Amendment 0005 Sheet 180-25-0984G-101-G-101.pdf

PDF 2 MB Posted

Attached to
North Apron Repairs Federal contract opportunity
Solicitation number
W9123822R0003
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document contains plans for a federal construction contract to repair an aircraft apron at Hill Air Force Base in Utah. The contractor will replace Portland cement concrete slabs and rework structural base materials for the portion of the North Apron immediately north of Hangar 204, in accordance with UFC standards. The demolition work includes removing existing concrete slabs and drainage structures, as well as five feet of adjacent asphalt pavement. The contractor must also provide grounding points and new pavement markings, and any asbestos or lead-based paint removal will be performed by a certified abatement subcontractor. The solicitation was issued by the Department of the Army Corps of Engineers Sacramento District for a design-bid-build contract.

View the file

Other files for this federal contract opportunity

Other files attached to North Apron Repairs, newest first.
File Type Posted
Amendment 0005 Sheet 180-25-0984C-122-C-122.pdf PDF
Amendment 0005 Survey.pdf PDF
Amendment 0005 Sheet 180-25-0984C-121-C-121.pdf PDF
Amendment 0005 Updated 32 13 14.13 Concrete Paving.pdf PDF
W912822R0003 Amendment 0005.pdf PDF
SF30 W9123822R0003 0004 North Apron Extend.pdf PDF
Attachment 9 PPQ.pdf PDF
W9123822R0003 Site Visit Sign_In_Sheet.pdf PDF
W9123822R0003 Amendment 003.pdf PDF
Attachment 3 Supplemental Contract Requirements.pdf PDF
Attachment 4 DBW Rates.pdf PDF
Attachment 6 North Apron Site Walk.pdf PDF
Attachment 2 Drawings.pdf PDF
Attachment 7_Utah Resident Office Map.pdf PDF
Attachment 8 Project Information Form.pdf PDF
Attachment 5 Pre Award Survey.pdf PDF
Attachment 1 Specifications.pdf PDF
W9123822R0003 North Apron Repairs Amendment 002.pdf PDF
Atch 7_Utah Resident Office Map.pdf PDF
W9123822R0003 Amendment 001.pdf PDF
Blank - Site Visit Roster_ (002).xlsx XLSX spreadsheet
North Apron Site Walk.pdf PDF
Attachment 4 Pre Award Survey.pdf PDF
Attachment 3 Davis Bacon Wage Determination.pdf PDF
Attachment 1 Specifications.pdf PDF
W9123822R0003.pdf PDF
Attachment 2 Drawings.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT BOUNDARY

HANGAR 204

HANGAR 1

BUILDING 1A

ENGINE

CONTRACTOR HAUL ROUTE

W

AR

D

LE

IG

H

R D

C O

TT

O

N W

O O

D S

T.

ROY GATE

SO

U

TH

G

ATE R

D

SOUTH GATE

PROJECT SITE

E

AV

E.

6TH ST.

PROPOSED SITE FOR MATERIALS

AND CONTRACTORS TRAILERS

H A

VE

PROJECT SITE HAUL ROUTE

F

AV

E.

MATERIAL HAUL ROUTE

PROPOSED STAGING AREA

FOR MATERIALS AND

CONTRACTOR TRAILERS

G-101

H

AU

L R

O U

TE

A

N D

S

TA

G

IN

G A

R

EA

K.

F

IS

C

H

ER

K.

F

IS

C

H

ER

R . C

O N

N

M . H

AY

N

ES

EQ

U

IP

M

EN

T

ST

AG

IN

G

A R

EA

R

EM

O

VE

D

FE

B

NOTES:

1. CONTRACTOR ACCESS WILL BE THROUGH DESIGNATED GATE AS SHOWN

ON PLANS.

2. LOCATION OF THE CONTRACTOR STAGING AREAS SHOWN ARE

APPROXIMATE. THE EXACT LOCATIONS WILL BE DETERMINED IN THE

FIELD BY THE CONTRACTING OFFICER. EQUIPMENT STAGING WILL BE

ON THE PAVED AREAS IDENTIFIED ON THE PHASING PLANS.

3. THE CONTRACTOR STAGING AREA LOCATED WEST OF F AVENUE CAN BE

UTILIZED FOR THE CONTRACTOR'S FIELD OFFICE, PARKING OF COMPANY

VEHICLES AND FOR STORAGE OF MATERIALS.

4. TRACKED VEHICLES SHALL NOT BE STORED OR ALLOWED TO OPERATE

ON PCC TO REMAIN. TRACKED CONSTRUCTION EQUIPMENT MAY BE

PARKED OVERNIGHT IN THE CONSTRUCTION AREA. ALL OTHER PARKING

AND ALL EQUIPMENT STORAGE SHALL BE IN THE STAGING AREA.

5. NO BLADES OR BUCKETS SHALL BE ALLOWED TO CONTACT EXISTING

PAVEMENTS THAT ARE TO REMAIN. ONLY POWER SWEEPERS SHALL BE

ALLOWED TO REMOVE DEBRIS FORM THE SURFACE OF PAVEMENTS TO

REMAIN.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DRAINAGE,

GRADING, EROSION CONTROL, STABILIZATION, AND UTILITY

CONNECTIONS IN STAGING AREAS AND SHALL RESTORE SITE TO

ORIGINAL CONDITIONS UPON COMPLETION.

7. ALL CONSTRUCTION AREAS SHALL BE CONSIDERED LAND DISTURBANCE

AREAS.

8. OVERHEAD UTILITIES AND POLES BELONG TO CITY LIGHT AND POWER.

9. CONTRACTOR MUST VERIFY UTILITY CAPACITY IS ADEQUATE FOR

PROJECT NEEDS. IF CAPACITY IS INSUFFICIENT, CONTRACTOR IS

RESPONSIBLE FOR UPGRADES OR NEW LINES.

10. CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY CONNECTIONS,

CONNECTION REQUIREMENTS, AND COORDINATION WITH UTILITY

OWNERS.

11. ALL EQUIPMENT MUST BE FLAGGED AND LIGHTED PER SPECIFICATION

SECTION 01 35 13 SPECIAL PROCEDURES FOR AIRFIELD SAFETY

12. CONTRACTOR TO PROVIDE ACCESS TO ONE OF THE BAYS TO BUILDING

1A FOR DELIVERIES ETC. (WEST OF EQUIPMENT STAGING AREA)..

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

XX

XX

XX

-X

X- X-

XX

XX

XX

XX

XX

-X

X- X-

XX

XX

M

AY

SA

C

R

AM

EN

TO

, C

AL

IF

O

R N

IA

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

J

S

TR

EE

T

IN

-H

O U

SE

D

ES

IG

N

KR

SM

P

A R

EP

AI

R N

O R

TH

A

PR

O

N B

P H

AS

E

A H

IL

L

AF

B, U

TA

H

AM05

D R

AW

IN

G F

IL

E

N U

M

BE

R

0-

-0

SP

EC

N U

M

BE

R

Sheets and Views
G-101

File details come from the government source that posted it. Updated .