Attachment 2 Drawings.pdf
PDF 15 MB Posted
- Attached to
- North Apron Repairs Federal contract opportunity
- Solicitation number
- W9123822R0003
About this file
This solicitation requests offers to perform improvements to repair the portion of the North Apron immediately North of Hangar 204 at Hill Air Force Base in Davis County, Utah. The work includes replacement of existing Portland cement concrete slabs along with full rework of structural base materials for seasonal frost conditions, in accordance with UFC standards. Additional work comprises providing grounding points, pavement markings on new apron pavement, and replacement of an adjacent concrete drainage swale and asphalt strip. Demolition encompasses removal of existing concrete slabs, drainage swale, and a five foot asphalt strip. Any required asbestos or lead-based paint removal will be performed by a certified contractor. This will be a design-bid-build contract awarded by the Department of the Army Corps of Engineers Sacramento District. The solicitation number is W9123822R0003.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
C O
V E
R
S
H E
E T
K
F
I S
C H
E R
K
F
I S
C H
E R
R
C
O N
N
M
H
A Y
N E
S
ISSUE DATE:
US Army Corps of Engineers
SOLICITATION NO.:
CONTRACT NO.:
SACRAMENTO DISTRICT
W91238-XX-X-XXXX
W91238-XX-X-XXXX
HILL AFB, UTAH
REPAIR NORTH APRON B5009 PHASE A
CAPITAL PROJECT # 1026533
PROJECT # 487672
SOUTH GATE
WEST GATE
CONTRACTING
6038 ASPEN AVE
BLDG. 1289
NE
ROY GATE
FIRE DEPARTMENT
BLDG. 9
PROJECT LOCATION
VICINITY MAP PROJECT MAP
PREPARED UNDER THE DIRECTION OF:
USACE SACRAMENTO SIGNATURE BLOCK
Col. Corps of Engineers, Sacramento District
Chief, Engineering Division
Chief, Military Design Branch
APPROVED BY:
APPROVED FUNCTIONAL ADEQUACY:
This project was designed by the Sacramento District of the U. S. Army Corps of Engineers.The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
T
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
J U
E
S A
C R
A M
E N
T O
C
A L I F
O R
N I A
S A
C R
A M
E N
D
I S
T R
I C
T
S A
C R
A M
E N
T O
C
A
J
S
T R
E E
T
I N
H
O U
S
I G
N
K R
S M
P
A
R E
P A
R
R
H
A
R
B
P
H A
I L L
A
F B
U
T A
H
RTA
D R
A W
I N
G
F
I L
U M
B E
R
S P
M
B E
R
G-002
H
E E
T
I N
D E
X
K
F
I S
C H
E R
K
F
I S
C H
E R
R C
O N
N
M
H
A Y
N E
S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
J U
S A
C R
A M
E N
T O
C
A L I F
O R
N I A
S A
C R
A M
E N
S
T R
I C
T
S A
C R
A M
E N
T O
C
A
J
S
T R
E E
T
I N
H
O U
S
I G
N
K R
S M
P
A
R E
P A
R
R
P
H A
I L L
A
F B
U
T A
H
RTA
D R
A W
I N
G
F
I
M
B E
R
S P
M
B E
R
SHEET INDEX
SHEET NUMBER SHEET NAME
G-001 COVER SHEET
G-002 SHEET INDEX
G-101 HAUL ROUTE AND STAGING AREA
G-102 GENERAL NOTES
B-101 BORING LOCATIONS PLAN
B-102 BORING LOGS
B-103 BORING LOGS
V-100 TOPOGRAPHIC SURVEY MAP
V-101 TOPOGRAPHIC SURVEY MAP
V-102 TOPOGRAPHIC SURVEY MAP
V-103 TOPOGRAPHIC SURVEY MAP
CD101 DEMOLITION PLAN
C-001 LEGEND & ABBREVIATIONS
C-121 PHASE 1 PHASING PLAN
C-122 PHASE 2 PHASING PLAN
C-141
SITE, PAVING AND PAVEMENT MARKING PLAN
C-151 GRADING AND DRAINAGE PLAN
C-201 SUBDRAIN PROFILE
C-301 SECTIONS
C-401 JOINT PLAN
C-501 DETAILS
C-502 DETAILS
C-503 DETAILS
C-504 DETAILS
C-505 DETAILS
C-506 DETAILS
PROJECT BOUNDARY
EQUIPMENT
STAGING AREA
HANGAR 204
HANGAR 1
BUILDING 1A
E
N
G
I
N
E
CONTRACTOR HAUL ROUTE
W A
R D
L E
I G
H
R
D
C O
T T
O N
W O
ROY GATE
S O
U T
H
G
A T
E
R
D
SOUTH GATE
PROJECT SITE
E
A
V E
6TH ST.
PROPOSED SITE FOR MATERIALS
AND CONTRACTORS TRAILERS
H
A
V E
PROJECT SITE HAUL ROUTE
F
A
V E
MATERIAL HAUL ROUTE
PROPOSED STAGING AREA
FOR MATERIALS AND
CONTRACTOR TRAILERS
G-101
H A
U
A
G I N
G
A
R E
A
K
F
I S
C H
E R
K
F
I S
C H
E R
R
C
O N
N
M
H
A Y
N E
S
NOTES:
1. CONTRACTOR ACCESS WILL BE THROUGH DESIGNATED GATE AS SHOWN
ON PLANS.
2. LOCATION OF THE CONTRACTOR STAGING AREAS SHOWN ARE
APPROXIMATE. THE EXACT LOCATIONS WILL BE DETERMINED IN THE
FIELD BY THE CONTRACTING OFFICER. EQUIPMENT STAGING WILL BE
ON THE PAVED AREAS IDENTIFIED ON THE PHASING PLANS.
3. THE CONTRACTOR STAGING AREA LOCATED WEST OF F AVENUE CAN BE
UTILIZED FOR THE CONTRACTOR'S FIELD OFFICE, PARKING OF COMPANY
VEHICLES AND FOR STORAGE OF MATERIALS.
4. TRACKED VEHICLES SHALL NOT BE STORED OR ALLOWED TO OPERATE
ON PCC TO REMAIN. TRACKED CONSTRUCTION EQUIPMENT MAY BE
PARKED OVERNIGHT IN THE CONSTRUCTION AREA. ALL OTHER PARKING
AND ALL EQUIPMENT STORAGE SHALL BE IN THE STAGING AREA.
5. NO BLADES OR BUCKETS SHALL BE ALLOWED TO CONTACT EXISTING
PAVEMENTS THAT ARE TO REMAIN. ONLY POWER SWEEPERS SHALL BE
ALLOWED TO REMOVE DEBRIS FORM THE SURFACE OF PAVEMENTS TO
REMAIN.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DRAINAGE,
GRADING, EROSION CONTROL, STABILIZATION, AND UTILITY
CONNECTIONS IN STAGING AREAS AND SHALL RESTORE SITE TO
ORIGINAL CONDITIONS UPON COMPLETION.
7. ALL CONSTRUCTION AREAS SHALL BE CONSIDERED LAND DISTURBANCE
AREAS.
8. OVERHEAD UTILITIES AND POLES BELONG TO CITY LIGHT AND POWER.
9. CONTRACTOR MUST VERIFY UTILITY CAPACITY IS ADEQUATE FOR
PROJECT NEEDS. IF CAPACITY IS INSUFFICIENT, CONTRACTOR IS
RESPONSIBLE FOR UPGRADES OR NEW LINES.
10. CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY CONNECTIONS,
CONNECTION REQUIREMENTS, AND COORDINATION WITH UTILITY
OWNERS.
11. ALL EQUIPMENT MUST BE FLAGGED AND LIGHTED PER SPECIFICATION
SECTION 01 35 13 SPECIAL PROCEDURES FOR AIRFIELD SAFETY
12. CONTRACTOR TO PROVIDE ACCESS TO ONE OF THE BAYS TO BUILDING
1A FOR DELIVERIES ETC. (WEST OF EQUIPMENT STAGING AREA)..
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
J U
S A
C R
A M
E N
T O
C
A L I F
O R
N I A
S A
C R
A M
E N
S
T R
I C
T
S A
C R
A M
E N
T O
C
A
J
S
T R
E E
T
I N
H
O U
S
I G
N
K R
S M
P
A
R E
P A
R
R
P
H A
I L L
A
F B
U
T A
H
RTA
D R
A W
I N
G
F
I
M
B E
R
S P
M
B E
R
G-102
G E
N E
R A
L
N
O T
E S
K
F
I S
C H
E R
K
F
I S
C H
E R
E
G
A B
E L L E
C
Y
A G
H O
B I
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
J U
S A
C R
A M
E N
T O
C
A L I F
O R
N I A
S A
C R
A M
E N
S
T R
I C
T
S A
C R
A M
E N
T O
C
A
J
S
T R
E E
T
I N
H
O U
S
I G
N
K R
S M
P
A
R E
P A
R
R
P
H A
I L L
A
F B
U
T A
H
RTA
D R
A W
I N
G
F
I
M
B E
R
S P
M
B E
R
GENERAL NOTES:
1. ALL COST FOR OBTAINING PERMITS AND FEES ARE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE INCLUDED
IN THE BID PRICE.
2. THE CONTRACTOR SHALL FOLLOW THE FOLLOW THE REQUIREMENTS OF SPECIFICATION SECTION 01 57 23 AND PREPARE
A COMPLETE EROSION PREVENTION AND SEDIMENT CONTROL PLAN FOR THE SITE AND STAGING AREA, INCLUDING THE
CRUSHER SITE AND THE BATCH PLANT. SITE, AS SPECIFIED. THE CONTRACTOR SHALL IMPLEMENT AND MAINTAIN THE
EROSION PREVENTION AND SEDIMENT CONTROL MEASURES INCLUDED IN THAT PLAN.
3. THE CONTRACTOR WILL BE REQUIRED TO COORDINATE HIS OPERATIONS WITH ANY OTHER CONTRACTORS WORKING ON
THE BASE AND WITH THE BASE TENANTS AS REQUIRED.
4. THE SITE LAYOUT IS BASED ON THE CONTROL POINTS AS INDICATED.
5. ITEMS NOT MARKED FOR REMOVAL SHALL BE PROTECTED FROM DAMAGE BY THE CONTRACTOR.
6. ITEMS NOT MARKED FOR REMOVAL THAT ARE DAMAGED SHALL BE REPAIRED OR REPLACED IN KIND AT NO COST TO THE
GOVERNMENT.
7. THE CONTRACTOR SHALL KEEP ALL PAVED SURFACES CLEAN AND FREE OF MUD AND DEBRIS.
8. THE CONTRACTOR MUST KEEP TAXIWAYS AND APRONS USED AS HAUL ROUTES CLEAR OF FOREIGN OBJECT DEBRIS
(FOD) AT ALL TIMES. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN A VACUUM SWEEPER TRUCK FOR REMOVAL OF
FOD. THE CONTRACTOR SHALL THOROUGHLY CLEAN ALL APRONS, TAXIWAYS AND SHOULDERS USED AS HAUL ROUTE
THROUGHOUT THE CONSTRUCTION AND IMMEDIATELY BEFORE THE PAVEMENT IS OPENED TO AIRCRAFT TRAFFIC.
9. AFTER ENTERING THE AIRFIELD, HAUL ROUTES MUST BE PAVED OR ALL VEHICLES MUST PERFORM A COMPLETE FOD
CHECK AT EACH ENTRANCE TO AIRFIELD PAVEMENT.
10. THE CONTRACTOR SHALL PROVIDE PUMPS AND/OR INSTALL SUBDRAINS OR BLEEDER TRENCHES TO ENSURE NO WATER
IS ALLOWED TO STAND IN THE EXCAVATED AREAS.
11. DUMP TRUCKS SHALL USE LOAD COVERS AND SHALL BE LOADED BY THE CONTRACTOR SUCH THAT NO SPILLAGE OCCUR.
12. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT ITS MOVEMENT BY WIND, JET BLAST, PROPELLER WASH, OR WATER FROM ANY SOURCE. DAILY STOCKPILES ARE ALLOWED BUT NO OVERNIGHT
STOCKPILING. NO STOCKPILES ON AIRFIELD.
13. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED BY BARRICADES
HAVING STEADY-BURN RED LIGHTS CONFORMING TO THE BARRICADE DETAILS SHOWN IN THESE PLANS OR OTHERWISE
ACCEPTABLE TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND AIRFIELD MANAGER.
14. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL SUBMIT TO THE COR THE NAMES AND PHONE NUMBERS OF AT
LEAST TWO INDIVIDUALS WHO SHALL BE AVAILABLE ON A 24 HOUR CALL BASIS FOR EMERGENCY BARRICADE AND
BARRICADE LIGHTING MAINTENANCE. THE INDIVIDUALS SHALL BE CAPABLE OF MAINTAINING AND REPAIRING THE
TEMPORARY ELECTRICAL SYSTEMS AND WIRING.
15. THE CONTRACTOR SHALL CHECK ALL EXISTING AND FINISH GRADES AND DIMENSIONS IN THE FIELD PRIOR TO
COMMENCEMENT OF ANY WORK ON THIS PROJECT. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE
CONTRACTING OFFICER IMMEDIATELY.
16. EXISTING PAVEMENT THICKNESSES SHOWN IN THESE PLANS ARE BASED ON CONSTRUCTION RECORDS; ACTUAL
THICKNESSES MAY VARY. SOME PCC SLABS ARE CONSTRUCTED WITH THICKENED EDGES.
17. ANY AND ALL DAMAGE BY THE CONTRACTOR TO EXISTING AC, OR PCC PAVEMENT, INCLUDING HAUL ROUTES OR
STRUCTURES WHICH ARE DESIGNATED TO REMAIN, SHALL BE REPLACED WITH LIKE MATERIALS AND ITEMS AT THE
CONTRACTOR'S EXPENSE AND TO THE SATISFACTION OF THE CONTRACTING OFFICER. THE CONTRACTOR MUST
IDENTIFY AND DOCUMENT ANY PRE-EXISTING DAMAGE TO ANY PAVEMENTS TO REMAIN PRIOR TO STARTING ANY WORK.
THE PRE-EXISTING DAMAGE MUST BE REPORTED TO THE CONTRACTING OFFICER IN WRITING BEFORE ANY WORK IS
STARTED. IF NO DEFICIENCIES ARE DOCUMENTED AND REPORTED, THEN THE PAVEMENTS WILL BE CONSIDERED TO BE
IN GOOD CONDITION AND COMPLETELY UNDAMAGED.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL, STATE AND LOCAL CODES, LAWS, AND
REGULATIONS, AND SHALL OBTAIN ALL NECESSARY PERMITS REQUIRED FOR CONSTRUCTION, INCLUDING BUT NOT
LIMITED TO NOISE CONTROL, EROSION CONTROL, WATERSHED, EMISSIONS, AND POLLUTION CONTROL PERMITS.
19. NOTHING IN THE GENERAL NOTES OR CONSTRUCTION DOCUMENTS SHALL RELIEVE THE CONTRACTOR FROM HIS
RESPONSIBILITIES TOWARD THE SAFETY AND CONVENIENCE OF THE GENERAL PUBLIC AND THE TENANTS OF THE BASE.
20. THE CONTRACTOR WILL PROVIDE ALL NECESSARY PROTECTIVE MEASURES TO SAFEGUARD EXISTING UTILITIES FROM
DAMAGE DURING CONSTRUCTION OF THIS PROJECT. IN THE EVENT THAT SPECIAL EQUIPMENT IS REQUIRED TO WORK
OVER AND AROUND THE UTILITIES, THE CONTRACTOR SHALL FURNISH SUCH EQUIPMENT. THE COST OF PROTECTING
UTILITIES FROM DAMAGE AND FURNISHING SPECIAL EQUIPMENT SHALL BE INCLUDED IN THE CONTRACTOR'S BID.
21. BEFORE BEGINNING ANY WORK, THE CONTRACTOR SHALL VERIFY THE EXACT ROUTING AND LOCATION OF ALL EXISTING
UTILITIES TO BE DEMOLISHED AND TO REMAIN.
22. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS SHOWN ON THESE PLANS PRIOR TO BEGINNING ANY
CONSTRUCTION OR DEMOLITION.
23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING ALL UTILITY CONNECTIONS REQUIRED AT NO ADDITIONAL COST
TO THE GOVERNMENT. THE CONTRACTOR'S UTILITY CONNECTIONS SHALL BE ON A SEPARATE METER(S). THE
CONTRACTOR SHALL COMPLY WITH AMERICAN WATER REQUIREMENTS. BACKFLOW PREVENTION AND CONNECTION
MUST BE INSPECTED BY CONTRACTING OFFICER AND AMERICAN WATER.
24. BACK FLOW PREVENTION DEVICES ARE REQUIRED ON ALL CONTRACTOR CONNECTIONS TO BASE WATER SUPPLIES
INCLUDING TEMPORARY AND FIRE HYDRANT CONNECTIONS.
25. ALL STORM SEWER PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS
WATERTIGHT.
26. CONTRACTOR SHALL PROPERLY DISPOSE OF ALL WASTE MATERIALS OFF GOVERNMENT PROPERTY. SEE
SPECIFICATIONS FOR PCC PAVEMENT RECYCLING REQUIREMENTS.
27. IF EXISTING PCC PAVEMENT IS UNDERMINED, THE ENTIRE AFFECTED SLAB SHALL BE REMOVED AND REPLACED AT NO
ADDITIONAL COST.
28. UNDERMINING OF PCC IS DEFINED AS LOSS OF MATERIAL BENEATH THE SLAB TO ANY DEPTH FOR MORE THAN 15% OF
ANY INDIVIDUAL EXPOSED FACE OF A SLAB -OR- LOSS OF MATERIAL GREATER THAN 3" IN DEPTH AT ANY POINT ON THE
FACE OF THE SLAB.
29. IF EXISTING AC PAVEMENT IS UNDERMINED, THE FACE OF THE PAVEMENT SHALL BE SAWCUT FULL WIDTH TO REMOVE
THE UNDERMINED PAVEMENT AND REPLACED AT NO ADDITIONAL COST.
30. UNDERMINING IN AC PAVEMENT IS DEFINED AS LOSS OF MATERIAL GREATER THAN 3" IN DEPTH AT ANY POINT ALONG
THE FACE OF THE PAVEMENT.
31. INTERRUPTION TO UTILITIES BY THIS PROJECT SHALL BE COORDINATED WITH THE COR AND IAW THE SPECIFICATIONS.
32. MILITARY OPERATIONS MAY UNEXPECTEDLY REQUIRE SHUT DOWN OF CONTRACTOR OPERATIONS. GOVERNMENT WILL
PROVIDE 24 HOURS NOTICE TO SHUT DOWN IF POSSIBLE.
33. ALL COST RELATING TO THE CONTRACTOR'S ACCESS AND SECURITY SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
34. ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT AND MATERIALS SHALL REMAIN WITHIN
THE LIMITS OF CONSTRUCTION STAGING AREA OR HAUL ROUTES.
35. AIRFIELD OPERATIONS-CONTRACTOR SHALL ACQUAINT ALL SUPERVISORS AND EMPLOYEES WITH THE NATURE AND
EXTENT OF AIRFIELD OPERATION THAT ARE INHERENT TO THIS ACTIVE AIR BASE. CONTRACTOR SHALL CONDUCT
CONSTRUCTION ACTIVITIES TO CONFORM TO ALL ROUTINE EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES
ON SAFETY AND SECURITY SPECIFIED IN CONTRACT DOCUMENTS, AS SPECIFIED BY THE GOVERNMENT.
36. VEHICLE IDENTIFICATION-ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE ON THE AIRPORT
OPERATIONS AREA (AOA) SHALL DISPLAY IN FULL ABOVE THE VEHICLE A 3' X 3' ORANGE AND WHITE CHECKERED FLAG
EACH CHECK BEING 1' SQUARE OR A 360° FLASHING YELLOW BEACON MOUNTED ON TOP OF THE VEHICLE. ALL
CONTRACTORS VEHICLE OPERATIONS IN THE ACTIVE AIRCRAFT OPERATION AREA DURING THE HOURS OF POOR
VISIBILITY OR HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING YELLOW BEACON MOUNTED ON TOP OF THE
VEHICLE AND OF SUCH INTENSITY TO CONFORM TO LOCAL CODES FOR MAINTENANCE AND EMERGENCY VEHICLES. THE
360° FLASHING YELLOW BEACON SHALL BE A LIGHT BAR WITH A MINIMUM DIMENSION OF 16
"L X 7
" W X 2
"H
37. GROUND CONTROL-ALL CONTRACTOR'S VEHICLES THAT ARE REQUIRED TO CROSS ACTIVE RUNWAYS, TAXIWAYS, SAFETY AREAS, AND APPROACH CLEAR ZONES SHALL DO SO UNDER THE DIRECT CONTROL OF THE CONTRACTOR'S
SAFETY OFFICER AND THE BASE AIRSIDE OPERATIONS PERSONNEL IN CONTACT WITH THE AIR BASE GROUND
CONTROLLER. THE CONTRACTOR'S DESIGNATED SAFETY OFFICER SHALL BE APPROVED IN WRITING, TRAINED AND
INSTRUCTED BY THE BASE AIRSIDE OPERATIONS IN THE REGULATIONS GOVERNING OPERATIONS OF THE AIR BASE. THE
CONTRACTOR'S SAFETY OFFICER SHALL REMAIN WITH THEIR VEHICLE AND THE VHF RADIO AT ALL TIMES. THE
CONTRACTOR SHALL FURNISH THE SAFETY OFFICER WITH A HANDHELD VHF TRANSCEIVER RADIO. CONTRACTOR'S
RADIO CALL SIGNS CANNOT MATCH FLIGHT OPERATIONS CALL SIGNS. CONTRACTOR MUST COORDINATE WITH AIRFIELD
OPERATIONS FOR RADIO FREQUENCIES AND CALL SIGNS PRIOR TO ENTERING AIRFIELD AREA.
38. ALL CONSTRUCTION ACTIVITIES WITHIN THE TAXIWAY/TAXILANE SAFETY AREA (TSA) WILL REQUIRE THE
TAXIWAY/TAXILANE CLOSURE. THE CONTRACTOR SHALL REQUEST THROUGH THE CONTRACTING OFFICER THE CLOSURE
OF THE REQUIRED PORTION OF TAXIWAY/TAXILANE. THIS REQUEST SHALL INCLUDE A DETAILED MAINTENANCE OF
AIRCRAFT MOVEMENT PLAN, THE CLOSURE TIMELINE, AND A DETAILED SCHEDULE OF OPERATIONS WITHIN THE AREA.
THE CONTRACTOR IS ADVISED THAT THERE MAY BE OTHER CRITICAL ACTIVITIES THAT MAY PREVENT TO CLOSURE OF OF
SPECIFIC AREA DURING THE REQUESTED TIMELINE. THEREFORE CLOSE COORDINATION BY THE CONTRACTOR WITH THE
BASE'S AIRSIDE OPERATIONS MANAGER AND THE CONTRACTING OFFICER IS REQUIRED.
39. PAVEMENT CLOSURES-TAXIWAYS, TAXILANES, AND APRONS SHALL NOT BE CLOSED WITHOUT PRIOR WRITTEN
APPROVAL FROM THE BASE AIRSIDE OPERATIONS OR THE CONTRACTING OFFICER TO ENABLE NECESSARY NOTICES TO
AIRMEN OR ADVISORIES TO AIRPORT SERVICES AND/OR TENANTS. A MINIMUM OF 72 HOURS WRITTEN NOTICE OF A
REQUESTED CLOSING SHALL BE DIRECTED TO THE CONTRACTING OFFICER WHO WILL COORDINATE THE REQUEST WITH
AIRSIDE OPERATIONS.
40. AIRCRAFT TRAFFIC WITHIN THE AIRFIELD SHALL HAVE PRIORITY OVER CONTRACTOR'S TRAFFIC.
41. CONTRACTOR SHALL COMPLY WITH THE BASE AOA DRIVER TRAINING AND VEHICLE REGISTRATION PROGRAM. NO
PERSONAL VEHICLES ARE ALLOWED WITHIN THE AOA.
42. CONSTRUCTION EQUIPMENT HEIGHT-THE MAXIMUM ALLOWABLE EQUIPMENT HEIGHT IS GOVERNED BY UFC 3-260-01 AND
IS TAKEN FROM THE 7 H TO 1 V TRANSITION ZONE BEYOND THE RUNWAY LATERAL CLEARANCE. DUE TO THE DISTANCE
TO THE RUNWAY THIS HEIGHT IS OVER 27'. FAA FORM 7460-1 MUST BE SUBMITTED WHEN EQUIPMENT IS EXPECTED TO
PENETRATE ANY OF THE SURFACES DESCRIBED IN APPENDIX B, SECTION 5, FAR PART 77.9.
43. CONTRACTOR'S VEHICLES SHALL BE IN GOOD WORKING ORDER.
44. ALL VEHICLES ENTERING THE AOA MUST BE MARKED WITH THE COMPANY LOGO. PERSONAL VEHICLES ARE NOT
ALLOWED IN THE AOA.
45. ALL VEHICLES ENTERING THE AOA MUST DISPLAY A FLIGHTLINE SECURITY ACCESS PASS IN THE WINDOW.
46. MAXIMUM VEHICLE SPEED WITHIN THE AOA IS 15 MPH.
47. CONTRACTOR'S DRIVERS SHALL HAVE MANDATORY FLIGHTLINE DRIVERS TRAINING PRIOR TO OPERATING ON THE AOA.
A MINIMUM OF 72 HRS NOTIFICATION TO OSS IS REQUIRED PRIOR TO SCHEDULING TRAINING.
48. NO TRACKED EQUIPMENT SHALL BE ALLOWED TO OPERATE ON EXISTING AIRFIELD PAVEMENTS THAT ARE SLATED TO
REMAIN.
49. NO BLADES OR BUCKETS SHALL BE ALLOWED TO CONTACT THE SURFACE OF EXISTING PAVEMENTS THAT ARE SLATED
TO REMAIN. ONLY POWER SWEEPERS SHALL BE ALLOWED TO REMOVE DEBRIS FROM THE SURFACE OF EXISTING
PAVEMENTS AND THIS SHALL BE KEPT TO A MINIMUM.
50. CONTRACTOR SHALL PROVIDE DEDICATED FOD CHECKPOINTS FOR CONSTRUCTION TRAFFIC CROSSING ACTIVE
TAXILANES. CONTRACTOR SHALL HAVE A MINIMUM OF ONE PERSON ON SITE DURING CONSTRUCTION ACTIVITIES TO
MONITOR AND SWEEP AREA WHERE CONSTRUCTION TRAFFIC CROSSED TAXILANE.
1. PAVEMENT DESIGNED IN ACCORDANCE WITH AIR FORCE MEDIUM LOAD TRAFFIC PER UFC 3-260-02.
2. LOCATION OF UNDERGROUND UTILITIES AS INDICATED ON THE PLANS HAVE BEEN OBTAINED FROM EXISTING RECORDS AND FIELD SURVEYS. THE GOVERNMENT DOES NOT ASSUME ANY RESPONSIBILITY WITH RESPECT TO THE ACCURACY, COMPLETENESS, OR
SUFFICIENCY OF THE INFORMATION. THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE AND TYPE OF OF EXISTING UNDERGROUND UTILITIES INDICATED ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED IN THE
CONSTRUCTION.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE ACTUAL LOCATION OF ALL SUCH FACILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND UTILITIES, PRIOR TO DIGGING. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR) OF HIS OPERATIONAL PLANS. THE CONTRACTOR SHALL MAKE ARRANGEMENTS FOR DETAILED INFORMATION AND ASSISTANCE IN LOCATING UTILITIES WITH BASE CIVIL ENGINEERING AND BASE COMMUNICATIONS. IN THE EVENT
AN UNEXPECTED UTILITY IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR. ANY UTILITIES OR SERVICES DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED IMMEDIATELY AT THE
CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE COR.
4. THE CONTRACTOR SHALL COORDINATE ALL AIRFIELD CLOSURES WITH AIRFIELD MANAGEMENT THROUGH THE COR.
HANGAR 1
BUILDING 1A
H A
N G
N-1 N-3
N-2 N-4
B-101
B O
R I N
G
L
O C
A T
I O
A
N
K F
I S
C H
E R
K
F
I S
C H
E R
R
C
O N
N
M
H
A Y
N E
S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
J U
S A
C R
A M
E N
T O
C
A L I F
O R
N I A
S A
C R
A M
E N
S
T R
I C
T
S A
C R
A M
E N
T O
C
A
J
S
T R
E E
T
I N
H
O U
S
I G
N
K R
S M
P
A
R E
P A
R
R
P
H A
I L L
A
F B
U
T A
H
RTA
D R
A W
I N
G
F
I
M
B E
R
S P
M
B E
R
LEGEND
NOTES
1. GEOTECHNICAL INVESTIGATIONS PROVIDED BY
TERRACON CONSULTANTS, INC. SEE SPECIFICATIONS
FOR FULL GEOTECHNICAL ENGINEERING REPORT
2. SEE SHEETS B-102 AND B-103 FOR BORING LOGS
N
GRAPHIC SCALE
( IN FEET )
20 10 20 40 80
1 inch = 20 ft.
BORING LOCATION AND DESIGNATION
PCC SLAB REPLACEMENT BOUNDARY
B-102
O
R I N
G
L
O G
S
K
F
I S
C H
E R
K
F
I S
C H
E R
R
C
O N
N
M
H
A Y
N E
S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
J U
S A
C R
A M
E N
T O
C
A L I F
O R
N I A
S A
C R
A M
E N
S
T R
I C
T
S A
C R
A M
E N
T O
C
A
J
S
T R
E E
T
I N
H
O U
S
I G
N
K R
S M
P
A
R E
P A
R
R
P
H A
I L L
A
F B
U
T A
H
RTA
D R
A W
I N
G
F
I
M
B E
R
S P
M
B E
R
B-103
O
R I N
G
L
O G
S
K
F
I S
C H
E R
K
F
I S
C H
E R
R
C
O N
N
M
H
A Y
N E
S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
J U
S A
C R
A M
E N
T O
C
A L I F
O R
N I A
S A
C R
A M
E N
S
T R
I C
T
S A
C R
A M
E N
T O
C
A
J
S
T R
E E
T
I N
H
O U
S
I G
N
K R
S M
P
A
R E
P A
R
R
P
H A
I L L
A
F B
U
T A
H
RTA
D R
A W
I N
G
F
I
M
B E
R
S P
M
B E
R
V-101
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S C
R I P
T I O
N
A
M A
R K
D A
T E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
S I Z
E
S U
B M
I T
T E
D
B
Y
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
S P
D E
S I G
N
F
I
RTA
H I L L
A
R
S
E
D A
V
U
N T
Y
L A
Y T
O N
U
T A
H
S U
R V
Y
H
O U
S E
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
S A
C R
A M
E N
S
T R
I C
T
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
J U
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
A N
S I
D
V-100
T O
P O
G R
A P
H
R
V E
Y
M
A P
O F
N O
R T
I G
S
T
A
P R
J
M
A R
I N
O
G
P
A S
C U
A
M
S
H E
L D
O N
J
O
L I V
E R
V-102 V-103
1370900.00 1371000.00 1371100.00 1371200.00 1371300.00 1371400.00 1371500.00 1371600.00 1371700.00 1371800.00 1371900.00 1372000.00 1372100.00 1372200.00
1371500.00 1371600.00 1371700.00 1371800.00 1371900.00 1372000.00 1372100.00 1372200.00 1372300.00 1372400.00 1372500.00 1372600.00 1372700.00
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S C
R I P
T I O
N
A
M A
R K
D A
T E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
S I Z
E
S U
B M
I T
T E
D
B
Y
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
S P
D E
S I G
N
F
I
V-101
T O
P O
G R
A P
H
R
V E
Y
M
A P
O F
N O
R T
I G
S
T
A
P R
M
A R
I N
O
G
P
A S
C U
A
M
S
H E
L D
O N
J
O
L I V
E R
1371500.00 1371600.00 1371700.00 1371800.00 1371900.00
RTA
H I L L
A
R
S
E
D A
V
U
N T
Y
L A
Y T
O N
U
T A
H
S U
R V
H
O U
S E
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
S A
C R
A M
E N
S
T R
I C
T
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
J U
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
A N
S of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S C
R I P
T I O
N
A
M A
R K
D A
T E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
S I Z
E
S U
B M
I T
T E
D
B
Y
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
S P
D E
S I G
N
F
I
V-102
T O
P O
G R
A P
H
R
V E
Y
M
A P
O F
N O
R T
I G
S
T
A
P R
M
A R
I N
O
G
P
A S
C U
A
M
S
H E
L D
O N
J
O
L I V
E R
1371400.00 1371500.00 1371600.00 1371700.00 1371800.00
1371900.00 1372000.00 1372100.00 1372200.00
RTA
H I L L
A
R
S
E
D A
V
U
N T
Y
L A
Y T
O N
U
T A
H
S U
R V
H
O U
S E
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
S A
C R
A M
E N
S
T R
I C
T
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
J U
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
A N
S of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D E
S C
R I P
T I O
N
A
M A
R K
D A
T E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
S I Z
E
S U
B M
I T
T E
D
B
Y
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
S P
D E
S I G
N
F
I
V-103
T O
P O
G R
A P
H
R
V E
Y
M
A P
O F
N O
R T
I G
S
T
A
P R
M
A R
I N
O
G
P
A S
C U
A
M
S
H E
L D
O N
J
O
L I V
E R
1372400.00 1372500.00 1372600.00 1372700.00 1372800.00
RTA
H I L L
A
R
S
E
D A
V
U
N T
Y
L A
Y T
O N
U
T A
H
S U
R V
H
O U
S E
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
S A
C R
A M
E N
S
T R
I C
T
J
S
T R
E E
T
S A
C R
A M
E N
T O
C
A
J U
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
A N
S x
C x
C x
C x
C x
S
D x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x E x
E x
E x
E x
E x
E x
E x
E x x
E x
G x
G x
G x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
S S x
SS
x
SS
x
SS
x
SS
x
SS
x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x W x W x W x W x W x W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
C
C
SS
HANGAR 1
BUILDING 1A
H A
N G
CD101
D E
M O
L I T
I O
N
P
L A
N
K F
I S
C H
E R
K
F
I S
C H
E R
R
C
O N
N
M
H
A Y
N E
S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
J U
S A
C R
A M
E N
T O
C
A L I F
O R
N I A
S A
C R
A M
E N
S
T R
I C
T
S A
C R
A M
E N
T O
C
A
J
S
T R
E E
T
I N
H
O U
S
I G
N
K R
S M
P
A
R E
P A
R
R
P
H A
I L L
A
F B
U
T A
H
RTA
D R
A W
I N
G
F
I
M
B E
R
S P
M
B E
R
REMOVE PCC PAVING (12-13.5" THICK).
REMOVE EXISTING BASE (17-24" THICK) AND
SUBGRADE MATERIAL THE DEPTH NECESSARY TO
INSTALL NEW PAVEMENT SECTION.
DEMOLITION LEGEND DEMOLITION NOTES
1. EXISTING FEATURES ARE BASED ON FIELD SURVEY
AND BASE MAPPING INFORMATION. CONTRACTOR
SHALL FIELD VERIFY EXISTING UTILITIES PRIOR TO ANY
DEMOLITION.
2. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY
DISCREPANCIES IN THE FIELD WHICH VARY FROM
WHAT IS INDICATED.
3. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO
EXISTING PCC PAVEMENT TO REMAIN. CONTRACTOR
SHALL CAREFULLY DOCUMENT ANY EXISTING DAMAGE
AND REPORT IT TO THE CONTRACTING OFFICER PRIOR
TO ANY DEMOLITION. ANY SLABS DAMAGED BY THE
CONTRACTOR SHALL BE REMOVED AND REPLACED
FROM JOINT LINE TO JOINT LINE.
4. JOINT LINES SHOW EXISTING CONCRETE PAVEMENT.
5. NO DEMOLITION WILL BE PERMITTED PRIOR TO
PAVEMENT MIX DESIGN APPROVAL.
6. SEE SHEET C-141 FOR COORDINATES OF DEMOLITION
BOUNDARIES.
7. ODD SHAPED PANELS AND PANELS WITH
PENETRATIONS SHOULD BE ASSUMED TO
HAVE REINFORCEMENT.
8. ALL CONCRETE AND OTHER MATERIALS TO BE
REMOVED SHALL BE HAULED OFF BASE AND DISPOSED
AT PERMITTED LANDFILL BY CONTRACTOR.
9. EXISTING BASE/SUBGRADE MATERIALS MAY BE USED
AS SATISFACTORY MATERIAL PROVIDED THEY MEET
SPECIFIED REQUIREMENTS IN SECTION 31 00 00.
EXISTING BASE/SUBGRADE MATERIALS SHALL NOT BE
USED AS AGGREGATE BASE, SEPARATION LAYER, AND
STABILIZED DRAINAGE LAYER MATERIAL.
10. THE ESTIMATED PAVEMENT THICKNESS OF 12-13.5
INCHES IS BASED ON RECORD DOCUMENTS. ACTUAL
THICKNESS MAY VARY AT SOME LOCATIONS.
CONTRACTOR SHOULD ANTICIPATE THAT REINFORCING
STEEL MAY BE PRESENT AT MULTIPLE LOCATIONS.
11. REMOVE EXISTING GROUNDING POINTS IN ALL PCC TO
BE REMOVED.
KEY NOTES
1. DOUBLE SAWCUT EXISTING PCC PAVING PER DETAIL 6,
C-504.
2. EXISTING UNDERGROUND ELECTRIC LINE. PROTECT IN
PLACE.
3. EXISTING WATER MAIN. LINE OWNED BY BASE AND
OPERATED BY AMERICAN WATER. PROTECT IN PLACE.
4. EXISTING ELECTRICAL GROUNDING POINT BOXES.
REPLACE IN KIND.
REMOVE PCC VALLEY GUTTER (THICKNESS UNKNOWN).
REMOVE EXISTING BASE (THICKNESS UNKNOWN)
AND/OR SUBGRADE MATERIAL THE DEPTH NECESSARY
TO INSTALL NEW VALLEY GUTTER.
REMOVE AC PAVING (THICKNESS UNKNOWN).
REMOVE EXISTING BASE (THICKNESS UNKNOWN)
AND/OR SUBGRADE MATERIAL THE DEPTH NECESSARY
TO INSTALL NEW PAVEMENT SECTION. SAWCUT AND
LEAVE CLEAN/STRAIGHT FACE AT EDGE.
N
GRAPHIC SCALE
( IN FEET )
20 10 20 40 80
1 inch = 20 ft.
REMOVE EXISTING STATIC GROUND
CIVIL ABBREVIATIONS
ABC -- AGGREGATE BASE COURSE
AC -- ASPHALT CONCRETE
ADJ -- ADJACENT
AFFF -- AQUEOUS FILM FORMING FOAM
AIP -- ABANDON IN PLACE
ALT -- ALTERNATE
APPROX -- APPROXIMATE
ASC -- AGGREGATE SURFACE COURSE
ASPH -- ASPHALT
ASTM -- AMERICAN SOCIETY FOR TESTING & MATERIALS
BC -- BACK OF CURB OR BEGINNING OF CURVE
BFP -- BACKFLOW PREVENTER
BITUM -- BITUMINOUS
BLDG -- BUILDING
BOR -- BUREAU OF RECLAMATION
BPRV -- BACKFLOW PREVENTER
BRG -- BEARING
BT -- BLACKTOP
BW -- BACK OF WALK
CC -- CLEAR COVER
C&G -- CURB & GUTTER
C&HW -- CHILLED & HOT WATER
CI -- CAST IRON
CJ -- CONSTRUCTION JOINT
CL -- CENTERLINE
CLR -- CLEARANCE
CMP -- CORRUGATED METAL PIPE
CMU -- CONCRETE MASONRY UNIT
CO -- CLEAN-OUT
COMM -- COMMUNICATIONS
COMP -- COMPACTION
CONC -- CONCRETE
CONST -- CONSTRUCTION
CONT -- CONTINUOUS
COORD -- COORDINATE
COR -- CONTRACTING OFFICER'S REPRESENTATIVE
CSG -- COMPACTED SUBGRADE
CTJ -- CONTRACTION JOINT
CU.FT. -- CUBIC FEET
CWB -- CAPILLARY WATER BARRIER
CWR -- CHILLED WATER RETURN
CWS -- CHILLED WATER SUPPLY
D -- DOWELED
DCV -- DOUBLE CHECK VALVE
DI -- DRAIN or DROP INLET
DIP -- DUCTILE IRON PIPE
DIA -- DIAMETER
DIM -- DIMENSION
E -- EAST or EASTING or ELECTRICAL
EJ -- EXPANSION JOINT
EOP or EP -- EDGE OF PAVEMENT
EOR -- EDGE OF ROAD
ELEC -- ELECTRICAL
ELEV or EL -- ELEVATION
EXIST or (E) -- EXISTING
EXP -- EXPANSION
FAC -- FACILITY
FD -- FLOOR DRAIN
FDC -- FIRE DEPARTMENT CONNECTION
FED -- FEDERAL
FES -- FLARED END SECTION
FF -- FINISH FLOOR
FG -- FINISH GRADE
FH -- FIRE HYDRANT
FL -- FLOW LINE
FM -- FORCE MAIN
FT -- FEET or FOOT
FW -- FIRE WATER
G -- GAS
GA -- GAGE
GALV -- GALVANIZED
GFGI -- GOVERNMENT FURNISHED & GOVERNMENT INSTALLED
GV -- GATE VALVE
H -- HORIZONTAL
HORIZ -- HORIZONTAL
HT -- HEIGHT
HWR -- HOT WATER RETURN
HWS -- HOT WATER SUPPLY
IAW -- IN ACCORDANCE WITH
ID -- INSIDE DIAMETER
IE -- INVERT ELEVATION
IN -- INCH
CIVIL ABBREVIATIONS
ABC -- AGGREGATE BASE COURSE
AC -- ASPHALT CONCRETE
ADJ -- ADJACENT
AFFF -- AQUEOUS FILM FORMING FOAM
AIP -- ABANDON IN PLACE
ALT -- ALTERNATE
APPROX -- APPROXIMATE
ASC -- AGGREGATE SURFACE COURSE
ASPH -- ASPHALT
ASTM -- AMERICAN SOCIETY FOR TESTING & MATERIALS
BC -- BACK OF CURB OR BEGINNING OF CURVE
BFP -- BACKFLOW PREVENTER
BITUM -- BITUMINOUS
BLDG -- BUILDING
BOR -- BUREAU OF RECLAMATION
BPRV -- BACKFLOW PREVENTER
BRG -- BEARING
BT -- BLACKTOP
BW -- BACK OF WALK
CC -- CLEAR COVER
C&G -- CURB & GUTTER
C&HW -- CHILLED & HOT WATER
CI -- CAST IRON
CJ -- CONSTRUCTION JOINT
CL -- CENTERLINE
CLR -- CLEARANCE
CMP -- CORRUGATED METAL PIPE
CMU -- CONCRETE MASONRY UNIT
CO -- CLEAN-OUT
COMM -- COMMUNICATIONS
COMP -- COMPACTION
CONC -- CONCRETE
CONST -- CONSTRUCTION
CONT -- CONTINUOUS
COORD -- COORDINATE
COR -- CONTRACTING OFFICER'S REPRESENTATIVE
CSG -- COMPACTED SUBGRADE
CTJ -- CONTRACTION JOINT
CU.FT. -- CUBIC FEET
CWB -- CAPILLARY WATER BARRIER
CWR -- CHILLED WATER RETURN
CWS -- CHILLED WATER SUPPLY
D -- DOWELED
DCV -- DOUBLE CHECK VALVE
DI -- DRAIN or DROP INLET
DIP -- DUCTILE IRON PIPE
DIA -- DIAMETER
DIM -- DIMENSION
E -- EAST or EASTING or ELECTRICAL
EJ -- EXPANSION JOINT
EOP or EP -- EDGE OF PAVEMENT
EOR -- EDGE OF ROAD
ELEC -- ELECTRICAL
ELEV or EL -- ELEVATION
EXIST or (E) -- EXISTING
EXP -- EXPANSION
FAC -- FACILITY
FD -- FLOOR DRAIN
FDC -- FIRE DEPARTMENT CONNECTION
FED -- FEDERAL
FES -- FLARED END SECTION
FF -- FINISH FLOOR
FG -- FINISH GRADE
FH -- FIRE HYDRANT
FL -- FLOW LINE
FM -- FORCE MAIN
FT -- FEET or FOOT
FW -- FIRE WATER
G -- GAS
GA -- GAGE
GALV -- GALVANIZED
GFGI -- GOVERNMENT FURNISHED & GOVERNMENT INSTALLED
GV -- GATE VALVE
H -- HORIZONTAL
HORIZ -- HORIZONTAL
HT -- HEIGHT
HWR -- HOT WATER RETURN
HWS -- HOT WATER SUPPLY
IAW -- IN ACCORDANCE WITH
ID -- INSIDE DIAMETER
IE -- INVERT ELEVATION
IN -- INCH
INDUSTRIAL WASTE
SURVEY CONTROL POINT
TREE
CHAIN LINK FENCE
SWALE OR DITCH
FINISH GRADE SPOT ELEVATION
CONTOUR LINE
DRAIN INLET or DROP INLET
COMMUNICATIONS
GAS VALVE
GAS LINE
FORCE MAIN (SEWER)
STORM DRAIN LINE
RAILROAD TRACK
BARBED WIRE FENCE
BENCH MARK
ELECTRICAL LINE
DIRECTION OF FLOW
POWER POLE W/GUY
POWER LINE
MANHOLE W/ SLOTTED INLET
INLET OR CATCH BASIN
PUMP STATION or LIFT STATION
PRESSURE REDUCER-BACKFLOW
SANITARY SEWER LINE
CLEANOUT
CHILLED & HOT WATER
CONCRETE CURB & GUTTER
TAPPING SLEEVE AND VALVE
GATE VALVE
GATE VALVE
FIRE WATER
WATER LINE
ASPHALT CONCRETE PVMT.
NON-AIRFIELD PCC. PVMT.
AIRFIELD PCC PAVEMENT
SIDEWALK
TO BE REMOVED
CIVIL LEGEND
EXISTING NEW
MANHOLE
BACKFLOW PREVENTER
PREVENTER ASSEMBLY
W/ INDICATOR POST
FIRE HYDRANT
BUILDING
DETAIL NUMBER
SHEET # WHERE DETAIL IS
DRAWN
DETAIL ID
FIBER OPTICS/COMM. LINE
SEE DEMOLITION SHEET
SEE DEMOLITION SHEET
C-XXX
INDUSTRIAL WASTE
SURVEY CONTROL POINT
TREE
CHAIN LINK FENCE
SWALE OR DITCH
FINISH GRADE SPOT ELEVATION
CONTOUR LINE
DRAIN INLET or DROP INLET
COMMUNICATIONS
GAS VALVE
GAS LINE
FORCE MAIN (SEWER)
STORM DRAIN LINE
RAILROAD TRACK
BARBED WIRE FENCE
BENCH MARK
ELECTRICAL LINE
DIRECTION OF FLOW
POWER POLE W/GUY
POWER LINE
MANHOLE W/ SLOTTED INLET
INLET OR CATCH BASIN
PUMP STATION or LIFT STATION
PRESSURE REDUCER-BACKFLOW
SANITARY SEWER LINE
CLEANOUT
CHILLED & HOT WATER
CONCRETE CURB & GUTTER
TAPPING SLEEVE AND VALVE
GATE VALVE
GATE VALVE
FIRE WATER
WATER LINE
ASPHALT CONCRETE PVMT.
NON-AIRFIELD PCC. PVMT.
AIRFIELD PCC PAVEMENT
SIDEWALK
TO BE REMOVED
CIVIL LEGEND
EXISTING NEW
MANHOLE
BACKFLOW PREVENTER
PREVENTER ASSEMBLY
W/ INDICATOR POST
FIRE HYDRANT
BUILDING
DETAIL NUMBER
SHEET # WHERE DETAIL IS
DRAWN
DETAIL ID
NOTE:
THE CIVIL LEGEND AND ABBREVIATIONS SHOWN ON
THIS SHEET ARE TYPICAL AND FOR INFORMATION
ONLY. SOME ARE NOT APPLICABLE TO THE PROJECT
DRAWINGS.
FIBER OPTICS/COMM. LINE
SEE DEMOLITION SHEET
SEE DEMOLITION SHEET
C-XXX
COCO
IE -- INVERT ELEVATION
IN -- INCH
INV -- INVERT ELEVATION
IW -- INDUSTRIAL WASTE
JT -- JOINT
Kg -- KILOGRAM
KJ -- KEYED JOINT
kPa -- KILOPASCAL
L -- LENGTH or LEFT
LB -- POUNDS
LG -- LIP OF GUTTER
LF -- LINEAR FEET
m -- METER
MAX -- MAXIMUM
MECH -- MECHANICAL
MFR -- MANUFACTURER
MH -- MANHOLE
MIN -- MINIMUM
mm -- MILLIMETER
N -- NEWTON or NORTH or NORTHING
NIC -- NOT IN CONTRACT
NO. -- NUMBER
NPW -- NON-POTABE WATER
NTS -- NOT TO SCALE
NTC -- NATIONAL TRAINING CENTER
OC -- ON CENTER
OCEW -- ON CENTER EACH WAY
OD -- OUTSIDE DIAMETER
OHP -- OVERHEAD POWER
OS&Y -- OUTSIDE STEM & YOKE
P -- POWER LINE
POC -- POINT OF CONNECTION
PCC -- PORTLAND CEMENT CONCRETE
PFJ -- PERFORATED FELT JOINT
PI -- POINT OF INTERSECTION
PIV -- POST INDICATOR VALVE
POV -- PRIVATELY OWNED VEHICLE
PP -- POWER POLE
PP -- PLASTIC PIPE
PPP -- PERFORATED PLASTIC PIPE
PRV -- PRESSURE REDUCING VALVE
PSI -- POUNDS PER SQ.IN.
PT -- POINT
PVC -- POLYVINYL CHLORIDE
PVMT -- PAVEMENT
R -- RADIUS or RIGHT
RD -- ROAD
REF -- REFERENCE
REINF -- REINFORCED
REQ'D -- REQUIRED
RR -- RAILROAD
RWD -- REDWOOD
S -- SLOPE or SOUTH
S&R -- SUPPLY & RETURN
SS OR S/S -- SANITARY SEWER
S4S -- SURFACE 4 SIDES
SD -- STORM DRAIN
SEC -- SECTION
SEJ -- SPECIAL EXPANSION JOINT
SHT -- SHEET
SJ -- SLIP JO INT
SL -- SLOPE
SMS -- SELECT MATERIAL SUBBASE
SPA -- SPACES
SPECS -- SPECIFICATIONS
SQ.FT. -- SQUARE FEET
SS -- SANITARY SEWER
SSMH -- SANITARY SEWER MANHOLE
ST -- STREET
STA -- STATION
STD -- STANDARD
SW -- SIDEWALK or SOUTHWEST
SYM -- SYMMETRICAL
IE -- INVERT ELEVATION
IN -- INCH
INV -- INVERT ELEVATION
IW -- INDUSTRIAL WASTE
JT -- JOINT
Kg -- KILOGRAM
KJ -- KEYED JOINT
kPa -- KILOPASCAL
L -- LENGTH or LEFT
LB -- POUNDS
LG -- LIP OF GUTTER
LF -- LINEAR FEET
m -- METER
MAX -- MAXIMUM
MECH -- MECHANICAL
MFR -- MANUFACTURER
MH -- MANHOLE
MIN -- MINIMUM
mm -- MILLIMETER
N -- NEWTON or NORTH or NORTHING
NIC -- NOT IN CONTRACT
NO. -- NUMBER
NPW -- NON-POTABE WATER
NTS -- NOT TO SCALE
NTC -- NATIONAL TRAINING CENTER
OC -- ON CENTER
OCEW -- ON CENTER EACH WAY
OD -- OUTSIDE DIAMETER
OHP -- OVERHEAD POWER
OS&Y -- OUTSIDE STEM & YOKE
P -- POWER LINE
POC -- POINT OF CONNECTION
PCC -- PORTLAND CEMENT CONCRETE
PFJ -- PERFORATED FELT JOINT
PI -- POINT OF INTERSECTION
PIV -- POST INDICATOR VALVE
POV -- PRIVATELY OWNED VEHICLE
PP -- POWER POLE
PP -- PLASTIC PIPE
PPP -- PERFORATED PLASTIC PIPE
PRV -- PRESSURE REDUCING VALVE
PSI -- POUNDS PER SQ.IN.
PT -- POINT
PVC -- POLYVINYL CHLORIDE
PVMT -- PAVEMENT
R -- RADIUS or RIGHT
RD -- ROAD
REF -- REFERENCE
REINF -- REINFORCED
REQ'D -- REQUIRED
RR -- RAILROAD
RWD -- REDWOOD
S -- SLOPE or SOUTH
S&R -- SUPPLY & RETURN
SS OR S/S -- SANITARY SEWER
S4S -- SURFACE 4 SIDES
SD -- STORM DRAIN
SEC -- SECTION
SEJ -- SPECIAL EXPANSION JOINT
SHT -- SHEET
SJ -- SLIP JO INT
SL -- SLOPE
SMS -- SELECT MATERIAL SUBBASE
SPA -- SPACES
SPECS -- SPECIFICATIONS
SQ.FT. -- SQUARE FEET
SS -- SANITARY SEWER
SSMH -- SANITARY SEWER MANHOLE
ST -- STREET
STA -- STATION
STD -- STANDARD
SW -- SIDEWALK or SOUTHWEST
SYM -- SYMMETRICAL
T -- TELEPHONE
TAN -- TANGENT
TC -- TOP OF CURB
TE -- THICKENED EDGE JOINT
TEB -- THICKENED EDGE AT BLDG.
TP -- TOP OF PAVEMENT
TR -- TOP OF RETAINING WALL
TRANS -- TRANSFORMER
TS -- TOP OF SAND
TW -- TOP OF WALL
TYP -- TYPICAL
U.O.N -- UNLESS OTHERWISE NOTED
UG -- UNDERGROUND
V -- VERTICAL
VCP -- VITRIFIED CLAY PIPE
VERT -- VERTICAL
W -- WATER, WEST or WIDTH
W/ -- WITH
W/O -- WITHOUT
& -- AND
@ -- AT
Ø -- DIAMETER
# -- NUMBER
T -- TELEPHONE
TAN -- TANGENT
TC -- TOP OF CURB
TE -- THICKENED EDGE JOINT
TEB -- THICKENED EDGE AT BLDG.
TP -- TOP OF PAVEMENT
TR -- TOP OF RETAINING WALL
TRANS -- TRANSFORMER
TS -- TOP OF SAND
TW -- TOP OF WALL
TYP -- TYPICAL
U.O.N -- UNLESS OTHERWISE NOTED
UG -- UNDERGROUND
V -- VERTICAL
VCP -- VITRIFIED CLAY PIPE
VERT -- VERTICAL
W -- WATER, WEST or WIDTH
W/ -- WITH
W/O -- WITHOUT
& -- AND
@ -- AT
Ø -- DIAMETER
# -- NUMBER
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
J U
S A
C R
A M
E N
T O
C
A L I F
O R
N I A
S A
C R
A M
E N
S
T R
I C
T
S A
C R
A M
E N
T O
C
A
J
S
T R
E E
T
I N
H
O U
S
I G
N
K R
S M
P
A
R E
P A
R
R
P
H A
I L L
A
F B
U
T A
H
RTA
D R
A W
I N
G
F
I
M
B E
R
S P
M
B E
R
C-001
L E
G E
B
R E
V I A
T I O
N S
K
F
I S
C H
E R
K
F
I S
C H
E R
R
C
O N
N
M
H
A Y
N
A-10 Thunderbolt II
A-10 Thunderbolt II
A-10 Thunderbolt II
LOW PROFILE BARRIER
CONSTRUCTION AREA
EQUIPMENT STAGING AREA
HANGAR 1
HANGAR 204
BUILDING 1A
CONTRACTOR ACCESS
54'
C-501
C-121
P H
A S
A
S I N
G
P
L A
N
K
F
I S
C H
E R
K
F
I S
C H
E R
R
C
O N
N
M
H
A Y
N E
S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
J U
S A
C R
A M
E N
T O
C
A L I F
O R
N I A
S A
C R
A M
E N
S
T R
I C
T
S A
C R
A M
E N
T O
C
A
J
S
T R
E E
T
I N
H
O U
S
I G
N
K R
S M
P
A
R E
P A
R
R
P
H A
I L L
A
F B
U
T A
H
RTA
D R
A W
I N
G
F
I
M
B E
R
S P
M
B E
R
N
GRAPHIC SCALE
( IN FEET )
40 20 40 80 160
1 inch = 40 ft.
PHASING NOTES
1. WORK IN PHASE ONE INCLUDES, BUT IS NOT LIMITED TO, EXISTING PAVEMENT DEMOLITION AND PCC
PAVEMENT INSTALLATION IN THE THREE EASTERN MOST ROWS, AS WELL AS THE SUBSURFACE
DRAINAGE PIPES AND STRUCTURES.
2. AIRCRAFT HANGARS 1 AND 204 SHALL BE REMAIN ACCESSIBLE TO AIRCRAFT TRAFFIC DURING ALL
PHASES.
3. THE PROJECT IS LOCATED WITHIN A RESTRICTED/CONTROLLED AREA AND THEREFORE CONSTRUCTION
ACTIVITIES (INCLUDING DEMOLITION) CANNOT START UNTIL A FREE ZONE (FZ) APPLICATION IS APPROVED
BY THE USER/CUSTOMER AND THE 75TH OSS/RESTRICTED AREA. PLEASE SEE AIRFIELD SAFETY SPEC
SECTION FOR THIS SUBMITTAL REQUIREMENT.
4. FREE ZONE AREA TO BE ESTABLISHED BY THE CONTRACTOR AFTER LIMITS OF FREE ZONE AREA IS
COORDINATED AND APPROVED BY THE CONTRACTING OFFICER INCLUDING INPUTS FROM AIRFIELD
MANAGEMENT AND SECURITY FORCES. THE CONTRACTOR SHALL COMPLY WITH ALL IDENTIFICATION
BADGING, VEHICLE PASSES, ESCORTS, FLIGHT LINE DRIVER TRAINING, COMPANY LOGO VEHICLES, ETC
AS REQUIRED WHEN TRAVELING THROUGH THE AIRFIELD ENVIRONMENT TO AND FROM THE FREE ZONE
AREA. THE CONTRACTOR VEHICLES AND PERSONNEL MAY MOVE FREELY WITHIN THE FREE ZONE AREA
ONCE THEY HAVE ARRIVED.
5. ALL WORK SHALL BE PHASED TO MINIMIZE IMPACT TO THE APRON. WORK SHALL BE SCHEDULED AND
COORDINATED WITH THE CONTRACTING OFFICER/AIRFIELD MANAGER PRIOR TO APPROVAL OF
CONTRACTOR'S SCHEDULE. WORK TO BE DONE IN THIS AREA SHALL BE CLEARLY IDENTIFIED IN THE
CONTRACTOR'S SCHEDULE.
6. GATE AT THE CONTRACTOR ACCESS SHALL REMAIN OPEN DURING CONSTRUCTION. CONTRACTOR
SHALL PROVIDE PERSONNEL TO PROVIDE TRAFFIC SAFETY, MAINTAIN FOD CHECKPOINT AND RESTRICT
ACCESS TO SITE TO AUTHORIZED PERSONNEL.
7. ALL AIRCRAFT OPERATING ADJACENT TO WORKING AREAS WILL BE TOWED AND NOT UNDER POWER.
8. CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING ROAD WAY AND
AIRFIELD PAVEMENT CAUSED BY CONSTRUCTION TRAFFIC.
9. CONTRACTOR TO SWEEP UP ANY FOD OUTSIDE FREE ZONE GENERATED FROM THE PROJECT.
10. EQUIPMENT STAGING AREA SHOWN ON THIS SHEET IS APPROXIMATE. ACTUAL LOCATION SHALL BE
COORDINATED WITH CONTRACTING OFFICER OR PROJECT MANAGER. SEE SHEET G-101 FOR LOCATION
OF CONTRACTOR TRAILER AND MATERIALS STAGING AREA.
11. THE ANTICIPATED AIRCRAFT REQUIRING ACCESS TO APRON AND HANGAR 1 DURING CONSTRUCTION IS
THE A-10. AIRCRAFT SHALL ENTER HANGAR 1 THROUGH NORTH SIDE OF HANGAR 1 DOOR AND WILL NOT
ENTER INTO CONSTRUCTION AREA.
12. THE ANTICIPATED AIRCRAFT REQUIRING ACCESS TO APRON AND HANGAR 204 DURING CONSTRUCTION IS
THE C-130. CONTRACTOR SHALL REMOVE AND REPLACE BARRICADES WHEN AIRCRAFT REQUIRE ACCESS
TO THE HANGARS/APRON. CONTRACTOR SHALL PROVIDE VERTICAL AND HORIZONTAL CLEARANCE OF
ALL EQUIPMENT AND MATERIALS WITHIN AIRCRAFT TOW PATH DURING ALL AIRCRAFT TOWS. ALL C-130
AIRCRAFT WILL BE BACKED INTO HANGARS.
13. C-130 AIRCRAFT ARE ANTICIPATED TO ARRIVE EVERY 175 CALENDAR DAYS. ANTICIPATED SCHEDULE OF
ARRIVALS AND DEPARTURES IS SEPTEMBER/OCTOBER 2021, MARCH/APRIL 2022, AND
SEPTEMBER/OCTOBER 2022. EXACT SCHEDULES SHALL BE CONFIRMED WITH THE CONTRACTING
OFFICER PRIOR TO COMMENCING CONCRETE WORK. CONTRACTOR SHALL BE PROVIDED WITH A MINIMUM
OF 30 DAYS PRIOR NOTICE OF AIRCRAFT ENTERING CONSTRUCTION AREAS.
14. AIRCRAFT TRAFFIC SHALL NOT BE ALLOWED ON THE NEW CONCRETE PAVEMENT BEFORE THE
REQUIREMENTS UNDER PARAGRAPH "PAVEMENT PROTECTION" IN SPECIFICATION SECTION 32 13 11 ARE
MET AND THE CONCRETE HAS CURED FOR 28 DAYS.
15. PRIOR TO OPENING ANY RUNWAY, TAXIWAY, OR TOWWAY PAVEMENTS AT THE END OF A PHASE, THE
CONTRACTOR SHALL REMOVE ALL LOOSE MATERIALS AND FOREIGN OBJECT DEBRIS (FOD) FROM THE
PAVEMENT SURFACES. ONCE THE PAVEMENTS AREA IS APPROVED BY AIRFIELD MANAGEMENT FOR
AIRCRAFT OPERATIONS, THE CONTRACTOR SHALL REMOVE THE BARRICADES.
16. THE HILL AFB AIR SHOW WILL BE FROM JUNE 24-26, 2022. THE CONTRACTOR SHALL CLEAR THE SITE BY
MONDAY JUNE 20, 2022 AND WILL RESUME CONSTRUCTION ON MONDAY, JUNE 27 2022. ANY
CONSTRUCTION BARRIERS/FENCE, EQUIPMENT, FOD, MATERIAL, ETC. SHALL BE REMOVED TO PROVIDE
ACCESS TO THE APRON. THE APRON SHALL HAVE A HARD PAVED SURFACE AND NO OPEN TRENCHES.
17. IN THE EVENT THAT NEW CONCRETE PAVEMENTS HAVE NOT BEEN COMPLETED WHEN A C-130 AIRCRAFT
IS TO BE TOWED IN OR OUT OF HANGAR 204, A TEMPORARY UNPAVED ACCESS ROAD AND RAMPS INTO
AND OUT OF THE EXCAVATION WILL NEED TO BE CONSTRUCTED. THE SURFACE OF THE RAMP MUST BE
A MINIMUM OF 25' WIDE.
PHASING PLAN LEGEND
PAVEMENT REPLACEMENT AREA
CONTRACTOR STAGING AREA
LOW PROFILE BARRIERS
GEOTECHNICAL NOTES
DESIGN AND CONSTRUCTION OF TEMPORARY UNPAVED AIRCRAFT-TOWING ACCESS ROAD AND RAMP:
1. SUBMIT DRAWINGS AND CALCULATIONS, CERTIFIED BY A UTAH LICENSED PROFESSIONAL ENGINEER WITH 3
YEARS OF RELEVANT GEOTECHNICAL EXPERIENCE IN AIRFIELD DESIGN AND THE UTAH GREAT SALT LAKE
REGION, DESCRIBING THE METHODS FOR THE TEMPORARY UNPAVED ACCESS ROAD AND RAMP SYSTEM.
DRAWINGS MUST INCLUDE MATERIAL SIZES AND TYPES AND THE SEQUENCE AND METHOD OF INSTALLATION
AND REMOVAL. CALCULATIONS MUST INCLUDE DATA AND REFERENCES USED.
2. SUBSURFACE INFORMATION INCLUDING BORING LOGS AND LABORATORY TEST RESULTS ARE INCLUDED IN THE
SPECIFICATION SECTION 31 00 00 AS PART OF THE CONSTRUCTION DOCUMENTS. THE SPECIFICATIONS OF
THE C-130J AND C-130J-30 HERCULES AIRCRAFT ARE AVAILABLE UPON REQUEST. CONTRACTOR MUST SUBMIT
THE TEMPORARY UNPAVED ACCESS ROAD AND RAMP DESIGN, INCLUDING MATERIAL GRADATION, AND
SUBGRADE CBR TEST RESULTS IN ACCORDANCE WITH SPECIFICATION SECTION 01 33 00 - SUBMITTAL
PROCEDURES, A MINIMUM OF 30 DAYS PRIOR TO STARTING WORK.
a. THE UNPAVED AIRCRAFT TOWING ROAD MUST BE DESIGNED USING THE LATEST VERSION OF THE
PAVEMENT-TRANSPORTATION COMPUTER ASSISTED STRUCTURAL ENGINEERING (PCASE) SOFTWARE
AVAILABLE FROM THE TRI-SERVICE TRANSPORTATION WEBSITE AS SHOWN BELOW:
HTTPS://TRANSPORTATION.ERDC.DREN.MIL/PCASE/SOFTWARE.ASPX
b. THE SLOPE OF THE RAMP MUST NOT BE STEEPER THAN 1 VERTICAL TO 15 HORIZONTAL RATIO IN THE
DIRECTION OF AIRCRAFT TRAVEL. THE DESIGN MUST DEMONSTRATE THAT ALL PARTS OF THE AIRCRAFT
(NOSE, TAIL, AND WINGS) ARE CLEAR FROM THE GROUND AND THE HANGAR STRUCTURE DURING THE TOWING
OPERATION.
c. THE DESIGN MUST ALSO INCLUDE SLOPE STABILITY ANALYSES TO ENSURE THE RAMP CAN PROVIDE STABILITY
AGAINST FAILURE DURING THE TOWING OPERATION.
d. TEMPORARY ROAD AND RAMP MUST BE CONSTRUCTED USING THE SAME TYPE OF AGGREGATE BASE COURSE
MATERIAL AS SHOWN IN PARAGRAPHS UNDER “PART 2 – PRODUCTS” OF THE SPECIFICATION SECTION 32 11 23
COMPACTED TO AT LEAST 95% OF THE LABORATORY MAXIMUM DENSITY.
3. THE THICKNESS OF THE BASE COURSE SPECIFIED IN THE DESIGN OF THE ACCESS ROAD AND RAMPS MUST BE
NO LESS THAN 6". PRIOR TO TRAFFICKING THE RAMPS, THE CONTRACTOR MUST PROOF LOAD, WITH A FULL
WATER TRUCK OR LOADED DUMP TRUCK, THE RAMPS TO ID ANY UNSTABLE AREAS. IF UNSTABLE AREAS EXIST
THE BASE WILL PROVIDE AND PLACE AM-2 MAT OVER THE AREAS TO ALLOW FOR TRANSIT OF AIRCRAFT AND
TOW VEHICLES. THE BASE IS RESPONSIBLE FOR TOWING THE AIRCRAFT AND REMOVING THE AM-2 IF USED.
A-10 Thunderbolt II
A-10 Thunderbolt II
TUG GT35
TUG GT35
Tow-bar13.3ft
C J
H e r c u l e s
C J
H e r c u l e s
TUG GT35
TUG GT35
Tow-bar13.3ft
C J
H e r c u l e s
C J
H e r c u l e s
CONSTRUCTION AREA
EQUIPMENT STAGING AREA
HANGAR 1
BUILDING 1A
CONTRACTOR ACCESS
LOW PROFILE BARRIER
54'
HANGAR 204
C-501
C-122
P H
A S
A
S I N
G
P
L A
N
K
F
I S
C H
E R
K
F
I S
C H
E R
R
C
O N
N
M
H
A Y
N E
S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
A N
S I
D
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
J U
S A
C R
A M
E N
T O
C
A L I F
O R
N I A
S A
C R
A M
E N
S
T R
I C
T
S A
C R
A M
E N
T O
C
A
J
S
T R
E E
T
I N
H
O U
S
I G
N
K R
S M
P
A
R E
P A
R
R
P
H A
I L L
A
F B
U
T A
H
RTA
D R
A W
I N
G
F
I
M
B E
R
S P
M
B E
R
N
PHASING PLAN LEGEND
PAVEMENT REPLACEMENT AREA
CONTRACTOR STAGING AREA
LOW PROFILE BARRIERS
PHASING NOTES
1. WORK IN PHASE TWO INCLUDES, BUT IS NOT LIMITED TO, EXISTING PAVEMENT DEMOLITION AND PCC
PAVEMENT INSTALLATION IN THE REMAINING WESTERN ROWS, PLACEMENT OF PAVEMENT MARKINGS, DEMOLITION AND CONSTRUCTION OF CONCRETE VALLEY GUTTER AND ASPHALT PAVEMENTS .
2. AIRCRAFT HANGARS 1 AND 204 SHALL BE REMAIN ACCESSIBLE TO AIRCRAFT TRAFFIC DURING ALL
PHASES.
3. THE PROJECT IS LOCATED WITHIN A RESTRICTED/CONTROLLED AREA AND THEREFORE CONSTRUCTION
ACTIVITIES (INCLUDING DEMOLITION) CANNOT START UNTIL A FREE ZONE (FZ) APPLICATION IS APPROVED
BY THE USER/CUSTOMER AND THE 75TH OSS/RESTRICTED AREA. PLEASE SEE AIRFIELD SAFETY SPEC
SECTION FOR THIS SUBMITTAL REQUIREMENT.
4. FREE ZONE AREA TO BE ESTABLISHED BY THE CONTRACTOR AFTER LIMITS OF FREE ZONE AREA IS
COORDINATED AND APPROVED BY THE CONTRACTING OFFICER INCLUDING INPUTS FROM AIRFIELD
MANAGEMENT AND SECURITY FORCES. THE CONTRACTOR SHALL COMPLY WITH ALL IDENTIFICATION
BADGING, VEHICLE PASSES, ESCORTS, FLIGHT LINE DRIVER TRAINING, COMPANY LOGO VEHICLES, ETC
AS REQUIRED WHEN TRAVELING THROUGH THE AIRFIELD ENVIRONMENT TO AND FROM THE FREE ZONE
AREA. THE CONTRACTOR VEHICLES AND PERSONNEL MAY MOVE FREELY WITHIN THE FREE ZONE AREA
ONCE THEY HAVE ARRIVED.
5. ALL WORK SHALL BE PHASED TO MINIMIZE IMPACT TO THE APRON. WORK SHALL BE SCHEDULED AND
COORDINATED WITH THE CONTRACTING OFFICER/AIRFIELD MANAGER PRIOR TO APPROVAL OF
CONTRACTOR'S SCHEDULE. WORK TO BE DONE IN THIS AREA SHALL BE CLEARLY IDENTIFIED IN THE
CONTRACTOR'S SCHEDULE.
6. GATE AT THE CONTRACTOR ACCESS SHALL REMAIN OPEN DURING CONSTRUCTION. CONTRACTOR
SHALL PROVIDE PERSONNEL TO PROVIDE TRAFFIC SAFETY, MAINTAIN FOD CHECKPOINT AND RESTRICT
ACCESS TO SITE TO AUTHORIZED PERSONNEL.
7. ALL AIRCRAFT OPERATING ADJACENT TO WORKING AREAS WILL BE TOWED AND NOT UNDER POWER.
8. CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING ROAD WAY AND
AIRFIELD PAVEMENT CAUSED BY CONSTRUCTION TRAFFIC.
9. CONTRACTOR TO SWEEP UP ANY FOD OUTSIDE FREE ZONE GENERATED FROM THE PROJECT.
10. EQUIPMENT STAGING AREA SHOWN ON THIS SHEET IS APPROXIMATE. ACTUAL LOCATION SHALL BE
COORDINATED WITH CONTRACTING OFFICER OR PROJECT MANAGER. SEE SHEET G-101 FOR LOCATION
OF CONTRACTOR TRAILER AND MATERIALS STAGING AREA.
11. THE ANTICIPATED AIRCRAFT REQUIRING ACCESS TO APRON AND HANGAR 1 DURING CONSTRUCTION IS
THE A-10. AIRCRAFT SHALL ENTER HANGAR 1 THROUGH NORTH SIDE OF HANGAR 1 DOOR AND WILL NOT
ENTER INTO CONSTRUCTION AREA.
12. THE ANTICIPATED AIRCRAFT REQUIRING ACCESS TO APRON AND HANGAR 204 DURING CONSTRUCTION IS
THE C-130. CONTRACTOR SHALL REMOVE AND REPLACE BARRICADES WHEN AIRCRAFT REQUIRE ACCESS
TO THE HANGARS/APRON. CONTRACTOR SHALL PROVIDE VERTICAL AND HORIZONTAL CLEARANCE OF
ALL EQUIPMENT AND MATERIALS WITHIN AIRCRAFT TOW PATH DURING ALL AIRCRAFT TOWS. ALL C-130
AIRCRAFT WILL BE BACKED INTO HANGARS.
13. C-130 AIRCRAFT ARE ANTICIPATED TO ARRIVE EVERY 175 CALENDAR DAYS. ANTICIPATED SCHEDULE OF
ARRIVALS AND DEPARTURES IS SEPTEMBER/OCTOBER 2021, MARCH/APRIL 2022, AND
SEPTEMBER/OCTOBER 2022. EXACT SCHEDULES SHALL BE CONFIRMED WITH THE CONTRACTING
OFFICER PRIOR TO COMMENCING CONCRETE WORK. CONTRACTOR SHALL BE PROVIDED WITH A MINIMUM
OF 30 DAYS PRIOR NOTICE OF AIRCRAFT ENTERING CONSTRUCTION AREAS.
14. AIRCRAFT TRAFFIC SHALL NOT BE ALLOWED ON THE NEW CONCRETE PAVEMENT BEFORE THE
REQUIREMENTS UNDER PARAGRAPH "PAVEMENT PROTECTION" IN SPECIFICATION SECTION 32 13 11 ARE
MET AND THE CONCRETE HAS CURED FOR 28 DAYS.
15. PRIOR TO OPENING ANY RUNWAY, TAXIWAY, OR TOWWAY PAVEMENTS AT THE END OF A PHASE, THE
CONTRACTOR SHALL REMOVE ALL LOOSE MATERIALS AND FOREIGN OBJECT DEBRIS (FOD) FROM THE
PAVEMENT SURFACES. ONCE THE PAVEMENTS AREA IS APPROVED BY AIRFIELD MANAGEMENT FOR
AIRCRAFT OPERATIONS, THE CONTRACTOR SHALL REMOVE THE BARRICADES.
16. THE HILL AFB AIR SHOW WILL BE FROM JUNE 24-26, 2022. THE CONTRACTOR SHALL CLEAR THE SITE BY
MONDAY JUNE 20, 2022 AND WILL RESUME CONSTRUCTION ON MONDAY, JUNE 27 2022. ANY
CONSTRUCTION BARRIERS/FENCE, EQUIPMENT, FOD, MATERIAL, ETC. SHALL BE REMOVED TO PROVIDE
ACCESS TO THE APRON. THE APRON SHALL HAVE A HARD PAVED SURFACE AND NO OPEN TRENCHES.
17. IN THE EVENT THAT NEW CONCRETE PAVEMENTS HAVE NOT BEEN COMPLETED WHEN A C-130 AIRCRAFT
IS TO BE TOWED IN OR OUT OF HANGAR 204, A TEMPORARY UNPAVED ACCESS ROAD AND RAMPS INTO
AND OUT OF THE EXCAVATION WILL NEED TO BE CONSTRUCTED. THE SURFACE OF THE RAMP MUST BE
A MINIMUM OF 25' WIDE.
GRAPHIC SCALE
( IN FEET )
40 20 40 80 160
1 inch = 40 ft.
GEOTECHNICAL NOTES
DESIGN AND CONSTRUCTION OF TEMPORARY UNPAVED AIRCRAFT-TOWING ACCESS ROAD AND RAMP:
1. SUBMIT DRAWINGS AND CALCULATIONS, CERTIFIED BY A UTAH LICENSED PROFESSIONAL ENGINEER WITH 3
YEARS OF RELEVANT GEOTECHNICAL EXPERIENCE IN AIRFIELD DESIGN AND THE UTAH GREAT SALT LAKE
REGION, DESCRIBING THE METHODS FOR THE TEMPORARY UNPAVED ACCESS ROAD AND RAMP SYSTEM.
DRAWINGS MUST INCLUDE MATERIAL SIZES AND TYPES AND THE SEQUENCE AND METHOD OF INSTALLATION
AND REMOVAL. CALCULATIONS MUST INCLUDE DATA AND REFERENCES USED.
2. SUBSURFACE INFORMATION INCLUDING BORING LOGS AND LABORATORY TEST RESULTS ARE INCLUDED IN THE
SPECIFICATION SECTION 31 00 00 AS PART OF THE CONSTRUCTION DOCUMENTS. THE SPECIFICATIONS OF
THE C-130J AND C-130J-30 HERCULES AIRCRAFT ARE AVAILABLE UPON REQUEST. CONTRACTOR MUST SUBMIT
THE TEMPORARY UNPAVED ACCESS ROAD AND RAMP DESIGN, INCLUDING MATERIAL GRADATION, AND
SUBGRADE CBR TEST RESULTS IN ACCORDANCE WITH SPECIFICATION SECTION 01 33 00 - SUBMITTAL
PROCEDURES, A MINIMUM OF 30 DAYS PRIOR TO STARTING WORK.
a. THE UNPAVED AIRCRAFT TOWING ROAD MUST BE DESIGNED USING THE LATEST VERSION OF THE
PAVEMENT-TRANSPORTATION COMPUTER ASSISTED STRUCTURAL ENGINEERING (PCASE) SOFTWARE
AVAILABLE FROM THE TRI-SERVICE TRANSPORTATION WEBSITE AS SHOWN BELOW:
HTTPS://TRANSPORTATION.ERDC.DREN.MIL/PCASE/SOFTWARE.ASPX
b. THE SLOPE OF THE RAMP MUST NOT BE STEEPER THAN 1 VERTICAL TO 15 HORIZONTAL RATIO IN THE
DIRECTION OF AIRCRAFT TRAVEL. THE DESIGN MUST DEMONSTRATE THAT ALL PARTS OF THE AIRCRAFT
(NOSE, TAIL, AND WINGS) ARE CLEAR FROM THE GROUND AND THE HANGAR STRUCTURE DURING THE TOWING
OPERATION.
c. THE DESIGN MUST ALSO INCLUDE SLOPE STABILITY ANALYSES TO ENSURE THE RAMP CAN PROVIDE STABILITY
AGAINST FAILURE DURING THE TOWING OPERATION.
d. TEMPORARY ROAD AND RAMP MUST BE CONSTRUCTED USING THE SAME TYPE OF AGGREGATE BASE COURSE
MATERIAL AS SHOWN IN PARAGRAPHS UNDER “PART 2 – PRODUCTS” OF THE SPECIFICATION SECTION 32 11 23
COMPACTED TO AT LEAST 95% OF THE LABORATORY MAXIMUM DENSITY.
3. THE THICKNESS OF THE BASE COURSE SPECIFIED IN THE DESIGN OF THE ACCESS ROAD AND RAMPS MUST BE
NO LESS THAN 6". PRIOR TO TRAFFICKING THE RAMPS, THE CONTRACTOR MUST PROOF LOAD, WITH A FULL
WATER TRUCK OR LOADED DUMP TRUCK, THE RAMPS TO ID ANY UNSTABLE AREAS. IF UNSTABLE AREAS EXIST
THE BASE WILL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .