Amendment_0003_-_Change_to_Specifications.pdf

PDF 175 KB Posted

Attached to
New Water Distribution System in Durham and Middletown, Connecticut
Solicitation number
W912WJ18B0016
Issued by

About this file

Addendum to Specifications

View the file

Other files

File Type Posted
Bid_Abstract-signed.pdf PDF
Bid_Snapsheet.pdf PDF
Amendment_0006_-_Durham_Spec_Section_11355_Revised_15_Aug_2018.pdf PDF
Amendment_0006_-_Durham_Sheet_E3_Revised_15_Aug_2018.pdf PDF
Amendment_0006_-_Durham_Sheet_E4_Revised_15_Aug_2018.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005_-_19_Maiden_Lane_Amendment.pdf PDF
Volume_2_Appendix_B_pages_401_to_600.pdf PDF
Amendment_0005_.pdf PDF
Volume_2_Appendix_C_pages_687_to_688.pdf PDF
Amendment_0005_-_Updated_Specifications.pdf PDF
Amendment_0005_-_C-505_Bid_Amendment.pdf PDF
Volume_2_Appendix_B_pages_208_to_400.pdf PDF
Volume_2_Appendix_B_pages_601_to_686.pdf PDF
Volume_2_Appendix_D_pages_689_to_696.pdf PDF
Amendment_0005_-_C-4_Bid_Amendment.pdf PDF
Volume_2_Appendix_A_pages_1_to_207.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Durham_BasisOfDesignReport_25Apr18.pdf PDF
Durham_Waterline_BODR_Appendices_25_April_2018.pdf PDF
Specifications.pdf PDF
Specs_Vol_2_Durham_Appendix_10_May_2018_Final.pdf PDF
Plans_Durham_Meadows_Waterline_10_May_2018_Final.pdf PDF
W912WJ18B0016.pdf PDF
Specs_Vol_1_Durham_Waterline_10_May_2018_Final.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 13225, Section 1.07, Paragraph D.5

Current Text:

“5. Submittals: The general contractor shall state the name of the tank contractor proposed for the work in their bid. Tank contractors seeking approval as an “equal” shall provide the submittals listed below with their bids. Bids that do not state the name of the tank contractor or include the required qualifications as shown below will be rejected.”

Revised Text:

“5. Submittals: The general contractor shall state the name of the tank contractor proposed for the work in a submittal within 60 days of contract award. Tank contractors seeking approval as an “equal” shall provide the submittals listed below with within 60 days of contract award.”

File details come from the government source that posted it.