Attachment 3 Supplemental Contract Requirements.pdf

PDF 50 KB Posted

Attached to
North Apron Repairs Federal contract opportunity
Solicitation number
W9123822R0003
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document outlines requirements for a federal construction contract opportunity. The contractor will perform repairs to the North Apron at Hill Air Force Base in Davis County, Utah, including replacement of existing Portland cement concrete slabs and structural base work, as well as providing grounding points, pavement markings, and replacement of an adjacent drainage swale and asphalt pavement. Demolition is required to remove existing apron slabs, drainage swale, and a five foot strip of adjacent asphalt. The performance period is 365 calendar days, with liquidated damages of $2,974.34 per day of delay. Only the contracting officer may modify the contract terms. Wage determinations from the Service Contract Act apply. The document includes anticipated weather delay work days by month.

View the file

Other files for this federal contract opportunity

Other files attached to North Apron Repairs, newest first.
File Type Posted
Amendment 0005 Sheet 180-25-0984C-121-C-121.pdf PDF
Amendment 0005 Updated 32 13 14.13 Concrete Paving.pdf PDF
Amendment 0005 Sheet 180-25-0984C-122-C-122.pdf PDF
Amendment 0005 Survey.pdf PDF
Amendment 0005 Sheet 180-25-0984G-101-G-101.pdf PDF
W912822R0003 Amendment 0005.pdf PDF
SF30 W9123822R0003 0004 North Apron Extend.pdf PDF
Attachment 9 PPQ.pdf PDF
W9123822R0003 Site Visit Sign_In_Sheet.pdf PDF
W9123822R0003 Amendment 003.pdf PDF
Attachment 6 North Apron Site Walk.pdf PDF
Attachment 4 DBW Rates.pdf PDF
Attachment 1 Specifications.pdf PDF
Attachment 2 Drawings.pdf PDF
Attachment 7_Utah Resident Office Map.pdf PDF
Attachment 8 Project Information Form.pdf PDF
Attachment 5 Pre Award Survey.pdf PDF
W9123822R0003 North Apron Repairs Amendment 002.pdf PDF
Atch 7_Utah Resident Office Map.pdf PDF
North Apron Site Walk.pdf PDF
W9123822R0003 Amendment 001.pdf PDF
Blank - Site Visit Roster_ (002).xlsx XLSX spreadsheet
Attachment 2 Drawings.pdf PDF
Attachment 4 Pre Award Survey.pdf PDF
Attachment 3 Davis Bacon Wage Determination.pdf PDF
Attachment 1 Specifications.pdf PDF
W9123822R0003.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

SUPPLEMENTAL CONTRACT REQUIREMENTS

1. Performance Period: Refer to contract section 00700, FAR 52.211-10. The performance period for the work stated above shall be 365 calendar days.

2. Liquidated Damages: Refer to contract section 00700, FAR 52.211-12, Liquidated Damages-

Construction. Liquidated damages for this work are $2,974.34 for each day of delay.

3. Authorities: “Only a warranted Contracting Officer (either PCO or ACO) acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the

Contracting Officer.”

Wage Determination: General Decision No: UT20220091 01/07/2022, or its most current modification atthe time of award is hereby applicable to work performed under this task order. The most current decision or its modification can be found at:

SAM.gov

6. Time Extensions For Unusually Severe Weather: Refer to FAR 52.249-10, Default (Fixed- Priced

Construction). All weather delay will need to be submitted and approved by the Contracting Officer

Representative.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK-HILL AFB

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

(22) (19) (15) (07) (04) (03) (01) (02) (02) (05) (15) (22) https://sam.gov/wage-determination/UT20210083/5

File details come from the government source that posted it. Updated .