Amendment 0005 Sheet 180-25-0984C-122-C-122.pdf

PDF 316 KB Posted

Attached to
North Apron Repairs Federal contract opportunity
Solicitation number
W9123822R0003
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document provides a phasing plan and technical specifications for the North Apron Repairs project at Hill Air Force Base in Utah. The project involves replacing existing Portland cement concrete slabs along the North Apron immediately north of Hangar 204, including full rework of structural base materials to meet seasonal frost requirements. Additional work includes providing grounding points, pavement markings on the new apron, and replacing an adjacent concrete swale and five-foot strip of asphalt pavement. Demolition of existing structures is also required. The specifications provide guidance on phasing the work to minimize impacts to aircraft operations, maintaining access to hangars, and coordinating work with anticipated aircraft arrival and departure schedules. Technical requirements include designing temporary unpaved access roads and ramps if needed during aircraft towing, and procedures for protecting new concrete until fully cured. The solicitation number for this Design-Bid-Build contract is W9123822R0003 and is issued by the Department of the Army Corps of Engineers Sacramento District. The response due date and award date are not included.

View the file

Other files for this federal contract opportunity

Other files attached to North Apron Repairs, newest first.
File Type Posted
Amendment 0005 Sheet 180-25-0984G-101-G-101.pdf PDF
W912822R0003 Amendment 0005.pdf PDF
Amendment 0005 Survey.pdf PDF
Amendment 0005 Sheet 180-25-0984C-121-C-121.pdf PDF
Amendment 0005 Updated 32 13 14.13 Concrete Paving.pdf PDF
SF30 W9123822R0003 0004 North Apron Extend.pdf PDF
Attachment 9 PPQ.pdf PDF
W9123822R0003 Site Visit Sign_In_Sheet.pdf PDF
W9123822R0003 Amendment 003.pdf PDF
Attachment 2 Drawings.pdf PDF
Attachment 7_Utah Resident Office Map.pdf PDF
Attachment 8 Project Information Form.pdf PDF
Attachment 5 Pre Award Survey.pdf PDF
Attachment 3 Supplemental Contract Requirements.pdf PDF
Attachment 4 DBW Rates.pdf PDF
Attachment 1 Specifications.pdf PDF
Attachment 6 North Apron Site Walk.pdf PDF
W9123822R0003 North Apron Repairs Amendment 002.pdf PDF
Atch 7_Utah Resident Office Map.pdf PDF
W9123822R0003 Amendment 001.pdf PDF
Blank - Site Visit Roster_ (002).xlsx XLSX spreadsheet
North Apron Site Walk.pdf PDF
Attachment 4 Pre Award Survey.pdf PDF
Attachment 3 Davis Bacon Wage Determination.pdf PDF
Attachment 1 Specifications.pdf PDF
W9123822R0003.pdf PDF
Attachment 2 Drawings.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-10 Thunderbolt II

A-10 Thunderbolt II

A-10 Thunderbolt II

A-10 Thunderbolt II

TUG GT35

TUG GT35

Tow-bar13.3ft

C -1

J-

H er cu le s

C -130J-30 H ercules TUG GT35

TUG GT35

Tow-bar13.3ft

C -1

J-

H er cu le s

C -130J-30 H ercules

CONSTRUCTION AREA

PHASE 2 EQUIPMENT STAGING AREA

HANGAR 1 BUILDING 1A

CONTRACTOR ACCESS

LOW PROFILE BARRIER

54'

3'

10'

HANGAR 204

78'

C-501

C-122

PH

AS

E

PH

AS

IN

G

P

LA

N

K.

F

IS

C

H

ER

K.

F

IS

C

H

ER

R . C

O N

N

M . H

AY

N

ES

R

EV

IS

ED

E Q

U

IP

M

EN

T

ST

AG

IN

G A

R

EA

FE

B

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

AN

SI

D

XX

XX

XX

-X

X- X-

XX

XX

XX

XX

XX

-X

X- X-

XX

XX

M

AY

SA

C

R

AM

EN

TO

, C

AL

IF

O

R N

IA

SA

C R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

, C A

J

S

TR

EE

T

IN

-H

O U

SE

D

ES

IG

N

KR

SM

P

A R

EP

AI

R N

O R

TH

A

PR

O

N B

P H

AS

E

A H

IL

L

AF

B, U

TA

H

AM05

D R

AW

IN

G F

IL

E

N U

M

BE

R

0-

-0

SP

EC

N U

M

BE

R

N

PHASING PLAN LEGEND

PAVEMENT REPLACEMENT AREA

CONTRACTOR STAGING AREA

LOW PROFILE BARRIERS

PHASING NOTES

1. WORK IN PHASE TWO INCLUDES, BUT IS NOT LIMITED TO, EXISTING PAVEMENT DEMOLITION AND PCC PAVEMENT INSTALLATION IN THE REMAINING WESTERN ROWS, PLACEMENT OF PAVEMENT MARKINGS, DEMOLITION AND CONSTRUCTION OF CONCRETE VALLEY GUTTER AND ASPHALT PAVEMENTS .

2. AIRCRAFT HANGARS 1 AND 204 SHALL BE REMAIN ACCESSIBLE TO AIRCRAFT TRAFFIC DURING ALL

PHASES.

3. THE PROJECT IS LOCATED WITHIN A RESTRICTED/CONTROLLED AREA AND THEREFORE CONSTRUCTION ACTIVITIES (INCLUDING DEMOLITION) CANNOT START UNTIL A FREE ZONE (FZ) APPLICATION IS APPROVED BY THE USER/CUSTOMER AND THE 75TH OSS/RESTRICTED AREA. PLEASE SEE AIRFIELD SAFETY SPEC

SECTION FOR THIS SUBMITTAL REQUIREMENT.

4. FREE ZONE AREA TO BE ESTABLISHED BY THE CONTRACTOR AFTER LIMITS OF FREE ZONE AREA IS COORDINATED AND APPROVED BY THE CONTRACTING OFFICER INCLUDING INPUTS FROM AIRFIELD MANAGEMENT AND SECURITY FORCES. THE CONTRACTOR SHALL COMPLY WITH ALL IDENTIFICATION BADGING, VEHICLE PASSES, ESCORTS, FLIGHT LINE DRIVER TRAINING, COMPANY LOGO VEHICLES, ETC AS REQUIRED WHEN TRAVELING THROUGH THE AIRFIELD ENVIRONMENT TO AND FROM THE FREE ZONE AREA. THE CONTRACTOR VEHICLES AND PERSONNEL MAY MOVE FREELY WITHIN THE FREE ZONE AREA

ONCE THEY HAVE ARRIVED.

5. ALL WORK SHALL BE PHASED TO MINIMIZE IMPACT TO THE APRON. WORK SHALL BE SCHEDULED AND

COORDINATED WITH THE CONTRACTING OFFICER/AIRFIELD MANAGER PRIOR TO APPROVAL OF

CONTRACTOR'S SCHEDULE. WORK TO BE DONE IN THIS AREA SHALL BE CLEARLY IDENTIFIED IN THE

CONTRACTOR'S SCHEDULE.

6. GATE AT THE CONTRACTOR ACCESS SHALL REMAIN OPEN DURING CONSTRUCTION. CONTRACTOR SHALL PROVIDE PERSONNEL TO PROVIDE TRAFFIC SAFETY, MAINTAIN FOD CHECKPOINT AND RESTRICT

ACCESS TO SITE TO AUTHORIZED PERSONNEL.

7. ALL AIRCRAFT OPERATING ADJACENT TO WORKING AREAS WILL BE TOWED AND NOT UNDER POWER.

8. CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING ROAD WAY AND

AIRFIELD PAVEMENT CAUSED BY CONSTRUCTION TRAFFIC.

9. CONTRACTOR TO SWEEP UP ANY FOD OUTSIDE FREE ZONE GENERATED FROM THE PROJECT.

10. EQUIPMENT STAGING AREA SHOWN ON THIS SHEET IS APPROXIMATE. ACTUAL LOCATION SHALL BE COORDINATED WITH CONTRACTING OFFICER OR PROJECT MANAGER. SEE SHEET G-101 FOR LOCATION

OF CONTRACTOR TRAILER AND MATERIALS STAGING AREA.

11. THE ANTICIPATED AIRCRAFT REQUIRING ACCESS TO APRON AND HANGAR 1 DURING CONSTRUCTION IS THE A-10. AIRCRAFT SHALL ENTER HANGAR 1 THROUGH NORTH SIDE OF HANGAR 1 DOOR AND WILL NOT

ENTER INTO CONSTRUCTION AREA.

12. THE ANTICIPATED AIRCRAFT REQUIRING ACCESS TO APRON AND HANGAR 204 DURING CONSTRUCTION IS THE C-130. CONTRACTOR SHALL REMOVE AND REPLACE BARRICADES WHEN AIRCRAFT REQUIRE ACCESS TO THE HANGARS/APRON. CONTRACTOR SHALL PROVIDE VERTICAL AND HORIZONTAL CLEARANCE OF ALL EQUIPMENT AND MATERIALS WITHIN AIRCRAFT TOW PATH DURING ALL AIRCRAFT TOWS. ALL C-130

AIRCRAFT WILL BE BACKED INTO HANGARS.

13. C-130 AIRCRAFT ARE ANTICIPATED TO ARRIVE EVERY 175 CALENDAR DAYS. ANTICIPATED SCHEDULE OF

ARRIVALS AND DEPARTURES IS SEPTEMBER/OCTOBER 2021, MARCH/APRIL 2022, AND

SEPTEMBER/OCTOBER 2022. EXACT SCHEDULES SHALL BE CONFIRMED WITH THE CONTRACTING

OFFICER PRIOR TO COMMENCING CONCRETE WORK. CONTRACTOR SHALL BE PROVIDED WITH A MINIMUM

OF 30 DAYS PRIOR NOTICE OF AIRCRAFT ENTERING CONSTRUCTION AREAS.

14. AIRCRAFT TRAFFIC SHALL NOT BE ALLOWED ON THE NEW CONCRETE PAVEMENT BEFORE THE REQUIREMENTS UNDER PARAGRAPH "PAVEMENT PROTECTION" IN SPECIFICATION SECTION 32 13 11 ARE

MET AND THE CONCRETE HAS CURED FOR 28 DAYS.

15. PRIOR TO OPENING ANY RUNWAY, TAXIWAY, OR TOWWAY PAVEMENTS AT THE END OF A PHASE, THE CONTRACTOR SHALL REMOVE ALL LOOSE MATERIALS AND FOREIGN OBJECT DEBRIS (FOD) FROM THE PAVEMENT SURFACES. ONCE THE PAVEMENTS AREA IS APPROVED BY AIRFIELD MANAGEMENT FOR

AIRCRAFT OPERATIONS, THE CONTRACTOR SHALL REMOVE THE BARRICADES.

16. THE HILL AFB AIR SHOW WILL BE FROM JUNE 24-26, 2022. THE CONTRACTOR SHALL CLEAR THE SITE BY

MONDAY JUNE 20, 2022 AND WILL RESUME CONSTRUCTION ON MONDAY, JUNE 27 2022. ANY

CONSTRUCTION BARRIERS/FENCE, EQUIPMENT, FOD, MATERIAL, ETC. SHALL BE REMOVED TO PROVIDE ACCESS TO THE APRON. THE APRON SHALL HAVE A HARD PAVED SURFACE AND NO OPEN TRENCHES.

17. IN THE EVENT THAT NEW CONCRETE PAVEMENTS HAVE NOT BEEN COMPLETED WHEN A C-130 AIRCRAFT IS TO BE TOWED IN OR OUT OF HANGAR 204, A TEMPORARY UNPAVED ACCESS ROAD AND RAMPS INTO AND OUT OF THE EXCAVATION WILL NEED TO BE CONSTRUCTED. THE SURFACE OF THE RAMP MUST BE

A MINIMUM OF 25' WIDE.

GRAPHIC SCALE

( IN FEET )

40 20 40 80 160

1 inch = 40 ft.

GEOTECHNICAL NOTES

DESIGN AND CONSTRUCTION OF TEMPORARY UNPAVED AIRCRAFT-TOWING ACCESS ROAD AND RAMP:

1. SUBMIT DRAWINGS AND CALCULATIONS, CERTIFIED BY A UTAH LICENSED PROFESSIONAL ENGINEER WITH 3 YEARS OF RELEVANT GEOTECHNICAL EXPERIENCE IN AIRFIELD DESIGN AND THE UTAH GREAT SALT LAKE REGION, DESCRIBING THE METHODS FOR THE TEMPORARY UNPAVED ACCESS ROAD AND RAMP SYSTEM.

DRAWINGS MUST INCLUDE MATERIAL SIZES AND TYPES AND THE SEQUENCE AND METHOD OF INSTALLATION

AND REMOVAL. CALCULATIONS MUST INCLUDE DATA AND REFERENCES USED.

2. SUBSURFACE INFORMATION INCLUDING BORING LOGS AND LABORATORY TEST RESULTS ARE INCLUDED IN THE SPECIFICATION SECTION 31 00 00 AS PART OF THE CONSTRUCTION DOCUMENTS. THE SPECIFICATIONS OF THE C-130J AND C-130J-30 HERCULES AIRCRAFT ARE AVAILABLE UPON REQUEST. CONTRACTOR MUST SUBMIT THE TEMPORARY UNPAVED ACCESS ROAD AND RAMP DESIGN, INCLUDING MATERIAL GRADATION, AND SUBGRADE CBR TEST RESULTS IN ACCORDANCE WITH SPECIFICATION SECTION 01 33 00 - SUBMITTAL

PROCEDURES, A MINIMUM OF 30 DAYS PRIOR TO STARTING WORK.

a. THE UNPAVED AIRCRAFT TOWING ROAD MUST BE DESIGNED USING THE LATEST VERSION OF THE PAVEMENT-TRANSPORTATION COMPUTER ASSISTED STRUCTURAL ENGINEERING (PCASE) SOFTWARE

AVAILABLE FROM THE TRI-SERVICE TRANSPORTATION WEBSITE AS SHOWN BELOW:

HTTPS://TRANSPORTATION.ERDC.DREN.MIL/PCASE/SOFTWARE.ASPX

b. THE SLOPE OF THE RAMP MUST NOT BE STEEPER THAN 1 VERTICAL TO 15 HORIZONTAL RATIO IN THE DIRECTION OF AIRCRAFT TRAVEL. THE DESIGN MUST DEMONSTRATE THAT ALL PARTS OF THE AIRCRAFT (NOSE, TAIL, AND WINGS) ARE CLEAR FROM THE GROUND AND THE HANGAR STRUCTURE DURING THE TOWING

OPERATION.

c. THE DESIGN MUST ALSO INCLUDE SLOPE STABILITY ANALYSES TO ENSURE THE RAMP CAN PROVIDE STABILITY

AGAINST FAILURE DURING THE TOWING OPERATION.

d. TEMPORARY ROAD AND RAMP MUST BE CONSTRUCTED USING THE SAME TYPE OF AGGREGATE BASE COURSE MATERIAL AS SHOWN IN PARAGRAPHS UNDER “PART 2 – PRODUCTS” OF THE SPECIFICATION SECTION 32 11 23

COMPACTED TO AT LEAST 95% OF THE LABORATORY MAXIMUM DENSITY.

3. THE THICKNESS OF THE BASE COURSE SPECIFIED IN THE DESIGN OF THE ACCESS ROAD AND RAMPS MUST BE NO LESS THAN 6". PRIOR TO TRAFFICKING THE RAMPS, THE CONTRACTOR MUST PROOF LOAD, WITH A FULL WATER TRUCK OR LOADED DUMP TRUCK, THE RAMPS TO ID ANY UNSTABLE AREAS. IF UNSTABLE AREAS EXIST THE BASE WILL PROVIDE AND PLACE AM-2 MAT OVER THE AREAS TO ALLOW FOR TRANSIT OF AIRCRAFT AND TOW VEHICLES. THE BASE IS RESPONSIBLE FOR TOWING THE AIRCRAFT AND REMOVING THE AM-2 IF USED.

Sheets and Views
C-122

File details come from the government source that posted it. Updated .