OR DOT 18(2) OR58: Fix it Corridor Culverts
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 69056721B000023
- Agency
- Federal Highway Administration Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Springfield, Oregon, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Oregon Department of Transportation Federal Highway Administration is soliciting proposals to complete culvert repair and replacement work along Oregon Route 58 through solicitation number 69056721B000023. The project involves replacing or repairing 54 culverts between milepost 2.73 and 84.97 that are rated in poor or critical condition. Proposals are due by December 9, 2022 and the work must be completed between January 2023 and October 2023. Evaluation will consider the bidder's experience with highway construction and drainage projects, and adherence to the traffic management and environmental protection requirements detailed in the attachments.
This is a total small business set-aside opportunity to be performed in Springfield, Oregon. The NAICS code is 237110 and PSC code is R499. Four bids were received by the December 9th deadline ranging from $6.1 million to $6.8 million, with the engineer's estimate being $5.3 million. The project will require single lane closures controlled by flaggers or temporary signals over its 40-week duration to replace culverts at discrete locations along the 82-mile stretch of Oregon Route 58.
Notice text
12 versions
Update #12 · Latest ·
Project: OR DOT 18(2) OR58: Fix-it Corridor Culverts
UPDATE 12/07/2022: QA 12_07_22 posted to attachments
UPDATE 12/06/2022: QA/QA2 12_06_22 posted to attachments
UPDATE 12/05/2022: Amendment A003 and QA 12_05_22 posted to attachments
UPDATE 12/02/2022: QA 12_01_22 posted to attachments
UPDATE 12/01/2022: Amendment A002 and amended plan sheets posted to attachments
UPDATE 11/30/2022: QA 11_30_22 posted to attachments
UPDATE 11/29/2022: QA 11_29_22 posted to attachments
UPDATE 11/28/2022: Amendment A001 posted to attachments.
UPDATE 11/21/2022: QA 11_21_22 posted to attachments.
UPDATE 11/16/2022: QA 11_16_22 posted to attachments.
*See attachments for full requirements*
Update #11 ·
Project: OR DOT 18(2) OR58: Fix-it Corridor Culverts
UPDATE 12/06/2022: QA/QA2 12_06_22 posted to attachments
UPDATE 12/05/2022: Amendment A003 and QA 12_05_22 posted to attachments
UPDATE 12/02/2022: QA 12_01_22 posted to attachments
UPDATE 12/01/2022: Amendment A002 and amended plan sheets posted to attachments
UPDATE 11/30/2022: QA 11_30_22 posted to attachments
UPDATE 11/29/2022: QA 11_29_22 posted to attachments
UPDATE 11/28/2022: Amendment A001 posted to attachments.
UPDATE 11/21/2022: QA 11_21_22 posted to attachments.
UPDATE 11/16/2022: QA 11_16_22 posted to attachments.
*See attachments for full requirements*
Update #10 ·
Project: OR DOT 18(2) OR58: Fix-it Corridor Culverts
UPDATE 12/06/2022: QA 12_06_22 posted to attachments
UPDATE 12/05/2022: Amendment A003 and QA 12_05_22 posted to attachments
UPDATE 12/02/2022: QA 12_01_22 posted to attachments
UPDATE 12/01/2022: Amendment A002 and amended plan sheets posted to attachments
UPDATE 11/30/2022: QA 11_30_22 posted to attachments
UPDATE 11/29/2022: QA 11_29_22 posted to attachments
UPDATE 11/28/2022: Amendment A001 posted to attachments.
UPDATE 11/21/2022: QA 11_21_22 posted to attachments.
UPDATE 11/16/2022: QA 11_16_22 posted to attachments.
*See attachments for full requirements*
Update #9 ·
Project: OR DOT 18(2) OR58: Fix-it Corridor Culverts
UPDATE 12/05/2022: Amendment A003 and QA 12_05_22 posted to attachments
UPDATE 12/02/2022: QA 11_01_22 posted to attachments
UPDATE 12/01/2022: Amendment A002 and amended plan sheets posted to attachments
UPDATE 11/30/2022: QA 11_30_22 posted to attachments
UPDATE 11/29/2022: QA 11_29_22 posted to attachments
UPDATE 11/28/2022: Amendment A001 posted to attachments.
UPDATE 11/21/2022: QA 11_21_22 posted to attachments.
UPDATE 11/16/2022: QA 11_16_22 posted to attachments.
*See attachments for full requirements*
Update #8 ·
Project: OR DOT 18(2) OR58: Fix-it Corridor Culverts
UPDATE 12/02/2022: QA 11_01_22 posted to attachments
UPDATE 12/01/2022: Amendment A002 and amended plan sheets posted to attachments
UPDATE 11/30/2022: QA 11_30_22 posted to attachments
UPDATE 11/29/2022: QA 11_29_22 posted to attachments
UPDATE 11/28/2022: Amendment A001 posted to attachments.
UPDATE 11/21/2022: QA 11_21_22 posted to attachments.
UPDATE 11/16/2022: QA 11_16_22 posted to attachments.
*See attachments for full requirements*
Update #7 ·
Project: OR DOT 18(2) OR58: Fix-it Corridor Culverts
UPDATE 12/01/2022: Amendment A002 and amended plan sheets posted to attachments
UPDATE 11/30/2022: QA 11_30_22 posted to attachments
UPDATE 11/29/2022: QA 11_29_22 posted to attachments
UPDATE 11/28/2022: Amendment A001 posted to attachments.
UPDATE 11/21/2022: QA 11_21_22 posted to attachments.
UPDATE 11/16/2022: QA 11_16_22 posted to attachments.
*See attachments for full requirements*
Update #6 ·
Project: OR DOT 18(2) OR58: Fix-it Corridor Culverts
UPDATE 11/30/2022: QA 11_30_22 posted to attachments
UPDATE 11/29/2022: QA 11_29_22 posted to attachments
UPDATE 11/28/2022: Amendment A001 posted to attachments.
UPDATE 11/21/2022: QA 11_21_22 posted to attachments.
UPDATE 11/16/2022: QA 11_16_22 posted to attachments.
*See attachments for full requirements*
Update #5 ·
Project: OR DOT 18(2) OR58: Fix-it Corridor Culverts
UPDATE 11/29/2022: QA 11_29_22 posted to attachments
UPDATE 11/28/2022: Amendment A001 posted to attachments.
UPDATE 11/21/2022: QA 11_21_22 posted to attachments.
UPDATE 11/16/2022: QA 11_16_22 posted to attachments.
*See attachments for full requirements*
Update #4 ·
Project: OR DOT 18(2) OR58: Fix-it Corridor Culverts
UPDATE 11/28/2022: Amendment A001 posted to attachments.
UPDATE 11/21/2022: QA 11_21_22 posted to attachments.
UPDATE 11/16/2022: QA 11_16_22 posted to attachments.
*See attachments for full requirements*
Update #3 ·
Project: OR DOT 18(2) OR58: Fix-it Corridor Culverts
UPDATE 11/21/2022: QA 11_21_22 posted to attachments.
UPDATE 11/16/2022: QA 11_16_22 posted to attachments.
*See attachments for full requirements*
Update #2 ·
Project_OR DOT 18(2) OR58: Fix-it Corridor Culverts
UPDATE 11/16/2022: QA 11_16_22 posted to attachments.
*See attachments for full requirements*
Update #1 ·
Project_OR DOT 18(2) OR58: Fix-it Corridor Culverts
*See attachments for full requirements*
Attachments
| File | Type | Posted |
|---|---|---|
| BidSum OR DOT 18(2).pdf | ||
| BidTab OR DOT 18(2).pdf | ||
| QA 12_07_22.pdf | ||
| QA2 12_06_22.pdf | ||
| QA 12_06_22.pdf | ||
| Amendment A003.pdf | ||
| QA 12_05_22.pdf | ||
| QA 12_01_22.pdf | ||
| D.3.pdf | ||
| A.1.pdf | ||
| F.9.pdf | ||
| Amendment A002.pdf | ||
| H.16.pdf | ||
| A.4.pdf | ||
| H.1 through H.3.pdf | ||
| QA 11_30_22.pdf | ||
| QA 11_29_22.pdf | ||
| Amendment_A001.pdf | ||
| QA 11_28_22.pdf | ||
| QA 11_21_22.pdf | ||
| QA 11_16_22.pdf | ||
| OR DOT 18(2)_Hydraulic Report.pdf | ||
| Physical Data_1.zip | ZIP file | |
| OR DOT 18(2)_Limited ESA Report.pdf | ||
| OR DOT 18(2)_Traffic Management Plan.pdf | ||
| OR DOT 18(2)_Geotechnical_Report.pdf | ||
| OR DOT 18(2)_Mobility Considerations Checklist.pdf | ||
| ORDOT18(2)_plans.pdf | ||
| IFB 69056721B000023.pdf |
Show all 29
Notice history
| Notice | Type | Posted |
|---|---|---|
| OR DOT 18(2) OR58: Fix it Corridor Culverts | Award Notice | |
| OR DOT 18(2) OR58: Fix it Corridor Culverts | Solicitation | |
| OR DOT 18(2) OR58: Fix it Corridor Culverts | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity