About this file

This document contains details for a federal transportation project in Oregon. The project aims to replace culverts along OR 58 to address drainage issues. The solicitation was issued by the Department of Transportation Federal Highway Administration seeking bids to replace culverts at multiple locations that are restricting water flow. The attached project documents provide the technical requirements, including drainage calculations, design standards, and completion deadlines. Bids are due by December 31, 2024, with work expected to be completed within one year of award.

View the file

Other files for this federal contract opportunity

Other files attached to OR DOT 18(2) OR58: Fix it Corridor Culverts, newest first.
File Type Posted
BidSum OR DOT 18(2).pdf PDF
BidTab OR DOT 18(2).pdf PDF
QA 12_07_22.pdf PDF
QA2 12_06_22.pdf PDF
QA 12_06_22.pdf PDF
Amendment A003.pdf PDF
QA 12_05_22.pdf PDF
QA 12_01_22.pdf PDF
D.3.pdf PDF
A.1.pdf PDF
H.1 through H.3.pdf PDF
Amendment A002.pdf PDF
H.16.pdf PDF
A.4.pdf PDF
QA 11_30_22.pdf PDF
QA 11_29_22.pdf PDF
Amendment_A001.pdf PDF
QA 11_28_22.pdf PDF
QA 11_21_22.pdf PDF
QA 11_16_22.pdf PDF
OR DOT 18(2)_Hydraulic Report.pdf PDF
Physical Data_1.zip ZIP file
OR DOT 18(2)_Limited ESA Report.pdf PDF
OR DOT 18(2)_Traffic Management Plan.pdf PDF
OR DOT 18(2)_Mobility Considerations Checklist.pdf PDF
ORDOT18(2)_plans.pdf PDF
IFB 69056721B000023.pdf PDF
OR DOT 18(2)_Geotechnical_Report.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE PROJECT

NUMBER

SHEET

OR DOT 18(2)

C h e c k e d b y

D e s ig n e d b y

F.9

TABLES

MANAGEMENT CONCEPT

TEMPORARY WATERNOTE:

FOOTNOTE:

[1]

50 Percent Exceedance Disharge (Average daily discharge expected to be exceeded 16 days each month.)

25 Percent Exceedance Disharge (Average daily discharge expected to be exceeded 8 days each month.)

5 Percent Exceedance Disharge (Average daily discharge expected to be exceeded 2 days each month.)

[2]

[3]

12/31/2024EXPIRES:

OREGON

98999PE

RE

GIS

TER

ED PROFESSIONALE

NGINEER

202 ,80 H

CRA

M

Y E

L

G

NIL EPOH

HA

R A

S c b m s w s p p b u s p w w s p a n th o n y .o d o n n e ll d O

R F .d g n

P

M in the subject watershed may differ.

Listed discharges are surface water from the upstream watershed. The estimated discharges are based on StreamStats. Discharges 1.

1 Revised by Amendment A002