This document is a specification section for concrete reinforcing and cast-in-place concrete work, along with structural steel and facility-scale solar photovoltaic (PV) systems for the Jefferson Barracks Covered Parking project (Contract 1218003).
Concrete Reinforcing (Section 03 20 00.00): The specification requires deformed reinforcing steel bars conforming to ASTM A615/A615M, ASTM A706/A706M, or ASTM A1035/A1035M, with a minimum of 25 percent recycled scrap steel content. Materials include dowels, fabricated bar mats, welded wire reinforcement, and wire ties. Shop drawings must be submitted for Government approval. Reinforcement placement must comply with ACI 318M standards with concrete coverage as indicated. Lap splices are permitted for bars No. 11 and smaller unless otherwise specified. Welders must be qualified per AWS D1.4/D1.4M with qualification tests performed at the worksite.
Cast-in-Place Concrete (Section 03 30 00): Exterior concrete must achieve a minimum compressive strength of 31 MPa (4,500 psi) at 28 days with a maximum water-cementitious materials ratio of 0.42 and 6 percent air content. The specification mandates trial mix designs, testing in accordance with ASTM C39/C39M, and compliance with ACI 301 and ACI 304R for mixing and placement. Fly ash content must be a minimum of 20 percent by weight of cementitious material, and recycled aggregate must comprise at least 25 percent. Curing periods follow ACI 301 requirements with temperature controls. Compressive strength tests require six cylinders per set at 7, 28, and 56 days, with a minimum of five sets sampled throughout the project.
Structural Steel (Section 05 12 00): Wide flange and WT shapes must conform to ASTM A992/A992M; angles, channels, and plates to ASTM A36/A36M, with minimum 80 percent recycled content. Structural steel tubing must meet ASTM A500/A500M Grade C with minimum 25 percent recycled content. High-strength bolts conform to ASTM F3125/F3125M Grade A325 with direct tension indicator washers. Fabrication requires AISC Certified Fabrication Plant Category BU certification, and erection requires AISC Certified Erector Category CSE. Bolted connections must be installed per AISC 360 specifications with non-shrink grout provided under base plates.
Solar Photovoltaic System (Section 26 31 00): The facility-scale PV system, rated less than 1 megawatt with system voltage not exceeding 1,000 VDC, must achieve minimum calculated annual energy production as indicated in project drawings. Photovoltaic modules must be IEC 61215 compliant, UL 1703 listed, monocrystalline technology with greater than 17 percent efficiency, manufactured in ISO 9001 certified facilities, with a 25-year linear 80 percent minimum power warranty and 10-year material/workmanship warranty. Inverters must be IEEE 1547 and UL 1741 compliant with 20-year manufacturing defect warranty, anti-islanding protection, and integrated monitoring. Combiner boxes require UL 1741 listing with 5-year warranty. Mounting systems must comply with UL 2703 and withstand seismic, wind, and snow loads per ASCE 7-16 and ICC IBC. All electrical work must comply with NFPA 70, with wiring in galvanized rigid steel conduit above grade and Schedule 40 PVC below grade. Grounding systems must not exceed 25 ohms resistance. Commissioning requires NABCEP-certified professionals and NETA acceptance testing, with functional performance testing including inverter startup, grid loss/resume, data monitoring, and islanding functionality verification. Final acceptance occurs after correcting all deficiencies and successful operation during a 30-day initial testing period. Training by factory-trained instructors (2 hours minimum) must be provided to Government personnel and fire department representatives prior to final acceptance.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jefferson Barracks - Covered Parking 1218003
Section 03 20 00.00 Page 1
SECTION 03 20 00.00
10 CONCRETE
REINFORCING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 117 (2010; Errata 2011) Specifications for
Tolerances for Concrete Construction and
Materials and Commentary
ACI 318 (2014; Errata 1-2 2014; Errata 3-5 2015;
Errata 6 2016) Building Code Requirements for Structural Concrete and Commentary
ACI 318M (2014; ERTA 2015) Building Code
Requirements for Structural Concrete &
Commentary
ACI SP-66 (2004) ACI Detailing Manual
AMERICAN WELDING SOCIETY (AWS)
AWS D1.4/D1.4M (2011) Structural Welding Code -
Reinforcing Steel
ASTM INTERNATIONAL (ASTM)
ASTM A1035/A1035M (2016a) Standard Specification for
Deformed and Plain, Low-carbon, Chromium, Steel Bars for Concrete Reinforcement
ASTM A1064/A1064M (2016b) Standard Specification for
Carbon-Steel Wire and Welded Wire
Reinforcement, Plain and Deformed, for
Concrete
ASTM A184/A184M (2006; E2011) Standard Specification for
Fabricated Deformed Steel Bar Mats for
Concrete Reinforcement
Section 03 20 00.00 Page 2
ASTM A36/A36M (2014) Standard Specification for
Carbon Structural Steel
ASTM A370 (2016) Standard Test Methods and
Definitions for Mechanical Testing of Steel Products
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-
Coated, Welded and Seamless
ASTM A615/A615M (2016) Standard Specification for
Deformed and Plain Carbon-Steel Bars for
Concrete Reinforcement
ASTM A675/A675M (2014) Standard Specification for
Steel Bars, Carbon, Hot-Wrought, Special Quality, Mechanical Properties
ASTM A706/A706M (2016) Standard Specification for
Low-Alloy Steel Deformed and Plain
Bars for Concrete Reinforcement
ASTM A767/A767M (2016) Standard Specification for
Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement
ASTM A884/A884M (2014) Standard Specification for
Epoxy-Coated Steel Wire and Welded
Wire Reinforcement
ASTM A934/A934M (2016) Standard Specification for Epoxy-Coated Prefabricated
Steel Reinforcing Bars
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
CRSI 10MSP (2009; 28th Ed) Manual of Standard Practice
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for [Contractor Quality Control approval.] [information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the
Government.] Submittals with an "S" are for inclusion in the
Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY
REPORTING. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Reinforcement; G[, [ ]]
SD-03 Product Data
Reinforcing Steel; G[, [ ]]
Section 03 20 00.00 Page 3
1.3 QUALITY ASSURANCE
1.3.1 Welding Qualifications
Welders are required to be qualified in accordance with AWS D1.4/D1.4M.
Perform qualification test at the worksite and notify the Contracting
Officer 24 hours prior to conducting tests. Special welding procedures and welders qualified by others may be accepted as permitted by AWS
D1.4/D1.4M. Submit a list of qualified welders names.
1.4 DELIVERY, STORAGE, AND HANDLING
Store reinforcement and accessories off the ground on platforms, skids, or other supports.
PART 2 PRODUCTS
2.1 DOWELS
Provide dowels conforming to ASTM A675/A675M, Grade 80 or ASTM
A1035/A1035M. Steel pipe conforming to ASTM A53/A53M, Schedule 80, may be used as dowels provided the ends are closed with metal or plastic inserts or with mortar.[
Provide plate dowels conforming to ASTM A36/A36M, of size and spacing indicated. Plate dowel system must minimize shrinkage restraint by
[using a tapered shape] [or] [formed void] [or] [by having compressible material on the vertical faces with a thin bond breaker on the top and bottom dowel surfaces.]]
2.2 FABRICATED BAR MATS
Fabricated bar mats conforming to ASTM A184/A184M.
2.3 REINFORCING STEEL
Reinforcing steel of deformed bars conforming to ASTM A615/A615M, ASTM A706/A706M, or ASTM A1035/A1035M grades and sizes as indicated. Cold drawn wire used for spiral reinforcement must conform to ASTM A1064/A1064M.
Submit certified copies of mill reports attesting that the reinforcing steel furnished contains no less than 25 percent recycled scrap steel and meets the requirements specified herein, prior to the installation of reinforcing steel.
2.4 WELDED WIRE REINFORCING
Welded wire reinforcing conforming to ASTM A1064/A1064M. When directed by the Contracting Officer for special applications, use welded wire reinforcing conforming to ASTM A884/A884M. For wire with a specified yield strength (fy) exceeding 400 MPa 60,000 psi, fy must be the stress corresponding to a strain of 0.35 percent.
2.5 WIRE TIES
Use wire ties that are 16 gauge or heavier black annealed steel wire.[
Ties for epoxy-coated bars mustl be vinyl-coated or epoxy-coated.][ Use zinc-coated ties for zinc-coated bars.]
Section 03 20 00.00 Page 4
PART 3 EXECUTION
3.1 REINFORCEMENT
Fabricate and place reinforcement steel and accessories as specified, as indicated, and as shown on approved shop drawings. Fabrication and placement details of steel and accessories not specified or shown mustl be in accordance with ACI SP-66 and ACI 318M ACI 318. Cold bend reinforcement unless otherwise authorized. Bending may be accomplished in the field or at the mill.[ Mill bend zinc-coated and epoxy-coated bars prior to coating. Bend all steel cold unless authorized.] Do not bend bars after embedment in concrete. Place safety caps on all exposed ends of vertical concrete reinforcement bars that pose a danger to life safety. Face wire tie ends away from the forms. Submit detail drawings showing reinforcing steel placement, schedules, sizes, grades, and splicing and bending details. Show support details including types, sizes and spacing.
3.1.1 Placement
Reinforcement must be free from loose rust and scale, dirt, oil, or other deleterious coating that could reduce bond with the concrete. Place reinforcement in accordance with ACI 318M ACI 318 at locations indicated plus or minus one bar diameter. Do not continue reinforcement through expansion joints and place as indicated through construction or contraction joints. Cover with concrete coverage as indicated or as required by
ACI 318M ACI 318. If bars are moved more than one bar diameter to avoid interference with other reinforcement, conduits or embedded items, the resulting arrangement of bars, including additional bars required to meet structural requirements, requires approval before concrete is placed.
3.1.2 Placing Tolerances
Conform bar spacing and concrete cover to ACI 117.
3.1.3 Splicing
Conform splices of reinforcement to ACI 318M ACI 318 and make only as required or indicated. Bars may be spliced at alternate or additional locations at no additional cost to the Government subject to approval.
Splicing must be by lapping or by mechanical or welded butt connection;
except that lap splices must not be used for bars larger thanNo. 35 No. 11 unless otherwise indicated.
3.1.3.1 Lap Splices
Place lapped bars in contact and securely tied or spaced transversely apart to permit the embedment of the entire surface of each bar in concrete. Do not space lapped bars farther apart than 1/5 the required length of lap or
150 mm 6 inches.
3.2 WELDED-WIRE REINFORCEMENT PLACEMENT
Place welded-wire reinforcement in slabs as indicated. Reinforcement placed in slabs on grade must be continuous between expansion, construction, and contraction joints. Reinforcement placement at joints must be as indicated.
Section 03 20 00.00 Page 5
May lap splices in such a way that the overlapped area equals the distance between the outermost crosswires plus 50 mm 2 inches. Stagger laps to avoid continuous laps in one direction. Wire or clip together reinforcement at laps at intervals not to exceed 1.2 m 4 feet. Position reinforcement by the use of supports.
3.3 DOWEL INSTALLATION
Install dowels in slabs on grade at locations indicated and at right angles to joint being doweled. Accurately position and align dowels parallel to the finished concrete surface before concrete placement. Rigidly support dowels during concrete placement. Coat one end of dowels with a bond breaker.[
-- End of Section --
Section 03 30 00 Page 1
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 117 (2010; Errata 2011) Specifications for
Tolerances for Concrete Construction and Materials and Commentary
ACI 121R (2008) Guide for Concrete
Construction Quality Systems in
Conformance with ISO 9001
ACI 211.1 (1991; R 2009) Standard Practice for Selecting Proportions for
Normal, Heavyweight and Mass
ACI 301 (2016) Specifications for Structural
ACI 304.2R (1996; R 2008) Placing Concrete by Pumping
Methods
ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete
ACI 305R (2010) Guide to Hot Weather Concreting
ACI 306.1 (1990; R 2002) Standard Specification for
Cold Weather Concreting
ACI 306R (2016) Guide to Cold Weather Concreting
ACI 308.1 (2011) Specification for Curing Concrete
ACI 318 (2014; Errata 1-2 2014; Errata 3-5 2015;
Errata 6 2016) Building Code Requirements for Structural Concrete and Commentary
ACI 347 (2004; Errata 2008; Errata 2012) Guide to
Formwork for Concrete
ACI SP-15 (2011) Field Reference Manual: Standard
Specifications for Structural Concrete ACI
301-05 with Selected ACI References
ACI SP-2 (2007; Abstract: 10th Edition) ACI Manual
Section 03 30 00 Page 2 of Concrete Inspection
ACI SP-66 (2004) ACI Detailing Manual
ASTM A615/A615M (2016) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM A706/A706M (2016) Standard Specification for
Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement
ASTM C1017/C1017M (2013; E 2015) Standard Specification for
Chemical Admixtures for Use in Producing
Flowing Concrete
ASTM C1077 (2016) Standard Practice for Laboratories
Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for
Laboratory Evaluation
ASTM C1218/C1218M (1999; R 2008) Standard Specification for
Water-Soluble Chloride in Mortar and
ASTM C1260 (2014) Standard Test Method for Potential
Alkali Reactivity of Aggregates
(Mortar-Bar Method)
ASTM C143/C143M (2015a) Standard Test Method for Slump of
Hydraulic-Cement Concrete
ASTM C150/C150M (2016; E 2016) Standard Specification for
Portland Cement
ASTM C1567 (2013) Standard Test Method for Potential
Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate
(Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2012) Standard Specification for Mixing
Water Used in Production of Hydraulic
Cement Concrete
ASTM C172/C172M (2014a) Standard Practice for Sampling
Freshly Mixed Concrete
ASTM C173/C173M (2016) Standard Test Method for Air
Content of Freshly Mixed Concrete by the
Volumetric Method
ASTM C192/C192M (2016a) Standard Practice for Making and
Curing Concrete Test Specimens in the
Laboratory
ASTM C231/C231M (2014) Standard Test Method for Air
Content of Freshly Mixed Concrete by the
Pressure Method
ASTM C260/C260M (2010a; R 2016) Standard Specification for
Section 03 30 00 Page 3
Air-Entraining Admixtures for Concrete
ASTM C31/C31M (2015a; E 2016) Standard Practice for
Making and Curing Concrete Test Specimens in the Field
ASTM C311/C311M (2013) Sampling and Testing Fly Ash or
Natural Pozzolans for Use as a Mineral
Admixture in Portland-Cement Concrete
ASTM C33/C33M (2016) Standard Specification for Concrete
Aggregates
ASTM
C39/C39M
(2016b) Standard Test Method for
Compressive Strength of Cylindrical
Concrete Specimens
ASTM C494/C494M (2016) Standard Specification for Chemical
Admixtures for Concrete
ASTM C595/C595M (2016) Standard Specification for Blended
Hydraulic Cements
ASTM C618 (2012a) Standard Specification for Coal
Fly Ash and Raw or Calcined Natural
Pozzolan for Use in Concrete
ASTM C920 (2014a) Standard Specification for
Elastomeric Joint Sealants
ASTM C94/C94M (2016a) Standard Specification for
Ready-Mixed Concrete
Section 03 30 00 Page 4
ASTM C989/C989M (2014) Standard Specification for Slag
Cement for Use in Concrete and Mortars
Section 03 30 00 Page 5
ASTM D5759 (2012) Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for
Potential Uses
ASTM E329 (2014a) Standard Specification for
Agencies Engaged in the Testing and/or
Inspection of Materials Used in
Construction
ASTM E96/E96M (2016) Standard Test Methods for Water
Vapor Transmission of Materials
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
CRSI 10MSP (2009; 28th Ed) Manual of Standard Practice
DEFINITIONS
a. "Cementitious material" as used herein must include all portland cement, pozzolan, fly ash, ground granulated blast-furnace slag, and
[silica fume].
b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the building. A public location is accessible to persons not responsible for operation or maintenance of the building.
c. "Chemical admixtures" are materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.
d. "Supplementary cementing materials" (SCM) include coal fly ash, [silica fume, granulated blast-furnace slag, natural or calcined pozzolans, and ultra-fine coal ash when used in such proportions to replace the portland cement that result in improvement to sustainability and durability and reduced cost.
e. "Design strength" (f'c) is the specified compressive strength of concrete at time(s) specified in this section to meet structural design criteria.
f. "Mass Concrete" is any concrete system that approaches a maximum temperature of 70 degrees C 158 degrees F within the first 72 hours of placement. In addition, it includes all concrete elements with a section thickness of 1 meter 3 feet or more regardless of temperature.
g. "Mixture proportioning" is the process of designing concrete mixture proportions to enable it to meet the strength, service life and constructability requirements of the project while minimizing the initial and life-cycle cost.
h. "Mixture proportions" are the masses or volumes of individual ingredients used to make a unit measure (cubic meter or cubic yard) of
Section 03 30 00 Page 6 concrete.
i. "Pozzolan" is a siliceous or siliceous and aluminous material, which in itself possesses little or no cementitious value but will, in finely divided form and in the presence of moisture, chemically react with calcium hydroxide at ordinary temperatures to form compounds possessing cementitious properties.
j. "Workability (or consistence)" is the ability of a fresh (plastic) concrete mix to fill the form/mould properly with the desired work
(vibration) and without reducing the concrete's quality.
Workabilit y depends on water content, chemical admixtures, aggregate (shape and size distribution), cementitious content and age (level of hydration).
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality
Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the
Sustainability Notebook, in conformance to Section 01 33 29
SUSTAINABILITY REPORTING. Submit the following in accordance with
Section 01 33 00 SUBMITTAL PROCEDURES:
Reinforcing Steel; G[, [ ]
Admixtures
Section 03 30 00 Page 7
SD-05 Design Data
Concrete Mix Design; G[, [ ]]
] SD-06 Test Reports
Concrete Mix Design; G[, [ ]]
Compressive Strength Tests; G[, [ ]]
Air Content
Slump Tests
SD-07 Certificates
Reinforcing Bars
SD-08 Manufacturer's Instructions
Curing Compound
1.3 DELIVERY, STORAGE, AND HANDLING
Follow ACI 301, ACI 304R and ASTM A934/A934M requirements and recommendations. Do not deliver concrete until vapor barrier, forms, reinforcement, embedded items, and chamfer strips are in place and ready for concrete placement. Do not store concrete curing compounds or sealers with materials that have a high capacity to adsorb volatile organic compound (VOC) emissions. Do not store concrete curing compounds or sealers in occupied spaces.
1.3.1 Reinforcement
Store reinforcement of different sizes and shapes in separate piles or racks raised above the ground to avoid excessive rusting. Protect from contaminants such as grease, oil, and dirt. Ensure bar sizes can be accurately identified after bundles are broken and tags removed.
1.4 QUALITY ASSURANCE
1.4.1Design Data
1.4.1.1 Concrete Mix Design
Submit a mix design for each strength and type of concrete. Submit a complete list of materials including type; brand; source and amount of cement, complementary cementitious materials, and admixtures; and applicable reference specifications. Submit mill test and all other test for cement, complementary cementitious materials, aggregates, and admixtures. Provide documentation of maximum nominal aggregate size, gradation analysis, percentage retained and passing sieve, and a graph of
Section 03 30 00 Page 8 percentage retained verses sieve size. If source material changes, resubmit mix proportion data using revised source material. Provide only materials that have been proven by trial mix studies to meet the requirements of this specification, unless otherwise approved in writing by the Contracting Officer. Indicate clearly in the submittal where each mix design is used when more than one mix design is submitted. Resubmit data on concrete components if the qualities or source of components changes.
For previously approved concrete mix designs used within the past twelve months, the previous mix design may be re-submitted without further trial batch testing if accompanied by material test data conducted within the last six months. Obtain mix design approval from the contracting officer prior to concrete placement.
a. Shop Drawings
1.4.1.2 Reinforcing Steel
ACI SP-66. Indicate bending diagrams, assembly diagrams, splicing and laps of bars, shapes, dimensions, and details of bar reinforcing, accessories, and concrete cover. Do not scale dimensions from structural drawings to determine lengths of reinforcing bars. Reproductions of contract drawings are unacceptable.
1.4.2 Test Reports
1.4.2.1 Fly Ash and Pozzolan
Submit test results in accordance with ASTM C618 for fly ash and pozzolan.
Submit test results performed within 6 months of submittal date.
1.4.2.2 Aggregates
ASTM C1260 for potential alkali-silica reactions, ASTM C295/C295M for petrographic analysis.
1.4.2.3 Field Testing Technician and Testing Agency
Submit data on qualifications of proposed testing agency and technicians for approval by the Contracting Officer prior to performing testing on concrete.
a Work on concrete under this contract must be performed by an ACI Concrete Field Testing Technician Grade 1 qualified in accordance with ACI SP-2 or equivalent. Equivalent certification programs must include requirements for written and performance examinations as stipulated in ACI
SP-2.
b Testing agencies that perform testing services on reinforcing steel must meet the requirements of ASTM E329.
c Testing agencies that perform testing services on concrete materials must meet the requirements of ASTM
C1077.
1.4.3 Laboratory Qualifications for Concrete Qualification Testing
Section 03 30 00 Page 9
The concrete testing laboratory must have the necessary equipment and experience to accomplish required testing. The laboratory must meet the requirements of ASTM C1077 and be Cement and Concrete Reference Laboratory
(CCRL) inspected.
1.4.4 Laboratory Accreditation
Laboratory and testing facilities must be provided by and at the expense of the Contractor. The laboratories performing the tests must be accredited in accordance with ASTM C1077, including ASTM C78/C78M and ASTM
C1260. The accreditation must be current and must include the required test methods, as specified. Furthermore, the testing must comply with the following requirements:
1.4.4.1 Aggregate Testing and Mix Proportioning: Aggregate testing and mixture proportioning studies must be performed by an accredited laboratory and under the direction of a [registered professional engineer in a U.S. state or territory competent in concrete materials][ ] who is competent in concrete materials and must sign all reports and designs.
1.4.4.2 Acceptance Testing: Furnish all materials, labor, and facilities required for molding, curing, testing, and protecting test specimens at the site and in the laboratory. Furnish and maintain boxes or other facilities suitable for storing and curing the specimens at the site while in the mold within the temperature range stipulated by
ASTM C31/C31M.
1.4.4.3 Contractor Quality Control: All sampling and testing must be performed by an approved, onsite, independent, accredited laboratory.
1.5 ENVIRONMENTAL REQUIREMENTS
1.5.1 Submittals for Environmental Performance
a. Provide data indication the percentage of post-industrial pozzolan (fly ash, blast furnace slag) cement substitution as a percentage of the full product composite by weight.
b. Provide data indicating the percentage of post-industrial and post-consumer recycled content aggregate.
c. Provide product data indicating the percentage of post-consumer recycled steel content in each type of steel reinforcement as a percentage of the full product composite by weight.
d. Provide product data stating the location where all products were manufactured
e. For projects using FSC certified formwork, provide chain-of-custody documentation for all certified wood products.
f. For projects using reusable formwork, provide data showing how formwork is reused.
Section 03 30 00 Page 10
g. Provide MSDS product information data showing that form release agents meet any environmental performance goals such as using vegetable and soy based products.
h. Provide MSDS product information data showing that concrete adhesives meet any environmental performance goals including low emitting, low volatile organic compound products.
2.1 MATERIALS FOR FORMS
Provide wood, plywood, plastic, carton, or steel. Use plywood or steel forms where a smooth form finish is required.
Perimeter insulation must be polystyrene conforming to ASTM C578, Type II;
polyurethane conforming to ASTM C591, Type II; or cellular glass conforming to ASTM C552, Type I or IV. Comply with EPA requirements in accordance with Section 01 33 29 SUSTAINABILITY REPORTING.
2.3 CONCRETE MIX DESIGN
2.3.2.1 Exterior Concrete
Proportion normal-weight concrete mixture as follows:
a. Minimum Compressive Strength: 31 MPa 4500 psi at 28 days.
b. Maximum Water-Cementitious Materials Ratio: 0.42.
c. Slump Limit: 100 mm 4 inches, 200 mm 8 inche] for concrete with verified slump of 50 to 100 mm 2 to 4 inches before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 25 mm 1 inch.
d. Air Content: 6 percent, plus or minus 1 percent at point of delivery for 38 mm 1-1/2 inch nominal maximum aggregate size.
2.3.2.2 Mix Proportions for Normal Weight Concrete
Trial design batches, mixture proportioning studies, and testing requirements for various classes and types of concrete specified are the responsibility of the Contractor. Base mixture proportions on compressive strength as determined by test specimens fabricated in accordance with
ASTM C192/C192M and tested in accordance with ASTM C39/C39M. Samples of all materials used in mixture proportioning studies must be representative of those proposed for use in the project and must be accompanied by the manufacturer's or producer's test report indicating compliance with these specifications. Base trial mixtures having proportions, consistencies, and
[air content] suitable for the work on methodology described in ACI 211.1.
In the trial mixture, use at least three different water-cementitious material ratios for each type of mixture, which must produce a range of strength encompassing those required for each class and type of concrete required on the project. The maximum water-cementitious material ratio allowed must be based on equivalent water-cementitious material ratio calculations as determined by the conversion from the weight ratio of water
Section 03 30 00 Page 11 to cement plus pozzolan by weight equivalency method. Design laboratory trial mixture for maximum permitted slump and air content. Each combination of material proposed for use must have separate trial mixture, except for accelerator or retarder use can be provided without separate trial mixture. Report the temperature of concrete in each trial batch.
For each water-cementitious material ratio, at least three test cylinders for each test age must be made and cured in accordance with ASTM C192/C192M and tested in accordance with ASTM C39/C39M for 7, 28, [56,][90] days.
From these results, plot a curve showing the relationship between water-cementitious material ratio and strength for each set of trial mix studies. In addition, plot a curve showing the relationship between 7 and
28 [56,][90] day strengths.
2.3.2.10 Required Average Strength of Mix Design
The selected mixture must produce an average compressive strength exceeding the specified strength by the amount indicated in ACI 301, but may not exceed the specified strength at the same age by more than 20 percent.
When a concrete production facility has a record of at least 15 consecutive tests, the standard deviation must be calculated and the required average compressive strength must be determined in accordance with ACI 301.
2.3.3 Ready-Mix Concrete
Provide concrete that meets the requirements of ASTM C94/C94M.
Ready-mixed concrete manufacturer must provide duplicate delivery tickets with each load of concrete delivered. Provide delivery tickets with the following information in addition to that required by ASTM C94/C94M:
Type and brand cement
Cement and complementary cementitious materials content in 43 kilogram
Section 03 30 00 Page 12
94-pound bags per cubic meter yard of concrete
Maximum size of aggregate
Amount and brand name of admixtures
Total water content expressed by water cementitious material ratio
2.3.4 Concrete Curing Materials
Provide concrete curing material in accordance with ACI 301 Section 5 and
ACI 308.1 Section 2. Submit product data for concrete curing compounds.
Submit manufactures instructions for placement of curing compound.
2.4 MATERIALS
2.4.1 Cementitious Materials
For exposed concrete, use one manufacturer and one source for each type of cement, ground slag, fly ash, and pozzolan.
2.4.1.1 Fly Ash
ASTM C618, Class F, except that the maximum allowable loss on ignition must not exceed [3][6] percent. Class F fly ash for use in mitigating
Alkali-Silica Reactivity must have a Calcium Oxide (CaO) content of less than 8 percent and a total equivalent alkali content less than 1.5 percent.
Add with cement. Fly ash content must be a minimum of 20 percent by weight of cementitious material, provided the fly ash does not reduce the amount of cement in the concrete mix below the minimum requirements of local building codes.Where the use of fly ash cannot meet the minimum level, provide the maximum amount of fly ash permittable that meets the code requirements for cement content. Report the chemical analysis of the fly ash in accordance with ASTM C311/C311M. Evaluate and classify fly ash in accordance with ASTM D5759.
2.4.1.2 Raw or Calcined Natural Pozzolan
Natural pozzolan must be raw or calcined and conform to ASTM C618, Class N, including the optional requirements for uniformity and effectiveness in controlling Alkali-Silica reaction and must have an ignition loss not exceeding 3 percent. Class N pozzolan for use in mitigating Alkali-Silica
Reactivity must have a Calcium Oxide (CaO) content of less than 13 percent and total equivalent alkali content less than 3 percent.
2.4.1.3 Ultra Fine Fly Ash and Ultra Fine Pozzolan
Ultra Fine Fly Ash (UFFA) and Ultra Fine Pozzolan (UFP) must conform to
ASTM C618, Class F or N, and the following additional requirements:
a. The strength activity index at 28 days of age must be at least 95 percent of the control specimens.
b. The average particle size must not exceed 6 microns.
c. The sum of SiO2 + Al2O3 + Fe2O3 must be greater than 77 percent.
Section 03 30 00 Page 13
2.4.1.4 Portland Cement
Provide cement that conforms to ASTM C150/C150M, Type [I][II][III], [low alkali] [including false set requirements] with tri-calcium aluminates
(C3A) content less than 10 percent and a maximum cement-alkali content of
0.80 percent Na2Oe (sodium oxide) equivalent. Use one brand and type of cement for formed concrete having exposed-to-view finished surfaces.
For portland cement manufactured in a kiln fueled by hazardous waste, maintain a record of source for each batch.][ Supplier must certify that no hazardous waste is used in the fuel mix or raw materials.][ Supplier must certify that the hazardous waste is neutralized by the manufacturing process and that no additional pollutants are discharged.
2.4.1.5 Blended Cements
Blended cement must conform to ASTM C595/C595M and ASTM C1157/C1157M, Type
IP or IS, including the optional requirement for mortar expansion and consist of a mixture of ASTM C150/C150M Type I, or Type II cement and a complementary cementing material. The slag added to the Type IS blend must be ASTM C989/C989M ground granulated blast-furnace slag. The pozzolan added to the Type IP blend must be ASTM C618 Class F and must be interground with the cement clinker. The manufacturer must state in writing that the amount of pozzolan in the finished cement will not vary more than plus or minus 5 mass percent of the finished cement from lot-to-lot or within a lot. The percentage and type of mineral admixture used in the blend must not change from that submitted for the aggregate evaluation and mixture proportioning.
2.4.2 Water
Water must comply with the requirements of ASTM C1602/C1602M. Minimize the amount of water in the mix. Improve workability by adjusting the grading rather than by adding water. Water must be potable; free from injurious amounts of oils, acids, alkalis, salts, organic materials, or other substances deleterious to concrete.
2.4.3 Aggregates
ASTM C33/C33M, except as modified herein. Furnish aggregates for exposed concrete surfaces from one source. Provide aggregates that do not contain any substance which may be deleteriously reactive with the alkalies in the cement. Submit test report showing compliance with ASTM C33/C33M.
2.4.3.1 Aggregates/Combined Aggregate Gradation (Floor Slabs Only)
ASTM C33/C33M, uniformly graded and as follows: Nominal maximum aggregate size of 25 mm 1 inch. A combined sieve analysis must indicate a well graded aggregate from coarsest to finest with not more than 18 percent and not less than 8 percent retained on an individual sieve, except that less than 8 percent may be retained on coarsest sieve and on No. 50 (0.3mm) sieve, and less than 8 percent may be retained on sieves finer than No. 50
(0.3mm). Provide sand that is at least 50 percent natural sand.
2.4.3.2 Aggregates for Lightweight Concrete
ASTM C330/C330M.
Section 03 30 00 Page 14
2.4.3.3 Recycled Aggregate Materials
Use a minimum of 25 percent recycled aggregate, depending on local availability and conforming to requirements of the mix design. Recycled aggregate to include: recovered concrete and recovered stone that meets the aggregate requirements specified. Submit recycled material request with the aggregate certification submittals and do not use until approved by the Design-Builder.
2.4.5 Admixtures
ASTM C494/C494M: Type A, water reducing; Type B, retarding; Type C, accelerating; Type D, water-reducing and retarding; and Type E, water-reducing and accelerating admixture. Do not use calcium chloride admixtures. Submit product data for admixtures used in concrete.
2.4.5.1 Air-Entraining
ASTM C260/C260M.
2.4.5.2 High Range Water Reducer (HRWR) (Superplasticizers)
ASTM C494/C494M, Type F and Type G (HRWR retarding admixture) and
ASTM C1017/C1017M.
2.4.9 Biodegradable Form Release Agent
Provide form release agent that is colorless, biodegradable, and [rapeseed oil-based] [soy oil-based] [water-based], with a [low (maximum of 55 grams/liter (g/l))] [zero] VOC content. [A minimum of [85][ ] percent of the total product must be biobased material. ]Provide product that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces. Provide form release agent that does not contain diesel fuel, petroleum-based lubricating oils, waxes, or kerosene. Submit documentation indicating type of biobased material in product and biobased content. Indicate relative dollar value of biobased content products to total dollar value of products included in project.
2.5 REINFORCEMENT
2.5.1 Reinforcing Bars (Refer to Section 032000.00-10)
3.1 EXAMINATION
Do not begin installation until substrates have been properly constructed; verify that substrates are level.
If substrate preparation is the responsibility of another installer, notify Contracting Officer of unsatisfactory preparation before processing.
Check field dimensions before beginning installation. If dimensions vary too much from design dimensions for proper installation, notify
Contracting Officer and wait for instructions before beginning
Section 03 30 00 Page 15 installation.
3.2 PREPARATION
Determine quantity of concrete needed and minimize the production of excess concrete. Designate locations or uses for potential excess concrete before the concrete is poured.
3.2.1 General
Surfaces against which concrete is to be placed must be free of debris, loose material, standing water, snow, ice, and other deleterious substances before start of concrete placing.
Remove standing water without washing over freshly deposited concrete. Divert flow of water through side drains provided for such purpose.
3.2.2 Subgrade Under Foundations and Footings
When subgrade material is semiporous and dry, sprinkle subgrade surface with water as required to eliminate suction at the time concrete is deposited, or seal subgrade surface by covering surface with specified vapor retarder. When subgrade material is porous, seal subgrade surface by covering surface with specified vapor retarder.
3.2.3 Reinforcement and Other Embedded Items
Secure reinforcement, joint materials, and other embedded materials in position, inspected, and approved before start of concrete placing.
3.3 FORMS
Provide forms, shoring, and scaffolding for concrete placementin accordance with ACI 301 Section 2 and 5 and ACI 347. Set forms mortar-tight and true to line and grade. Chamfer above grade exposed joints, edges, and external corners of concrete 20 mm 0.75 inch unless otherwise indicated. Provide formwork with clean-out openings to permit inspection and removal of debris.
3.3.1 Coating
Before concrete placement, coat the contact surfaces of forms with a form release agent.
3.3.2 Reuse
Reuse forms providing the structural integrity of concrete and the aesthetics of exposed concrete are not compromised. Wood forms must not be clogged with paste and must be capable of absorbing high water-cementitious material ratio paste.
3.3.3 Forms for Standard Rough Form Finish
Section 03 30 00 Page 16
Provide formwork in accordance with ACI 301 Section 5 with a surface finish, SF-1.0, for formed surfaces that are to be concealed by other construction.
3.3.4 Forms for Standard Smooth Form Finish
Provide formwork in accordance with ACI 301 Section 5 with a surface finish, SF-3.0, for formed surfaces that are exposed to view. Do not provide mockup of concrete surface appearance and texture.
3.3.5 Form Ties
Provide ties in accordance with ACI 301 section 2.
3.3.6 Tolerances for Form Construction
Construct formwork to ensure that after removal of forms and prior to patching and finishing of formed surfaces, provide concrete surfaces in accordance with tolerances specified in ACI 301 Section 5 and ACI 117.
3.3.7 Removal of Forms and Supports
After placing concrete, removal of forms must be in accordance with ACI 301
Section 2 except as modified by approved form removal schedule.
3.4.1 Reinforcement Supports
Support reinforcement in accordance with ACI 301 Section 3. Supports for coated or galvanized bars must also be coated with electrically compatible material for a distance of at least 2 inches beyond the point of contact with the bars.
3.5.6 Splicing
As indicated. For splices not indicated ACI 301. Do not splice at points of maximum stress. Overlap welded wire reinforcement the spacing of the cross wires, plus 50 mm 2 inches.
3.5.7 Setting Miscellaneous Material
Place and secure anchors and bolts, pipe sleeves, conduits, and other such items in position before concrete placement and support against displacement. Plumb anchor bolts and check location and elevation.
Temporarily fill voids in sleeves with readily removable material to prevent the entry of concrete.
3.5.8 Fabrication
Shop fabricate reinforcing bars to conform to shapes and dimensions indicated for reinforcement, and as follows:
Provide fabrication tolerances that are in accordance with ACI 318 and
ACI SP-66.
Provide hooks and bends that are in accordance with ACI 318 and ACI SP-66.
Section 03 30 00 Page 17
Reinforcement must be bent cold to shapes as indicated. Bending must be done in the shop. Rebending of a reinforcing bar that has been bent incorrectly is not be permitted. Bending must be in accordance with standard approved practice and by approved machine methods.
Tolerance on nominally square-cut, reinforcing bar ends must be in accordance with ACI SP-66.
Deliver reinforcing bars bundled, tagged, and marked. Tags must be metal with bar size, length, mark, and other information pressed in by machine.
Marks must correspond with those used on the placing drawings.
Do not use reinforcement that has any of the following defects:
a. Bar lengths, depths, and bends beyond specified fabrication tolerances
b. Bends or kinks not indicated on drawings or approved shop drawings
c. Bars with reduced cross-section due to rusting or other cause
Replace defective reinforcement with new reinforcement having required shape, form, and cross-section area.
3.5.9 Placing Reinforcement
Place reinforcement in accordance with ACI 301 and ACI SP-66.
For slabs on grade (over earth or over capillary water barrier) and for footing reinforcement, support bars or welded wire reinforcement on precast concrete blocks, spaced at intervals required by size of reinforcement, to keep reinforcement the minimum height specified above the underside of slab or footing.
For slabs other than on grade, supports for which any portion is less than
25 mm 1 inch from concrete surfaces that are exposed to view or to be painted must be of precast concrete units, plastic-coated steel, or stainless steel protected bar supports. Precast concrete units must be wedge shaped, not larger than 90 by 90 mm, 3-1/2 by 3-1/2 inches, and of thickness equal to that indicated for concrete protection of reinforcement. Provide precast units that have cast-in galvanized tie wire hooked for anchorage and blend with concrete surfaces after finishing is completed.
Provide reinforcement that is supported and secured together to prevent displacement by construction loads or by placing of wet concrete, and as follows:
Provide supports for reinforcing bars that are sufficient in number and have sufficient strength to carry the reinforcement they support, and in accordance with ACI 318, ACI SP-66 and CRSI 10MSP. Do not use supports to support runways for concrete conveying equipment and similar construction loads.
Secure reinforcements to supports by means of tie wire. Wire must be black, soft iron wire, not less than 1.6 mm 16 gage.
Reinforcement must be accurately placed, securely tied at intersections, and held in position during placing of concrete by spacers, chairs, or other approved supports. Point wire-tie ends away from the form.
Section 03 30 00 Page 18
Unless otherwise indicated, numbers, type, and spacing of supports must conform to ACI SP-66.
Bending of reinforcing bars partially embedded in concrete is permitted only as specified in ACI SP-66 and ACI 318.
3.5.10 Spacing of Reinforcing Bars
Spacing must be as indicated. If not indicated, spacing must be in accordance with the ACI 318 and ACI SP-66.
Reinforcing bars may be relocated to avoid interference with other reinforcement, or with conduit, pipe, or other embedded items. If any reinforcing bar is moved a distance exceeding one bar diameter or specified placing tolerance, resulting rearrangement of reinforcement is subject to preapproval by the Contracting Officer.
3.5.11 Concrete Protection for Reinforcement
Concrete protection must be in accordance with the ACI 318 and ACI SP-66.
3.6 BATCHING, MEASURING, MIXING, AND TRANSPORTING CONCRETE
ASTM C94/C94M, ACI 301, ACI 302.1R and ACI 304R, except as modified herein. Batching equipment must be such that the concrete ingredients are consistently measured within the following tolerances: 1 percent for cement and water, 2 percent for aggregate, and 3 percent for admixtures. Furnish mandatory batch ticket information for each load of ready mix concrete.
3.6.1 Measuring
Make measurements at intervals as specified in paragraphs SAMPLING and
TESTING.
3.6.2 Mixing
ASTM C94/C94M, ACI 301 and ACI 304R. Machine mix concrete. Begin mixing within 30 minutes after the cement has been added to the aggregates. Place concrete within 90 minutes of either addition of mixing water to cement and aggregates or addition of cement to aggregates if the air temperature is less than 29 degrees C 84 degrees F. Reduce mixing time and place concrete within 60 minutes if the air temperature is greater than 29 degrees C 84 degrees F except as follows: if set retarding admixture is used and slump requirements can be met, limit for placing concrete may remain at 90 minutes. Additional water may be added, provided that both the specified maximum slump and water-cementitious material ratio are not exceeded and the required concrete strength is still met. When additional water is added, an additional 30 revolutions of the mixer at mixing speed is required. [If the entrained air content falls below the specified limit, add a sufficient quantity of admixture to bring the entrained air content within the specified limits.] Dissolve admixtures in the mixing water and mix in the drum to uniformly distribute the admixture throughout the batch. Do not reconstitute concrete that has begun to solidify.
3.6.3 Transporting
Transport concrete from the mixer to the forms as rapidly as practicable.
Prevent segregation or loss of ingredients. Clean transporting equipment
Section 03 30 00 Page 19 thoroughly before each batch. Do not use aluminum pipe or chutes. Remove concrete which has segregated in transporting and dispose of as directed.
3.7 PLACING CONCRETE
Place concrete in accordance with ACI 301 Section
5. 3.7.1 Footing Placement
Concrete for footings may be placed in excavations without forms upon inspection and approval by the Design-Builder.
3.7.2 Pumping
ACI 304R and ACI 304.2R. Pumping must not result in separation or loss of materials nor cause interruptions sufficient to permit loss of plasticity between successive increments. Loss of slump in pumping equipment must not exceed 50 mm 2 inches at discharge/placement. Do not convey concrete through pipe made of aluminum or aluminum alloy.
Avoid rapid changes in pipe sizes. Limit maximum size of course aggregate to 33 percent of the diameter of the pipe. Limit maximum size of well rounded aggregate to 40 percent of the pipe diameter. Take samples for testing at both the point of delivery to the pump and at the discharge end.
3.7.3 Cold Weather
ACI 306.1. Do not allow concrete temperature to decrease below 10 degrees C
50 degrees F. Obtain approval prior to placing concrete when the ambient temperature is below 4 degrees C 40 degrees F or when concrete is likely to be subjected to freezing temperatures within 24 hours. Cover concrete and provide sufficient heat to maintain 10 degrees C 50 degrees
F minimum adjacent to both the formwork and the structure while curing.
Limit the rate of cooling to 3 degrees C 37 degrees F in any 1 hour and 10 degrees C
50 degrees F per 24 hours after heat application.
3.7.4 Hot Weather
Maintain required concrete temperature using Figure 4.2 in ACI 305R to prevent the evaporation rate from exceeding 1 kg per square meter 0.2 pound of water per square foot of exposed concrete per hour. Cool ingredients before mixing or use other suitable means to control concrete temperature and prevent rapid drying of newly placed concrete. Shade the fresh concrete as soon as possible after placing. Start curing when the surface of the fresh concrete is sufficiently hard to permit curing without damage. Provide water hoses, pipes, spraying equipment, and water hauling equipment, where job site is remote to water source, to maintain a moist concrete surface throughout the curing period. Provide burlap cover or other suitable, permeable material with fog spray or continuous wetting of the concrete when weather conditions prevent the use of either liquid membrane curing compound or impervious sheets. For vertical surfaces, protect forms from direct sunlight and add water to top of structure once concrete is set.
3.7.5 Bonding
Section 03 30 00 Page 20
Surfaces of set concrete at joints, must be roughened and cleaned of laitance, coatings, loose particles, and foreign matter. Roughen surfaces in a manner that exposes the aggregate uniformly and does not leave laitance, loosened particles of aggregate, nor damaged concrete at the surface.
Obtain bonding of fresh concrete that has set as follows:
At joints between footings and walls or columns, between walls or columns and the beams or slabs they support, and elsewhere unless otherwise specified; roughened and cleaned surface of set concrete must be dampened, but not saturated, immediately prior to placing of fresh concrete.
At joints in exposed-to-view work; at vertical joints in walls; at joints near midpoint of span in girders, beams, supported slabs, other structural members; in work designed to contain liquids; the roughened and cleaned surface of set concrete must be dampened but not saturated and covered with a cement grout coating.
Provide cement grout that consists of equal parts of portland cement and fine aggregate by weight with not more than 22.5 liters 6 gallons of water per sack of cement. Apply cement grout with a stiff broom or brush to a minimum thickness of 1.6 mm
1/16 inch. Deposit fresh concrete before cement grout has attained its initial set.
3.7.6 High Wind
Provide protection as required when placing flatwork to protect from adverse effects of high wind.
3.8 WASTE MANAGEMENT
Provide as specified in the EPA Stormwater Best Management
Practices, Concrete Washout (EPA 833-F-11-06).
3.8.1 Mixing Equipment
Before concrete pours, designate on-site area to be paved later in project for cleaning out concrete mixing trucks. Minimize water used to wash equipment.
3.8.2 Hardened, Cured Waste Concrete
Crush and reuse hardened, cured waste concrete as fill or as a base course for pavement. Use hardened, cured waste concrete as aggregate in concrete mix if approved by Design-Builder.
3.8.3 Reinforcing Steel
Collect reinforcing steel and place in designated area for recycling.
3.8.4 Other Waste
Identify concrete manufacturer's or supplier's policy for collection or
Section 03 30 00 Page 21 return of construction waste, unused material, deconstruction waste, and/or packaging material. Return excess cement to supplier.][ Institute deconstruction and construction waste separation and recycling for use in manufacturer's programs. When such a program is not available, seek local recyclers to reclaim the materials.
3.9 SURFACE FINISHES EXCEPT FLOOR, SLAB, AND PAVEMENT FINISHES
3.9.1 Defects
Repair surface defects in accordance with ACI 301 Section 5.
3.9.2 Not Against Forms (Top of Walls)
Surfaces not otherwise specified must be finished with wood floats to even surfaces. Finish must match adjacent finishes.
3.9.3 Formed Surfaces
3.9.3.1 Tolerances
ACI 117 and as indicated.
3.9.3.2 As-Cast Rough Form
Provide for surfaces not exposed to public view a surface finish SF-1.0.
Patch holes and defects in accordance with ACI 301.
3.9.3.3 Standard Smooth Finish
Provide for surfaces exposed to public view a surface finish SF-3.0. Patch holes and defects in accordance with ACI 301.
3.13 CURING AND PROTECTION
ACI 301 Section 5, unless otherwise specified. Begin curing immediately following form removal.Avoid damage to concrete from vibration created by blasting, pile driving, movement of equipment in the vicinity, disturbance of formwork or protruding reinforcement, and any other activity resulting in ground vibrations. Protect concrete from injurious action by sun, rain, flowing water, frost, mechanical injury, tire marks, and oil stains. Do not allow concrete to dry out from time of placement until the expiration of the specified curing period. Do not use membrane-forming compound on surfaces where appearance would be objectionable, on any surface to be painted, where coverings are to be bonded to the concrete, or on concrete to which other concrete is to be bonded. If forms are removed prior to the expiration of the curing period, provide another curing procedure specified herein for the remaining portion of the curing period. Provide moist curing for those areas receiving liquid chemical sealer-hardener or epoxy coating. Allow curing compound/sealer installations to cure prior to the installation of materials that adsorb VOCs, including [ ].
3.13.1 Requirements for Type III, High-Early-Strength Portland Cement
The curing periods are required to be not less than one-fourth of those specified for portland cement, but in no case less than 72 hours.
Section 03 30 00 Page 22
3.13.2 Curing Periods
ACI 301 Section 5, except 10 days for retaining…