Appendix_FF_-_DD_Form_1391_Redacted.pdf

PDF 722 KB Posted

Attached to
Renovate Dormitory, Building 97, Thule Air Base, Greenland
Solicitation number
W912DS-14-R-0009
Issued by

About this file

Appendix FF

View the file

Other files

File Type Posted
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_HH_-_Fuel_Pricing_and_DLA_Information.pdf PDF
Appendix_EE_-_HVAC_Design_Narrative_ _Analysis.pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_U_-_DBA_Waiver.pdf PDF
Appendix_T_-_FY14_-_FY17_Sealift_Rates.pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_BB_-_Seismic_Eval_of_Exisit_Building_97_Struct.pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
Appendix_B_-_NFS_Material_Borrow_Site.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_Q_-_Shipping_Rates_Gov_Furnished_Transport.pdf PDF
Appendix_AA_-_Prelim_Code_Analysis.pdf PDF
W912DS-14-R-0009_Amendment-0002.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Appendix_N_-_Asbestos_Management_Plan.pdf PDF
Appendix_DD_-_Product_Data_Sheets.pdf PDF
Appendix_P_-_Dormitory_(Unaccopanied_Housing)_Design_Guide.pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
Appendix_X_-_Exist_Site_Utilities_Plans.pdf PDF
Appendix_W_-_Exist_Bldg_97_Photos.pdf PDF
Appendix_K_-_FGS-GL_(Environmental_Protection).pdf PDF
Appendix_M_-_PCB_Replacement_Plan.pdf PDF
Appendix_CC_-_Drawings.pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
Appendix_C_-_Conservation_Mgmt_Plan.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Appendix_S_-_Pacer_Goose_Shipping_Instructions.pdf PDF
Appendix_V_-_Facilities_Excellence_Plan_(Sept_2012).pdf PDF
Appendix_O_-_Lead_Paint_Management_Plan.pdf PDF
Technical_Provisions_Div._01 _General_Requirements__7-23-2014.pdf PDF
Appendix_R_-_FY13_Dormitory_Permafrost_ _Geotechnical_Investigation.pdf PDF
Appendix_GG_-_CID_24_July_14.pdf PDF
W912DS-14-R-0009-0001.pdf PDF
W912DS-14-R-0009_-_Phase-1_RFP.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. COMPONENT

AF(AFSPC) FY 2014 MILITARY CONSTRUCTION PROJECT DATA

2. DATE

3 MAR 2014

3. INSTALLATION AND LOCATION

THULE AIR BASE, GREENLAND

4. PROJECT TITLE

REPAIR DORMITORY, BLDG 97

5. PROGRAM ELEMENT

31378f

6. CATEGORY CODE

721-315

7. PROJECT NUMBER

WWCX 10-3005

8. PROJECT COST (USD000)

EEIC 52400

EEIC 52900

9. COST ESTIMATES

ITEM U/M QUANTITY UNIT COST

(USD)

COST

(USD000)

REPAIR DORMITORY, BLDG 97

Mobilization/Equipment (52400) Materials (52400) Labor (52400) Mobilization/Equipment (52900) Materials (52900) Labor (52900)

PROJECT SUBTOTAL

Overhead & Profit (26.5%)

SIOH (6.5%)

TOTAL FUNDED COST

TOTAL REQUEST (ROUNDED)

LS

LS

LS

LS

LS

LS

10. DESCRIPTION OF PROPOSED WORK

The scope of this project is the total renovation of Building 97, Thule Air Base, Greenland, in accordance with the Thule Air Base Consolidation Plan. The existing three-story dorm shall be renovated into a studio room configuration to accommodate 54 personnel of grade mix E5-E6 (NCO).

11. REQUIREMENT

Project: Repair Dormitory, Building 97, Thule Air Base, Greenland

The mission of Thule Air Base is to perform air and sea sustainment operations to enable space capabilities, resupply missions, and scientific research in defense of our nation and its allies.

Requirement: The requirements of this project include repair of the roof and exterior walls, and the complete renovation of the interior. Interior renovation includes the complete remodel of each floor into eighteen, 363 GSF studio configuration modules, with each module consisting of a living room/kitchen, bedroom, bathroom, and entry area. An addition to the facility will be included for all three floors and will accommodate mechanical room space, and a common kitchen and dining room. The addition will have an area of 877 SF per floor.

A major Air Force objective is to provide unaccompanied enlisted personnel with housing conducive to their proper rest, relaxation, and personal well-being. Properly designed and furnished quarters providing some degree of individual privacy are essential to the successful accomplishment of the increasingly complicated and essential jobs these people perform at this remote arctic location. This project is in accordance with Air Staff guidance for quality of life improvement and meets the Air Force Unaccompanied Housing Design Guide criteria.

DD FORM 1391 PAGE NO. 1

2. DATE

3 MAR 2014

3. INSTALLATION AND LOCATION

THULE AIR BASE, GREENLAND

4. PROJECT TITLE

REPAIR DORMITORY, BLDG 97

5. PROJECT NUMBER

WWCX 10-3005

Current Situation: Building 97 was constructed in 1959 and has surpassed its useful life expectancy.

The interior layout is a three-story Central Latrine configured building which is outdated and out of compliance with Air Force Standards, having small rooms, common bathroom and kitchen space, and limited laundry capacity. This dorm is constructed of steel frame and has a metal roof. Furthermore, the building has no fire suppression system. The building is air heated, which is unhealthy and energy inefficient. The building contains asbestos and most mechanical equipment and utilities are approaching failure.

As verified by the 2008 Air Force Dormitory Master Plan, the base has insufficient facilities to adequately accommodate unaccompanied enlisted personnel assigned to Thule AB, Greenland. Thule is a remote site located in an extreme arctic environment. All base personnel are required to reside in dormitories.

This dorm renovation matches the consolidation study plan that is currently being implemented. This dorm is critical as it will allow for movement of personnel from substandard living conditions to acceptable living conditions and it will allow for the renovation of existing living areas. Without this project, renovations cannot be completed as there are not adequate temporary lodging facilities available.

Building 97 is currently vacant and used as a TLF for seasonal contractors and special events.

Impact if not provided: Adequate living quarters, which provide a level of privacy required for today’s NCOs, will not be available, resulting in continued degradation of morale, productivity, and career satisfaction for unaccompanied enlisted personnel. The facility will continue to not meet current standards for fire safety and quality of life, as well as not meeting energy efficiency criteria and goals.

Additional: This project meets the criteria/scope specified in Air Force Handbook 32-1084, Facility Requirements. Plant Replacement Value is $22,577,528 per DoD Facilities Cost Factor Handbook (Version 3.0, April 2001), adjusted to current year costs. Total repair costs = 60.0% of PRV. The FY14 MILCON cost of the 54-person dorm is $29,999,862 as reference.

DD FORM 1391 PAGE NO. 2

COMPONENT

3 MAR 2014

3. INSTALLATION AND LOCATION

THULE AIR BASE, GREENLAND

4. PROJECT TITLE

REPAIR DORMITORY, BLDG 97

DD FORM 1391 PAGE NO. 5

THULE AIR BASE

80° 70° 60° 50° 40° 30° 20° 10°

60°

65°

70°

75°

80°

Nothern polar circle

Thule Air Base 76° 32' 32" North 68° 49' 00" West

This area

GREENLAND

3 MAR 2014

3. INSTALLATION AND LOCATION

THULE AIR BASE, GREENLAND

4. PROJECT TITLE

REPAIR DORMITORY, BLDG 97

7621 622

CRESENT ROAD

10021

29 14

10021

10021

31391 70387039

30631 30632

DD FORM 1391 PAGE NO. 6

THULE AIR BASE

EXISTING DORMITORY CAMPUS

EXISTING DORM, Bldg 97

3 MAR 2014

3. INSTALLATION AND LOCATION

THULE AIR BASE, GREENLAND

4. PROJECT TITLE

REPAIR DORMITORY, BLDG 97

DD FORM 1391 PAGE NO. 7

PROPOSED DORM CAMPUS

Existing Dormitory, Bldg 97

EXISTING DORMITORY, BLDG 97

File details come from the government source that posted it. Updated .