This document contains a pre-award survey form for a construction contractor and details for a federal contract opportunity to perform repairs to the North Apron at Hill Air Force Base in Utah. The pre-award survey requests information on the contractor's organization, personnel, equipment, financial data, experience on past construction projects, type of work specialized in, and commitments on existing contracts. It also includes supplemental schedules requesting details on existing commitments, completed projects, and owned construction equipment. The federal contract opportunity involves replacing Portland cement concrete slabs and structural base materials for the North Apron, providing grounding points and markings, and demolishing an adjacent concrete swale and asphalt pavement. The work must be done in accordance with UFC standards and any asbestos or lead-based paint removal will be performed by a certified contractor. This will be a design-bid-build contract administered by the Department of the Army Corps of Engineers Sacramento District.

View the file

Other files for this federal contract opportunity

Other files attached to North Apron Repairs, newest first.
File Type Posted
Amendment 0005 Sheet 180-25-0984C-122-C-122.pdf PDF
Amendment 0005 Survey.pdf PDF
Amendment 0005 Sheet 180-25-0984G-101-G-101.pdf PDF
W912822R0003 Amendment 0005.pdf PDF
Amendment 0005 Sheet 180-25-0984C-121-C-121.pdf PDF
Amendment 0005 Updated 32 13 14.13 Concrete Paving.pdf PDF
SF30 W9123822R0003 0004 North Apron Extend.pdf PDF
Attachment 9 PPQ.pdf PDF
W9123822R0003 Site Visit Sign_In_Sheet.pdf PDF
W9123822R0003 Amendment 003.pdf PDF
Attachment 3 Supplemental Contract Requirements.pdf PDF
Attachment 4 DBW Rates.pdf PDF
Attachment 1 Specifications.pdf PDF
Attachment 2 Drawings.pdf PDF
Attachment 7_Utah Resident Office Map.pdf PDF
Attachment 8 Project Information Form.pdf PDF
Attachment 5 Pre Award Survey.pdf PDF
Attachment 6 North Apron Site Walk.pdf PDF
W9123822R0003 North Apron Repairs Amendment 002.pdf PDF
Atch 7_Utah Resident Office Map.pdf PDF
North Apron Site Walk.pdf PDF
W9123822R0003 Amendment 001.pdf PDF
Blank - Site Visit Roster_ (002).xlsx XLSX spreadsheet
Attachment 2 Drawings.pdf PDF
Attachment 3 Davis Bacon Wage Determination.pdf PDF
Attachment 1 Specifications.pdf PDF
W9123822R0003.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Award Survey

CONSTRUCTION CONTRACTOR

DATA

DATE:

Firm Name and Telephone Number Main Office Address (Street, City, and State)

Branch Offices Services Rendered Construction

Design

Consultant

Organization

Individual Joint Venture

Partnership Corporation

Date Organized Date Incorporated:

State:

Names of Officers and Other Key Personnel

I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below)

Partners:

Officers: Other Key:

Remainder: Subtotal Permanent:

Maximum Personnel at Any Time: Date: Total:

II—EQUIPMENT OWNED III—FINANCIAL DATA AS OF (DATE):

Present Value ($)

Current Assets:

Acquisition Cost ($) Current Liabilities:

Net Worth:

IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION

WORK IN PAST 6 YRS EXCLUSIVE OF JOINT VENTURE

(LIST MOST RECENT FIRST)

V—LARGEST JOB EVER CONTRACTED

(If Other Than in Past Six Years)

$ LARGEST JOB IN PAST 6 YRS Contract Amount: Date: Description:

Owner:

$ Contract Amount: Date: Description:

Owner:

Avg. Annual

Income $

VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES

NAME AND POSITION/TITLE OF PERSON SIGNING SIGNATURE

See attachment for explanations or detailed description of item(s) reported above.

The completed Construction Contractor Data Form with Supplemental Schedules A-C (see format which follows). If the offeror is a large multi- segmented business concerns, the data provided on the supplemental schedules may be limited to information that directly pertains to the specific segment of the business concern (e.g., the division, group, unit, etc.) proposed to perform work under the prospective contract with its own work force. If the offer is being submitted by a Joint Venture, submit a separate form for each Joint Venture participant. The offeror may submit pre-award survey information in another format, provided that the information furnished is substantially the same as that which would be furnished on the Construction Contractor Data Form and its supplemental schedules.

Current financial statements. If the financial statement is more than 60 days old, submit a certificate stating that the firm's financial condition is substantially the same, or, if not the same, state the changes that have taken place. If a

Joint Venture, provide this information for each participant in the Joint Venture.

CONSTRUCTION CONTRACTOR DATA – SCHEDULE A – EXISTING COMMITMENTS

List below the construction projects your firm currently has under way, including recent awards. Also list construction projects for which your firm is the apparent successful offeror/bidder, but for which a contract has not yet been awarded.

CONTRACT

DESCRIPTION/

ORGANIZATION/

PERCENT

NUMBER AMOUNT LOCATION CONTACT COMPLETE

PERSON/

PHONE NUMBER

Banking information. Provide letters from banks or other financial institutions with which the contractor conducts business. The letters should contain information about your firm's accounts, loans, lines of credit, etc. The

Government is interested in financial stability, timely payments, the length and nature of the relationship between the firm and the financial institution, and the firm's financial ability to perform the contract. The letters should also provide the name and telephone number of the bank representative the Government may contact. If a Joint Venture, provide this information for each Joint Venture participant.

The Government will treat the pre-award survey information submitted by the offeror as proprietary

CONSTRUCTION CONTRACTOR DATA – SCHEDULE B – COMPLETED PROJECTS

List below the principal construction projects your firm has completed within the past five years, including all DoD contracts.

NUMBER

AMOUNT

DESCRIPTION/

LOCATION

ORGANIZATION/

CONTACT PERSON/

PHONE NUMBER

PERCENT

SUBLET

CONSTRUCTION CONTRACTOR DATA – SCHEDULE C – CONSTRUCTION AND/OR TECHNICAL

EQUIPMENT

List total equipment and facilities owned for performing the prospective contract and present status as to whether or not it is currently committed to existing contracts.

QUANTITY

DESCRIPTION

CONDITION

YEARS OF SERVICE

PRESENT STATUS