LTUY202005 Construct Vehicle Operations Covered Parking
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W50S8K26QA002
- Agency
-
Missouri National Guard
Army National Guard, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Saint Louis, Missouri 63125, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Missouri Air National Guard seeks construction of two covered parking structures with rooftop solar panels at Jefferson Barracks Air National Guard Station in St. Louis, with quotations due August 11 at 10:00 AM local time. This is a total small business set-aside using simplified acquisition procedures under FAR Part 12.
Place of performance is Lemay Township, Missouri. The project encompasses approximately 6,100 square feet of new exterior parking canopy designed to cover 20 parking stalls (10 per structure) and includes a 122.4 kW grid-interactive photovoltaic system with four 25 kW three-phase string inverters interconnecting at 208V to Building 41. The structure is classified as Type II-B construction with zero-hour fire resistance rating under NFPA 101 and IBC 2021.
The Government's target price range is $500,000 to $1,000,000. The preferred project schedule is 260 calendar days after notice to proceed. Performance and payment bonds equal to 100 percent of contract price are required within 10 calendar days after award. The solicitation is Firm Fixed Price with Davis-Bacon wage rates applicable; prevailing wage rates for St. Louis County construction trades range from approximately $31.80 to $52.73 per hour with fringe benefits ranging from 14.91 to 38.44 percent.
Distinctive technical requirements include AISC Certified Fabrication Plant Category BU certification and AISC Certified Erector Category CSE for structural steel work; concrete must achieve 31 MPa compressive strength at 28 days with minimum 20 percent fly ash content and 25 percent recycled aggregate; photovoltaic modules must be IEC 61215 and UL 1703 compliant with minimum 17 percent efficiency and 25-year/80 percent power warranty; inverters require IEEE 1547 and UL 1741 compliance with 20-year manufacturing defect warranty; and all electrical work must comply with NFPA 70. Contractors must perform field utility locates through MO One Call and coordinate with Base Civil Engineering. The base project includes 24 bollards; four alternates provide optional waterproof receptacles, standing seam metal roof deletion of PV system, and gutter/downspout installation.
NAICS 236220, Commercial and Institutional Building Construction; PSC Y1PZ, Construction Of Other Non-Building Facilities. The original quotation deadline of July 21 was extended to August 5, then to August 11 by amendments issued July 16 and July 31 to allow pre-award RFI responses. Amendment 2, effective July 31, added new architectural site plan and electrical drawings dated July 24, 2026, and a paints and coatings specification. Contracting officer is Joseph P. Bernier, MSgt, MOANG.
Notice text
5 versions
Update #5 · Latest ·
This is combined presolicitation/solicitation notice for commercial services prepared in accordance with RFO FAR part 12. This announcement constitutes the only solicitation notice. Quotations are being requested.
Solicitation W50S8K26QA002 is being issued as a Request for Quotation (RFQ) in accordance with RFO FAR 12.201-1 simplified procedures for construction of two covered parking structures with rooftop solar panels at Jefferson Barracks Air National Guard Station, St. Louis, MO.
This acquisition is set-aside for small business concerns. All responsible sources may submit a quotation which will be considered by the agency. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
See attachments for line item details, description of requirements, completion time, applicable provisions & clauses, date, time, and place for receipt of quotations, and points of contact for the RFQ. This solicitation includes option line items that will be evaluated as part of the award decision.
The Government's target price range is between $500,000 and $1,000,000.
In accordance with RFO FAR 36.101-4, the following information is provided:
1. The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at RFO FAR 43.304, RFO DFARS 243.304 and AFARS 5143.304.
2. Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non-Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor’s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see “History” section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Update, 15 July 2026: Pre-quotation site visit sign-in sheet and MDP pictures added to files. Other RFI are being worked and responses will be posted once available. MDP pictures are provided for informational purposes only. Contractors are responsible for verifying all site conditions. Additional site visits can be scheduled upon request.
Update, 16 July 2026: Amendment 1 extending due date to 5 August 2026 added to attachments. Only change in amendment is the due date. There are no changes to other attachments, system geneated table of contents on SF30 was not changed.
Update, 30 July 2026: Revised drawings and paint specifications added to files. Panel location in Building 41 has been corrected on drawings. Responses to RFI are being worked and will be posted to SAM.gov with Amendment 2. Quotation due date will be extended.
Update, 31 July 2026: Amendment 2 formally incorporated revised drawings and specifications attached. Also attached are responses to all pre-award RFI with supporting documents. New quote due date is 11 August 2026 at 10:00 AM local time.
Update #4 ·
This is combined presolicitation/solicitation notice for commercial services prepared in accordance with RFO FAR part 12. This announcement constitutes the only solicitation notice. Quotations are being requested.
Solicitation W50S8K26QA002 is being issued as a Request for Quotation (RFQ) in accordance with RFO FAR 12.201-1 simplified procedures for construction of two covered parking structures with rooftop solar panels at Jefferson Barracks Air National Guard Station, St. Louis, MO.
This acquisition is set-aside for small business concerns. All responsible sources may submit a quotation which will be considered by the agency. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
See attachments for line item details, description of requirements, completion time, applicable provisions & clauses, date, time, and place for receipt of quotations, and points of contact for the RFQ. This solicitation includes option line items that will be evaluated as part of the award decision.
The Government's target price range is between $500,000 and $1,000,000.
In accordance with RFO FAR 36.101-4, the following information is provided:
1. The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at RFO FAR 43.304, RFO DFARS 243.304 and AFARS 5143.304.
2. Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non-Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor’s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see “History” section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Update, 15 July 2026: Pre-quotation site visit sign-in sheet and MDP pictures added to files. Other RFI are being worked and responses will be posted once available. MDP pictures are provided for informational purposes only. Contractors are responsible for verifying all site conditions. Additional site visits can be scheduled upon request.
Update, 16 July 2026: Amendment 1 extending due date to 5 August 2026 added to attachments. Only change in amendment is the due date. There are no changes to other attachments, system geneated table of contents on SF30 was not changed.
Update 30 July 2026: Revised drawings and paint specifications added to files. Panel location in Building 41 has been corrected on drawings. Responses to RFI are being worked and will be posted to SAM.gov with Amendment 2. Quotation due date will be extended.
Update #3 ·
This is combined presolicitation/solicitation notice for commercial services prepared in accordance with RFO FAR part 12. This announcement constitutes the only solicitation notice. Quotations are being requested.
Solicitation W50S8K26QA002 is being issued as a Request for Quotation (RFQ) in accordance with RFO FAR 12.201-1 simplified procedures for construction of two covered parking structures with rooftop solar panels at Jefferson Barracks Air National Guard Station, St. Louis, MO.
This acquisition is set-aside for small business concerns. All responsible sources may submit a quotation which will be considered by the agency. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
See attachments for line item details, description of requirements, completion time, applicable provisions & clauses, date, time, and place for receipt of quotations, and points of contact for the RFQ. This solicitation includes option line items that will be evaluated as part of the award decision.
The Government's target price range is between $500,000 and $1,000,000.
In accordance with RFO FAR 36.101-4, the following information is provided:
1. The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at RFO FAR 43.304, RFO DFARS 243.304 and AFARS 5143.304.
2. Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non-Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor’s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see “History” section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Update, 15 July 2026: Pre-quotation site visit sign-in sheet and MDP pictures added to files. Other RFI are being worked and responses will be posted once available. MDP pictures are provided for informational purposes only. Contractors are responsible for verifying all site conditions. Additional site visits can be scheduled upon request.
Update, 16 July 2026: Amendment 1 extending due date to 5 August 2026 added to attachments. Only change in amendment is the due date. There are no changes to other attachments, system geneated table of contents on SF30 was not changed.
Update #2 ·
This is combined presolicitation/solicitation notice for commercial services prepared in accordance with RFO FAR part 12. This announcement constitutes the only solicitation notice. Quotations are being requested.
Solicitation W50S8K26QA002 is being issued as a Request for Quotation (RFQ) in accordance with RFO FAR 12.201-1 simplified procedures for construction of two covered parking structures with rooftop solar panels at Jefferson Barracks Air National Guard Station, St. Louis, MO.
This acquisition is set-aside for small business concerns. All responsible sources may submit a quotation which will be considered by the agency. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
See attachments for line item details, description of requirements, completion time, applicable provisions & clauses, date, time, and place for receipt of quotations, and points of contact for the RFQ. This solicitation includes option line items that will be evaluated as part of the award decision.
The Government's target price range is between $500,000 and $1,000,000.
In accordance with RFO FAR 36.101-4, the following information is provided:
1. The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at RFO FAR 43.304, RFO DFARS 243.304 and AFARS 5143.304.
2. Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non-Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor’s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see “History” section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Update, 15 July 2026: Pre-quotation site visit sign-in sheet and MDP pictures added to files. Other RFI are being worked and responses will be posted once available. MDP pictures are provided for informational purposes only. Contractors are responsible for verifying all site conditions. Additional site visits can be scheduled upon request.
Update #1 ·
This is combined presolicitation/solicitation notice for commercial services prepared in accordance with RFO FAR part 12. This announcement constitutes the only solicitation notice. Quotations are being requested.
Solicitation W50S8K26QA002 is being issued as a Request for Quotation (RFQ) in accordance with RFO FAR 12.201-1 simplified procedures for construction of two covered parking structures with rooftop solar panels at Jefferson Barracks Air National Guard Station, St. Louis, MO.
This acquisition is set-aside for small business concerns. All responsible sources may submit a quotation which will be considered by the agency. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
See attachments for line item details, description of requirements, completion time, applicable provisions & clauses, date, time, and place for receipt of quotations, and points of contact for the RFQ. This solicitation includes option line items that will be evaluated as part of the award decision.
The Government's target price range is between $500,000 and $1,000,000.
In accordance with RFO FAR 36.101-4, the following information is provided:
1. The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at RFO FAR 43.304, RFO DFARS 243.304 and AFARS 5143.304.
2. Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements.
DISCLAIMER: The official solicitation and attachments will only be posted to SAM.gov and the Government is not liable for information furnished by any other source. If you are accessing this notice via a third-party non-Government website, you may not be seeing all available project information or attachments. Amendments, if/when issued will be posted to SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the contractor’s responsibility to check the website periodically for any amendments to the solicitation. Ensure you are viewing the latest version of the notice (see “History” section at bottom of webpage). Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a contractor’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Files
Show all 21
Notice history
| Notice | Type | Posted |
|---|---|---|
| LTUY202005 Construct Vehicle Operations Covered Parking | Award Notice | |
| This notice | Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity