W912DS-14-R-0009_Amendment-0002.pdf
PDF 28 KB Posted
- Solicitation number
- W912DS-14-R-0009
About this file
Amendment 0002
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Issue plans and specifications: Div. 01 - General Requirements, Appendices A thru HH and the Main Table of Contents.
The due date and time for Phase-1 proposals is unchanged and remains 21 August 2014 at 2:00PM EST.
NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Aug-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-14-R-0009
X 9B. DATED (SEE ITEM 11)
22-Jul-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Aug-2014
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-14-R-0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
AMENDMENT 0002
REQUEST FOR PROPOSAL
DESIGN BUILD
Request for Proposal Design Build
Renovate Dormitory Building 97 Thule Air Base
Greenland
MAIN TABLE OF CONTENTS
Section Title
00 00 10 SF 1442 AND BIDDING SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
00 22 10 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA,
AND BASIS OF AWARD - BEST VALUE LPTA-PHASE ONE OF TWO PHASE
DESIGN-BUILD SELECTION PROCEDURES
00 22 20 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA,
AND BASIS OF AWARD - BEST VALUE LPTA -PHASE TWO OF TWO
PHASE DESIGN-BUILD SELECTION PROCEDURES
00 60 00 REPRESENTATIONS AND CERTIFICATIONS AND OTHER
STATEMENTS OF BIDDERS
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
TECHNICAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 10 PROJECT DESCRIPTION AND DESIGN REQUIREMENTS
01 12 00.00 18 DESIGN AND RECORD DRAWING REQUIREMENTS
01 12 00.01 DESIGN SUBMISSION REQUIREMENTS AFTER AWARD
01 32 01.00 18 PROJECT SCHEDULE
01 33 00.00 18 SUBMITTAL PROCEDURES DESIGN-BUILD CONSTRUCTION
01 35 26 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 02.00 18 QUALITY CONTROL SYSTEM (QCS)
01 45 04.00 18 CONTRACTOR QUALITY CONTROL DESIGN -BUILD CONSTRUCTION
01 45 20.00 18 TESTING FOR MECHANICAL AND ELECTRICAL SYSTEMS
01 52 60.00 18 CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 62 35 RECYCLED/RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00.00 18 CLOSEOUT SUBMITTALS
01 78 23.00 18 OPERATION AND MAINTENANCE DATA
LIST OF APPENDICES
Appendix Title Date Notes/Remarks
A Active Landfills July 2004 B NFS Material Borrow Site Undated C Conservation Mgmt Plan Approved 23
May 12
D Hazardous Waste Management Plan Approved 9
E Spill Prevention & Response Plan Approved 23
F Pollution Prevention Management Plan Approved 9
G Solid Waste Management Plan Approved 24
H Storm Water Management Plan Approved 23
I Slug Management Plan Approved 23
J Installation HAZMAT Management Plan October 2011 K Final Governing Standards for
Environmental Protection by United States Forces in Greenland (FGS-GL)
24 July 2003
L Affirmative Procurement Plan Approved 23
M Polychlorinated Biphenyl (PCB) Replacement Plan
1 January 2012
N Asbestos Management Plan Approved 9
O Lead Paint Management Plan Approved 9
P Air Force Unaccompanied Housing Design Guide
January 2006
Q Shipping Rates Gov Furnished Transport R Geotechnical Investigation (FY12 &13
Dormitories)
S Pacer Goose Shipping Instructions T FY14 Sealift Rates U DBA Waiver V Thule Air Base – Facilities Excellence
Plan (FEP) September 2012
W Existing Building 97 Photos X Existing Site Utilities Drawings Y As-built drawings of Building 97;
“Airmen’s Dormitory, 3-Story, 200 men, 26 January 1961
Z Asbestos Surveys
AA Preliminary Code Analysis BB Seismic Evaluation of Existing Building
97 Structure
CC Drawings of proposed renovation of Building 97
DD Product Data Sheets EE HVAC Design Narrative and Analysis FF DD Form 1391 for Building 97
Renovation (redacted)
GG Comprehensive Interior Design (CID) HH Fuel Pricing and DLA Information
File details come from the government source that posted it. Updated .