This document contains answers to technical questions regarding the OR DOT 18(2) OR58: Fix it Corridor Culverts project. The project involves guardrail installation and culvert work along OR58. Question 1 addresses minimum lengths for buried backslope guardrail terminals specified in bid item A1000. Questions 2 and 4 relate to whether a pre-bid conference will be held and if the bid date will be extended, with the responses indicating any updates will be provided in Amendment A001. Question 3 notes discharge spreadsheet MP locations in the plans do not correspond to other MP locations, and this issue will also be addressed in Amendment A001.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum OR DOT 18(2).pdf | ||
| BidTab OR DOT 18(2).pdf | ||
| QA 12_07_22.pdf | ||
| QA2 12_06_22.pdf | ||
| QA 12_06_22.pdf | ||
| Amendment A003.pdf | ||
| QA 12_05_22.pdf | ||
| QA 12_01_22.pdf | ||
| A.1.pdf | ||
| F.9.pdf | ||
| Amendment A002.pdf | ||
| H.16.pdf | ||
| A.4.pdf | ||
| H.1 through H.3.pdf | ||
| D.3.pdf | ||
| QA 11_30_22.pdf | ||
| QA 11_29_22.pdf | ||
| Amendment_A001.pdf | ||
| QA 11_28_22.pdf | ||
| QA 11_16_22.pdf | ||
| OR DOT 18(2)_Traffic Management Plan.pdf | ||
| OR DOT 18(2)_Geotechnical_Report.pdf | ||
| OR DOT 18(2)_Mobility Considerations Checklist.pdf | ||
| ORDOT18(2)_plans.pdf | ||
| IFB 69056721B000023.pdf | ||
| OR DOT 18(2)_Hydraulic Report.pdf | ||
| Physical Data_1.zip | ZIP file | |
| OR DOT 18(2)_Limited ESA Report.pdf |
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.: OR DOT 18(2) Project: OR58: Fix it Corridor Culverts
# General Technical Question Answer Date
1 x
I am bidding on the guardrail portion of this project. Bid Item A1000 is for Buried in Backslope Terminal by the each, but they have a minimum of 125 Lnft per the standard drawing. Sheet # D.13 has a length of 85 Lnft and sheet # D.14 has a length of 77 Lnft. Please advise.
The limits/lengths listed on sheets D.13 and D.14 are those of existing guardrail installations. New guardrail needs to meet minimum lengths per the standard drawings
11/15/22
2 X Is there a Pre Bid Conference for the OR58: Fix‐It Corridor Culverts Project?
At this time, we are not planning on having a pre‐bid conference. If you have any questions about the Invitation for Bid (IFB), plans, or specs, please email wfl.plans‐spec@dot.gov, and we will publicly post responses to your questions on SAM.gov.
11/16/22
3 X
See Plan Sheet Number F.9
More than half of the MP locations referenced in the discharge spreadsheets do not correspond to MP locations provided elsewhere in the plans.
this will be addressed under Amendment A001 11/21/22
4 X Will the bid date be extended? this will be addressed under Amendment A001 11/21/22