About this file
This document contains details for a federal transportation project in Oregon. The project aims to replace culverts along OR 58 to address drainage issues. The solicitation was issued by the Department of Transportation Federal Highway Administration seeking bids to replace culverts at multiple locations that are restricting water flow. The attached project documents provide the technical requirements, including drainage calculations, design standards, and completion deadlines. Bids are due by December 31, 2024, with work expected to be completed within one year of award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum OR DOT 18(2).pdf | ||
| BidTab OR DOT 18(2).pdf | ||
| QA 12_07_22.pdf | ||
| QA2 12_06_22.pdf | ||
| QA 12_06_22.pdf | ||
| Amendment A003.pdf | ||
| QA 12_05_22.pdf | ||
| QA 12_01_22.pdf | ||
| D.3.pdf | ||
| A.1.pdf | ||
| H.1 through H.3.pdf | ||
| Amendment A002.pdf | ||
| H.16.pdf | ||
| A.4.pdf | ||
| QA 11_30_22.pdf | ||
| QA 11_29_22.pdf | ||
| Amendment_A001.pdf | ||
| QA 11_28_22.pdf | ||
| QA 11_21_22.pdf | ||
| QA 11_16_22.pdf | ||
| OR DOT 18(2)_Hydraulic Report.pdf | ||
| Physical Data_1.zip | ZIP file | |
| OR DOT 18(2)_Limited ESA Report.pdf | ||
| OR DOT 18(2)_Traffic Management Plan.pdf | ||
| OR DOT 18(2)_Mobility Considerations Checklist.pdf | ||
| ORDOT18(2)_plans.pdf | ||
| IFB 69056721B000023.pdf | ||
| OR DOT 18(2)_Geotechnical_Report.pdf |
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE PROJECT
NUMBER
SHEET
OR DOT 18(2)
C h e c k e d b y
D e s ig n e d b y
F.9
TABLES
MANAGEMENT CONCEPT
TEMPORARY WATERNOTE:
FOOTNOTE:
[1]
50 Percent Exceedance Disharge (Average daily discharge expected to be exceeded 16 days each month.)
25 Percent Exceedance Disharge (Average daily discharge expected to be exceeded 8 days each month.)
5 Percent Exceedance Disharge (Average daily discharge expected to be exceeded 2 days each month.)
[2]
[3]
12/31/2024EXPIRES:
OREGON
98999PE
RE
GIS
TER
ED PROFESSIONALE
NGINEER
202 ,80 H
CRA
M
Y E
L
G
NIL EPOH
HA
R A
S c b m s w s p p b u s p w w s p a n th o n y .o d o n n e ll d O
R F .d g n
P
M in the subject watershed may differ.
Listed discharges are surface water from the upstream watershed. The estimated discharges are based on StreamStats. Discharges 1.
1 Revised by Amendment A002
| 2022-11-28T17:01:00-0800 | |
| Sarah Lingley |
File details come from the government source that posted it. Updated .