Amendment A003.pdf

PDF 123 KB Posted

Attached to
OR DOT 18(2) OR58: Fix it Corridor Culverts Federal contract opportunity
Solicitation number
69056721B000023
Issued by
Department of Transportation Federal Highway Administration

About this file

This amendment modifies a solicitation for a highway construction project. The Oregon Department of Transportation Federal Highway Administration is seeking bids to replace culverts along OR Route 18(2) and OR Route 58 as part of the "Fix-it Corridor Culverts" project. The amendment revises the bid opening date from December 6, 2022 to December 9, 2022. It also deletes a limitation on concurrent work zones and requires either a temporary or permanent pavement section be completed after each culvert replacement.

View the file

Other files for this federal contract opportunity

Other files attached to OR DOT 18(2) OR58: Fix it Corridor Culverts, newest first.
File Type Posted
BidSum OR DOT 18(2).pdf PDF
BidTab OR DOT 18(2).pdf PDF
QA 12_07_22.pdf PDF
QA2 12_06_22.pdf PDF
QA 12_06_22.pdf PDF
QA 12_05_22.pdf PDF
QA 12_01_22.pdf PDF
H.1 through H.3.pdf PDF
D.3.pdf PDF
A.1.pdf PDF
F.9.pdf PDF
Amendment A002.pdf PDF
H.16.pdf PDF
A.4.pdf PDF
QA 11_30_22.pdf PDF
QA 11_29_22.pdf PDF
Amendment_A001.pdf PDF
QA 11_28_22.pdf PDF
QA 11_21_22.pdf PDF
QA 11_16_22.pdf PDF
OR DOT 18(2)_Mobility Considerations Checklist.pdf PDF
ORDOT18(2)_plans.pdf PDF
IFB 69056721B000023.pdf PDF
OR DOT 18(2)_Hydraulic Report.pdf PDF
Physical Data_1.zip ZIP file
OR DOT 18(2)_Limited ESA Report.pdf PDF
OR DOT 18(2)_Traffic Management Plan.pdf PDF
OR DOT 18(2)_Geotechnical_Report.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A003 12/05/2022 N/A See Box 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056721B000023

9B. DATED (SEE ITEM 11)

10/31/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__x ) is extended, ( ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

OR DOT 18(2), OR58 Fix-it Corridor Culverts

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A003, dated 12-05-2022 OR DOT 18(2)

Solicitation No. 69056721B000023 OR58 Fix-it Corridor Culverts

REVISIONS ARE AS FOLLOWS:

SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)

Page A-3, Block 13A. Revises bid opening date from 12/06/2022 to 12/09/2022.

SPECIAL CONTRACT REQUIREMENTS

Page E-54, Subsection 156.07 Limitations on Construction Operations. Deletes sub-paragraph (o)

ENCLOSURES

Pages:

E-54

New bid opening date: 12/09/2022

E-54 DIVISION 150

Special Contract Requirements Project: OR DOT 18(2), OR58: Fix-It Corridor Culverts inconsistent devices until they are applicable to the work. When signage is no longer required for staging or shift work, remove all temporary signs, flag boards, supports, sign covers, and ballast associated with the staging or shift work.

(o) Do not operate more than two work zones that impact traffic at any given time. If more than one work zone with traffic impacts is used, zones must be separated by a minimum of three miles.

(p) Complete construction of the final permanent pavement section or a 3-inch minimum temporary pavement thickness at the completion of each culvert replacement before opening up to public traffic. If temporary pavement is used, construct the final permanent pavement section no more than 30 days after placement of the temporary pavement.

156.09 Traffic Control Supervisor. Add the following:

(l) Transport personnel, construction signs, barricades, drums, cones, tubular markers, and other traffic control devices.

Revised by Amendment A003