W912DS-14-R-0009_Amendment-0002.pdf

PDF 28 KB Posted

Attached to
Renovate Dormitory, Building 97, Thule Air Base, Greenland
Solicitation number
W912DS-14-R-0009
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_HH_-_Fuel_Pricing_and_DLA_Information.pdf PDF
Appendix_EE_-_HVAC_Design_Narrative_ _Analysis.pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_U_-_DBA_Waiver.pdf PDF
Appendix_T_-_FY14_-_FY17_Sealift_Rates.pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_BB_-_Seismic_Eval_of_Exisit_Building_97_Struct.pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
Appendix_B_-_NFS_Material_Borrow_Site.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_Q_-_Shipping_Rates_Gov_Furnished_Transport.pdf PDF
Appendix_AA_-_Prelim_Code_Analysis.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Appendix_FF_-_DD_Form_1391_Redacted.pdf PDF
Appendix_N_-_Asbestos_Management_Plan.pdf PDF
Appendix_DD_-_Product_Data_Sheets.pdf PDF
Appendix_P_-_Dormitory_(Unaccopanied_Housing)_Design_Guide.pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
Appendix_X_-_Exist_Site_Utilities_Plans.pdf PDF
Appendix_W_-_Exist_Bldg_97_Photos.pdf PDF
Appendix_K_-_FGS-GL_(Environmental_Protection).pdf PDF
Appendix_M_-_PCB_Replacement_Plan.pdf PDF
Appendix_CC_-_Drawings.pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
Appendix_C_-_Conservation_Mgmt_Plan.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Appendix_S_-_Pacer_Goose_Shipping_Instructions.pdf PDF
Appendix_V_-_Facilities_Excellence_Plan_(Sept_2012).pdf PDF
Appendix_O_-_Lead_Paint_Management_Plan.pdf PDF
Technical_Provisions_Div._01 _General_Requirements__7-23-2014.pdf PDF
Appendix_R_-_FY13_Dormitory_Permafrost_ _Geotechnical_Investigation.pdf PDF
Appendix_GG_-_CID_24_July_14.pdf PDF
W912DS-14-R-0009-0001.pdf PDF
W912DS-14-R-0009_-_Phase-1_RFP.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Issue plans and specifications: Div. 01 - General Requirements, Appendices A thru HH and the Main Table of Contents.

The due date and time for Phase-1 proposals is unchanged and remains 21 August 2014 at 2:00PM EST.

NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Aug-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-14-R-0009

X 9B. DATED (SEE ITEM 11)

22-Jul-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Aug-2014

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-14-R-0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

AMENDMENT 0002

REQUEST FOR PROPOSAL

DESIGN BUILD

Request for Proposal Design Build

Renovate Dormitory Building 97 Thule Air Base

Greenland

MAIN TABLE OF CONTENTS

Section Title

00 00 10 SF 1442 AND BIDDING SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS

00 22 10 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA,

AND BASIS OF AWARD - BEST VALUE LPTA-PHASE ONE OF TWO PHASE

DESIGN-BUILD SELECTION PROCEDURES

00 22 20 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA,

AND BASIS OF AWARD - BEST VALUE LPTA -PHASE TWO OF TWO

PHASE DESIGN-BUILD SELECTION PROCEDURES

00 60 00 REPRESENTATIONS AND CERTIFICATIONS AND OTHER

STATEMENTS OF BIDDERS

00 72 00 CONTRACT CLAUSES

00 73 00 SPECIAL CONTRACT REQUIREMENTS

TECHNICAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 10 PROJECT DESCRIPTION AND DESIGN REQUIREMENTS

01 12 00.00 18 DESIGN AND RECORD DRAWING REQUIREMENTS

01 12 00.01 DESIGN SUBMISSION REQUIREMENTS AFTER AWARD

01 32 01.00 18 PROJECT SCHEDULE

01 33 00.00 18 SUBMITTAL PROCEDURES DESIGN-BUILD CONSTRUCTION

01 35 26 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02.00 18 QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 18 CONTRACTOR QUALITY CONTROL DESIGN -BUILD CONSTRUCTION

01 45 20.00 18 TESTING FOR MECHANICAL AND ELECTRICAL SYSTEMS

01 52 60.00 18 CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 62 35 RECYCLED/RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00.00 18 CLOSEOUT SUBMITTALS

01 78 23.00 18 OPERATION AND MAINTENANCE DATA

LIST OF APPENDICES

Appendix Title Date Notes/Remarks

A Active Landfills July 2004 B NFS Material Borrow Site Undated C Conservation Mgmt Plan Approved 23

May 12

D Hazardous Waste Management Plan Approved 9

E Spill Prevention & Response Plan Approved 23

F Pollution Prevention Management Plan Approved 9

G Solid Waste Management Plan Approved 24

H Storm Water Management Plan Approved 23

I Slug Management Plan Approved 23

J Installation HAZMAT Management Plan October 2011 K Final Governing Standards for

Environmental Protection by United States Forces in Greenland (FGS-GL)

24 July 2003

L Affirmative Procurement Plan Approved 23

M Polychlorinated Biphenyl (PCB) Replacement Plan

1 January 2012

N Asbestos Management Plan Approved 9

O Lead Paint Management Plan Approved 9

P Air Force Unaccompanied Housing Design Guide

January 2006

Q Shipping Rates Gov Furnished Transport R Geotechnical Investigation (FY12 &13

Dormitories)

S Pacer Goose Shipping Instructions T FY14 Sealift Rates U DBA Waiver V Thule Air Base – Facilities Excellence

Plan (FEP) September 2012

W Existing Building 97 Photos X Existing Site Utilities Drawings Y As-built drawings of Building 97;

“Airmen’s Dormitory, 3-Story, 200 men, 26 January 1961

Z Asbestos Surveys

AA Preliminary Code Analysis BB Seismic Evaluation of Existing Building

97 Structure

CC Drawings of proposed renovation of Building 97

DD Product Data Sheets EE HVAC Design Narrative and Analysis FF DD Form 1391 for Building 97

Renovation (redacted)

GG Comprehensive Interior Design (CID) HH Fuel Pricing and DLA Information

File details come from the government source that posted it. Updated .