North Apron Repairs
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9123822R0003
- Agency
- ENDIST Sacramento US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238110 Poured Concrete Foundation and Structure Contractors
- Place of performance
- Roy, Utah, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a contractor to perform improvements repairing the portion of the North Apron immediately north of Hangar 204 at Hill Air Force Base in Davis County, Utah. The work includes replacing existing Portland cement concrete slabs and reworking structural base materials to meet seasonal frost requirements in accordance with UFC standards. Additional requirements include providing grounding points, pavement markings, and replacing an adjacent concrete drainage swale and section of asphalt pavement. Proposals will be evaluated based on technical qualifications, past performance, and price. The response deadline is February 17, 2022.
This will be a total small business set-aside conducted under NAICS 238110 and PSC Code Z2LA, with an anticipated value between $5-10 million. The work must be performed at Hill Air Force Base in Roy, Utah and completed within 456 calendar days from the notice to proceed. Demolition is required to remove and replace approximately 500 linear feet of concrete and asphalt surfaces. Any necessary asbestos or lead-based paint removal must be conducted by a certified abatement subcontractor.
Notice text
The Contractor shall perform improvements to repair the portion of the North Apron immediately North of Hangar 204 at Hill Air Force Base in Davis County, Utah. The work shall consist of replacement of existing Portland cement concrete (PCC) slabs along with full rework of structural base materials as required for seasonal frost conditions, all in accordance with current UFC standards. Work also includes providing grounding points and pavement markings on new apron pavement and replacement of adjacent existing PCC swale and adjacent asphalt pavement. The demolition includes but not limited to removal of existing apron PCC slabs, adjacent PCC drainage swale and the 5 foot wide strip of Asphalt adjacent to the swale. Any asbestos/LBP removal shall be accomplished by a certified asbestos/LBP removal contractor.
**This will be a DBB contract.**
Attachments
Show all 28
Notice history
| Notice | Type | Posted |
|---|---|---|
| North Apron Repairs | Award Notice | |
| North Apron Repairs | Solicitation | |
| North Apron Repairs | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity