New Water Distribution System in Durham and Middletown, Connecticut

Award Notice Posted

Solicitation number
W912WJ18B0016
Agency
Awarded
to Ludlow Construction Co., Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
W912WJ19C0002 Federal contract award
NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Not on record
Place of performance
Durham, Connecticut 06422, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Awarded Vendors: Ludlow Construction Co., Inc.. Contract Award Dollar Amount: $24,401,154.00. Contract Award Date: 2018-11-26.

Update #4 ·

The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids (IFB) for a project in Durham and Middletown, Connecticut. This project is to install a new water distribution system in Durham while using the existing water distribution system in Middletown for its water source. This procurement will be a small business set-aside only. The NAICS code for the work is 237110 with a size standard of $36,500,000. This project is scheduled to be awarded before the end of fiscal year 2018 with construction completion in 2021. The estimated construction cost is between $10 to $30 million.


The proposed project includes approximately 31,000 linear feet of 6" through 16" ductile iron water mains; an 880,000 gallon pre-stressed concrete water storage tank with new access road; hydrants, valves, tees and other fittings; service connections to approximately 200 buildings; two blow-off valve assemblies; three vaults for an altitude valve, a water meter, and a pressure reducing valve; modifications to the existing Long Hill Pump Station in Middletown; site work including blasting, storm drains, and paving; and abandonment of approximately 110 private drinking wells.


The Government anticipates including two definitive responsibility criteria in the solicitation. In addition to examining the criteria in FAR 9.104-1, the Contracting Officer will also examine whether the low bidder can meet the following experience requirements:


1. A project completed within the past seven years that involved construction of a new water line of greater than $5 million that included at least 50 service connections.


2. A project completed within the past seven years that involved construction of a new water storage tank with capacity of at least 500,000 gallons.


The Contracting Officer will verify that the submitted projects meet the definitive responsibility criteria as part of the responsibility determination. Bidders are not required to submit additional documentation related to these criteria at the time of bid. The bidder anticipated to receive will be required to submit documentation of the experience in the definitive responsibility criteria within 3 business days of bid opening.


The solicitation is now available. The bid opening date will be stated in the solicitation. Please note this solicitation will be a small business set-aside. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online. In order to download the solicitation, offerors must access the Federal Business Opportunities website (www.fbo.gov). All responsible sources may submit a bid which shall be considered by the New England District. Any additional questions may be emailed to the Contract Specialist at Alysha.MacDonald@usace.army.mil.

.

Update #3 ·

The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids (IFB) for a project in Durham and Middletown, Connecticut. This project is to install a new water distribution system in Durham while using the existing water distribution system in Middletown for its water source. This procurement will be a small business set-aside only. The NAICS code for the work is 237110 with a size standard of $36,500,000. This project is scheduled to be awarded before the end of fiscal year 2018 with construction completion in 2021. The estimated construction cost is between $10 to $30 million.


The proposed project includes approximately 31,000 linear feet of 6" through 16" ductile iron water mains; an 880,000 gallon pre-stressed concrete water storage tank with new access road; hydrants, valves, tees and other fittings; service connections to approximately 200 buildings; two blow-off valve assemblies; three vaults for an altitude valve, a water meter, and a pressure reducing valve; modifications to the existing Long Hill Pump Station in Middletown; site work including blasting, storm drains, and paving; and abandonment of approximately 110 private drinking wells.


The Government anticipates including two definitive responsibility criteria in the solicitation. In addition to examining the criteria in FAR 9.104-1, the Contracting Officer will also examine whether the low bidder can meet the following experience requirements:


1. A project completed within the past seven years that involved construction of a new water line of greater than $5 million that included at least 50 service connections.


2. A project completed within the past seven years that involved construction of a new water storage tank with capacity of at least 500,000 gallons.


The Contracting Officer will verify that the submitted projects meet the definitive responsibility criteria as part of the responsibility determination. Bidders are not required to submit additional documentation related to these criteria at the time of bid. The bidder anticipated to receive will be required to submit documentation of the experience in the definitive responsibility criteria within 3 business days of bid opening.


The solicitation is now available. The bid opening date will be stated in the solicitation. Please note this solicitation will be a small business set-aside. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online. In order to download the solicitation, offerors must access the Federal Business Opportunities website (www.fbo.gov). All responsible sources may submit a bid which shall be considered by the New England District. Any additional questions may be emailed to the Contract Specialist at Alysha.MacDonald@usace.army.mil.

Update #2 ·

The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids (IFB) for a project in Durham and Middletown, Connecticut. This project is to install a new water distribution system in Durham while using the existing water distribution system in Middletown for its water source. This procurement will be a small business set-aside only. The NAICS code for the work is 237110 with a size standard of $36,500,000. This project is scheduled to be awarded before the end of fiscal year 2018 with construction completion in 2021. The estimated construction cost is between $10 to $30 million.


The proposed project includes approximately 31,000 linear feet of 6" through 16" ductile iron water mains; an 880,000 gallon pre-stressed concrete water storage tank with new access road; hydrants, valves, tees and other fittings; service connections to approximately 200 buildings; two blow-off valve assemblies; three vaults for an altitude valve, a water meter, and a pressure reducing valve; modifications to the existing Long Hill Pump Station in Middletown; site work including blasting, storm drains, and paving; and abandonment of approximately 110 private drinking wells.


The Government anticipates including two definitive responsibility criteria in the solicitation. In addition to examining the criteria in FAR 9.104-1, the Contracting Officer will also examine whether the low bidder can meet the following experience requirements:


1. A project completed within the past seven years that involved construction of a new water line of greater than $5 million that included at least 50 service connections.


2. A project completed within the past seven years that involved construction of a new water storage tank with capacity of at least 500,000 gallons.


The Contracting Officer will verify that the submitted projects meet the definitive responsibility criteria as part of the responsibility determination. Bidders are not required to submit additional documentation related to these criteria at the time of bid. The bidder anticipated to receive will be required to submit documentation of the experience in the definitive responsibility criteria within 3 business days of bid opening.


This is NOT a request for proposals at this time. The solicitation requirements and contract documents to include instructions for submission will be available on or about mid-May 2018. The bid opening date will be stated in the solicitation. Please note this solicitation will be a small business set-aside. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online. In order to download the solicitation, offerors must access the Federal Business Opportunities website (www.fbo.gov). All responsible sources may submit a bid which shall be considered by the New England District. Any additional questions may be emailed to the Contract Specialist at Alysha.MacDonald@usace.army.mil.

.

Update #1 ·

The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids (IFB) for a project in Durham and Middletown, Connecticut. This project is to install a new water distribution system in Durham while using the existing water distribution system in Middletown for its water source. This procurement will be a small business set-aside only. The NAICS code for the work is 237110 with a size standard of $36,500,000. This project is scheduled to be awarded before the end of fiscal year 2018 with construction completion in 2021. The estimated construction cost is between $10 to $30 million.


The proposed project includes approximately 31,000 linear feet of 6" through 16" ductile iron water mains; an 880,000 gallon pre-stressed concrete water storage tank with new access road; hydrants, valves, tees and other fittings; service connections to approximately 200 buildings; two blow-off valve assemblies; three vaults for an altitude valve, a water meter, and a pressure reducing valve; modifications to the existing Long Hill Pump Station in Middletown; site work including blasting, storm drains, and paving; and abandonment of approximately 110 private drinking wells.


The Government anticipates including two definitive responsibility criteria in the solicitation. In addition to examining the criteria in FAR 9.104-1, the Contracting Officer will also examine whether the low bidder can meet the following experience requirements:


1. A project completed within the past seven years that involved construction of a new water line of greater than $5 million that included at least 50 service connections.


2. A project completed within the past seven years that involved construction of a new water storage tank with capacity of at least 500,000 gallons.


The Contracting Officer will verify that the submitted projects meet the definitive responsibility criteria as part of the responsibility determination. Bidders are not required to submit additional documentation related to these criteria at the time of bid. The bidder anticipated to receive will be required to submit documentation of the experience in the definitive responsibility criteria within 3 business days of bid opening.


This is NOT a request for proposals at this time. The solicitation requirements and contract documents to include instructions for submission will be available on or about mid-May 2018. The bid opening date will be stated in the solicitation. Please note this solicitation will be a small business set-aside. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online. In order to download the solicitation, offerors must access the Federal Business Opportunities website (www.fbo.gov). All responsible sources may submit a bid which shall be considered by the New England District. Any additional questions may be emailed to the Contract Specialist at Alysha.MacDonald@usace.army.mil.

Files

File Type Posted
Bid_Abstract-signed.pdf PDF
Bid_Snapsheet.pdf PDF
Amendment_0006_-_Durham_Sheet_E4_Revised_15_Aug_2018.pdf PDF
Amendment_0006.pdf PDF
Amendment_0006_-_Durham_Spec_Section_11355_Revised_15_Aug_2018.pdf PDF
Amendment_0006_-_Durham_Sheet_E3_Revised_15_Aug_2018.pdf PDF
Volume_2_Appendix_A_pages_1_to_207.pdf PDF
Amendment_0005_-_19_Maiden_Lane_Amendment.pdf PDF
Volume_2_Appendix_B_pages_401_to_600.pdf PDF
Amendment_0005_.pdf PDF
Amendment_0005_-_C-505_Bid_Amendment.pdf PDF
Volume_2_Appendix_B_pages_208_to_400.pdf PDF
Volume_2_Appendix_C_pages_687_to_688.pdf PDF
Amendment_0005_-_C-4_Bid_Amendment.pdf PDF
Amendment_0005_-_Updated_Specifications.pdf PDF
Volume_2_Appendix_B_pages_601_to_686.pdf PDF
Volume_2_Appendix_D_pages_689_to_696.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0003_-_Change_to_Specifications.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Specs_Vol_1_Durham_Waterline_10_May_2018_Final.pdf PDF
Specs_Vol_2_Durham_Appendix_10_May_2018_Final.pdf PDF
Durham_Waterline_BODR_Appendices_25_April_2018.pdf PDF
Specifications.pdf PDF
W912WJ18B0016.pdf PDF
Plans_Durham_Meadows_Waterline_10_May_2018_Final.pdf PDF
Durham_BasisOfDesignReport_25Apr18.pdf PDF
Show all 29

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors