Amendment_0005_.pdf

PDF 782 KB Posted

Attached to
New Water Distribution System in Durham and Middletown, Connecticut
Solicitation number
W912WJ18B0016
Issued by

About this file

Amendment 0005

View the file

Other files

File Type Posted
Bid_Abstract-signed.pdf PDF
Bid_Snapsheet.pdf PDF
Amendment_0006_-_Durham_Spec_Section_11355_Revised_15_Aug_2018.pdf PDF
Amendment_0006_-_Durham_Sheet_E3_Revised_15_Aug_2018.pdf PDF
Amendment_0006_-_Durham_Sheet_E4_Revised_15_Aug_2018.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005_-_19_Maiden_Lane_Amendment.pdf PDF
Volume_2_Appendix_B_pages_401_to_600.pdf PDF
Volume_2_Appendix_C_pages_687_to_688.pdf PDF
Amendment_0005_-_Updated_Specifications.pdf PDF
Amendment_0005_-_C-505_Bid_Amendment.pdf PDF
Volume_2_Appendix_B_pages_208_to_400.pdf PDF
Volume_2_Appendix_B_pages_601_to_686.pdf PDF
Volume_2_Appendix_D_pages_689_to_696.pdf PDF
Amendment_0005_-_C-4_Bid_Amendment.pdf PDF
Volume_2_Appendix_A_pages_1_to_207.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0003_-_Change_to_Specifications.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Durham_BasisOfDesignReport_25Apr18.pdf PDF
Durham_Waterline_BODR_Appendices_25_April_2018.pdf PDF
Specifications.pdf PDF
Specs_Vol_2_Durham_Appendix_10_May_2018_Final.pdf PDF
Plans_Durham_Meadows_Waterline_10_May_2018_Final.pdf PDF
W912WJ18B0016.pdf PDF
Specs_Vol_1_Durham_Waterline_10_May_2018_Final.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er RFIs and update the specifications, bid schedule, and draw ings. The bid opening date remains unchanged. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 24

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ-18-B-0016

X 9B. DATED (SEE ITEM 11)

14-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0005

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Aug-2018

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ-18-B-0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

An * in the bid schedule represents changes.

The following have been modified:

BIDDING SCHEDULE

Refer to Section 01 22 00 MEASUREMENT AND PAYMENT.

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

Base Bid Items

0001 16-inch DI Pipe 5,070 LF $______ $________

0002 12-inch DI Pipe 3,700 LF $______ $________

0003 8-inch DI Pipe 1,900 LF $______ $________

0004 20-inch Restrained Joint DI Pipe 202 LF $______ $________

0005 16-inch Restrained Joint DI Pipe 7,900 LF $______ $________

0006 12-inch Restrained Joint DI Pipe 5,700 LF $______ $________

0007 8-inch Restrained Joint DI Pipe 3,600 LF $______ $________

0008 6-inch Restrained Joint DI Pipe 200 LF $______ $________

0009 4-inch DI Pipe for School Services 600 LF $______ $________

0010 16” x 16” x 16” Tee 5 EA $______ $________

0011 16” x 16” x 12” Tee 6 EA $______ $________

0012 16” x 16” x 8” Tee 11 EA $______ $________

0013 16” x 16” x 8” x 8" Cross 1 EA $______ $________

0014 12” x 12” x 12” Tee 5 EA $______ $________

0015 12” x 12” x 8” Tee 6 EA $______ $________

0016 12” x 12” x 4” Tee 4 EA $______ $________

0017 12” x 8” Wye 1 EA $______ $________

0018 8” x 8” x 8” Tee 4 EA $______ $________

0019 4” x 4” x 4” Tee 1 EA $______ $________

0020 20” Butterfly Valve 1 EA $______ $________

0021 16” Butterfly Valve 43 EA $______ $________

0022 12” Gate Valve 37 EA $______ $________

0023 8” Gate Valve 30 EA $______ $________

0024 6” Gate Valve 1 EA $______ $________

0025 4” Gate Valve 8 EA $______ $________

0026 Fire Hydrant Assembly 57 EA $______ $________

0027 Manual Drain Assembly 1 EA $______ $________

0028 Water Service 1-inch Corporations 211 EA $______ $________

0029 Water Service 1.5-inch Corporations 12 EA $______ $________

0030 Water Service 2-inch Corporations 5 EA $______ $________

0031 Water Service 1-inch Curb Stops 211 EA $______ $________

0032 Water Service 1.5-inch Curb Stops 12 EA $______ $________

0033 Water Service 2-inch Curb Stops 5 EA $______ $________

0034 Water Service 1-inch Copper Pipe 19,000 LF $______ $________

0035 Water Service 1.5-inch Copper Pipe 3,500 LF $______ $________

0036 Water Service 2-inch Copper Pipe 2,700 LF $______ $________

0037 External Water Service Meter Pits 20 EA $______ $________

0038 Special 4-inch Water Service Meter Pits 2 EA $______ $________

0039 External Backflow Preventer 1 EA $______ $________

0040 Water Service Installation by Soil Piercing Method Under Sidewalks 1,120 LF $______ $________

0041 Plumbing Work Required to Complete New Water Service Installation to Building Cold Water Feed Plumbing 115 EA $______ $________

0042 Decommissioning of Water Supply Wells 125 EA $______ $________

0043 Conversion of Water Supply Wells to Monitoring Wells *4* EA $______ $________

0044 Decommissioning of Durham Fairground Wells 1 Job Job $________

0045 Removal and Disposal of Treatment Units 52 EA $______ $________

0046 Stream Crossing, STA 904+50 to STA 905+50 1 Job Job $________

0047 Stream Crossing, STA 509+20 to STA 512+00 1 Job Job $________

0048 Stream Crossing, STA 410+50 to STA 412+00 1 Job Job $________

0049 Long Hill Pump Station Modifications 1 Job Job $________

0050 Meter Vault at Main Street, STA 125+60+/- 1 Job Job $________

0051 PRV Vault at Main Street, STA 163+50+/- 1 Job Job $________

0052 Excavation and Backfill of Test Pits 100 CD $______ $________

0053 Excavation of Earth Material Outside of Standard Trench Limits 7,600 CD $______ $________

0054 Rock and/or Boulder Excavation Including Replacement With Suitable Fill Material 1,800 CD $______ $________

0055 Bank-run Gravel 2,000 CD $______ $________

0056 Additional Screened Gravel 2,000 CD $______ $________

0057 Selected Borrow 1,100 CD $______ $________

0058 Removal and Disposal of Contaminated Material 1,100 CD $______ $________

0059 Miscellaneous Concrete 100 CD $______ $________

0060 Sheeting Left in Place 200 SY $______ $________

0061 **Sawcut in State Roads *29,000* LF $______ $________

0062 **Sawcut in Town Roads *75,000* LF $______ $________

0063 Road Gravel Base Course Material 500 CD $______ $________

0064 3-inch Trench Pavement Furnished and Placed in Town Roads 500 SY $______ $________

0065 6-inch Trench Pavement in State Roads 7,300 SY $______ $________

0066 HMA S1 Bituminous Concrete to Match Existing Thickness in State Roads 1,300 Ton $______ $________

0067 2-inch Overlay Pavement in Town Roads 43,600 SY $______ $________

0068 Milling and 2-inch Overlay Pavement Furnished and Placed in State Roads *31,000* SY $______ $________

0069 Driveway Apron Overlay at State Roadways 600 SY $______ $________

0070 6-inch Bituminous Concrete Curbing 360 LF $______ $________

0071 Main Street Traffic Loop Detector at Middlefield Road 1 Job Job $________

0072 Main Street Traffic Loop Detector at Wallingford Road 1 Job Job $________

0073 Main Street Traffic Loop Detector at Pickett Lane 1 Job Job $________

0074 Calcium Chloride, Furnished and Placed for Dust Control 2,000 LB $______ $________

0075 Erosion Control Silt Fence, Furnished and Placed for Dust Control 8,200 LF $______ $________

0076 Uniformed Police Officers 1 Job Job $________

0077 Dewatering for Water Main Installation, Furnished, Installed, Maintained and Removed 1 Job Job $________

0078 Dewatering for Stream Crossing at STA 904+50 to STA 905+50 Furnished, Installed, Maintained and Removed 1 Job Job $________

0079 Dewatering for Stream Crossing at STA 509+20 to STA 512+00

0080 Dewatering for Stream Crossing at STA 410+50 to STA 412+00

0081 Coordination, Permitting, Traffic Control, Site Preparation, Environmental Controls, and Turf Establishment or Other Incidental Work 1 Job Job $________

0082 Engineer’s Field Office, Furnished, Installed, 0083 Engineer’s Field Office, Maintained 36 MO $______ $________

0084 Construct Water Treatment System, Furnished, Installed

0085 Construct Water Treatment System, Operated and Maintained 20 MO $______ $________

0086 Construction Water Analytical Testing 1 Job Job $________

0087 Water Storage Tank and Access Roadway to STA 23+00 1 Job Job $________

0088 Booster Station and Appurtenances (Sta. 750+59) 1 Job Job $________

0089 Permanent Electrical Service to Water Tank, Booster Station, Meter Station, and PRV Vault 1 Job Job $20,000

0090 Permanent Telephone Service to Water Tank, Booster Station, and Meter Station 1 Job Job $15,000

0091 Permanent Natural Gas Service to Booster Station 1 Job Job $5,000

0092 Connecticut Water Service Company Service Connections 1 Job Job $50,000

0093 Connection Fee for Access to City of Middletown Water System 1 Job Job $140,000

TOTAL ESTIMATED AMOUNT $_____________

Note 1: "CD" = Cubic Yard, "EA" = Each, "LB" = Pound, "LF" = Linear Foot, "MO" = Month, "SY" = Square Yard.

Note 2: Bidders must bid all items. The work will be awarded as a whole to one bidder.

Note 3: All work shall be completed within the time period specified in Section 00 80 00 SPECIAL CONTRACT REQUIREMENTS, Subpart COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984) FAR 52.211-10.

Note 4: In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

-- End of Document --

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

Prior RFIs are answered in Amendments 0001-0003.

Amendment 0005:

44. Specification 01 11 00, 1.11.7: Please confirm that the gas main contractor will be complete prior to the start of this project.

The gas main contractor may not be done before the water line project begins. It is assumed that all work on Route 17 will have been completed but the work on Route 68 and the gas main extension on Maiden Lane and Pickett lane will not be completed before the start of the water line project.

On 17 July 2018 a representative of the gas company provided the following information – “The intersection of Rte 17 and Rte 68 will be completed tonight and in about 1 week they will be past Talcott Ridge Rd in Middletown. We do have a new business project off the 16” line on Maiden Lane and Pickett Lane to serve the high school and Korn School in 2019. Rte 68 between Rte 17 and the skating pond (and further west) will be phase 3 work in 2019. We have installed a stub halfway across the intersection of Rte 17 and Rte 68 to continue our phase 3 work in 2019.”

45. Please provide as-built or plan drawings of the location of the new gas line.

As of now, we do not have as-built drawings. A representative of the gas company provided the following information – “We should be able to provide you with GIS mapping showing our main installation in the water main installation area before you start. The 16” gas main was installed with a normal depth of cover of 36” and the mapping is for reference only and will not have depth information that can be used to locate our facilities in the vertical plane.”

46. Will the current gas line installation company be required to re-pave State Route 17?

The gas line installation company is responsible to re-pave the side of Route 17 where the gas main is installed. The water line will run on the opposite side and the water line contractor must re-pave along that side as well as any curb stop and intersections.

47. Compensation for well decommissioning is standard regardless of depth, and is based on actual number completed. Please confirm that this unit price item will be paid based on units, and is not to be considered a lump sum item. Please additionally confirm that FAR 52.211-18 (Variation in Estimated Quantity) applies.

This question refers to bid item 0042. Yes – the item will be paid based on unit price each, not lump sum. Yes – the Variations in Quantity clause applies.

48. Measurement and Payment: CLINs 001 to 0009 does not mention compaction. Please confirm that compaction testing should be priced with the appropriate pipe installation area.

Yes – compaction testing should be priced as part of items 0001 through 0009. Consider it to be part of the ‘backfill’ and ‘testing’ requirement.

49. Measurement and Payment: CLIN 0042 indicates decommissioning and conversion to monitoring wells is under 0039; this appears to be in error and should be 0043; please indicate where to price the conversion – at 0042 or 0043?

You are correct, the reference should be line item 0043, not 0039. See revisions to Measurement and Payment section.

50. Measurement and Payment: CLIN 0043 says three wells converted plus the Durham Fair Ground well are included in this item. That would make 4. Bid form only shows three. What should be priced?

The quantity for item 0043 should be 4 not 3. Refer to revised unit price schedule.

51. Measurement and Payment: Paragraph 1.4 pp: The text says that the contractor must gain an access agreement before working on private property for decommissioning wells. It appears that the Consent for Access to Property forms included with the contract documents already cover that work. Please clarify what additional information / access agreements will be required beyond what is already established.

The water line contractor will be responsible for confirming that there has not been a change in property ownership that would require a new access agreement and provide information to support scheduling and interaction with property owners regarding the work to be performed.

52. Measurement and Payment: “Miscellaneous Earthwork Excavation” is called out in Items 0055, 0056, and 0057 does not exist on the bid form. Is this meant as a reference to bid item 0053, Excavation of Earth Material Outside of Standard Trench Limits?

It is not meant as a reference to bid item 0053.

53. Please confirm that all material excavated from the trench will require analytical testing for legal disposal.

Material excavated from the service line trench on the Durham Manufacturing Company property at 201/203 Main Street in Durham shall be analyzed as appropriate to meet disposal facility requirements. Historical data is available in Appendix D. Trenching operations outside the limits of the 201/203 Main Street property shall comply with the requirements of the CT DEEP Guidance for Utility Company Excavation, if contaminated soil is encountered.

54. Measurement and Payment: Payment for Removal and disposal of contaminated materials in CLIN 0058 (paragraph fff) will only be used if the contaminated materials are encountered during construction. It further states that the Contracting Officer will review invoices, etc. If this item will only be paid if contaminated materials are encountered, would it be better suited as an optional item?

Delete the sentence “This item would only be used if contaminated materials are encountered during construction.” Line item 0058 will not be an optional item. Refer to Appendix D for information regarding the contaminated material.

55. Measurement and Payment: Payment for Removal and disposal of contaminated materials in CLIN 0058 states that payments will be based on a review of invoices submitted by the Contractor for work by subcontractors, consultants, vendors, haulers, or disposal facilities, and detailed, itemized summaries for work completed directly by the contractor, as reviewed and approved by the Contracting Officer. Does this mean that if costs are significantly below the price per cubic yard that is bid that USACE would compensate for costs plus a negotiated fee?

The purpose of the review is to confirm that contaminated materials were in fact disposed of properly and to confirm quantity. The Variations in Quantity clause would apply to this line item.

56. Measurement and Payment: CLINs 0089 to 0093 include plug numbers. CLINs 92 and 93 include language related to a debit or credit, which is dependent on actual costs for installation / connection fees. This debit/credit language is not used in CLINs 89 through 91. Are offerors to assume that the CLINs 89 through 91 will be treated the same as 92 and 93?

Yes, items 89 through 91 will be treated the same as items 92 and 93 in that payment will be based on actual invoices.

57. Bid Item 0058 in the Measurement and Payment section specifically references property 203R Main St. In the Specification summary (01 11 00), 1.1.1, it states that contamination additionally exists at 201 Main Street. Under which item should bidders price contamination at property 201? Is the contaminant profile at 201 expected to be the same as at 203? Is the volume at 201 included in the stated volume at bid item 0058?

201 and 203 Main Street are part of the same parcel. The extent of the contamination is shown on sheet C-21 and the total quantity is part of bid item 0058.

58. Specification Section 01 11 00, 1.1.2 Winter Shutdown states “A mandatory winter shutdown period extending from 1 December to 31 March, inclusive, of any year, will be enforced during the performance period of this contract. During the winter shutdown periods, the Contractor will not be permitted to perform on-site construction work of any kind.”

a. Please confirm that this shutdown will be enforced regardless of unusual weather (i.e.

late winter freeze or early spring).

Yes, the shutdown will be enforced regardless of weather.

b. Please confirm that “work of any kind” includes basic site prep items or test pitting.

Yes, basic site prep and test pitting is part of “work of any kind.”

59. Please confirm that the “Durham Service Area” is limited to Areas A, E, and I on Figure 1 of the Basis of Design Report.

Response: The contractor should rely on the drawings to confirm the extent of the water line installation. Figure 1 of the is a general representation of the area to be served but the drawings supersede Figure 1.

60. Section 01 57 20, 3.1 states that the contractor is required to apply for a CTDOT encroachment permit, and to allow CTDOT an informal review of the contractor’s work plans.

What will the informal review entail?

As part of obtaining the encroachment permit CTDOT may request the work plans relating to work in the State right of way for review. Please be aware that a separate encroachment request must be submitted for the work in Durham and Middletown. EPA will coordinate obtaining the “owner” signatures on the encroachment permit.

61. Section 01 57 20, 3.1 indicates that the Contractor is responsible for obtaining a CT DEEP General Permit. What entity is considered the Registrant for this permit? What is the permit fee?

The contractor performing the work shall be the Registrant. Contact the CT DEEP for permit fee information.

Information regarding the General Permit can be found at http://www.ct.gov/deep/lib/deep/Permits_and_Licenses/Water_Discharge_General_Permits/com prehensive_gp.pdf

The contractor shall be required to complete the forms at the website below and comply with the requirements in the Comprehensive General Permit.

http://www.ct.gov/deep/lib/deep/Permits_and_Licenses/Water_Discharge_General_Permits/com prehensive_reg.pdf

62. Have all of the Consent for Access to Property forms necessary for the project been obtained? If no will USACE specify which properties do not have access agreements in place?

There are 5 properties which have not yet consented to a water line connection and 14 which have not yet consented to a curb stop. The contract should price the project assuming access for all properties is obtained but will only be responsible for installing work for properties where access has actually been obtained.

63. Drawing C-4: Please clarify the call-outs below Sta. 22+00. They are difficult to discern.

Refer to revised partial drawing C-4 which relocates the call-outs.

64. Reference RFI 3 of Amendment 0001 regarding lump sum reimbursement for Bid Item 0076, Uniformed Police Officers. During the estimating period crew sizes and the number of crews are determined, however, this may change in operation (at no cost to the Government). However, by adjusting the number of crews and therefore the number of locations being performed at any given time, the number of uniformed police officers that are needed will change. As a result, bidding this as a lump sum will cause some offerors to place significant markup on this item to protect itself against bearing significantly more costs than originally anticipated. Is it in the best interest of the Government to structure the unit of measure for this item as either a certain number of hours at a given rate or as an allowance of a given amount?

There will be no change to the bid schedule. Bid as shown.

65. Measurement and Payment: Paragraph 1.4, h says that 6” restrained joint pipe for hydrant laterals is paid under the hydrant assembly item. Paragraph 1.4, z says that the price for hydrant laterals does not include excavation. Please confirm that all excavation for all components of the hydrant assembly is included in Bid Item 0026.

Yes, the complete hydrant assembly (including 6-in hydrant lateral) is included in Bid item 0026 (and Paragraph 1.4 h notes that point). Paragraph 1.4 z states “The unit price for this item shall not include payment for items related to excavation which are paid under other items.

66. Measurement and Payment: Paragraph 1.4 pp: Please provide the average depth of wells to be decommissioned.

The average depth is estimated to be approximately 300 ft. (Note: Known well depths vary from approximately 150’ to over 400’. Logs are available for only a limited number of wells.)

67. Please confirm that ductile iron water piping is not required to be encased in polywrap.

There is no requirement to encase the ductile iron pipe in polywrap.

68. Specification 02521, 3.02A & B: Paragraphs note that Fairground wells may require additional or alternate treatment compared to those described in the specification. Please describe what those treatment methods might be.

The two Fairground wells will remain intact and not be abandoned. They will both be used as monitoring wells. The contractor shall remove the pumps and terminate the connection to the Pump Station to prevent cross-connection.

69. Please provide a new pavement cross-section for the storage tank access roadway.

The profile of the new roadway is shown on C-4 with a cross-section detail shown on C-506.

70. While the plans include indication of the proposed alignment of the new gas main, please provide revised or updated plans showing the actual location of the new gas main (including services if applicable) currently being installed if it varies from the proposed.

See response to question 45.

71. Drawing C-43: Please provide details for the domestic and fire service connections at the High School.

The services are to be brought to the vaults as shown. The connection will be performed by others (RSD #13).

72. Vibration-generating activities will require notification of residents within a 500-ft. radius per the plans (C-3, Note 5). Note that there are no explicit requirements for vibration monitoring on the plans. Please clarify whether vibration monitoring is required IAW Spec. Vol 1. Section 02018

Yes, vibration monitoring is required as per specification section 02018.

73. Sheet Numbers C-25 & C-27 state that the new 16” on Main Street & 12” on Maple Avenue should be connected to the existing 12” Line on Main Street & 8” on Maple Avenue. However, that line appears to be owned by Connecticut Water.

a. Is the cost of doing this covered by the plug number provided in CLIN 0092 (Connecticut Water Service Company Service Connections)?

No, that cost is not covered by item 0092 and should be included as part of the installation of the water main.

b. Will a meter be required between the Connecticut Water system and the new Durham system?

No, the Durham Center Water Service system is owned by the Town of Durham. Once installed, the two systems will be combined. No meter between the systems is required.

74. Sheets C-25 & C-27 show new domestic water services being installed on Connecticut Water’s System.

a. Will Connecticut Water install these connections or should the offerors include the cost?

b. If Connecticut Water performs the installation, who will be paving, milling, and overlaying in those areas?

The offerer shall include the cost for items identified in a and b.

75. Measurement and Payment CLINs 0034 – 0036 for service piping: Are excavation, sawcutting, bedding, backfill, temporary pavement, etc. included in these items? If not please identify where they are to be carried.

Yes, payment for services is inclusive as noted.

76. Section 02740, 3.11 requires water service installation by soil piercing method. This method often results in failed sidewalks due to the void created by the method applied.

a. Who will be responsible for the failed sidewalks?

The Contractor will be responsible for all failures to properly backfill all excavations.

b. Will USACE allow removal and replacement of sidewalks as an alternative?

The removal and replacement of sidewalks is not an acceptable alternative. The contractor shall backfill annular space under sidewalk with sand or bentonite slurry to eliminate all voids.

77. Amendment 2, RFI 21 regarding Tax Exempt status. Frequently when real property is installed on behalf of the Government it is tax exempt. We believe infrastructure such as a water main and service connections would fall under this category. Please clarify who is responsible for submitting the appropriate paperwork related to obtaining Tax Exempt status.

Tax exemption is approved on a case by case basis by the Contracting Officer. The contractor is responsible for submitting the appropriate state Tax Exempt form to the Contracting oOficer after award. While infrastructure is generally tax exempt, the Government cannot guarantee tax exempt status until reviewing the submitted form.

78. Measurement and Payment CLINs 0061 and 0062: Please confirm that sawcutting is for both main line and service piping.

Yes, sawcutting is for both main line and service piping. Item 0061 has been changed to read “Sawcut in State Roads” and Item 0062 shall be changed to read “Sawcut in Town Roads.”

Also, in the Bidding Schedule (Doc 00 41 00) the titles and estimated quantities are revised as follows:

0061 Sawcut in State Roads 29,000 lf 0062 Sawcut in Town Roads 75,000 lf

79. Measurement and Payment CLINs 0061 and 0062: These items are for Concrete Sawcut in State Roads and Bituminous Sawcut in Town Roads. It appears that there should be an additional item for Bituminous Sawcut in State Roads for trench lengths that are not underlain by concrete.

The estimated quantities under these items have been revised to reflect 2 sawcuts for pipeline and 2 sawcuts for services in each type of roadway.

80. Measurement and Payment: CLINs 0001 – 0009: The descriptions for these items include saw cutting. Should existing pavement sawcutting be carried here or in CLINs 0060 & 0062?

Sawcutting should be carried in line items 0061 and 0062. The descriptions for line items 0001 through 0009 are revised to delete the reference to sawcutting.

81. Measurement and Payment: CLINs 0001 – 0009: Please confirm that compaction testing is included in these items.

Yes, this work should be included in the pipeline installation items. Since there is no specific item for compaction testing, according to 01 22 00, Para 1.4, it must be included in the work item that it is most closely associated with the work involved.

82. Who is the contractor that installed the Treatment Units listed in CLIN 0045?

The bidder will be responsible for removal and disposal. The name of the maintenance contractor is not necessary.

83. Who is the contractor performing Operations and Maintenance of the Treatment Units listed in CLIN 0045?

The offeror will be responsible for removal and disposal. The name of the maintenance contractor is not necessary.

84. Please provide a list of disposal facilities that will accept discarded material from cleaning and regular O&M of the Treatment Units listed in CLIN 0045.

That is the responsibility of the bidder. Specific facilities must be identified and submitted for approval. Approval is only valid for 90 days; therefore, advanced approval cannot be provided.

85. Is the analytical data provided (Attachment 3- Environmental Sampling Results (2013) and Appendix D- Historical Site Data) representative of material that exists at 203R Main Street?

Yes, the analytical data in Appendix D is representative of the material to be found at 203R Main Street.

What are the contaminants of concern related to the Treatment Units?

The analytical data in Appendix D is representative of the material to be found at 203R Main Street. Contaminants of concern include Volatile organic compounds (VOCs) and chlorinated VOCs.

86. Please provide product information related to the Treatment Units (i.e. a cut sheet) so that offerors will know what materials the treatment units consist of and the general sizing.

No cut sheets are available for these units. The carbon vessels are approximately 1 ft. in diameter and 4.5 ft high.

87. Please re-issue Specification Vol. 2 of 2 in sections or in another format as the document is too large and not navigable or printable— an error occurs when trying to print.

We have broken down the pdf file into smaller, more manageable files and uploaded them with this amendment.

88. Amendment 0002, RFI 18: Response regarding AIS refers to Clause 52-225-12. Please confirm that this requirement, in fact, applies to this procurement.

Clause 52.225-12 is applicable and included in the contract in section 00100. Bidders are to adhere to the Buy American requirements when preparing their bid.

89. Due to the level of detail and complexity of this project, please provide at least a 3-week extension (August 21) to the July 31 date for receipt of bids.

As of Amendment 0004, the bid opening date is extended to August 21, 2018.

90. Clarification: Will different elements of this project be bid separately? IE, the utility work and the tank subcontracting?

In accordance with FAR Part 14, this project is bid as one complete project. Subcontractors interested in teaming with primes should check with FBO.GOV, where they will find the attendees from the site visit in Amendment 0001 or the interested vendors tab.

91. Please confirm that CTDOT will not allow traffic to be re-routed off of the state route 17 and onto town roads.

Re-routing of traffic is not allowed by Durham and is not possible in Middletown.

92. Clarification to Sheet C-505.

See revised detail changing ‘Temporary Trench Pavement Detail’ to ‘Permanent Trench Pavement Detail’.

93. Revised water connection details for 19 Maiden Lane.

Refer to revised service connection details sheets for 19 Maiden Lane.

94. Amendment No. 0001 issued July 5, 2018 indicates that the contractor is responsible for all costs of testing (i.e., concrete testing, compaction testing, etc.). Specification Section 13225 – Pre-stressed Concrete Tanks, Paragraph 3.02.A states that the "Contracting Officer shall engage and pay for the services of an independent National Voluntary Laboratory Accreditation Program

(NVLAP) accredited construction materials testing laboratory to perform field quality assurance testing. Contractor shall engage and pay for NVLAP testing laboratory for all services required to demonstrate compliance of materials submitted for shop drawing review". Please confirm who is responsible for concrete testing associated with the pre-stressed concrete storage tank.

The contractor is responsible for concrete testing associated with the pre-stressed concrete storage tank.

Delete 13225, 3.02.A:

“Contracting Officer shall engage and pay for the services of an independent National Voluntary Laboratory Accreditation Program (NVLAP) accredited construction materials testing laboratory to perform field quality assurance testing. Contractor shall engage and pay for NVLAP testing laboratory for all services required to demonstrate compliance of materials submitted for shop drawing review.”

Replace with:

“Contractor shall engage and pay for the services of an independent National Voluntary Laboratory Accreditation Program (NVLAP) accredited construction materials testing laboratory to perform field quality assurance testing. Contractor shall engage and pay for NVLAP testing laboratory for all services required to demonstrate compliance of materials submitted for shop drawing review.”

(End of Summary of Changes)