UFC provided seismic data to match site soil characteristics. In the absence of such classification, preliminary analyses can be performed using an assumed site class “D” and finalized analyses shall be updated once the site class information becomes available.

C1001.4 SEISMIC PERFORMANCE OBJECTIVE

UFC 3-310-04 and ASCE/SEI 41-13 provides information about the required evaluation and rehabilitation performance objectives for various risk categories. The dormitory building shall be classified as having a risk category II and therefore shall require the satisfaction of the following performance objectives:

SECTION 01 10 10 Page 15

RISK

Category

SCOPE ITEM EVALUATION

PERFORMANCE OBJECTIVE

RETROFIT

PERFORMANCE OBJECTIVE

II STRUCTURAL LIFE SAFETY IN BSE-1E LIFE SAFETY IN BSE-1N

Collapse Prevention in

BSE-2N

NON-

STRUCTURAL

LIFE SAFETY IN BSE-1E LIFE SAFETY IN BSE-1N

C1002 STRUCTURAL SYSTEMS

C1002.1 GRAVITY SYSTEM

The existing dormitory building utilizes steel framing as the primary load-carrying system to support the building’s gravity loads (i.e.

dead, live, snow). The new addition shall match the existing building by using steel frames to support gravity loads from added floors and steel roof. Typical floors shall be constructed of composite floor slabs supported by composite steel beams that span between steel columns. All beam to girder connections are to be of the shear-type while all beam/girder-to-column connections are to be of the moment-resisting type.

The contractor is responsible for the detailed design of the framing system, floor slabs and the metal roofing system. The contractor is responsible for providing sufficient documentation to verify that all performance requirements have been met, the design configuration matched and may have to provide added substrate support to adequately resist imposed loads.

C1002.2 LATERAL SYSTEM

The existing dormitory building utilizes ordinary moment resisting steel frames in both orthogonal directions to provide resistance to lateral loads. Floor slabs and roof deck serve as rigid diaphragms transferring lateral loads due to wind or earthquake effects to supporting frames at various levels along the building height. The new building addition shall be connected to the existing building at all floor and/or roof levels and shall also utilize ordinary moment resisting frames in both direction to add to the building overall lateral stability.

SECTION 01 10 10 Page 16

C1010 FLOOR CONSTRUCTION

C1010.1 FLOOR STRUCTURAL FRAME

The proposed floor structural system for the new addition consists of floor metal decks supported by steel floor beams that span between steel columns. Floor slab construction is indicated by Section C1010.2 below. All floor beam-to-column connections in both directions are to be of the moment-resisting type to ensure lateral stability.

C1010.2 FLOOR DECKS, SLABS, AND TOPPINGS

From the 2013 Dorm Design, the floor slab construction for the new addition consists of three layers of gypsum board (from top down: one

¾” gypsum board over two layers of ½” gypsum board.) on top of 2” rigid mineral fiber insulation with an additional layer of ½” gyps um board underneath of the rigid insulation. The whole gypsum board and rigid insulation assembly is supported by a combination of one 1 5/16” metal deck and one 6” metal deck. The 1 5/16” metal deck must be laid on top of 6” metal deck. In addition, the 1 5/16” metal deck must be laid in the direction perpendicular to the span direction of the 6” metal deck. The 6” metal deck must be able to span between support steel beams for support of design loads.

For slab in fill at openings of the existing stair well where existing stairs being removed, floor system shall match existing floor construction, i.e. 2” concrete reinforced with weld wire fabric over 4

½” steel metal deck.

C1010.3 EXTERIOR STAIRS

Exterior stairs and landings shall be fabricated and constructed of structural steel rolled sections and plates. The stairs framing shall be supported by an independent foundation system.

SECTION 01 10 10 Page 17

C1020 ROOF CONSTRUCTION

C1020.1 ROOF STRUCTURAL FRAME

The proposed gabled roof structural system for the new addition consists of metal roof deck supported by roof steel purlins spanning between roof steel beams and columns. The roof sloped profile shall be planned to fit perpendicularly to the existing building gabled roof.

Roof purlin-to-beam connections are to be of the shear-type while purlin and/or beam-to-column connections are of the moment-resisting type to ensure lateral stability in addition to improved gravity load carrying capacity.

C1020.2 ROOF DECKS, SLABS, AND SHEATHING

Roof construction for the new addition consists of metal deck spanning between steel purlins. Selected roof deck depth and thickness should be adequate to provide required flexural strength and satisfy serviceability requirements. Steel roof deck is designed to support all out-of-plane applied loads and resist lateral loads, acting as a diaphragm to collect and transfer lateral loads to the building frames. The metal decking shall be designed to run perpendicular to roof slope and spans between roof purlins. Standing seam metal roof is assumed to be installed over the metal deck diaphragm to serve as an aesthetic element and water proofing material.

C1020.3 CANOPIES

Steel framed canopies shall be provided at the three (3) exterior stairs. Canopies shall be constructed of metal deck supported by shallow beams/ tubes that shall be resting on steel posts on one side and framing into the building’s exterior cladding support. Connections to the building shall be provided with thermal breaks.

C20 EXTERIOR ENCLOSURE

See B20 Exterior Enclosure

C30 ROOFING

See B30 Roofing

SECTION 01 10 10 Page 18

D - INTERIORS

The facility shall provide an inviting atmosphere where customers/ tenants feel comfortable while living in there. This will reflect both the user's needs and functionality and provide a comfortable yet durable facility to support and assist the customers/ tenants of those that serve.

The interior finishes shall be simple, yet functional and durable. The colors shall be soothing and pleasing to the eye with the overall scheme centered on warm neutral tones. Sustainable design in the selection of the finishes shall be incorporated to promote the environmental quality of the interior space. The flooring finishes offer durability, sustainability and safety while providing complementary accents. Wall colors shall be painted a soothing neutral with thoughts to complimentary accent colors in appropriate locations throughout the space. The restroom areas shall be finished with a ceramic porcelain through-color tile that will provide the areas with a pleasing look and ease of cleaning. The walls in these areas shall have a pattern of accent tile around the upper portion of the wall.

The floors shall have a similar corresponding pattern around the perimeter of the room.

The overall look and feel of the Building 97 at Thule Air Base in

Greenland shall be one the occupants as well as the neighboring community will be proud of for many years to come.

D10 INTERIOR CONSTRUCTION

D1010 PARTITIONS

D1010.1 INTERIOR FIXED PARTITIONS

The demising partition between each dwelling units and dwelling unit/ corridor shall have a full height partition, extend to underside of structural slab and provide a Sound Transmission Class (STC) of at least 50. Demising partition shall be fire-rated and meets the requirements of IBC 2012.

Partitions between bathroom, bed room and living space shall have STC

45, and is non fire rated.

D1010.2 INTERIOR PARTITION FIRESTOPPING

Provide firestopping at all fire-rated assemblies.

SECTION 01 10 10 Page 19

D1020 INTERIOR DOORS

D1020.1 INTERIOR SWINGING DOORS

Entry doors to each dwelling units shall be Solid-Core Wood (SCWD) with Hollow Metal (HM) door frame. Door hardware sets shall include: 1

½ pair hinges, lock & latch set, door closer, protective trim, door stop, threshold, door silencers and a wide-angle peephole for viewing visitors. The hardware and accessories shall meet BHMA A156.16 requirements

The entry doors shall be 3’-0” wide and 7’-0” high. The bathrooms and bedrooms doors shall be a minimum of 2’-6” wide and 7’-0” high.

D1020.2 INTERIOR ENTRANCE DOORS

The interior doors to vestibule, multipurpose room and laundry rooms shall be SCWD with insulated vision glass and HM frame.

D1020.3 INTERIOR FIRE DOORS

Doors to dwelling unit entry, utility rooms, egress stairs and storage rooms shall be fire door assemblies having a fire protection rating as per IBC section 702 & 715.4.3 requirements.

D1020.4 INTERIOR SLIDING AND FOLDING DOORS

Pocket sliding door with wall-build in kit shall be installed at bathroom and bedroom. Pocket door with framing assembly shall house inside of the interior partition for better circulation. Hang on wall sliding doors can be considered at bedroom and bathroom only where wall space available.

D1020.5 OTHER INTERIOR DOORS

Interior doors to utility rooms including mechanical rooms, electrical rooms, laundry rooms and telecom rooms shall be hollow metal door and frame with proper fire-rating label.

D1030 FITTINGS

D1030.1 TELEPHONE CLOSET

Provide telephone closet for each floor as required.

D1030.2 HANDRAILS

1 ½” diameter (exterior dimension) handrails painted, shall be installed on both sides of the egress stairs as required by IBC section 1009.12. The inner handrail shall be continuous and supported

SECTION 01 10 10 Page 20 to the guardrail by steel brackets, while the outer handrail shall be supported at the wall by steel brackets.

D1030.3 INTERIOR IDENTIFYING DEVICES

The exterior and interior signage system shall conform to current Air

Force Signs Standard (UFC 3-120-01) for sign standards design and placement.

Exterior signs include the facility directional and building entry identification sign to clearly direct visitors to the main entrance.

Interior signs include wall mounted signs for dwelling rooms, stairs, utility rooms and lounge room. A 46” LCD flat-screen TV at the lounge room is required. The sign design and placement shall be in compliance with the National Fire Protection Association Code for Safety to Life

(NFPA).

D20 STAIRS

D2010 INTERIOR STAIRS

Enclosed steel stairs shall be fabricated of steel stringers, risers, treads and landings. The treads and landing shall be filled with concrete and non-slip cement. The stringers, guardrails, handrails, necessary bolts and other fastenings shall be painted. The stairs and accessories shall be hot-dip galvanize steel.

Design stairs to sustain a live load of not less than 100 psf or a concentrated load of 300 lbs applied where it is most critical. The design and fabrication of steel stairs shall conform to ANSI/AISC 360 with, other than a commercial product. The design of fire stairs s hall conform to NFPA 101.

SECTION 01 10 10 Page 21

D30 INTERIOR FINISHES

D3010 WALL FINISHES

Wall materials and wall finishes shall be as indicated in “Room Finish

Schedule” of Appendix GG.

D3010.1 GYPSUM BOARD WALL FINISHES

If CMU is used for interior partitions, add additional furring partition consists of 5/8” gypsum board and ¾” metal studs on top of

CMU wall. Exposed CMU wall is not acceptable, with exception in utility rooms at inside finish.

D3010.2 TILE WALL FINISHES

All wall finishes shall be Gypsum painted. Wall finishes in the mechanical rooms shall be painted with semi-gloss finish. All bathrooms shall have ceramic tile on walls to a height of 5 feet with painted gypsum board above.

D3010.3 STONE FACING WALL FINISHES

Use of non-porous solid surfacing material for countertops and back splashes; based on durability and ease of maintenance. Provide blocking throughout for wall mounted accessories, including doorstops, bathroom accessories and accessibility requirements.

D3010.4 INTERIOR WALL PAINTING

Interior wall paint shall be low-odor and low VOC content.

D3020 FLOOR FINISHES

D3020.1 TILE FLOOR FINISHES

Through-color ceramic floor tile.

D3020.2 RESILIENT FLOORING

Recycled and recyclable cork rubber sustainable floor tiles.

D3020.3 CARPET FLOORING

Modular carpet tile conforming to the highest sustainable standards.

SECTION 01 10 10 Page 22

D3030 CEILING FINISHES

D3030.1 GYPSUM BOARD CEILING FINISHES

Ceiling finish material shall be gypsum board in bathroom areas.

D3030.2 ACOUSTICAL CEILING TREATMENT

Finish surface of ceiling tiles shall be selected to address acoustical, maintenance, moisture and impact resistance requirements of the room. Primary ceiling finish shall be 24 inches x 24 inches by

½ inch minimum thickness suspended acoustical panel system, except where is indicated to provide a suspended gypsum board ceiling on the

Room Finished Schedule in Appendix GG. Acoustical panels shall have a square edge. Provide closed pore panel surface. Provide environmentally friendly panels.

D3030.3 INTERIOR CEILING PAINTING

Interior ceiling paint shall be low-odor and low VOC content.

SECTION 01 10 10 Page 23

E20 PLUMBING

E20.1 CODES AND STANDARDS

2012 International Building Code as modified by UFC 3-420-01

2012 International Plumbing Code as Modified by UFC 3-420-01

2012 International Mechanical Code as Modified by UFC 3-410-01FA

2012 International Energy Conservation Construction Code as

Modified by UFC 3-400-01

UFC 3-420-01, Plumbing Systems

UFC 3-310-04, Seismic Design for Buildings

UFC 3-450-01, Noise and Vibration Control

UFC 3-430-07, Inspection and Certification of Boilers and Unfired

Pressure Vessels

Energy Policy Act (EPACT) 2005

ASPE, American Society of Plumbing Engineers, Plumbing Engineer’s

Design Guide

ASME A112 – Plumbing Fixture Standards

Occupational Safety and Health Administration (OSHA) Standards

NFPA 13 Standards for Sprinklers

NFPA 14 Standards for Standpipe 2012 International Mechanical

Code as Modified by

UFC 3-130-05 Utilities – Arctic and Subarctic Construction

UFC 3-130-07 Buildings – Arctic and Subarctic Construction

Thule Air Force Base (TAB) Standard

E20.2 GENERAL REQUIREMENTS

Plumbing system shall be in accordance with IPC 2012 and UFC 3 420 01.

The plumbing design shall reduce domestic water usage by 40%. The

Design/Builder shall submit calculations to substantiate water efficiency performance to the government for review and approval.

The domestic hot water system shall contribute to the building overall energy performance. Domestic hot water shall be produced and stored at a minimum temperature of 140 deg. F. Water shall be delivered to shower fixtures at a temperature not to exceed 120 deg. F.

Plumbing fixture counts shall be in accordance with UFC 3 420 01

Plumbing Systems.

SECTION 01 10 10 Page 24

E20.3 DOMESTIC WATER SERVICE

The main water service to building 97 Dormitory is from a 3-inch water line coming off of an 8-inch utility main located north of the facility. The 3-inch incoming domestic water line shall be separate from the fire protection service. The incoming 3-inch water service line enters the facility through a centrally located Mechanical Room on the northeast side. This should have adequate capacity to handle the modernization project and shall be reused.

There will be 48 occupants being housed in the Building 97 Dormitory building. The Dormitory water usage is estimated 170 gallons per minute.

Inside the mechanical room, there is to be a domestic water meter

(Advance Metering Type) that has the ability to provide output to the building management DDC system, allowing real time monitoring of domestic water consumption and totalized usage. After the water meter, a primary Reduced Pressure Backflow Preventer (RPZ) with redundancy shall be provided to give maximum water separation protection. There shall be no connection to the potable water system for HVAC make-up. Provide hose bibs in the mechanical room so that

Thule personnel can manually fill the system if needed. The main backflow preventer assembly shall meet the requirement of

International Plumbing Code (IPC), ASSE standard 1013, AWWA standard

C511-92, CSA B64.5, UL Classified.

Copper tubing type L or PEX piping shall be utilized throughout the project for domestic water. All hot and cold water pipe shall have 1 inch insulation jacket.

Water supply piping shall not be installed under floors unless feasible to do otherwise.

Isolation valves shall be provided on water supply lines to all plumbing fixtures in addition to

Isolation valves on each bathroom group.

E20.4 HOT WATER DISTRIBUTION SYSTEM

Domestic hot water shall be generated by a flat plate heat exchanger

(water to water) along with two 250-gallon hot water storage tanks, recirculation pumps, mixing valve temperature reducing station. The domestic hot water supply temperature shall be generated and stored at a minimum of 60.0°C (140°F) to eliminate the chance for Legionella bacteria to form.

SECTION 01 10 10 Page 25

Water heaters and storage tanks shall be located and connected s o as to provide access for observation, maintenance, servicing and replacement. The storage tanks must be drainable to facilitate service, sediment removal, repair or replacement. Drain valves must be constructed and tested in accordance with ASSE 1005.

The domestic water piping shall be routed to the first floor corridor ceiling space from the mechanical room and then split to serve both northwest and northeast wing. Hot water branch lines shall be routed over to the pipe chase inside the Dormitory rooms where pipe risers shall up to the 2 nd floor feeding the 3 rd floor from the 2 nd floor ceiling. The hot water return pipe shall gather in the 3 rd floor corridor ceiling of the building and return down a chase back to the water heaters inside the first floor mechanical room. The water temperature is maintained via hot water recirculation system. There shall be one hot water recirculation pump and piping located in the mechanical room on the ground floor. The recirculation systems requires a circulator pump, isolation valves, flow check valve, purge valves, timer control, and aquastat to control the return temperature.

Balancing valves should be used on the piping at the top floor ceiling space for return hot water flow balancing from the Dormitory rooms.

Where the length of hot water piping from the source of hot water supply to the farthest fixture exceeds 100 feet, the hot water supply system shall be provided with a method of maintaining the temperature in accordance with the International Energy Conservation Code (IECC).

Domestic hot water shall be available at each hot water outlet within

5 to 7 seconds from the time of operation. ALUpex or PEX piping shall be utilized throughout the project. All hot and cold water pipe shall have 1 inch insulation and vapor barrier with PVC jacketing.

Allowance for expansion and contraction should be made in all hot water supply mains, risers, and branches. A suitable expansion loops and swing joints shall be provided at appropriate locations in the hot water piping system. Allow 1/8" per 10 feet for expansion in copper tubing.

E20.5 SANITARY WASTE

The upper floor sanitary pipe that serves each floor fixture module groups shall be routed down inside a utility chase. The building main sanitary sewer lines shall connect below the first floor between the insulated floor cavity spaces. After collecting the pipes from the upper floors, there shall be a total (5) 4” sanitary pipe lateral routed to the exterior wall from three floors having one lateral serving each floor collecting four room module group to the northwest

SECTION 01 10 10 Page 26 side and from the northeast side and then connect to the above ground site sewer system.

Heat trace shall be provided on the sanitary pipe that is located inside the facility below the first floor cavity space to the exterior wall where then connecting to site sewer system. The control panel should be located on the wall of the first floor mechanical room.

Vent through roof shall be installed per TAB vent header standard detail. Vent pipe shall be located within one meter of the roof ridge. Vent thru roof (VTR) shall be limited to no more than two penetrations per building wing at a minimum size of 4” diameter.

The floor drains shall be provided with trap primer systems. Provide cleanouts as required per IPC. The new sanitary sewer system shall be drained by gravity.

The sanitary sewer piping system shall be cast iron hub-and-spigot type below floor. Cast Iron, Schedule 40 PVC, and Type DWV copper shall be acceptable for sanitary systems above the floor.

Any sanitary piping below first floor insulated floor cavity outside the building shall be factory manufactured jacketed, pre-insulated, and double heat traced (1 automatic heat element/ 1 manual heat element).

E20.6 HANGERS AND SUPPORTS

Plumbing Piping and equipment shall be supported or suspended in accordance with requirements of UFGS Section 22 00 00 Plumbing, General Purpose.

Suspended mechanical equipment shall be braced in accordance with UFC

4 010 01 Standard 20 - Equipment Bracing. Suspended equipment weighing more than 31 pounds shall be braced to withstand lateral acceleration of 0.5g, and vertical acceleration of 1.5g. Piping, and distributed systems do not require bracing under UFC 4 010 01 Standard 20.

SECTION 01 10 10 Page 27

E2010 PLUMBING FIXTURES

E2010.1 WATER CLOSETS

Water closets shall be tank type, vitreous china.

Water closet water usage shall meet or exceed ASHRAE 189.1 requirements.

Dual flush type 1.1 gallon per half flush/1.6 gallon per full flush, and ultra-low flush water closets of 1.28 gallons per full flush or better shall be acceptable when tested per the Applicable ASME 112 reference standards.

E2010.2 LAVATORIES

Private lavatory usage shall meet or exceed ASHRAE 189.1 requirements.

Lavatories shall be integral bowl, vitreous china.

Lavatory faucet shall meet the requirement of NSF 61, Section 9.

Faucet shall be center set, single control, mixing type. The water usage shall be limited to 0.5 gallons per minute.

Pop-up drain shall include stopper, lift rods, jam nut, washer and tail piece.

E2010.3 SINKS

Kitchen sinks shall be single compartment stainless steel basin type, set in architectural millwork.

Sink faucets shall meet the requirements of NSF 61, Section 9. Cast or wrought copper alloy shall be used. Aerator shall have internal threads. The water usage shall be limited to 0.5 gallons per minute.

Handle - Cast copper alloy, wrought copper alloy, or stainless steel.

Single lever handle type faucet.

Drain Assembly - Plug, cup strainer, crossbars, jam nuts, washers, couplings, stopper, etc., shall be copper alloy or stainless steel.

E2010.4 SHOWERS

Shower heads shall meet or exceed ASHRAE 189.1 requirements.

Shower water usage shall be limited to 1.5 gallons per minute.

SECTION 01 10 10 Page 28

E2010.5 MOP SINK

Enameled cast iron ASME A112.19.1M, copper alloy corner, floor mounted

711.2 mm (28 inches) square, 171.5 mm (6-3/4") deep with rim guard, hose and bracket and mop rack.

Faucet and spout - Cast or wrought copper alloy, with top or bottom brace with backflow preventer. Faucets shall have replaceable seat and the washer shall rotate onto the seat. Handle shall be lever type.

Strainers shall have internal threads.

Drain Assembly - Plug cup strainer, crossbars, jam nuts, washers, couplings, stopper, etc., shall be copper alloy or stainless steel.

E2010.6 OTHER PLUMBING FIXTURES

Washer Machine - The water supply to an automatic washer machine shall be protected against backflow by an air gap installed integrally within the machine conforming to ASSE 1007 or with the installation of a backflow preventer in accordance IPC requirements.

The waste from an automatic washer machine shall discharge through an air break into a standpipe in accordance with IPC. The trap and fixture drain for an automatic washer machine standpipe shall be a minimum of 2 inches in diameter.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .